HomeMy WebLinkAbout046771-A2 - Construction-Related - Contract - Freese and Nichols, Inc.CSC No. 46771-A2
AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 46771
WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 46771, (the
CONTRACT) which was authorized by M&C C-27313 on the 2nd day of June, 2015
in the amount of $ $271,622.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in
the amount of $405,491.00 which was authorized by M&C C-27833 on August
2nd, 2016; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Construction Management Services for TRV Bridges, CPN C00144; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $25,000.00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $ 702,113. 00. OFFICIAL RECORD
3.
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Construction Management Services for TRV Bridges
Prof Services Agreement Amendment CPN C00144
Revision Date: June 13, 2025
Page 1 of 4
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
DATE: 03/18/2026
,ogvvann�
F fORr a
ATTEST: p-d
�oe 0
*�9°0
o
OV° 8=4
d� dp
C\`�% .�� o n� tEzps44d
' �RUR040
Jannette S. Goodall
City Secretary
APPROVAL RECOMMENDED:
Lauren Prieur (Mar 12, 2026 09:08:07 CDT)
Lauren Prieur
ENGINEER
Freese and Nichols, Inc.
Joh Dewar (Mar 10, 2026 14:35:18 CDT)
John Dewar
Vice President
DATE: 03/10/2026
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
�. �rzgGas ena�f��ta�eY
A. Douglas Ral6emaker (Mar 10, 2026 23:03:43 CDT)
Doug Rademaker
Sr Capital Projects Officer
City of Fort Worth, Texas
Prof Services Agreement Amendment
Revision Date: June 13, 2025
Page 2 of 4
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Construction Management Services for TRV Bridges
CPN C00144
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Mar 12, 2026 20:07:57 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment
Revision Date: June 13, 2025
Page 3 of 4
M&C No.#: N/A
M&C Date: N/A
Construction Management Services for TRV Bridges
CPN C00144
FUNDING BREAKDOWN SHEET
City Secretary No. 46771
Amendment No. 2
Fund
Dept ID
Account
Project
ID
CF1-
Activity
CF2 -
Bond
Reference
Amount
39407
0200431
5330500
C00144
$25,000.00
Total:
$25,000.00
City of Fort Worth, Texas Construction Management Services for TRV Bridges
Prof Services Agreement Amendment CPN C00144
Revision Date: June 13, 2025
Page 4 of 4
801 Cherry Street ❑ Fort Worth, Texas 76102 ❑ 817-735-7300 ❑ fax 817-735-7491
March S, 2026
Doug Rademaker
City of Fort Worth Transportation and Public Works Department
100 Fort Worth Trail
Fort Worth, Texas 76102
Dear Mr. Rademaker,
www.freese.com
In response to our email and telephone conversations, Freese and Nichols (FNI) is pleased to submit this
proposal to provide professional services to the City of Fort Worth (CLIENT) for the TRV bridge project,
including the design of telecom box repair details (Basic Services) and future professional services related
to the Central City project impacts on the bridges (Special Services).
Freese and Nichols (FNI) will render the following professional services:
Basic Services
• Prepare telecom box repair details as outlined in the February 11, 2026, report titled "Telecom
Boxes at TRV Bridges on Henderson Street and White Settlement Road". It is assumed that FNI will
prepare two (2) detail sheets and that the contractor will install precast inserts in the existing
telecom boxes as part of the repair.
• Prepare for and conduct up to three (3) coordination meetings between CITY staff and FNI.
• Conduct up to four (4) construction site visits to observe vault preparation and installation
activities.
• It is assumed that the project will be constructed using a CITY on -call construction contractor;
therefore, the project will not be bid and bid phase services are not included.
Special Services
• Provide future miscellaneous professional services as directed by the CITY related to the Central
City project or similar needs.
Page 2
FNI proposes to furnish the services described herein for an hourly not -to -exceed fee of $17,000 for Basic
Services and $8,000 for Special Services, for a total amount of $25,000.00.
Basic Services
Name
Labor Category
Hours
Rate/Hour
Total
Todd Buckingham
Senior Project Mgr.
12
$267
$3,204.00
Brad Watson
Project Director
28
$309
$8,652.00
Misty Thomison
Project Director
5
$309
$1,545.00
Julia Whitcraft
Project Engineer
16
$201
$3,216.00
Labor Total
$16,617.00
Est. Expenses
$383.00
Basic Services Total
$17,000.00
Special Services
Name
Labor Category
Hours
Rate/Hour
Total
Todd Buckingham
Senior Project Mgr.
5
$267
$1,335.00
Brad Watson
Project Director
12
$309
$3,708.00
Misty Thomison
Project Director
54
$309
$1,236.00
Julia Whitcraft
Project Engineer
8
$201
$1,608.00
Labor Total
$7,887.00
Est. Expenses
$113.00
Special Services Total
$8,000.00
Basic and Special Services Total
$25,000.00
Yours very truly,
4',� /o—'k
Brad Watson
Freese and Nichols, Inc.
Principal/Vice President
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE' Construction Management Services for TRV Bridges Amendment
No. 2
M&C: N/A CPN: C00144 CSO: 46771 DOC#: n/a
Date:
To:
Name
Department
Initials
Date Out
1.
Seidi Tovar
TPW - initial
ST
ST
03/10/2026
2.
John Dewar
Consultant - signature
03/10/2026
3.
Doug Rademaker
TPW - signatures
03/10/2026
4.
Patricia Wadsack
TPW - initial
03/12/2026
5.
Lauren Prieur
TPW - signature
X9
03/12/2026
6.
Doug Black
Legal - signature
o Bink
03/12/2026
7.
Jesica McEachern
CMO - signature
CA
03/18/2026
8.
Jannette Goodall
CSO - signature
03/19/2026
9.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and
take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH: ❑YES ®No SAME DAY: El YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: CRYES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a,FortWorthTexas.gov at ext. 7233 for pick up when completed.
Thank you!
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Freese and Nichols, Inc.
Subject of the Agreement: Amendment No. 2 to City Secretary Contract No. 46771, in the Amount of $25,000.00 for
Construction Management Services for the Trinity River Vision Central City Project Bridges on North Main Street,
Henderson Street and White Settlement Road
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ 46771-A2
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑ No
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. C00144
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.