Loading...
HomeMy WebLinkAbout062381-CO1 - Construction-Related - Contract - The Fain Group, Inc.CSC No. 62381-COl FOR�. City of Fort Worth Change Order Request Project Name ARPA Long Ave Pedestrian Improvements City Sec # 62381 Client Project #(s) 104299 Project Description) Intersection improvements along Long Avenue from Azle Ave to McKinley Ave. Includes new trees in the median, paving, sidewalks, installation of traffic and pedestrian signals, median closures, extension of left -turn lanes, re -striping, and ADA ramps. Contractor!Fain Group, Inc. Change Order# 1 Date 12/3/2025 City Project Mgr. Seth Cooksey City Inspector Erik Loza Dept Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date TPW Totals Contract Time (CD) $3,791,653.20 $3,791,653.20 365 $0.00 $0.00 $0.00 $3,791,653.20 $3,791,653.20 365 Amount of Proposed Change Order $90,535.00 $90,535.00 0 Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 2.39% $4,739,566.50 365 EL JUSTIFICATION (REASONS) FOR CHANGE ORDER Several items were added to the contract by the City after the Notice to Proceed (NTP). These additions include the requirement to pay Tree Mitigation fees, the addition of two portable message boards, added irrigation services, correction of missing electrical components, and the removal of a 5-foot sewer manhole. In addition, the contractor was directed to correct a curb design discrepancy, include additional cameras and to include an item for the removal and demolition of existing curb ramps, as requested by the project inspector We have compared the proposed Contractor's prices to recent TxDOT prices and to prices found in recent City of Fort Worth Unit -Price Contracts, and we think the prices are reasonable. TxDOT Ave unit price list- below are the findings Portable Message Board - Bid Prices Vary $78.00 - $1800.00 Remove ADA Ramp (per Sq Yd) $257-$310 Remove Conc Curb and Gutter - $9 - $22 Remove MH $1051- $2250 (Fain price in this CO also includes additional pipe removal at MH which should justify their $4,500 fee) It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractors Company Name Contractor (Name) Contract Signature Date Fain Group, Inc. Larry Frazier 02/24/2026 In Inspection Supervisor Date Project and Contract Compliance Manager Date 02/25/2026_ 02/24/2026 Program Manager Date Senior Capital Project Officer Date 02/25/2026 --'. 03/03/2026 Assistant Director (Dept) -JELDate Director, Contracting Department (Dept) Date n"'` L —d—k Pat L. 'ads—k (Ma, 311'.�5:30 L'.IT, 03/03/2026 diO3/04/2026 ity Attorney Date Assistant City Manager Date 03/05/2026 03/16/2026 Council Action (if required) ATTEST: Jannette Goodall, City Secretary 4d4v�nnq po lFORT4. , 10 p!`° °.Id Ov8 '=d Odd* o °° a* dQ � ° QQni�'.(ogoapp M&C Number I NA M&C Date Approved NA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth —V�--- Change Order Additions Project Name ARPA Long Ave Pedestrian Improvements City Sec # 62381 Client Project # 104299 Contractor Fain Group, Inc. PM Seth Cooksey Inspector Erik Loza Change Order Submittal # Date 1213/2025 ADDITIONS IItM UtSI:KIY I IVN UtYI ury unit unit cost IOtaI 118 Tree Mitigation Fee 119 Portable Message Board Temporary (2) 16.00000000 DAY 40D.00 120 6" Rework F exbase 295.00000000 Y 25.00 121 Remove and reset concrete curb & gutter 350.00000000 LF sB.gU 122 Remove ADA Ramp 17.00000000 EA $2,000.OU 123 1" service for irrigation 2.00000000 EA 3,250.00 12 2605.3015 2" CONDT PVC SCH 80 (T) 45.00000000 LF $49.00 13 2605.3016 2" CONDT PVC SCH 80 B 130.00000000 LF $78.00 14 2605.3025 3" CONDT PVC SCH 80 (T) 25.00000000 LF $55.05 17 2605.3034 4" CONDT PVC SCH 80 B 45.00000000 