Loading...
HomeMy WebLinkAbout062924-CO4 - Construction-Related - Contract - McClendon Construction Company, Inc.CSC No. 62924-004 Fox_��W�o� c�ty of Fo�t wortn Change Order Request Project Name� South Hulen Street and West Risinger Road Intersection Improvements Project � Ciry Sec # I 62924 ClientProject#(s� 103312 Project Descrip6on Intersection improvements including paving, traffic signal and ADA improvements at the intersection of South Hulen Street and West Risinger Road. Contractor� McClendon Construction Company, Inc. I Change0rder#� 4 � Datel 1/30/2026 City Project Mgr.l Fanta Kaba � Ciry Inspector� Pedro Gu errero , Dept. Original ContractAmount F�ctras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date �Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining FundsAvailable f�r this CO Additional Funding (if necessary) TPW $2,092,822.65 Contract Time Totals (CD� $2,092,822.65 300 26 CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTRACT 0.00% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%J $2,616,028.31 JUSTIFICATION (REASONS) FOR CHANGE ORDER The proposed change order is needed for the contractor to address RFI #6 for the 103312: S Hulen St & W Risinger Rd intersection improvements project. Due to conflicts with overhead utility lines, the traffic signal poles on the northeast and southwest of the intersection will need to be replaced with poles that do not have luminaires. In order to provide additional lighting for road users, the luminaries in the streetlights on all four medians are proposed to be changed to a luminaire with a greater forward throw. Additional funding is not being requested as part of this change order because there is a construction allowance in the wntract which will be able to cover the additional items needed. The contractor has honored the pricing of the existing contract for all of the current bid items. There are three new bid items proposed, which accounts for the additional effort required for the change in traffic signal poles and luminaires for the streetlights. The City has reviewed the proposed unit costs, and compared them to our current unit price contracts and the costs are similar. The 60 days requested are to provide time for the contractor to complete the additional work in this Change Order, including material procurement of the additional quantities. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Company Name Contractor (Name) Contract Signature Date mcdendonconstruction.com � Dan McClendon ��(,(��'T?✓ 02/02/2026 Inspectorllnspection Supervisor Date Project and Contract Compliance Manager Date �'a'�>� �� 02/02/2026 --,-��, 02/03/2026 Program Manager Date Senior Capital Project Officer Date 02 11 2026 - ``"` 02/12/2026 Assistant Director (Dept) Date Director, Contracting Department (Dept) Date _�6�"„ � �r� 02115I2026 Pa�rclaLWedsack(Feb13,202610:29:44C5T) 02/13/2026 "' ��° '�'+�o,:��cs�� Assistant City Attomey Date Assistant City Manager Date ;,,� 02118/2026 , ,- 03/05/2026 Council Action (if required) 4�o an� M&C Number I N/A I M&C Date Approved �NIA I ATTEST: Y�..�. � �c .. Jannette Goodall, City Secretary a4 F °0°�° t�da a ��°°� a�o � �aQ p~� o�� d Ov� 0=4 P�0'� °°o o° �`� aadn nEzp54p OFFICIAL RECt�RD CITY SECRETARY FT. WORTH, TX Foar WoerH City of Fort Worth T' Change Order Additions Project Name � South Hulen Street and West Risinger Road Intersectbn Improvements Project Client Project # I 103312 contractor� McClendon Construction Companv. Inc. � PMI Fanta Kaba I Change Order Submittal # O4 � City Sec # Inspectorl Date � � s2s2a � I Pedro Guerrero i 1130I2026 � ADDITIONS IItM UtSGKINlri71v UtNI Uty Unit UnitGost tin u�4atib�4Fumisnnnstauiypeaa5ignaiNoie iNw tuuuuuuuU ta �t3,iuu.uu 107 �441.1616 Furnishllnstall Type 46 Signal Pole TPW 1.000OOOOU EA $21,500.OU 9999.0005 Furnishllnstall LED Lighting Fixture (137 watt