Fire Station 37 Public Art Final Design Addendum
This Final Design Addendum is entered into by and between the City of Fort Worth ("City"), a home-
rule municipality of the State of Texas, acting by and through Dana Burghdoff, its duly authorized Assistant
City Manager, and Kathleen Warwick ("Artist"), an individual located at 6004 Vickery Boulevard, Dallas,
Texas. The City has designated the Arts Council of Fort Worth and Tarrant County, Inc. D/B/A Arts Fort
Worth ("Contract Manager"), to manage this agreement on its behal£ The Contract Manager shall act through
its designated Public Art Project Manager.
WHEREAS, on November 10, 2025, the City and Artist entered into City Secretary Contract No.
64307, to develop a Conceptual Design Proposal for Public Art for the Site; and
WHEREAS, on February 16, 2026, the FWAC approved Artist's Conceptual Design Proposal and
recommended that the Artist develop a Final Design based on the Conceptual Design Proposal for public
artwark to be incorporated into the Site; and
WHEREAS, City and Artist wish to set out the terms and conditions under which said Final Design
shall be developed to promote the integrity of Artist's ideas and statements as represented by the Work;
NOW, THEREFORE, City and Artist, for and in consideration of the covenants and agreements
hereinafter set forth, the sufficiency of which is hereby acknowledged, agree as follows:
ARTICLE 14
EFFECTIVE DATE OF FINAL DESIGN ADDENDUM
The effective date of this Final Design Addendum is the date this Addendum is executed by the City.
ARTICLE 15
FINAL DESIGN SCOPE OF SERVICES AND DELIVERABLES
15.1 Acknowled�ment.
City and Artist acknowledge that Artist's Conceptual Design Proposal, as described in the attached
Exhibit "G," was reviewed and approved by the FWAC on February 16, 2026, and is the basis for executing
this Final Design Addendum with Artist.
15.2. Final Desi�n Scone of Services.
a. Artist shall perform all services and will furnish all supplies, materials, and equipment as necessary
for developing a Final Design of the Work and for providing the Final Design Deliverables (see Section
15.4.). Services shall be performed in a professional manner and in strict compliance with all terms
and conditions in this Agreement.
b. Artist shall determine the artistic expression, scope, design, color, size, material, and texture of the
Work, subject to review and input from Project Stakeholders and approval by Ciry as set forth in this
Agreement. Artist shall address the feedback received during the Conceptual Design Proposal Review
process from the FWAC, Project Core Team, and Project Stakeholders. OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Final Design Addendum between the Ciry of Fort Worth and Page 1 of 11
Kathleen Warwick for Public Art for Fire Station #37
c. The location at the Site on which the Work shall be installed shall be mutually agreed upon by City
and Artist.
d. Artist, upon request of Contract Manager, shall provide information and/or attend meetings with
appropriate City staff for purposes of risk assessment, safety review, siting of the Wark, permitting,
and accessibility, as applicable.
e. Artist shall meet and coordinate with City staff, Project Consultant(s), and others, as necessary, to
integrate the Work into the Site in terms of structural support, installation requirements, or other
infrastructure needs to support the Work.
f. Artist shall consult with a qualified art conservator to review the design and develop written
maintenance recommendations for the Work upon request of Contract Manager.
g. Artist shall present, in-person (preferred) or remotely, the Final Design to the FWAC for joint review
with the Project Core Team, other Project Stakeholders, and the appropriate City staff to obtain the
FWAC's approval at a regularly scheduled FWAC meeting.
h. Artist shall allow video recording and photography of their participation during activities related to
this Project such as presentations and meetings.
i. To maintain the integrity of the City of Fort Worth's public art process, for the duration of this Final
Design Addendum, if Artist intends to seek their own publicity for the Wark, including publication of
the artwork design on Artist's website or social media, such efforts will occur after Final Design has
been approved by the FWAC. Any potential publicity being sought for the Work, including
press/media release(s), must be approved, in advance, by Contract Manager, and shall credit the City
of Fort Worth in substantially the following form, "an original final artwork design for the City of Fort
Worth, Texas." A social media plan must be approved, in advance, by Contract Manager, and shall
include the hashtag #fwpublicart.
j. Artist shall reserve a suitable stone for the purpose of ensuring availability and timely delivery of stone
for implementation of the Work should the Final Design be approved.
k. Artist shall create a sculpture mock-up to work through fabrication approach and practical carving
issues. Artist has provided a cost estimate, including hourly labor rate, for a mock-up, attached hereto
as Exhibit "M".
