Loading...
HomeMy WebLinkAbout063595-CO1 - Construction-Related - Contract - LJA Engineering, Inc. PMB Team Ranch Devco, LLC, and Acadia Services, LLCDEVELOPER -AWARDED -PROJECT CHANGE ORDER "S No. 63595-CO 1 PROJE NAME: Aledo Road Infrastructure CHANGE CONTRACT: Water & Sewer Improvements ORDER No: CFA # CFA25-0037 CITY PARTICIPATION: YES CITY PROJECT # 105498 CITY SECRETARY CONTRACT # 63595 1 FID # 30114-0200431-105498-EO7685 X-28130 rFILE # N/A INSPECTOR: PROJECT MANAGER: Phone No: Mosadage Mohammdeen Phone No: 817-392-2443 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS CONTRACT Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost DAYS ORIGINAL CONTRACT $207,670.61 $952,500.39 $92,406.49 $1,286,794.81 $0.00 $12,350.45 $171,984.56 $0.00 160 EXTRAS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CREDITS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CONTRACT TO DATE $207,670.61 $952,500.39 $92,406.49 $1,286,794.81 $0.00 $0.00 $12,350.45 $171,984.56 $0.00 $0.00 AMOUNT OF PROP. CHANGE ORDER ($626.86) ($2,875.14) $4,317.24 $8,992.16 $0.00 $0.00 $434.16 $6,045.84 $0.00 $0.00 38 REVISED CONTRACT AMOUNT $207,043.75 $949,625.25 $96,723.73 $1,295,786.97 $0.00 $0.00 $12,784.61 1 $178,030.40 $0.00 $0.00 198 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,156,669.00 $1,392,510.70 $0.00 $190,815.00 $0.00 REVISED COST SHARE Dev. Cost: $316,552.08 City Cost: $2,423,442.62 TOTAL REVISED CONTRACT $2,739,994.70 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents UNIT I: WATER IMPROVEMENTS PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Developer Cost City Cost TOTAL 3 3311.0551 3 LF 16" DIP Water $190.00 $102.03 $467.97 $570.00 5 3305.0109 3 LF Trench Safety $2.00 $1.07 $4.93 $6.00 7 3312.3006 (1) EA 16" Gate Valve w/ Vault $41000.00 ($7,339.00) ($33,661.00) ($41,000.00) 12 3311.0001 (0.124) EA Ductile Iron fittings w/ Restraint $27000.00 ($599.29) ($2,748.71) ($3,348.00) 13* 1 3312.4212 1 1 1 EA 24" x 16" Tapping Sleeve & Valve 1 $40270.001 $7,208.33 1 $33,061.67 1 $40,270.00 UNIT I: WATER IMPROVEMENTS 626.86 2 875.14 ($3,502.00) UNIT II: SEWER IMPROVEMENTS PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Developer Cost City Cost TOTAL 1 3331.4117 (69) LF 8" Sewer Pipe, Select Backfill $100.00 ($462.30) ($6,437.70) ($6,900.00) 7 3331.4311 (20) LF 20" Fiberglass SN72 Sewer Pipe $183.00 ($245.22) ($3,414.78) ($3,660.00) 14 3301.0002 (16) EA Post -CCTV Inspection $8.00 ($8.58) ($119.42) ($128.00) 18 3339.0001 (5.5) EA Epoxy Manhole Liner $572.00 ($210.78) ($2,935.22) ($3,146.00) 18 1 3339.1003 (1.9)1 EA 1 4' Extra Depth Manhole $393.00 ($50.03) 1 ($696.67) 1 ($746.70) 19 3339.1103 (3.6)1 LF 1 5' Extra Depth Manhole $549.00 ($132.42) ($1,843.98) ($1,976.40) 24* 3331.4210 69 LF 12" Sewer Pipe - SDR 26, Specialized Backfill $155.00 $716.57 $9,978.44 $10,695.00 25* 9999.0007 1 LS Replacement Manhole Base t $3,671.50 $3,671.50 $0.00 $3,671.50 26* 135.0101 1 LS Railroad Coordination $15,500.00 $1,038.50 $14,461.50 $15,500.00 11,217.24 JggL92.16 $13,309.40 UNIT IV: PAVING IMPROVEMENTS PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Developer Cost City Cost TOTAL 1 241.0500 80 LF1 Remove Fence 1 $27.00 $144.72 $2,015.28 $2,160.00 2 3231.0212 80 LF1 Smooth Wire Fence, Metal Posts 1 $54.00 $289.44 $4,030.56 1 $4,320.00 TOTAL UNIT IV: PAVING IMPROVEMENTS 1424.16 ILQ45.84 $6,480.00 Asterisk (*) indicates New Pay Item Revised: 12-17-2018 Page 2 Water: The waterline connection was original thought to be PVC but field verifications came back as concrete and will need to be a tapping sleeve now. The REASONS FOR CHANGE ORDER cost is to adjust the connection type. Sewer., Adjusting the slope and size of a proposed stub. Track & Ground Monitoring added. Additional: Quantity reconciliation based on field conditions. RECOMMENDED: APPROVED: APPROVED: LJA Enginefiring, Inc. By: � Name: Jacob atre Title: Sr. Project Engineer APPROVAL RECOMMENDED: PMB Team Ranch Devco, LLC By: Tyl WA 5T, Name: Taylor Baird Title: Manager APPROVED: Acadia Services, LLC By: Donovan Kara -Ali Name: Donovan Kara -Ali Title: Project Manager APPROVED AS TO FORM AND LEGALITY: CFW - Water Department CFW - Assistant City Manager CFW - Assistant City Attorney kft MH By: S�� rid Q.`°" oC N/A By: N/A By: Name: Suby Varughese Name: Dana Name: Richard A. McCracken Title: Engineering Manager Title: Assistant city Manager Title: Sr. Assistant City Attorney RECOMMENDED: CFW - *Contract Compliance Manager ATTEST ccContract Compliance Manager (Project Manager): FORT°°a By signing I acknowledge that I am the person responsible By: peoV°'°°^=* 0 for the monitoring and administration of this contract, include Aug -rg- ensuring all performance and reporting requirements. Name: Jannette S. Goodall City Secretary P ❑There are NO City Funds associated with this Contract Title: Senior Professional Engineer OThere are City Funds associated with this Contract M&C Number: N/A M&C Date Approved: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 3 rl— CM O O Lf ) N U- ❑S .�2 00 It LO 0 vl- U o U U U O O � U U Fr � V1 • � � U O � H N � � O � Cd O O � Cd rn O "mod cOH � U O Cd U❑ �Z 2 U O o � o� 4 o ~ r N M Q O � U CA U R3 U ^U U 03 Cd ' o to p cqs Ln CJ cs O 0 O .— u z rA rA 7C sv, O O O sU- �O u Q U C M M M O O O O Cd Cd U y y y 4- '�, cd cd cd c� c� cd ¢¢uuuuu4QQwww�-,a aaaaaaaaU �UU �U �U � �����