LF 85.00 124 Install VIVDS DETECTION SYSTEM 4.00000000 EA T1,875.00 125 Remove and Dispose 5' Sewer MH 1.00000000 EA 4.500.00 Change Order Additions Page 1 of 1 TPW $90,535.00 Sub Total Additions 90,535.00 FORr�RTH City of Fort Worth Change Order Deletions Project Name ARPA Long Ave Pedestrian Improvements City Sec # 62351 Client Project # 104299 Contractor Fain Group, Inc. PM Seth Cooksey Inspector FErik Loza Change Order Submittal # Date 12/312025 Change Order Deletions Page 1 of 1 104299-CNCO-ARPA Long Ave Pedestrian Safety Improvement Change Order #1 Final Audit Report Created: 2026-02-24 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAlSmZry30l3DT6mHgDw6Vdv9LQrg4JOmN 2026-02-25 "104299-CNCO-ARPA Long Ave Pedestrian Safety Improvemen t Change Order #1" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2026-02-24 - 9:38:01 PM GMT- IP address: 204.10.90.100 Document emailed to LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) for filling 2026-02-24 - 10:20:46 PM GMT Document emailed to Ifrazier@faingp.com for signature 2026-02-24 - 10:20:47 PM GMT Document emailed to Erik Loza (erik.loza@fortworthtexas.gov) for signature 2026-02-24 - 10:20:47 PM GMT Document emailed to Seth Cooksey (seth.cooksey@fortworthtexas.gov) for signature 2026-02-24 - 10:20:47 PM GMT l Email viewed by Seth Cooksey (seth.cooksey@fortworthtexas.gov) 2026-02-25 - 0:38:49 AM GMT- IP address: 185.222.243.215 Ao Document e-signed by Seth Cooksey (seth.cooksey@fortworthtexas.gov) Signature Date: 2026-02-25 - 0:39:39 AM GMT - Time Source: server- IP address: 68.64.252.104 =i Email viewed by Ifrazier@faingp.com 2026-02-25 - 1:58:35 AM GMT- IP address: 104.190.201.177 Signer Ifrazier@faingp.com entered name at signing as Larry Frazier 2026-02-25 - 2:07:32 AM GMT- IP address: 104.190.201.177 Document e-signed by Larry Frazier (Ifrazier@faingp.com) Signature Date: 2026-02-25 - 2:07:34 AM GMT - Time Source: server- IP address: 104.190.201.177 FORT WORTH. Pawe`ed by Adobe Acrobat Sign -i Email viewed by Erik Loza (erik.loza@fortworthtexas.gov) 2026-02-25 - 1:16:39 PM GMT- IP address: 166.205.54.25 Document e-signed by Erik Loza (erik.loza@fortworthtexas.gov) Signature Date: 2026-02-25 - 2:45:28 PM GMT - Time Source: server- IP address: 204.10.90.100 l Email viewed by LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) 2026-02-25 - 4:22:30 PM GMT- IP address: 104.47.64.254 b Form filled by LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) Form filling Date: 2026-02-25 - 4:57:03 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Chad Allen (Chad.Allen@fortworthtexas.gov) for signature 2026-02-25 - 4:57:06 PM GMT Document e-signed by Chad Allen (Chad.Allen@fortworthtexas.gov) Signature Date: 2026-02-25 - 4:59:26 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for signature 2026-02-25 - 4:59:29 PM GMT r-i Email viewed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) 2026-02-25 - 7:19:06 PM GMT- IP address: 104.47.64.254 Document declined by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) Decline reason: Where are the other people's initials before me? 2026-02-25 - 9:49:48 PM GMT- IP address: 208.184.124.181 FoRTWORTH. pu I'lly Adobe Acrobat Sign 104299-CNCO-ARPA Long Ave Pedestrian Safety Improvement Change Order #1 Interim Agreement Report 2026-02-26 Created: 2026-02-25 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Out for Filling Transaction ID: CBJCHBCAABAAJIPhR79txei0QyhEyyFXGjZ3stuy5lOI Agreement History Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will be generated when the agreement is complete. "104299-CNCO-ARPA Long Ave Pedestrian Safety Improvemen t