15.3. Citv Assistance.
Upon request by Artist, City shall promptly furnish all information and materials required by Artist to
the extent that such materials are available. City, upon request by Artist, shall also provide correct scaled
drawings of the Site, if available.
Final Design Addendum between the Ciry of Fort Worth and Page 2 of 11
Kathleen Warwick for Public Art for Fire Station #37
15.4. Final Desi�n Deliverables.
a. Within three months after the Effective Date of this Final Design Addendum, Artist shall provide
services and all supplies, materials, and equipment necessary to provide certain deliverables, as set
forth in this Article 15.4. to City for approvaL Final Design Deliverables shall consist of the following:
i. Detailed design illustrations for the Work for the Site, which shall be in a high-resolution
digital format, such as JPEG or TIF files, showing the proposed Work from multiple vantage
points with at least one illustration showing the Work's size and placement on a site plan that
clearly shows site dimensions.;
ii. A final written narrative for the Work, describing the following: (1) Artist's Final Design
concept; (2) timeline for completion; (3) proposed materials, fabrication, and installation
methods for all elements of the Work, including information regarding Artist's
subcontractor(s), if any, for the Work; and (4) Maintenance requirements for all elements of
the Work as dictated by the Artist, along with cost estimates for annual maintenance;
iii. Material or fabrication samples, or photographs thereof, as deemed necessary by Contract
Manager and/or Artist;
iv. An updated, detailed final budget, on the budget form attached hereto as E�iibit "H," for
Artwark Commission of the Wark in an amount not to exceed One hundred sixteen thousand,
nine hundred forty-iive dollars and no cents ($116,945.00), which includes all costs, including,
but not limited to, for materials, engineering, consulting, labor, fabrication, delivery,
installation, insurance, travel costs (if applicable), transportation, remaining Artist's fee of
$8,995.00, and all other associated costs for the Work, with written quotes from subcontractors
and vendors attached, if applicable. The Artwark Commission budget of $116,945.00 does not
include a City-held contingency;
v. Comprehensive working drawings, detailing the means of installing all elements of the Work
on the Site, together with other such graphic material to permit City to carry out structural
design review. Professional Liability Insurance is required in all circumstances for artwork
requiring engineering and/or architectural services. City will conduct a review of structural
design and other related graphic material prior to installation of the Work. Upon City's request,
drawings must be signed and stamped by an engineer and/or architect licensed to work in the
State of Texas. Artist will provide the Contract Manager a certificate of insurance for each
licensed professional and provide City with at least thirty calendar days' notice of cancellation
of any policy required hereunder. (The City's insurance requirements were previously attached
to the Agreement as Exhibit "D"); and
Final Design Addendum between the Ciry of Fort Worth and Page 3 of 11
Kathleen Warwick for Public Art for Fire Station #37
vi. Artist shall provide an Artist's statement, which may include but is not limited to the following
topics: the overall philosophical approach of the Work; how the artwark relates to or engages
viewers in the community; what influenced the Artwork Design; how techniques or materials
relate to the content of the Wark; and how the Wark relates to the Artist's studio practice.
b. Artist shall provide the Final Design presentation materials in PowerPoint format to the Contract
Manager to become part of the City of Fort Worth Public Art Archive owned by City. All documents, models,
and/or drawings will be retained for archival and exhibition purposes.
c. Final Design Deliverables shall be submitted to the Contract Manager at least three weeks priar to the
scheduled Final Design presentation to the FWAC, for staffreview.
