HomeMy WebLinkAbout059847-CO2 - Construction-Related - Contract - S.J. Louis Construction of Texas, Ltd.FORT �CIRTN Cityof Fort Worth CSC No. 59847-CO2 Change Order Request Project Name: Part 14 -Channel Segment C Sanitary Sewer Relocations City Sec No.: 59847 Project No.(s): 59847 / 104484 / 26680 / 061018052 DOE No. N/A City Proj. No.: 104484 Relocation and abandonments of sanitary sewer facilities to accommodate future Bypass Channel C by the United States, Army Corps of Project Description: Engineering for the Fort Worth Central City project. Contractor: S.J. Louis Construction of Texas, Ltd. Change Order # Date: 1 3/11/2026 City Project Mgr.1 Bijay Upreti, P.E. City Inspector: Stephen Martinez Phone Number: 817-392-8909 Phone Number: 682-432-5485 Dept. i Sewer I Water Totals I Contract Time Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $34,824,041.30 $34,824,041.30 500 $244,271.03 $244,271.03 161 $0.00 $35,068,312.33 $35,068,312.33 661 Amount of Proposed Change Order $3,526,707.28 $3,526,707.28 552 Revised Contract Amount $38,595,019.61 Original Funds Available for Change Orders $417,888.00 Remaining Funds Available for this CO $173,616.97 Additional Funding (if necessary) $3,353,090.31 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $38,595,019.61 1.213 $417,888.00 $173,616.97 $3,353,090.31 10.83% $43,530,051.63 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 2 is for the modifications described in CMR #4, PCM No. 2 and PCM No. 3. CMR No. 4 is for the installation and removal of the concrete trail for the Cowtown marathon as requested by TRWD/Cowtown Marathon. PCM No. 2 adjusts the sanitary sewer pipe alignment on the downstream end of the project to mitigate potential settlement issued per CDM analysis for the additional fill area as necessitated by USACE revisions of the bypass channel design. The additional fill area required a 164 linear feet pipe cradle to support the sanitary sewer pipe and pier foundations for siphon structure B-1. PCM No. 2 also adds pier foundation for siphon structure C1 and C2 to accommodate poor soil conditions as noted in RFI #14, which were identified during excavation. PCM No. 3 is for the recommended subgrade improvements for Junction Structure A and Junction Structure D. Subgrade improvements are necessary due to the poor soils conditions noted in RFI #14, which were identified during excavation. The cost of the work to perform all of the additional work as described in CMR No. 4, PCM No. 2, and PCM No. 3 shall be included in the agreed cost of the change order. If there is not a specific work item included in the change order and its required to execute the work for CMR No. 4, PCM No. 2 and PCM No. 3 it shall be considered subsidiary to all other Work items. The change order also extends the contract time for the project to be completed on December 15, 2026 per attached contract time determination schedule. Explanation of new line items can be found in attachment. Staff concurs with the contractor's request for an additional 552 calendar days on the project for delays resulting from the above issue and to complete additional work. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Centractor's Gampany Name -.Coht�:a%io(,f 6me [rritractor ;� na ,.; S.J. I r-A; Cans Cuclion 0 Te�cas-Lld. .. — Inspector Clbrectof.(,NaterDept). TS 03/26/2026 S� i=-tan' City Attorney 104/09/2026 zs eiak a rz zoze iestao co D9:° ' ern 04/02/2026Jesica McEaehern Dale 2026.04.0922,423ica9-OS'00' M&C Number 26-0780 Council Action (If Required) M&C Date Approved 3/10/2026 OFFICIAL RECORD CITYSECRETARY FT. WORTH, TX Fa n-F W" RT» City of Fort worth Change Order Additions Project Name Part 14 - Channel Segment C Sanitary Sewer Relocations City Sec No.: 59847 Project No.