Change Order #1" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2026-02-25 - 10:27:00 PM GMT- IP address: 204.10.90.100 Document emailed to LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) for filling 2026-02-25 - 11:00:31 PM GMT Document emailed to Ifrazier@faingp.com for filling 2026-02-25 - 11:00:32 PM GMT Document emailed to Erik Loza (erik.loza@fortworthtexas.gov) for filling 2026-02-25 - 11:00:32 PM GMT Document emailed to Seth Cooksey (seth.cooksey@fortworthtexas.gov) for filling 2026-02-25 - 11:00:32 PM GMT `i Email viewed by Seth Cooksey (seth.cooksey@fortworthtexas.gov) 2026-02-26 - 0:44:34 AM GMT- IP address: 92.119.81.72 h Form filled by Seth Cooksey (seth.cooksey@fortworthtexas.gov) Form filling Date: 2026-02-26 - 3:50:44 AM GMT - Time Source: server- IP address: 92.119.81.72 FoRTWORTHg I PUw ""'Y Adobe Acrobat Sign 104299-CNCO-ARPA Long Ave Pedestrian Safety Improvement Change Order #1 Final Audit Report 2026-03-16 Created: 2026-02-26 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAA6bnvxJxfDK17x3m7GcLLPFbAvR3bw9rL "104299-CNCO-ARPA Long Ave Pedestrian Safety Improvemen t Change Order #1" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2026-02-26 - 7:02:25 AM GMT- IP address: 204.10.90.100 Document emailed to LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) for filling 2026-02-26 - 1:54:16 PM GMT Document emailed to Ifrazier@faingp.com for filling 2026-02-26 - 1:54:17 PM GMT Document emailed to Erik Loza (erik.loza@fortworthtexas.gov) for filling 2026-02-26 - 1:54:17 PM GMT Document emailed to Seth Cooksey (seth.cooksey@fortworthtexas.gov) for filling 2026-02-26 - 1:54:17 PM GMT Email viewed by LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) 2026-02-26 - 1:56:38 PM GMT- IP address: 104.47.64.254 Form filled by LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) Form filling Date: 2026-02-26 - 1:57:53 PM GMT - Time Source: server- IP address: 204.10.90.100 Email viewed by Ifrazier@faingp.com 2026-02-26 - 2:18:09 PM GMT- IP address: 104.190.201.177 Signer Ifrazier@faingp.com entered name at signing as Larry Frazier 2026-02-26 - 2:18:51 PM GMT- IP address: 104.190.201.177 =-,- Form filled by Larry Frazier (Ifrazier@faingp.com) Form filling Date: 2026-02-26 - 2:18:53 PM GMT - Time Source: server- IP address: 104.190.201.177 FORTWORTH. I Powered by Adobe Acrobat Sign Email viewed by Seth Cooksey (seth.cooksey@fortworthtexas.gov) 2026-02-26 - 2:53:11 PM GMT- IP address: 2.56.191.154 Form filled by Seth Cooksey (seth.cooksey@fortworthtexas.gov) Form filling Date: 2026-02-26 - 2:53:47 PM GMT - Time Source: server- IP address: 2.56.191.154 '+ Email viewed by Erik Loza (erik.loza@fortworthtexas.gov) 2026-02-26 - 3:40:37 PM GMT- IP address: 166.205.54.25 Form filled by Erik Loza (erik.loza@fortworthtexas.gov) Form filling Date: 2026-02-26 - 3:41:03 PM GMT - Time Source: server- IP address: 166.205.54.25 Document emailed to Chad Allen (Chad.Allen@fortworthtexas.gov) for filling 2026-02-26 - 3:41:06 PM GMT �, Form filled by Chad Allen (Chad.Allen@fortworthtexas.gov) Form filling Date: 2026-02-26 - 3:47:47 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for signature 2026-02-26 - 3:47:50 PM GMT 4. Document e-signed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) Signature Date: 2026-03-03 - 8:11:41 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for signature 2026-03-03 - 8:11:44 PM GMT ='. Signer Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) entered name at signing as Patricia L. Wadsack 2026-03-03 - 11:55:28 PM GMT- IP address: 208.184.124.181 �. Document e-signed by Patricia L. Wadsack(patricia.wadsack@fortworthtexas.gov) Signature