15.5. Final Desi�n Review.
a. Upon submission of the Final Design Deliverables and acceptance by Contract Manager, Artist shall
present the Final Design to the FWAC, Project Core Team, Project Stakeholders, City staff, and other
community members for the FWAC's approval at a regularly scheduled FWAC meeting. If the Final
Design is approved by the FWAC, it will subsequently be shared with City boards, commissions, and
staff, as appropriate.
b. City shall notify Artist of its approval or disapproval of the Final Design, either in whole or in part,
within thirty business days of Artist's presentation to the FWAC.
c. If City disapproves of the Final Design, either in whole or in part, then City shall inform Artist of each
revision to be made to the Final Design. City may require Artist to make such revisions to the Final
Design as City deems necessary in its sole discretion and/or for the Work to comply with applicable
statutes, ordinances, or regulations of any governmental agency having jurisdiction over the Site.
d. Artist shall have thirty calendar days from the date City informed Artist of the revision(s) to submit
the revised Final Design in conformance with City's requirements and subsequently present the
revisions at the next regularly scheduled meeting of the Fort Worth Art Commission.
e. If City disapproves of the resubmitted Final Design, any further Final Design resubmissions will be
by mutual agreement of the Parties and subject to the procedures and terms in this Article. If the
Parties desire not to continue with the resubmission process, then this Agreement will automatically
terminate, with payment for work performed per the payment schedule in Article 16 of this Final
Design Addendum up through the date of termination.
£ Artist shall incorporate any City-approved revisions into the Artwork Commission Addendum, if
applicable, in conformance with City's requirements.
g. If Artist's Final Design is approved by City, then Artist's Final Design shall be incorporated into this
Agreement and shall become the basis for proceeding to the Artwork Commission phase upon Fort
Worth City Council authorization.
Final Design Addendum between the Ciry of Fort Worth and Page 4 of 11
Kathleen Warwick for Public Art for Fire Station #37
h. Upon City's approval of the Final Design, Artist shall provide the Final Design presentation materials
to the Contract Manager to become part of the City of Fort Worth Public Art archive owned by City.
These documents, models, and/or drawings far the Wark performed under this Agreement will be
retained for archival and exhibition purposes. Artist's Final Design and all other wark product related
to this Agreement shall become the property of City, without restriction on future use, pursuant to
Article 6 of Conceptual Design Proposal Agreement, which is the foundation for this Final Design
Addendum.
ARTICLE 16
FINAL DESIGN COMPENSATION AND PAYMENT SCHEDULE
16.1. Compensation.
Total compensation to Artist under this Final Design Addendum shall be in an amount not to exceed
TWENTY-NINE THOUSAND, NINE HUNDRED SEVENTY-THREE DOLLARS AND NO CENTS
($29,973.00), which shall constitute full compensation for any and all costs associated with this Final Design
Addendum, including but not limited to an Artist's Fee of $13,493.00, an engineering and consulting fee
allowance of up to $6,000.00, a fabrication mock-up allowance of up to $3,980.00, insurance (if applicable),
material samples, and any and all other costs for services performed and materials furnished by Artist under
this Agreement. Any changes requested by the City shall not require City to pay Artist any additional
compensation under this Final Design Addendum. Artist and City may amend the Agreement to allow for
additional payment if additional services are required.
16.2. Pavment Schedule.
City agrees to pay Artist in the following installments, each installment to represent full and final, non-
refundable payment for all services and materials provided prior to the due date thereof:
a. SIX THOUSAND DOLLARS AND NO CENTS ($6,000.00) within thirty calendar days after Artist
meets with Project Core Team for feedback on Conceptual Design Proposal.
b. FIVE THOUSAND DOLLARS AND NO CENTS ($5,000.00) within thirty calendar days after Artist
submits the Final Design Deliverables as required under Article 15.4. of this Addendum.
c. TWO THOUSAND, FOUR HUNDRED NINETY-THREE DOLLARS AND NO CENTS
($2,493.00) within thirty calendar days after Artist makes presentation of the Final Design to the
FWAC pursuant to Article 15.5.
d. City will provide an allowance of up to SIX THOUSAND DOLLARS AND NO CENTS ($6,000.00)
for engineering, material samples, professional services, and conservator or other consulting fees, as
necessary. Such payment shall be made for actual services rendered only (a retainer fee of up to 50%
is allowed) and upon receipt of an invoice from Artist with the original invoice for such services
attached.
