Loading...
HomeMy WebLinkAbout046771-A2 - Construction-Related - Contract - Freese and Nichols, Inc.CSC No. 46771-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 46771 WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc., (ENGINEER) made and entered into City Secretary Contract No. 46771, (the CONTRACT) which was authorized by M&C C-27313 on the 2nd day of June, 2015 in the amount of $ $271,622.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $405,491.00 which was authorized by M&C C-27833 on August 2nd, 2016; and WHEREAS, the CONTRACT involves engineering services for the following project: Construction Management Services for TRV Bridges, CPN C00144; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $25,000.00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $ 702,113. 00. OFFICIAL RECORD 3. CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Construction Management Services for TRV Bridges Prof Services Agreement Amendment CPN C00144 Revision Date: June 13, 2025 Page 1 of 4 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager DATE: 03/18/2026 ,ogvvann� F fORr a ATTEST: p-d �oe 0 *�9°0 o OV° 8=4 d� dp C\`�% .�� o n� tEzps44d ' �RUR040 Jannette S. Goodall City Secretary APPROVAL RECOMMENDED: Lauren Prieur (Mar 12, 2026 09:08:07 CDT) Lauren Prieur ENGINEER Freese and Nichols, Inc. Joh Dewar (Mar 10, 2026 14:35:18 CDT) John Dewar Vice President DATE: 03/10/2026 Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. �. �rzgGas ena�f��ta�eY A. Douglas Ral6emaker (Mar 10, 2026 23:03:43 CDT) Doug Rademaker Sr Capital Projects Officer City of Fort Worth, Texas Prof Services Agreement Amendment Revision Date: June 13, 2025 Page 2 of 4 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Construction Management Services for TRV Bridges CPN C00144 APPROVED AS TO FORM AND LEGALITY: Douglas Black (Mar 12, 2026 20:07:57 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Revision Date: June 13, 2025 Page 3 of 4 M&C No.#: N/A M&C Date: N/A Construction Management Services for TRV Bridges CPN C00144 FUNDING BREAKDOWN SHEET City Secretary No. 46771 Amendment No. 2 Fund Dept ID Account Project ID CF1- Activity CF2 - Bond Reference Amount 39407 0200431 5330500 C00144 $25,000.00 Total: $25,000.00 City of Fort Worth, Texas Construction Management Services for TRV Bridges Prof Services Agreement Amendment CPN C00144 Revision Date: June 13, 2025 Page 4 of 4 801 Cherry Street ❑ Fort Worth, Texas 76102 ❑ 817-735-7300 ❑ fax 817-735-7491 March S, 2026 Doug Rademaker City of Fort Worth Transportation and Public Works Department 100 Fort Worth Trail Fort Worth, Texas 76102 Dear Mr. Rademaker, www.freese.com In response to our email and telephone conversations, Freese and Nichols (FNI) is pleased to submit this proposal to provide professional services to the City of Fort Worth (CLIENT) for the TRV bridge project, including the design of telecom box repair details (Basic Services) and future professional services related to the Central City project impacts on the bridges (Special Services). Freese and Nichols (FNI) will render the following professional services: Basic Services • Prepare telecom box repair details as outlined in the February 11, 2026, report titled "Telecom Boxes at TRV Bridges on Henderson Street and White Settlement Road". It is assumed that FNI will prepare two (2) detail sheets and that the contractor will install precast inserts in the existing telecom boxes as part of the repair. • Prepare for and conduct up to three (3) coordination meetings between CITY staff and FNI. • Conduct up to four (4) construction site visits to observe vault preparation and installation activities. • It is assumed that the project will be constructed using a CITY on -call construction contractor; therefore, the project will not be bid and bid phase services are not included. Special Services • Provide future miscellaneous professional services as directed by the CITY related to the Central City project or similar needs. Page 2 FNI proposes to furnish the services described herein for an hourly not -to -exceed fee of $17,000 for Basic Services and $8,000 for Special Services, for a total amount of $25,000.00. Basic Services Name Labor Category Hours Rate/Hour Total Todd Buckingham Senior Project Mgr. 12 $267 $3,204.00 Brad Watson Project Director 28 $309 $8,652.00 Misty Thomison Project Director 5 $309 $1,545.00 Julia Whitcraft Project Engineer 16 $201 $3,216.00 Labor Total $16,617.00 Est. Expenses $383.00 Basic Services Total $17,000.00 Special Services Name Labor Category Hours Rate/Hour Total Todd Buckingham Senior Project Mgr. 5 $267 $1,335.00 Brad Watson Project Director 12 $309 $3,708.00 Misty Thomison Project Director 54 $309 $1,236.00 Julia Whitcraft Project Engineer 8 $201 $1,608.00 Labor Total $7,887.00 Est. Expenses $113.00 Special Services Total $8,000.00 Basic and Special Services Total $25,000.00 Yours very truly, 4',� /o—'k Brad Watson Freese and Nichols, Inc. Principal/Vice President FORTWORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE' Construction Management Services for TRV Bridges Amendment No. 2 M&C: N/A CPN: C00144 CSO: 46771 DOC#: n/a Date: To: Name Department Initials Date Out 1. Seidi Tovar TPW - initial ST ST 03/10/2026 2. John Dewar Consultant - signature 03/10/2026 3. Doug Rademaker TPW - signatures 03/10/2026 4. Patricia Wadsack TPW - initial 03/12/2026 5. Lauren Prieur TPW - signature X9 03/12/2026 6. Doug Black Legal - signature o Bink 03/12/2026 7. Jesica McEachern CMO - signature CA 03/18/2026 8. Jannette Goodall CSO - signature 03/19/2026 9. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: DYES ®No RUSH: ❑YES ®No SAME DAY: El YES ®No NEXT DAY: ❑YES ®No ROUTING TO CSO: CRYES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts(a,FortWorthTexas.gov at ext. 7233 for pick up when completed. Thank you! FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Freese and Nichols, Inc. Subject of the Agreement: Amendment No. 2 to City Secretary Contract No. 46771, in the Amount of $25,000.00 for Construction Management Services for the Trinity River Vision Central City Project Bridges on North Main Street, Henderson Street and White Settlement Road M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ 46771-A2 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Expiration Date: If different from the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. C00144 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the following order: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.