Date: 2026-03-03 - 11:55:30 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) for signature 2026-03-03 - 11:55:33 PM GMT 6: _ Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) Signature Date: 2026-03-04 - 3:12:28 PM GMT - Time Source: server- IP address: 76.227.105.128 Document emailed to Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) for approval 2026-03-04 - 3:12:31 PM GMT Email viewed by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) 2026-03-04 - 3:13:05 PM GMT- IP address: 104.47.65.254 FORTWORTH. I Powered by Adobe Acrobat Sign Q. Document approved by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) Approval Date: 2026-03-04 - 3:17:46 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature 2026-03-04 - 3:17:48 PM GMT Document e-signed by Douglas Black (Douglas.Black@fortworthtexas.gov) Signature Date: 2026-03-05 - 3:38:24 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Jesica McEachern (jesica.mceachern@fortworthtexas.gov) for signature 2026-03-05 - 3:38:28 PM GMT c Document e-signed by Jesica McEachern (jesica.mceachern@fortworthtexas.gov) Signature Date: 2026-03-16 - 8:26:43 PM GMT - Time Source: server- IP address: 166.205.58.16 Document approval automatically delegated to Cristian Chavez (cristian.chavez@fortworthtexas.gov) by Katherine Cenicola (katherine.cenicola@fortworthtexas.gov) 2026-03-16 - 8:26:46 PM GMT Document emailed to Cristian Chavez (cristian.chavez@fortworthtexas.gov) for approval 2026-03-16 - 8:26:46 PM GMT Document emailed to Katherine Cenicola (katherine.cenicola@fortworthtexas.gov) for approval 2026-03-16 - 8:26:47 PM GMT Document declined by Cristian Chavez (cristian.chavez@fortworthtexas.gov) Decline reason: Please attach the appropriate M&C thank you. 2026-03-16 - 8:34:39 PM GMT- IP address: 208.184.124.181 FORTWORTH. I Powered by Adobe Acrobat Sign FORT WORTH.," Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: ARPA Long Ave Pedestrian Safety Improvement Change Order #1 M&C: CPN: 104299 CSO: 62381 DOC#: Date: To: Name Department Initials Date Out 1. Lakeshia Lynch TPW LL 02/26/2026 2. Larry Frazier Vendor 02/26/2026 3. Erik Loza TPW E 02/26/2026 4. Seth Cooksey TPW 5C 02/26/2026 5. Chad Allen TPW CA 02/26/2026 6. Lissette Acevedo TPW o(w 03/03/2026 7. Patricia Wadsack TPW AD PL W' 03/03/2026 8. Lauren Prieur TPW Director p• —Pr- 03/04/2026 9. Doug Black Legal paug1asH1ack 03/05/2026 10. Jesica McEachern CMO 03/16/2026 11 Jannette Goodall CSO a ne17-717 03/17/2026 12 Alexandra Ripley TPW CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts ALSO List: Prg Mgr: Chad Allen: Sr CPO: Lissette Acevedo DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ®YES ❑No Action Reguired: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: Please notify TPWContracts aAfortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you! FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Fain Group, Inc. Subject of the Agreement: Change Order No. 1 to CSC No. 62381, a Contract for the Long Avenue Pedestrian Safety Improvements Project (2022 Bond Program) M&C Approved by the Council? * Yes ❑ No If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No S If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes e No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No M If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Expiration Date: If different from the approval date. If applicable. Is a 1295 Form required? © Yes 13 No *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104299 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ® No ❑ Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.