HomeMy WebLinkAbout063670-CO1 - Construction-Related - Contract - The Fain Group, LLCCSC No. 63670-COl
FORT WORTH® City of Fort Worth
Change Order Request
Project Name Construction of the Airport Frontage Improvements Project at Meacham International Airport City Sec # 63670
Client Project #(s) 100602
Project Description This project consists of improvements to the Airport Frontage along N. Main Street including drainage improvements, curb, gutter, and sidewalk installation,
underground electrical infrastructure, and installation of street lighting, wayfaring signage, and gateway monument signs.
Contractor The Fain Group, LLC Change Order # 1 Date 4/9/2026
City Project Mgr. I Tyler Dale City Inspector Kevin Jackson
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Aviation
Totals
Contract Time
(CD)
$10,861,928.00
$10,861,928.00
400
$10,861,928.00
$10,861,928.00
400
Amount of Proposed Change Order
$95,074.53
$95,074.53
60
Revised Contract Amount $10,957,002.53
Original Funds Available for Change Orders $95,075.00
Remaining Funds Available for this CO $95,075.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$10,957,002.53
460
$95,075.00
$95,075.00
0.88%
$13,577,410.00
JUSTIFICATION (REASONS) FOR CHANGE ORDE
The light poles within the project limits along the Airport Frontage will be coated black for uniformity with the Airport parking lot's lighting infrastructure and for more pleasing
visual aesthetics. Seven of the lights have already been manufactured and installed, so these will be removed, coated black, and reinstalled.
The structure at Station 3+92.09 needs to be adjusted from a 10' recessed curb inlet to a 5' recessed curb wing inlet to work around private utility lines discovered during
construction. The adjusted inlet will maintain the 10' curb opening length that will intercept storm runoff.
A grade discrepancy was discovered adjacent to Structure A-11 just north of Commander Road, as the existing pavement elevation of North Main Street is lower than the design
elevation shown on the plans. Per the plans, a Type III box was to be installed here; however, due to the grades and an existing underground utility line preventing lowering of
the structure, a Type II inlet box will now be installed in this location.
Installation of the 2" water service includes 5 taps and new water service for irrigation for the landscaping being installed on the southern portion of the project. It has been
determined during construction that the existing irrigation infrastructure that was originally to be used in this area is privately -owned.
The additional sixty days are for potential delays resulting from the relocation of unknown, existing private communication lines discovered during construction. Even with the
additional days, the project is still progressing and is expected to be completed on schedule.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
om an
The Fain Group, LLC Larry Frazier ANY
Date
04/09/2026
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Mana er
Date
?*JW
04/10/2026
Program Manager
Date
Senior Capital Project Officer
Date
Assistant Director °" -F
wtL
Date
04/10/2026
Director, Contracting Department (Dept)
1
Date
04/10/2026
Assistant City Attorn
0
JAssistant Cit Mana er
Date
Candace Pa9�la (Apr t0, 2026 09:54:49 CDT)
04/10/2026
4 oongIl M&C Number N/A
ATTEST: c� fOp '100000
pV8 °=d-
Jannette Goodall, City Secretary °p0*%Il 45�tidp
M&C Date Approved NIA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
1'*"r Change Order Additions
Project Name Construction of the Airport Frontage Improvements Project at Meacham International Airport City Sec # 63670
Client Project # 100602
Contractorl The Fain Group, LLC PM1 Tyler Dale Inspector Kevin Jackson
Change Order Submittal # Date 41g12026
ADDITIONS
a► �
�
r r r r r r r r
�'���
�if•.kkibYrl
Emma
rrrrrrrr
rr •
�iC!<rkblrkT
rr-
r•
•r
rrrrrrrr
rr
llybYmlj
:rr
D r
rrrrrrrr
', r r
r ri
r r rr
rrrrrrrr
���kkilGblrli
�I
�I
SEEM=
Change Order Additions Page 2 of 3
FOR City of Fort Worth
Change Order Deletions
Project Name Construction of the Airport Frontage Improvements Project at Meacham International Airport City Sec # 63670
Client Project # 100602
Contractor The Fain Group, LLC PM Tyler Dale Inspector Kevin Jackson
Change Order Submittal # = Date 4/g/2026
Change Order Deletions Page 3 of 3
FORT WORTH
Routing and Transmittal Slip
Aviation
Department
DOCUMENT TITLE: FTW Airport Frontage Improvements Change Order
M&C CPN 100602 CSO # 63670 DOC#
DATE: 4/9/2026
INITIALS
DATE OUT
TO:
1.
Aaron Barth
7aron Barth
04/10/2026
2.
Roger Venables
Venables
04/10/2026
R
3.
Candace Pa liars
04/10/2026
4.
Valerie Washington
04/10/2026
5.
Jannette Goodall
Ja netteGoodall
04/10/2026
6.
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes El No
RUSH: ❑ Yes 0 No SAME DAY: ❑ Yes ❑ No
ROUTING TO CSO: 0 Yes ❑ No
Action Required:
❑ As Requested
❑ For Your Information
1 Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑ Yes ❑ No
❑ Attach Signature, Initial and Notary Tabs
Return to: Please call Tyler Dale at ext. 5416 for pick up when completed. Thank you.
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: The Fain Group, LLC
Subject of the Agreement: Change Order I for construction of the Airport Frontage Improvements Project
at Fort Worth Meacham International Airport
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ CSC 63670; Change Order 1
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 9 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No ® If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Date of Execution
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No W
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 100602
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.