Final Design Addendum between the Ciry of Fort Worth and Page 5 of 11
Kathleen Warwick for Public Art for Fire Station #37
e. SIX THOUSAND, FIVE HUNDRED DOLLARS AND NO CENTS ($6,500.00) within thirty
calendar days after Artist submits proof of stone reservation.
£ City will provide an allowance of up to THREE THOUSAND, NINE HLTNDRED EIGHTY
DOLLARS AND NO CENTS ($3,980.00) for a sculpture fabrication mock-up. Such payment sha11
be made for services provided as outlined in cost estimate provided by Artist (a downpayment of up
to 30°/o is allowed) and upon receipt of an invoice from Artist for such services.
16.3. Sales Taxes.
City is a tax-exempt organization, and therefore, no state ar local sales taxes or federal excise taxes
shall be due upon the project. City shall supply Artist with the "Texas Certificate of Exemption," in
substantially the same form as previously attached as Exhibit "E" for use by Artist in the fulfillment of this
Agreement.
16.4. Artist's Expenses.
Artist shall be responsible for the payments of all expenses incurred during the performance of this
Addendum, including, but not limited to, those for services, materials, mailing/shipping charges on
submissions to City and/or Contract Manager, insurance, cost of all travel (that are not covered by a travel
stipend), and costs for Artist's agents, consultants, and/or employees necessary for the proper performance of
the services required under this Agreement.
ARTICLE 17
TERM OF FINAL DESIGN ADDENDUM
This Final Design Addendum shall take effect on the date outlined in Article 14 above and, unless
terminated earlier pursuant to the provisions of the Agreement, shall extend until final payment to Artist by
City of any amounts due hereunder.
ARTICLE 18
CONTINUATION OF AGREEMENT
The Parties hereby acknowledge and agree that, unless explicitly modified by the terms of this Final
Design Addendum, all other terms and conditions of the original Agreement remain in full force and effect and
shall apply throughout the duration of this Final Design Addendum.
Final Design Addendum between the Ciry of Fort Worth and Page 6 of 11
Kathleen Warwick for Public Art for Fire Station #37
IN WITNESS WHEREOF, the Parties hereto have executed this Fina1 Design Addendum as of the
Effective Date stated in Article 14.
CITY OF FORT WORTH
by:
Dana �l�d��i�p�$"26 14:50:1 ST)
Assistant City Manager
Date: n�inai�n?�
RECOMMENDED BY:
.�
�d�ri .C�rk�(Mar 4, 2026 14:05:28 CST)
i ori ar
Fort Worth Library Director
Contract Compliance Manager
ARTTST
. � ,.
C�.��-.�s"��V��V G'�� �C.(�`��
tCathleen Warwick
I]ate: � � � � � ` ���� :7� [!1
By signing, I acknowledge that I am the person responsible
far the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Alida Labbe
Title: Public Art Project and Capital Budget Manager
APPROVED AS TO FORM
AND LEGALITY:
%��� l�n�
T y ualls
Assistant City Attorney
ATTESTED BY
!� ��x
nette S. Goodall
City Secretary
Form 1295:
Contract Authorization:
C�7��Cy1,1�:�X�%]:a�7
���i-�-�xy:��r��:�-i
FT. WORTH, TX
4,pp44pn�Il
� o� FORT�aad
v° �� � ���.� o
�a
Pvo o=d
O�C'� °°Q o00 *�a
�aB� nEXA54bb
Final Design Addendum between the Ciry of Fort Worth and
Kathleen Warwick for Public Art for Fire Station #37
Page 7 of 11
Exhibit G: Approved Conceptual Design Proposal
Narrative: Inspired by the current Fire Station 37 patch, which features a black long-horned
ram, the approved conceptual design is a contemporary stone sculpture honoring the
resilience, strength, and heroism of Fire Station 37 firefighters and first responders. The
centerpiece is a powerful black marble Bighorn Ram—Station 37's "black sheep" mascot—
depicted charging forward through billowing smoke, symbolizing courage, tenacity, and the
willingness to run toward danger. The ram emerges from sculpted smoke forms that subtly
reference iconic firefighting imagery, reinforcing the profession's identity and mission.
