Loading...
HomeMy WebLinkAbout061643-A1 - Construction-Related - Contract - Kimley-Horn and Associates, Inc.Docusign Envelope ID: 4A53DB4F-57D4-4B90-9380-F533BACCC774 CSC No. 61643-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 61643 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 61643, (the CONTRACT) which was authorized by M&C 24-0520 on the llth day of June, 2024 in the amount of $ 625,800.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2022, WSM-Z, CPN 104879; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $41,328.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $667,128.00. OFFICIAL RECORD CITY SECRETARY 3 • FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas W&SS Repl on Contract 2022, WSM-Z Prof Services Agreement Amendment Template 104879 Revision Date: June 13, 2025 Page 1 of 2 Docusign Envelope ID: 4A53DB4F-57D4-4B90-9380-F533BACCC774 EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth of the date subscribed by the City's Jesica McEachern Assistant City Manager DATE: 03/19/2026 a 4ovounIl � FORr Ilad t.o ATTEST: oio (/�'�aaQ °TEXASogb IlIl000444 Jannette Goodall City Secretary APPROVAL RECOMMENDED: chns, to hell-1fader Christopher Har er (Mar 17. 2026 06:39:01 CDT) Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Kimley-Horn and Associates, Inc. D//ocuSlgned by: Chris Igo, P.E. Associate DATE: 3/12/2026 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Jose Andrade Project Manager APPROVED AS TO FORM AND LEGALITY: M&C No.#: N/A Douglas Black (Mar 18, 2026 17:57:06 CDT) Douglas W. Black Sr. Assistant City Attorney M&C Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 2 of 2 WLSS Repl on Contract 2022, WSM-Z 104879 Docusign Envelope ID: 4A53DB4F-57D4-4B90-9380-F533BACCC774 Kim ley»>Horn March 5, 2026 Jose Andrade Project Manager City of Fort Worth Water Department 100 Fort Worth Trail Fort Worth, TX 76102 RE: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2022, WSM-Z Amendment No. 1 KHA No. 061018472 City Secretary No. 61643 — City Project No. 104879 Dear Jose: The City of Fort Worth (CITY) has requested that Kimley-Horn and Associates, Inc. (ENGINEER) perform additional services under Amendment No. 1 for the WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2022, WSM-Z project. This amendment adds approximately 3,660 linear feet of 8" and 12" water line design for N. Main Street, W. Northside Drive, Grand Avenue, and Terrace Avenue. Tasks included as part of this amendment are further described as follows: TASK 4.0 — FINAL DESIGN (90% and 100%): $47,950 ENGINEER will complete Final Design in accordance with the Original Contract for the following: • 1,800 linear feet of 12" water line in Main Street, including both horizontal plan view and vertical profiles in the sheets for this segment. This includes one round of City comments. 375 linear feet of 12" water line in W. Northside Drive, including both horizontal plan view and vertical profiles in the sheets for this segment. This includes one round of City comments. 1,130 linear feet of 8" water line in Terrace Avenue, including horizontal plan view and roadway cross -sections for implementation. This includes one round of City comments. • 355 linear feet of 8" water line in W. Northside Drive, including only horizontal plan view in the sheets for this segment. This includes one round of City comments. TASK 8.0 — SURVEY AND SUE SERVICES: $23,378 ENGINEER will complete Survey and SUE Services in accordance with the Original Contract for the following: • Survey Control o Establish horizontal control for the project by means of GPS RTK positioning. Horizontal control will be referenced to the Texas State Plane Coordinate System, NAD-83(2011), North Central Zone (4202), and scaled to surface using a surface adjustment factor of 1.00012. o Establish vertical control for the project by means of differential level loops. Vertical control will be based on the City of Fort Worth Vertical Datum. Docusign Envelope ID: 4A53DB4F-57D4-4B90-9380-F533BACCC774 Kim ey>>> Horn Page 2 • Topographic Survey W Central Avenue at N Main Street o Provide a topographic survey of the intersection of W Central Avenue at N Main Street. The survey will extend from right-of-way to right-of-way. The survey will include, but not be limited to, locating all existing features X, Y & Z, such as water valves, water meters (with serial numbers), curb & gutter, asphalt, sidewalks, fences, driveways, storm & sanitary sewer manholes (with flow line elevations), inlets and storm drain outfalls (with flow line elevations), trees 6" and larger, tops