(s): 59847 / 104484 / 26680 / 061018052 1 DOE No. N/A City Proi. No.: 104484 Project Description Relocation and abandonments of sanitary sewer facilites to accommodate future Bypass Channel C by the United States, Army Corps of Engineering for the Fort Worth Central City project. Contractor S.J. Louis Construction of Texas, Ltd. I Change Order:= Date: 3/11/2026 City Project Mgr. Bijay Upreti, P.E. City Inspector Stephen Martinez ADDITIONS DEPT QtY RaitL Unit Cost Total 3 3331,4723 66" Fiberglass Sewer Pipe, Deep Trench Backfill Sewer 74.00 LF $1,346.00 $99,604.00 57 3201.0113 6' Wide Asphalt Pvmt Repair, Residential Sewer 60.00 LF $83.00 $4,980.00 58 3201.0203 Asphalt Pvmt Repair Beyond Defined Width, Industrial Sewer 300.00 SY $129.00 $38,700.00 62 3216.0101 6" Conc Curb and Gutter Sewer 120.00 LF $45.00 $5,400.00 63 3231.0124 8' Chain Link, Aluminum Sewer 180.00 LF $50.00 $9,000.00 64 3291.0100 Topsoil Sewer 528.00 CY $19.00 $10,032.00 65 3292.0400 Seeding, Hydromulch Sewer 9,500.00 SY 1$0.80 $7,600.00 67 13301.0002 Post -CCTV Inspection Sewer 74.00 LF $1.50 $111.00 71 3305.0109 Trench Safety Sewer 74.00 LF $1.00 $74.00 73 3471.0001 Traffic Control Sewer 8.00 MO $3,000.00 $24,000.00 76 Install Concrete Trail Detour (Cowtown Marathon) Sewer 1.00 LS $51,222.72 $51,222.72 77 Remove Concrete Trail Detour (Cowtown Marathon) Sewer 1.00 LS 1$10,000.00 $10,000.00 78 66" Fiberglass Sewer Pipe, Pipe Support Cradle (PCM No. 2) Sewer 164.00 LF $8,929.88 $1,464,500.32 79 66" Fiberglass Sewer Pipe, Deep Trench Backfill (Excavation and Backfill Onl Sewer 1.00 LS $404,000.00 $404,000.00 80 Additional Exploratory Excavation for PCM No.2 Sewer 1.00 LS $7,575.00 $7,575.00 81 Additional Construction Staking for PCM No. 2 and PCM No. 3 Sewer 1.00 LS $25,250,00 $25,250.00 82 Additional Erosion Control Devices for PCM No.2 and PCM No.3 Sewer 1.00 LS $5,050.00 $5,050.00 83 30" Drilled Concrete Pier (Pipe Support Cradle) Sewer 387.00 VF $471.18 $182,346,66 84 30" Drilled Concrete Pier (Siphon Structure B-1) Sewer 332.00 VF $471.18 $156,431.76 85 30" Drilled Concrete Pier (Siphon Structure C-1) Sewer 312.00 VF $471.18 $147,008.16 86 30" Drilled Concrete Pier (Siphon Structure C-2) Sewer 298.00 VF $471.18 $140,411.64 87 Additional Dewatering, Site Preparation for Siphon Structure C1 and C2 Sewer 1.00 LS $146,450.00 $146,450.00 88 Additional Special Shoring for Siphon Structure C-1 Sewer 1.00 LS $101,000.00 $101,000.00 89 3305.0203 Imported Embedment/Backfill, CLSM Sewer 1,000.00 CY $160.00 $160,000.00 90 Junction Structure A (Subgrade Stabilization per PCM No.3) Sewer 1.00 LS $30,300.02 $30,300.02 91 Junction Structure D (Subgrade Stabilization per PCM No. 3) Sewer 1.00 LS $404,000.00 $404,000.00 Page 2 of 4 Sewer $3,635,047.28 Water Additions Sub Total $3,635,047.28 Fn lEz.T W[l lEz.T H City of Fort Worth Change Order Deletions Project Name Part 14 - Channel Segment C Sanitary Sewer Relocations City Sec No.: 59847 Project No.(s): 59847 / 104484 / 26680 / 061018052 DOE No. N/A City Proj. No.: 104484 Project Description Relocation and abandonments of sanitary sewer facilites to accommodate future Bypass Channel C by the United States, Army Corps of Engineering for the Fort Worth Central City project. Contractor I S.J. Louis Construction of Texas, Ltd. Change Order: E�:] Date 1 3/11/2026 City Project Mgr. Bijay Upreti, P.E. City Inspector: Stephen Martinez DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 1 3331.4721 66" Fiberglass Sewer Pipe Sewer 82.00 LF $1,284.00 $105,288.00 28 3339.1103 5' Extra Depth Manhole Sewer 4.00 VF $263.00 $1,052.00 37 3339.0001 Epoxv Manhole Liner Sewer 4.00 VF $500.00 $2,000.00 r 1$108,340.00 Deletions Sub Total 1$108,340.00 1 Page 3 of 4 Kimley>Morn REQUEST FOR INFORMATION Project: RFI #: 014 FWCC Part 14 — Channel Segment C Sanitary Sewer Relocations Project No.: City Project No. 104484 Date Initiated: 11/17/2025 KHA No. 061018052 Sender: S.J. Louis Construction of Texas Receiver: Kimley-Horn and Associates, Inc. Copies To: Subject: Existing Soil Conditions at Structures C1 and C2 Request: See attached RFI Sender's