HomeMy WebLinkAbout061324-AR1 - Construction-Related - Contract - Woody Contractors, Inc.CSC No. 61324-AR1
FoR_�TH.
City of Fort Worth
Construction Allowance Request
Project Namel Historic Southside Improvements City Sec # 161324
Client Project #(s)l 102932
Project Description Water, Sanitary Sewer, Storm Drain and Street Paving Improvements
Contractorl Woody Contractors, Inc. I CA # 1 1 Date 3/30/2026
City Project Mgr.1 Jose Orozco City Inspectorl Sergio Garcia
UNIT or DEPT
Original Contract Amount
Extras to Date
Credits to Date
Current Contract Amount
Amount of Pr000sed Allocation
Original Allowance Available to Allocation
Allowance Funds Previously Allocated
Revised Allowance Balance
UNIT 1 Water
UNIT 2 Sewer
UNIT 3 Paving
UNIT 4 Storm
Totals
6,020,770.70
2,077,3 00.40
4,958,2 88.25
623,399.00
713,679,758.35
$14,432.00
$235,643.40
$0.00
$0.00
$250,075.40
$6,035,202.70
$2,313,013.80
$4,958,218.25
$623,399.00
$13,929,833.75
0.00
0.00
42,750.00
$0.00
$42,750.00
100,000.00
$50,000.00
$100,000.00
$50,000.00
$300,000.00
$62,650.00
$33,952.00
$0.00
$7,000.00
$103,602.00
$37,350.00
$16,048.00
$57,250.00
$43,000.00
$153,648.00
JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Furnish all labor and materials necessary
to perform the work outlined in Construction Allowance #1. This Construction Allowance adds a new bid item to Unit 3 (Paving) to provide for
concrete pavement repair and replacement at the intersection of Missouri Avenue and Vickery Boulevard. This work was not included in the original
contract scope but was identified in the field as necessary to address deteriorated pavement conditions and maintain a consistent, durable pavement
section through the intersection.
>t: Staff reviewed the proposed work and confirmed that it will be performed using existing contract pay items. The Contractor has agreed to honor
original unit bid prices from other contract units; therefore, the pricing is considered fair and reasonable.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction
and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request.
The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
Contractor's any Name
"Na
Contractor Si
Woody Contractors, Inc.
Troy Woody
04/04/2026
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager IF
Date
04/02/2026
04/06/2026
Prograr,njftger
Date
Senior Capital Project Officer
Date
04/06/2026
04/06/2026
Assista
° 1. ad
Patricia L Watlsack (Apr 6. 2026 1426-36 CST)
Date
04/06/2026
Director, Contracting Department (Dept)
Date
04/07/2026
Date
Assistant City Manager
Date
04/08/2026
0
04/13/2026
ATTEST:
AA �°FOpT'�YCaOdd
0�8 `^AaP
Jannette Goodall, City SecretaryQ*000 D * d
aaIlnn�,Xo�a
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Construction Allowance SUMMARY
Page 1 of 3
FORT WORTH City of Fort Worth
Construction Allowance Additions
Project Name Historic Southside Improvements City Sec # 61324
Client Project # 1 22932
Contractorl Woody Contractors, Inc. PMr Jose Orozco InspectorF Sergio Garcia
Construction Allowance Submittal # = Date 313012026
ADDITIONS
ITEM DESCRIPTION DEPT Oty Unit Unit Cost Total
3-079 3201.0616 Conic Pvmt Repair, Arterial/Industrial UNIT 3 Paving 150.00000000 SY $285.00 $42,750.00
UNIT 1 Water $0.00
UNIT 2 Sewer $0.00
UNIT 3 Paving $42,750.00
UNIT 4 Storm $0.00
Total Additions $42,750.00
Construction Allowance Additions
Page 2 of 3
FORT WORTH,, City of Fort Worth
Construction Allowance Value
Project Name I Historic Southside Improvements City Sec #
Client Project # F 102932
Contractorl Woody Contractors, Inc. PMJ Jose Orozco Inspectorl Sergio Garcia
Construction Allowance Submittal # 0 Date
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM
DESCRIPTION
City
Unit
Unit Cost
Total
3-078
9999.0013 Construction Allowance(Paving)
0.43
I_S
$100,000.00
$42,750.00
Construction Allowance Value
3of3
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Historic Southside Improvements
Construction Allowance 1
M&C: CPN: 102932 CSO: 61324 DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Ann Estes
TPW
04/02/2026
2.
Troy Woody twood, 2�9aol.com
Vendor
A?
Troy Woody
04/04/2026
3.
Sergio Garcia
TPW
04/02/2026
4.
Cody Horton
TPW
04/06/2026
5.
Jose Orozco
TPW
04/06/2026
6.
Greg Robbins
TPW
Gk
04/06/2026
7
Mary Hanna
TPW
m�
04/06/2026
8
Patricia Wadsack
TPW
PLW
04/06/2026
9
Lauren Prieur
TPW
(M
04/07/2026
10.
Doug Black
Legal
oaaaK
04/08/2026
11.
Jesica McEachern
CMO
04/13/2026
12.
Jannette Goodall
I CSO
ane�o� „
04/13/2026
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room,
TPW Contracts ALSO List: - Bus Sppt: Ann Estes; Prg Mgr Greg Robbins; Sr CPO — Mary Hanna
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take
4O FSIJ�E NOTARIZED: DYES ®No
RUSH: [—]YES ®No SAME DAY: [—]YES ❑No NEXT DAY: DYES ❑No
ROUTING TO CSO: DYES ❑No
Action Required: ❑ Attach Signature, initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify TPWContracts(a,.fortworthtexas.2ov for pickup when complete. Call ext. 7233 or ext. 8363
with questions. Thank you!
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Woody Contractors, Inc.
Subject of the Agreement:
Please see justification on the Construction Allowance form
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 8
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 102932
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.