Loading...
HomeMy WebLinkAbout061596-A1 - General - Contract - Lockwood, Andrews, and Newman, Inc.CSC No. 61596-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 61596 WHEREAS, the City of Fort Worth (CITY) and Lockwood, Andrews, & Newman, Inc., (ENGINEER) made and entered into City Secretary Contract No. 61596, (the CONTRACT) which was authorized by M&C 24-0424 on the 14th day of May, 2024 in the amount of $ 276,674.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract 119, CPN 104878; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $19,326.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $296,000.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY SS Rehab on Contract 119, Salado Trail Prof Services Agreement Amendment Template 104878 Revision Date: June 13, 2025 FT. WORTH, TX Page 1 of 2 EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager of the date subscribed by the City's DATE: 04/17/2026 nnIlIl 0'.1 � FORT �OFFd ATTEST: Pd�o +d Fad¢ nEo pSQa Jannette Goodall City Secretary APPROVAL RECOMMENDED: Christopher Rarder Christopher Harder (A r 8, 2 126 18:17:11 CDT) Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: ENGI , Andrews, & Newman, Inc. Ju y✓n Veeves, PE Vic_ President DATE: March 31, 2026 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. ()01- 4 -p- 4166" Jose Andrade Project Manager APPROVED AS TO FORM AND LEGALITY: M&C No.#: N/A Douglas Black (Apr 13, 2026 15:02:16 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: June 13, 2025 Page 2 of 2 M&C Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX SS Rehab on Contract 119, Salado Trail 104878 c` LAN March 24, 2026 City of Fort Worth I Water Department Attention: lose Andrade 100 Fort Worth Trail Fort Worth, TX 76102 RE: REQUEST FOR CONTRACT AMENDMENT No. 1 City of Fort Worth Project Number 104878 City Sec Number: 61596 Sanitary Sewer Rehabilitation Contract 119, Salado Trail Dear Mr. Andrade: The following amendment is submitted due to the City of Fort Worth's direction to investigate and pursue the option of a possible point -of -entry into a Trinity River Authority (TRA) manhole. This effort required the redesign of 763-linear feet of 24-inch sanitary sewer interceptor, additional coordination with TRA, review and completion of TRA's point -of -entry application, and additional review of flows and service areas, and coordination with CoFW as defined by the City of Fort Worth. This direction was received following LAN's substantial completion of a 60% design of an open cut installation for the full distance of the previous scope and exhaustion of most of the preliminary design budget slated for this effort. Additionally, design and coordination for odor control was completed in final design phase. Due to realignment of the proposed sanitary sewer, River Trails Park will no longer be impacted by the project. LAN requests to reallocate funds from Task IX Additional Parks Coordination ($17,174) and Task X Allowances ($4,500) to partially fund the requested amendment amount shown on Attachment A ($41,000) and listed in the table below. Additional Services ($19,326) for the above -described work are described as follows: Additional Engineering Services Cost Task I: Project Management $1,000 Task III: Preliminary (60%) Design $36,500 Task IV: Final Design (90%) and Final Construction Documents (100%) $3,500 Total Additional Engineering Services $41,000 Task IX: Additional Parks Coordination -$17,174 Task X: Remaining Additional Services (Allowances) -$4,500 Total Cost $19,326 1300 Summit Avenue, Suite 300 • Fart Worth, Texas 76102 • 817.820.0420 • Fax, 817.820.0441 • www.lan-inc.com Jose Andrade City of Fort Worth I Water Department March 23, 2026 Page 2 The following presents the project fee summary to date, including this request: Original Contract $ 276,674 Amendment No. 1 $ 19,326 Revised Contract Amount $ 296,000 Please review this as a formal request to consider and process Amendment 1 in the amount of $19,326. Should you require further information for this request to support your consideration or have any questions, please contact me at 817-338-7512. Respectfully submitted, Lockwood, Andrews & Newnam, Inc. Reyna Johnson, PE Project Manager rojohnson@Ian-inc.com CC: John Kasavich, PE (City of Fort Worth) Attachments: Attachment A: CPN 104878 — Level of Effort (1 Page) 1300 Summit Avenue, Suite 300 • Fart Worth, Texas 76102 • 817.820.0420 • Fax, 817.820.0441 • www.lan-inc.com _n mD 1.J N pN pN N m m O w w O N � Hw F E A W Wb N A tit A A A W A A A W W W fn A l.W IV z O D N AO ? c m� m m O m o m_ '� A g D m O w° A a o c O r. D O N m ° 0 3^ m O O 0 m m °m m m '<_oo c o m m m y m C1 3 m OO n m 'c °-' n' p u _� 3 n 'w w v w O ' j� Q O u a - fn d w p> m a m y? m o� a p ?L m o m o ~ c d 2 D�=cOcm ?off � o .��m_s x- '^.➢\ o �_=__x=� yo N m Fe n' 0 3 g& EL3_ 3 e .� 6. s�° mwN F O O 2 w w w m r ° tz y O m a m m g O1 F w w 01 w w o O m o O a a] Q w > > w 2 m n o o ? d w 0� y A q - ➢ m C N w o m H y O m nsi o C70 m o aEr C S o o - ➢ F ro ="m`" -6= Nm m F D a Z F x O ro C. m = m 3 A _ m W m _ 2 0 _ z O _ A z m 6 n w 9 V W 3y O N. m N ^ N O O N O m� go o O1 N q A O NN N A w A u D b !O N A a A a N H H a v.w u. u. va F»v+e+ a v+v+f»Enr»e+f»vaw v+F»vi e+w wu. e.w F»v. e+en �nH A M f»fnwwu. u. v+Fnu y O r P 0 O O ^ 9 M H W M M H (A fA fA fA fA fA f9 fA M (A fA fA fA fA M fA fA (fi M fA fA fA fA fA fA fA :A fA fA fA (A :A M fA fA fA fA fA fA --- m W O z fA m m m a a ' u w w a u v. va . „ u. F»v+e. i i . e. e+ , i a v+v+f»v. i . . . rn Fn i , F»F»vaw . i i . v. v. i , r»v.w . , u. . . f»v+e. i i f»u . , v. . . Fnw . . . ti p a s a N H M a a+wf»t»f»f»En t» w tnv+f»tnt»tnt»wwva f»tn fnwwt»t»f»f»vi to H+tnw t»tnwwf»t»tn tnw A m = O w a m o 3 a . . . . . . . . . . . . . . . . . . . . . . m O� a � A o w m m m m v vvvv vv vvv v vv v m ovv «< IIJI.J - - - m z 3 01 �m m m a o o -8 � '• 0 m 7 m n m Vl 0 � n m Z c AO m �Dmo ;3tn� S m 7 y CC N Ocf m � 2 .�. yO m J M W •Z m 7C CL m m o m C � N O 7 n O 7 N M iD FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Lockwood, Andrews, & Newman, Inc. Subject of the Agreement: Sanitary Sewer Rehabilitation Contract 119 M&C Approved by the Council? * Yes 0 No ❑ If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 0 No ❑ 61596-Al If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see backpage for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: N/A If different from the approval date. Expiration Date: N/A If applicable. Is a 1295 Form required? * Yes ❑ No 0 *If so, please ensure it is attached to the approving AM or attached to the contract. Project Number: If applicable. 104878 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ✓❑ No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.