Proposed Answer/Solution: N/A THE PROPOSED ANSWER/SOLUTION❑ IS, ® IS NOT, INCLUDED IN THE CONTRACT. Receiver's Response: Further evaluation has been performed along the entire pipeline alignment and the following approach should be taken by the Contractor. Engineer will follow up with a proposed contract modification and request a change order proposal from the Contractor for the additional scope of work required: o Junction Structure A (12' Diameter Polymer Concrete Manhole): ■ Remove underlying soils to a minimum of 4-feet below proposed manhole bottom extending outward beyond proposed manhole footing (15.2-feet) a minimum of 2-feet, replace with compacted ASTM No. 57 stone (-80 CY). o Siphon Structure C-1: ■ Install drilled piers below proposed structure as indicted in revised drawings in PCM-02. o Siphon Structure C-2: ■ Install drilled piers below proposed structure as indicted in revised drawings in PCM-02. o Junction Structure D (12' Diameter Polymer Concrete Manhole): • Remove underlying soils to a minimum of 13-feet below proposed manhole bottom extending outward beyond proposed manhole footing (15.2-feet) a minimum of 6-feet, replace with compacted ASTM No. 57 stone (~360 CY). Response By: Company: Date: Josh Kercho, P.E. Kimley-Horn and Associates, Inc. 12/19/2025 DISTRIBUTION: S.J. Louis Construction of Texas Ltd. (Ronald Etter, Adam Lunsford) City of Fort Worth Water Department (Bijay Upreti, Stephen Martinez) Kimley-Horn Project File kimley-horn.com 18 RFI (RFI) - 4 Project: 104484-14 - W&SS Relocations for the FWCC Project - Part 14 -Channel Segment C SSr Reloc Process RFI - 4 Document: Current Workflow Consultant Review/Revise Step: Subject: Existing Soil Conditions at Structures C1 and C2 Status: Received General Information Question: Priority: RT WORTHO Project Number: 104484-14 Overall Due Date: 11.17.2025 OS:OOPM Step Due Date: While excavating down for structure C-2 the subgrade for this structure is very unstable and doesn't appear suitable to construct the C-2 structure as shown in plans unless some additional measures are taken to prevent settlement of the structure. Can the FOR and the GeotechnicaI Engineer review the existing ground conditions in this area and provide clarification on what is needed to support the structure? Please review structure C-1 as well as it is in the same area. High Is there a Potential Cost Impact?: Yes Estimated Cost ($): If yes was selected, please indicate the estimated cost by entering a whole number. 1 Is there a Potential Schedule Impact?: Yes Estimated If yes was selected, please indicate the estimated number of days. Schedule Impact: 1 Plan Sheet Number: 18A and 19A Specification Section: Proposed Solution: Need direction from Engineer or Geotech on what might be required to support the structures. Possibly drilled piers similar to what was added downstream. Date Submitted: 11.12.2025 Final Response Final Response: Updated Plan Sheet: Initiate Change «Change Order Request>> Order Request?: Comments Josh Kercho, KIMLEY HORN AND ASSOCIATES INC, 11.18.2025 9:41 PM Requested comment on step Consultant Review/Revise from Carl DeZee (KIMLEY HORN AND ASSOCIATES INC), Collin McGovern (IUMLEY HORN AND ASSOCIATES INC), Ivan Rocha (KIMLEY HORN AND ASSOCIATES INC). can yall respond with a formal RFI? Bijay Upreti, Fort Worth Water, 11.13.2025 2:35 PM Please review and respond. City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, March 10, 2026 REFERENCE NO.: **M&C 26-0180 LOG NAME: 60FWCCP14SSRCO2-SJLOUIS SUBJECT: (CD 2 and CD 9) Authorize Execution of Change Order No. 2 in the Amount of $3,526,707.28 to a Contract with S.J. Louis Construction of Texas, Ltd., for the Fort Worth Central City Part 14 - Channel Segment C, Sanitary Sewer Relocation, Adopt a Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt, and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2026-2030 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Change Order No. 2 in the amount of $3,526,707.28 to City Secretary No. 59847 a contract with S.J. Louis Construction of Texas, Ltd. for the Fort Worth Central City Part 14 - Channel Segment C, Sanitary Sewer Relocation for a revised contract amount of $38,595,019.61; 2. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds from future debt and/or annual payments from the Tarrant Regional Water District for the Fort Worth Central City Water and Sewer Relocations project; and 3. Adopt the attached appropriation ordinance adjusting appropriations in the Water and Sewer Commercial Paper Fund by increasing appropriations in the Fort Worth Central City Water and Sanitary Sewer Relocations project (City Project No. 104484) in the amount of $3,526,708.00 and decreasing appropriations in the W&S Commercial Paper project (City Project No. UCMLPR) by the same amount to effect a portion of Water's contribution to the Fiscal Years 2026-2030 Capital Improvement Program. DISCUSSION: On June 27, 2023 by Mayor and Council Communication (M&C) 23-0542, the City Council authorized a construction contract with S.J. Louis Construction of Texas, Ltd. in the amount of $34,824,041.30 for Fort Worth Central City Part 14 - Channel Segment C, Sanitary Sewer project. The contract was subsequently revised by Change Order No. 1 in the amount of $244,271.03 authorized by the City Council on March 25, 2025 (M&C 25-0268) that provided for sanitary sewer main and manhole rim elevation adjustments between stations 1+00 and 7+00 to accommodate future Channel grading by the United States Army Corps of Engineers (USACE). Change Order No. 2 primarily provides for the following: Adjustments to the sanitary sewer pipe alignment on the downstream end of the project to mitigate potential future settlement (from any analysis conducted by the consultant USACE for additional fill area due to the USACE's revisions to its bypass channel design; A 164 foot 30-inch pipe cradle to support the sanitary sewer pipe and 30-inch pier for siphon structure B-1 due to the additional fill; Pier foundations for siphon structures C1 and C2 to accommodate unstable and unusable soil material that was encountered during excavation; Additional dewatering, site preparation and shoring for the installation of siphon structures C1 and C2 due to unstable and unusable soil material that was encountered during construction; Additional subgrade stabilization for junction structures A and D due to unstable and unusable soil material that was encountered during excavation; Flowable fill material to replace unstable material that is encountered during construction and installation and removal of the concrete sidewalk detour requested by the Cowtown Marathon. This project is anticipated to be repaid from a series of annual reimbursements from the Tarrant Regional Water District (TRWD) as part of the Fort Worth Central City (FWCC) Water & Sewer Relocations project. In the event any bond -eligible costs are not fully reimbursed by TRWD, those costs would be anticipated to be included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Callable Commercial Paper Program (CP) will be used to provide interim financing for this project until the debt is issued. Once payment is received from TRWD and/or debt associated with the unreimbursed portions of this project is sold, those funds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached reimbursement resolution. Under federal law, debt must be issued within approximately three years in order for these expenses to be reimbursable. Adoption of the attached resolution does not obligate the City to sell bonds but preserves the ability of the City to reimburse itself from tax-exempt bond proceeds. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. Funding for the Fort Worth Central City Part 14 - Channel Segment C, Sanitary Sewer Relocations in the FWCC Water and Sewer Relocations Project is depicted below: Fund Existing Appropriations Additional Appropriations Project Total* W&S Commercial Paper— Fund $28,420,939.77 $3,526,708.00 $31,947,647.77 56026 W&S Capital _ Projects — Fund $28,017,620.49 $0.00 $28,017,620.49 56002 Project Total $56,438,560.26 $3,526,708.00 $59,965,268.26 Note: This table includes the actions considered in M&C 26-0112 on the February 10, 2026 City Council Agenda. The sanitary sewer $3,526,707.28 amount of this Change Order is considered Trinity River Vision Authority (TRVA)-relocated work, which are eligible for funding from Tax Increment Reinvestment Zone No. 9 pursuant to the TRVA Project Plan. Having met its $26.6 million commitment to the TRVA project, the City will be reimbursed the sanitary sewer amount of $3,526,707.28 by TRWD, in accordance with provisions of the executed Interlocal Agreement between the City and the TRWD (City Secretary Contract No. 43425 as amended). The TRVA Program Manager in the FW Lab Department will be responsible for collecting the full reimbursement from TRWD at the end of each fiscal year. Funding is available within the W&S Commercial Paper Fund for the Water Department for the purpose of funding the FWCC Water & Sewer Relocations project. This project is located in COUNCIL DISTRICTS 2 and 9. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Commercial Paper project within the W&S Commercial Paper Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Commercial Paper Fund for the FWCC Water & Sewer Relocations project to support execution of the change order. Prior to any expenditure being incurred, the Water Department has the responsibility to validate the availability of funds. FUND IDENTIFIERS (FIDs): TO and Department �ccoun Project frog ID ID Budget Reference # Year (Chartfield 2' FROM Fund Department Accoun Project Program ctivity Budget Reference # mount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by_ Jesica McEachern (5804) Originating Department Head: Chris Harder (5020) Additional Information Contact: Bijay Upreti (8909) ATTACHMENTS 1. 60FWCCP14SSRCO2-SJLOUIS FID Table (WCF 02.03.26).xlsx (CFW Internal) 2.60FWCCP14SSRCO2-SJLOUIS.pdf (Public) 3. 60FWCCP14SSRCO2-SJLOUIS FundsAvail.docx (CFW Internal) 4. Commercial Paper as of 02.03.26.xlsx (CFW Internal) 5. Form 1295.pdf (CFW Internal) 6. ORD.APP 60FWCCP14SSRCO2-SJLOUIS 56026 A026(R3) - JLM.docx (Public) 7. PBS CPN 104484.pdf (CFW Internal) 8. Res.60FWCCP14SSRCO2-SJLOUIS (Rev2.19.26).docx (Public) X „ X H YI YI O O O a a a L L L 3 3 3 a a a N c c c E E I- E I- a a =a W J L 0 d M _ M Y m Y cn O a u O O a Z a 7 111 '1 H V H V u H LL LL Z W a a X d to ba m m L m Y 0 W m Z a+ LU ++ a a Lua a oil a C d 0 o 0 'o LL a` a` a` c 3 c c 3 3 O U O O U U U a U U a a oil 11 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. DigifellVsignad by Bijay Upreb DNGUS, Bijay Upreti 'N°°e;;av�pr@fe Gale: 2025.04.11 14:18:-5- Signature Bijay Upreti, P.E. Name of Employee Sr. Professional Engineer Title anpq AoFFOR*waa J a n n ette S. Digitally signed by ATTEST: Jannette S. Goodall $a♦o, a,>,tl Goodall Date:2026.04.10 aaQnnX6saa 08:31:30-05'00' Jannette S. Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: S.J. Louis Construction of Texas, Ltd. Subject of the Agreement: Part 14 - Channel Segment C Sanitary Sewer Relocations M&C Approved by the Council? * Yes ❑ No 0 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑✓ No ❑ If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see back page for permanent contract listing. 59847-CO2 Is this entire contract Confidential? *Yes ❑ No ❑✓ If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: 3/10/26 If different from the approval date. Expiration Date: N/A If applicable. Is a 1295 Form required? * Yes 0 No ❑ *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104484 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ❑✓ No ❑ Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.