and toes of slope, power poles, mailboxes, signs, telephone risers, pavement type delineation, and any other above ground visible features. Topographic Survey W Northside Drive and Terrace Avenue o Provide a topographic survey of approximately 1,500 linear feet along W Northside Drive and Terrace Avenue. The survey will extend from right-of-way to right-of-way. The survey will include, but not be limited to, locating all existing features X, Y & Z, such as water valves, water meters (with serial numbers), curb & gutter, asphalt, sidewalks, fences, driveways, storm & sanitary sewer manholes (with flow line elevations), inlets and storm drain outfalls (with flow line elevations), trees 6" and larger, tops and toes of slope, power poles, mailboxes, signs, telephone risers, pavement type delineation, and any other above ground visible features. • Boundary Survey o Research all properties along the routes and obtain copies of plats, easements, and deeds. Prepare a deed sketch to locate property corners and establish existing boundary/right-of- way/easement lines. TASK 10.0 — ADDITIONAL SERVICES: $-30,000 ENGINEER will apply additional services fee from the Original Contract to the Amendment No. 1 services performed. We recommend that the CITY increase the budget by $41,328 for these additional services. The following tables summarize our recommended budget revisions, water design fees, and revised contract amount: Description Water Sewer Total Task 4 — Final Design $47,950 $0 $47,950 Task 8 — Survey and SUE Services $23,378 $0 $23,378 Task 10 — Additional Services -$30,000 $0 -$30,000 Total $41,328 $0 $41,328 The following table summarizes the fee for this amendment by project phase: Water Fee Sewer Fee Total Original Contract $531,930 $93,870 $625,800 Amendment No. 1 $41,328 $0 $41,328 Total 1 $573,258 $93,870 $667,128 Docusign Envelope ID: 4A53DB4F-57D4-4B90-9380-F533BACCC774 Kimley»>Horn Page 3 The following table summarizes our recommended budget revisions and shows the revised contract amount: Task Number Original Contract Amendment No.1 Revised Contract Task 1 - Design Management $30,500 - $30,500 Task 2 - Conceptual Design - - - Task 3 - Preliminary Design $169,300 - $169,300 Task 4 - Final Design $147,100 $47,950 $195,050 Task 5 - Bid Phase Services $23,200 - $23,200 Task 6 — Const. Phase Services - - - Task 7 - ROW/Easement Services - - - Task 8 - Survey and SUE $211,000 $23,378 $234,378 Task 9 - Permitting $14,700 - $14,700 Task 10 - Additional Services $30,000 -$30,000 $0 Total Project $625,800 $41,328 $667,128 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Chris Igo, P.E. Associate Attachments - Level of Effort Spreadsheet - Project Location Map cc: Tony Sholola, P.E., Assistant Director of Water Department KAFiW_Utilities\061018411-CFW-2019-WSM-1\PPP\P0ST_NTP\Amendment-4\WSM-1 Amendment 4 Summary Ltr.doex T-4 Dp 9¢ n � W O A o.� m m w N N w0 m o a U) `DmU) O m R N m 3 O m Oo A a N F O a 6 O N Ch C o 0 0 p D T w0 cn z a�� 0 p ^ m n o O x0 p w. m N p m cJ f O o N o f n x N D m � e a v N c V 0 v N m m m m � N a ct ° v O 0. O t � p o o 0 m N N � O O � a — V O N W N O w O O O O W 0 0 N N A A N N N N N N N N N A O d — O a m O o O) O O A N A N rn O) N m 0 Ol 0) O) A O N O o o a � .N. w Fu-i N U1 N O O I n d rd'.� W O] 0 w 0 O 0 a 0 O 0 d) A W 0 to A W 0 d) di J CO O o a di W (O N N o 0 di d3 W N N J 0 0 d> N d3 J 0 0 A di mW 0 0 En di A (O 0:0 d) A dl W 0 0 d1 H A N W V 0 0 d)) �. O dl 0 o A lO d� tl� c o ° r V O 0 0 O 0o A O v bl i0 O A O d3 i0 O A � iG O A bl o d k x m C � 'O N m O A p N O o �0@ 0 0 0 0 m x N O N 0 N 0 1iji11 ° m N 0 m J O ° OAO 0 OAD C� o c. O 0 1.) O c n O N O yp 11 O e w ^ N — m 1 a N C A W � N N 6� di di EA d) d3 dl ER d9 ti V A�� m O O m VN C� O OIO O JO �� a 21 O OI,H Dr,- _R Om c X o 00 U) my D m T w o a O y m Z M Docusign Envelope ID: 4A53DB4F-57D4-4B90-9380-F533BACCC774 PROJECT LOCATION NW 20TH ST 11 FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Kimley-Horn and Associates, Inc. Subject of the Agreement: Water and Sanitary Sewer Replacement Contract 2022 WSM-Z M&C Approved by the Council? * Yes ❑ No 0 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑✓ No ❑ 61643-Al If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes ❑✓ No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: 3/12/2026 If different from the approval date. Expiration Date: N/A If applicable. Is a 1295 Form required? * Yes ❑ No ❑✓ *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104879 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ❑✓ No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.