The sculpture rises from a strong vertical pillar mounted on an architectural plinth clad in
materials matching the new firehouse, creating visual continuity with the building. The front
of the pillar displays the number "37" and Fort Worth's longhorn emblem, while the rear
features engraved words describing the firefighters' core values—sourced directly from the
Station 37 community—to serve as daily inspiration.
Carved from black marble, the sculpture combines permanence and historical gravitas with
a contemporary aesthetic. Polished black surfaces contrast with textured grey tones in the
ram's horns and smoke, emphasizing movement, depth, and visual drama. At
approximately 7-8 feet tall including the plinth, the piece is designed for prominent
placement along a key pedestrian path, ensuring visibility for both the public and station
personnel.
�arr�ept ��et�F�
� w�k..
.' Ly 4
�T
� y�5.i
� �� �
5'
;W
�f"µ.1`'.f -�.q..
.� �� .
�• +'�'�r�}w� �
_ f�'
i
.
i- �
� a � ..{ti
]
•F�4}� � ' ' " 1t•:r"'
� _ i,�h� W... .
F . Jf- . .
'�,
, f . �.
�'�
r� "; �
' �Y;
F1E�S��![# '
�
� ' __ . _ _ n 1� .
- s
r�
'�fi� };.
,�� ', ',
. .. . �;•� �.
��
t_ r : � �
� k ,. �
i
r. �. �.��
'�i.:"' ..
Final Design Addendum between the Ciry of Fort Worth and Page 8 of 11
Kathleen Warwick for Public Art for Fire Station #37
�la�r I�riaq��##e ��" tall (1l4 scale�
�
.�
� �h �
G �.
i
.
_ � � ,�- .
�<
�',
- � �:.
�
,�
�� �
��
�`
� �� ' �
, : �, �
. �
��
. '
. �
. . . '�' . _ .*.
.�
. . . • � �'• . �.
I
�I� 1�1 I'1 �I�I �• �F . .
�:T��'
;. _. ..- ;' . . .� • '
, �.
�. . . . .�.
�� �
�.
�� �
� r�
r
�� � .
...._—�
,, ,,, ,;,; �-,;• . . ;,,_.,.�
,-,. „, , ,..
� - •'�'_,�_.� . �,� .� ',-ti
. . _T: _�
.. � .'��S��r ■
. . . • ��L� � �r ■
•� • ��
�
� . . �'•••��
f• .
. . . . . . . � �� . ����
�..ai . . . . . .. . . . � '� .r .
�' � �
� �� i , .
�, �
I I � �
��1� . . . . . . . . . �.. .
fl 1..1. I .I. . � . _'. �_ _� .
L 1 �1�. .�. .� . 1 .�. .�
- .-- . : . , - - _--: -, �
FS #37 Front Elevation with Sculpture
��J�'
�µ ��- �. ..
I ' •
.��-- �
r � . . �
... . .h. �
•� }
. •' —
r
�
Final Design Addendum between the Ciry of Fort Worth and Page 9 of 11
Kathleen Warwick for Public Art for Fire Station #37
Exhibit H: Budget Form (Commission Phase)
FEES
Artist's Fee (Design, Studio Overhead,
Admin)
Engineer
Lighting Designer
Conservator
Photographer
Other Consultants
SUB-TOTAL FEES
FABRICATION
Materials
Lighting Fixtures and Connections
ArtisYs Labor (_ hours at $_ per
hour)
Fabricator / Labor by Others
Rentals (equipment, fabrication space)
Storage
SUB-TOTAL FABRICATION
COSTS
ARTIST TRAVEL (Based on GSA
Rates)
Transportation (Airfare, Car Rental)
Lodging
Per Diem (Meals and incidentals)
SUB-TOTAL TRAVEL
I N STALLATI O N
Transportation of Artwork to Site
Installation CrewTravel
Permits
Site Preparation / Remediation
Footings / Foundations
Electrical Connections /
Modifications
Installer Labor
Rentals (Scaffolding, equipment,
generator)
Traffic Control
Security
SUB-TOTAL FABRICATION
COSTS �
I
�
I
� - �
CosTs I
INSURANCE
General Liability (Prorated)
Other as Applicable (Property, Auto)
$
COSTS
$
COSTS
$
TOTAL COMMISSION PHASE � $
�
�
_ �
SUB-TOTAL INSURANCE $ - �
Attach a written quote or estimate complete with per unit costs for all items.