AT82 Cobra Head) 108 R4 TPW 8.00000000 EA $650.00 3441.3051 RermvelSalvage LED Lighting Fixture (137 watt ATB2 Cobra 109 Head) R2 TPW 8.00000000 EA $300.00 i otai � �iS,�UU.UU� a��,5o0.00� $5.zoo.00l $z,400.001 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Change Order Additions Page 2 of 4 TPW $42,800.00 � � � � Sub Total Adtlitions $42,800.00� Change Order Additions Page 3 of 4 Foa� City of Fort Worth Change Order Deletions Project Name � South Hulen Street and West Risinger Road Intersection Improvements Project � City Sec # � 62924 � Client Project # � 103312 � Contractorl McClendon Construction Company, If1C.l PM� Fanta Kaba I Inspectorl Pedro Guerrero I Change Order Submittal # �4 Date � 1/30/2026 � I I tM Ut5(;I{IF' I IUN 57 3441.1410 NO 101nsulated Elec Gondr 63 3441.1613 FurniShllnSt811 I yp0 43 Sign81 F'010 65 8441.1615 Furnish/lnstall Type 45 Signal Pole 100 9999.0004 Construction Allowance DELETIONS UtF'I TPW TPW TPW TPW clry Unit UnitGost SSO.00OOOOOU LF $2AU 1.00000000 EA $16,b00AU 1.000OOOOU EA $22,850.00 0.00704167 LS $240,000.00 lotal � $1,760.00� $16,b00.00� $22,850.00 � $1,690.00� � � � � � � � � � � � 1 I I 1 I 1 I 1 I 1 I 1 I 1 1 I 1 I 1 I 1 I 1 � 1 1 I 1 I 1 I 1 I 1 I 1 I I 1 I 1 I 1 I 1 I 1 I 1 1 I 1 I 1 I 1 $42,800.00� � � � $42,800.00� I TPW I Sub Total Deletions Change Order Deletions Page 4 of 4 103312-CNCO-S Hulen St & W Risinger Rd I ntersection I mprovements Project — Construction CO #4 Request Final Audit Report Created: 2026-02-02 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAQgEBfOKCUCThjKfL2hqPpbrvpFPDDqVx 2026-02-26 "103312-CNCO-S Hulen St & W Risinger Rd Intersection Improv ements Project — Construction CO #4 Request" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2026-02-02 - 5:14:03 AM GMT- IP address: 204.10.90.100 Document emailed to Alexandra Ripley (alexandra.ripley@fortworthtexas.gov) for filling 2026-02-02 - 3:08:38 PM GMT Document emailed to Dan McClendon (dan@mcclendonconstruction.com) for signature 2026-02-02 - 3:08:38 PM GMT Document emailed to Pedro Guerrero (pedro.guerrero@fortworthtexas.gov) for signature 2026-02-02 - 3:08:39 PM GMT Document emailed to Fanta Kaba (fanta.kaba@fortworthtexas.gov) for signature 2026-02-02 - 3:08:39 PM GMT - Email viewed by Dan McClendon (dan@mcclendonconstruction.com) 2026-02-02 - 3:31:56 PM GMT- IP address: 47.37.93.50 ti Document e-signed by Dan McClendon (dan@mcdendonconstruction.com) Signature Date: 2026-02-02 - 3:32:36 PM GMT - Time Source: server- IP address: 47.37.93.50 _ Email viewed by Pedro Guerrero (pedro.guerrero@fortworthtexas.gov) 2026-02-02 - 3:34:10 PM GMT- IP address: 166.205.54.13 ,� Document e-signed by Pedro Guerrero (pedro.guerrero@fortworthtexas.gov) Signature Date: 2026-02-02 - 3:34:56 PM GMT - Time Source: server- IP address: 166.205.54.13 F�RTWaRTHg P°"'�"�bv � Ado6e AcrobatSign � Document e-signed by Fanta Kaba (fanta.kaba@fortworthtexas.gov) Signature Date: 2026-02-03 - 2:23:41 PM GMT - Time Source: server- IP address: 204.10.90.100 Email viewed by Alexandra Ripley (alexandra.ripley@fortworthtexas.gov) 2026-02-09 - 8:15:43 PM GMT- IP address: 104.47.64.254 New document URL requested by Alexandra Ripley (alexandra.ripley@fortworthtexas.gov) 2026-02-09 - 8:16:26 PM GMT- IP address: 204.10.90.100 '� �:� Form filled by Alexandra Ripley (alexandra.ripley@fortworthtexas.gov) Form filling Date: 2026-02-09 - 9:54:06 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Chad Allen (Chad.Allen@fortworthtexas.gov) for signature 2026-02-09 - 9:54:10 PM GMT ��j Document e-signed by Chad Allen (Chad.Allen@fortworthtexas.gov) Signature Date: 2026-02-12 - 2:29:55 AM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for signature 2026-02-12 - 2:29:58 AM GMT _ Email viewed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) 2026-02-12 - 2:30:05 AM GMT- IP address: 51.54.38.112 �%��, Document