The implementation budget above does not include the City-held contingency. Contingency funds are
accessed for unforeseen costs with supporting documentation approved by contract manager. Any unused
contingencyfunds shall remain with the City.
Final Design Addendum between the Ciry of Fort Worth and Page 10 of 11
Kathleen Warwick for Public Art for Fire Station #37
Exhibit M: Sculpture Mock-Up Estimate
BUDGET lTEi�
�c�€pture h.+loc�C lJp
Fre �tation #�� �ublic Art Sculpture
Febru�ry 11, �026
�to�re: LFmesto�e $ 48�.00
Fabrica#ion; �0 Hours at $75lhau� $�,Q0�.00
�verhead: Prarated h+lant�rly Arnaunt $ �0�.00
E�ui�r�ent: Farklift $ �0�.�0
��b Total
$�,98�.00
Bacause of the expected �ompletion da�e o� #his p�bfic art prajact and the delay in fab�ication
start da�e �fue to standard appravals arrd stane or�er �rocess I am recomment�ing to be
alEowed to wor�C throu�� the discavery carving process an a limestone mocEc-up, �reatEng a
mock-up in stone al€�ws m� #o work thr�ug�r the de.sign e�emen#s and the spactal ar�d practi�al
issues of F�and carv�ng fhe ram sculpt�re desit�n c�osen for Fire �tat�an #37.
The Fabricatian section o�f t�is b�dge� �s an estima�ian of t�re a�nount a# time f will sper�d in
#esting the strength of the shapes within the des�gn, adjustkng t�e design ao�ordingly and in
actuai fab�i�ation of scul�tural elemerrts. The moc�C-�p w�ll be 1 f� scale ar�e� v��ll not incl�de t�e
bri�k base. Addit€onal sculpted i#ems ma}r ir�clude cloud forma#i�ns and ra�n design �p#ions.
The amount of 40 #�ro€�rs is an estimate �nc} will be adjusted up ar down as rreeded.
The Overhe€�d sec�Eon of t�ris bud�et includes these �rorate� s�ud�o rent and Ciabilit�+ i�sura�r�e.
Respectful€y �ubmitted,
F�at Warwick
Final Design Addendum between the Ciry of Fort Worth and Page 11 of 11
Kathleen Warwick for Public Art for Fire Station #37
F�RT��RTHo
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Kathleen Warwick
Subject of the Agreement: Final Design of Artwork for Fire Station 37
M&C Approved by the Council? * Yes ❑ No ❑✓
If �so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No ❑✓ Addendum, not Amendment
If �so, provide the original contract number and the amendment number.
Is the Contract "PermanenY'? *Yes 0 No ❑
If �unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑ No ❑✓
*If �so, please ensure it is attached to the approving M&C or attached to the contract.
Proj ect Number: If applicable. 104711
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes ❑ No ❑✓
Contracts need to be routed for CSO processin� in the followin� order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.
Permanent Contracts
Advanced Funding Agreements
Architect Service
Community Facilities
Completion Agreement
Construction Agreement
Credit Agreement/ Impact Fees
Crossing Agreement
Design Procurement
Development Agreement
Drainage Improvements
Economic Development
Engineering Services
Escrow Agreement
Interlocal Agreements
Lake Worth Sale
Maintenance Agreement/Storm Water
Parks/Improvement
Parks/Other Amenities
Parks/Play Equipment
Project Development
Property/Purchase (Property owned by the City)
Property/Sales (Property owned by the City)
Property/Transfers (Property owned by the City)
Public Art
Sanitary Sewer Main Replacements
Sanitary Sewer Rehabilitations
Settlements (Employees Only)
Streets/Maintenance
Streets/Redevelopment
Streets/Repairs
Streets/Traffic Signals
Structural Demolition (City owned properties)
Utility Relocation
Water Reclamation Facility
Water/Emergency Repair
Water/Interceptor
Water/Main Repairs
Water/Main Replacement
Water/Sanitary Sewer Rehabilitation
Water/Sewer Service
Water/Storage Tank