e-signed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) Signature Date: 2026-02-12 - 2:59:52 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for signature 2026-02-12 - 2:59:55 PM GMT +-; Signer Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) entered name at signing as Patricia L. Wadsack 2026-02-13 - 429:02 PM GMT- IP address: 208.184.124.181 +-; Document e-signed by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov) Signature Date: 2026-02-13 - 4:29:04 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) for signature 2026-02-13 - 4:29:06 PM GMT Email viewed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) 2026-02-13 - 429:11 PM GMT- IP address: 62.10.205.4 ti Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) Signature Date: 2026-02-15 - 4:43:26 PM GMT - Time Source: server- IP address: 76.227.105.128 F�RTWaRTHg P°"'�"�bv � Ado6e AcrobatSign Document emailed to Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) for approval 2026-02-15 - 4:43:28 PM GMT Email viewed by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) 2026-02-17 - 1:31:40 PM GMT- IP address: 104.47.64.254 ��� Document approved by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) Approval Date: 2026-02-17 - 1:34:04 PM GMT - Time Source: server- IP address: 208.184.124.181 - Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature 2026-02-17 - 1:34:07 PM GMT y Document e-signed by Douglas Black (Douglas.Black@fortworthtexas.gov) Signature Date: 2026-02-19 - 5:50:39 AM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Jesica McEachern (jesica.mceachern@fortworthtexas.gov) for signature 2026-02-19 - 5:50:42 AM GMT Document canceled by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2026-02-26 - 8:07:33 PM GMT- IP address: 204.10.90.100 F�RTWaRTHg P°"'�"�bv � Ado6e AcrobatSign FORT WORTH� Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: M&C: Date: � To: I 1. , 2. 3. I 4. I 5. I 6. I 7• I 8• 1 l. 10. 11 I 12 Name Alexandra Ripley Dan McClendon Pedro Guerrero Fanta Kaba Chad Allen Lissette Acevedo Patricia Wadsack Lauren Prieur Doug Black Jesica McEachern Jannette Goodall TPW Contracts Department TPW Vendor TPW TPW TPW TPW TPW AD TPW Director Legal CMO CSO TPW CSO: 62924 Initials � � �d,o �e.,e� FLF� ��a� � �L1N' Laure�=-- Douolas Black � � , �.` �'� DOC#: 1 Date Out 02/09/2026 02/02/2026 02/02/2026 02/03/2026 02/11/2026 02/12/2026 02/13/2026 02/15/2026 02/18/2026 03/05/2026 03/05/2026 CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts ALSO L'1St: - Bus Sppt: Alexandra Ripley; Prg Mgr: Chad Allen; Sr CPO: Lissette Acevedo DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES �No RUSH: ❑YES �No SAME DAY: ❑YES ❑No ROUTING TO CSO: �YES ❑No Action Required: ❑ As Requested ❑ For Your Information � Signature/Routing and or Recording ❑ Comment ❑ File NEXT DAY: ❑YES ❑No ❑ Attach Signature, Initial and Notary Tabs Return To: Please notify TPWContracts(a�fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you! S Hulen St & W Risinger Rd Intersection Improvements Project— Construction CO #4 Request CPN: 103312 CONSTRUCTION CONTRACT ROUTING & TRANSMITTAL SLIP I Eff 06.2713, mdhm FORT �ORTH� City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: McClendon Construction Company, Inc. Subject of the Agreement: Chanqe Order No. 4 to CSC No. 62924, a Contract for the Construction of S Hulen Street & W Risinger Road Intersection Improvements M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No 8 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the appYoval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No 8 '�If so, please ensure it is attached to the approving M&C or attached to the contract. Proj ect Number: If applicable. 103312 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO nrocessin� in the followin� order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.