Loading...
HomeMy WebLinkAbout065068 - Construction-Related - Contract - Tarrant CountyCSC No. 65068 dam' ' `- ��>•s TARRANT COUNTY COMMISSIONERS COURT COMMUNICATION Court Date: October 14, 2025 Department: Transportation Court Order #:-146145 Prepared By: Sarah VanTassel Page: 1 of 11 Approved By: Joseph Jackson Consideration of an Interlocal Agreement between Tarrant County and the City of Fort Worth for the Inclusion of Water and Sanitary Sewer Improvements as Part of the Wichita Street Widening Project - 2021 Transportation Bond Program *** NUN AGENDI *** It is requested that the Commissioners Court approve an Interlocal Agreement (ILA) between Tarrant County and the City of Fort Worth for the inclusion of Water and Sanitary Sewer improvements as part of the Wichita Street Widening Project - 2021 Transportation Bond Program, located in Precinct 1. Following a presentation on November 1, 2022, the Commissioners Court gave consent to provide funding for the Wichita Street improvement project through the 2021 Transportation Bond Program - Countywide Initiatives and Partnerships. This project is located within the corporate limits of the Cities of Forest Hill, Everman and Fort Worth, and consists of widening an existing 2-lane asphalt roadway, from IH-20 to Roy C. Brooks Boulevard, to a 5-lane undivided curb and gutter roadway with continuous median turn -lane. The project will also include drainage improvements to the north fork of South Creek and South Creek crossings with an enclosed stormwater system to minimize current flooding conditions. To complete Wichita Street corridor improvements in a more timely and effective manner, the City of Fort Worth is requesting procurement assistance with a city-fuunded utility constriction project that overlaps the Wichita Street Widening Project. The city project includes water and sanitary sewer replacements on Wichita Street from E. Altamesa Boulevard to 400 feet south of Tiffany Meadows Lane, and it is requested that the County include this work in the bidding documents for the widening of Wichita Street to be constricted under one contract. This ILA will not have any fiscal impact to the County. The City will transfer full fiends to cover the City's portion of the bid at least sixty (60) days prior to the date set for receipt of the construction bids. Incorporating this work into the existing bidding documents is expected to save project time and inflation costs, and will ensure there is no delay to construction activities which are expected to begin in 2026. This ILA has been approved as to forni by the District Attorney's Office. FISCAL IMPACT OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Contribution will be deposited to Fund 45100-2026 Non -Debt Capital Fund/6880100000 Road & Bridge Non Departmental/485101 Donated/Contribution Capital. THE STATE OF TEXAS INTERLOCAL AGREEMENT COUNTY OF TARRANT This Interlocal Agreement is between Tarrant County, Texas ("COUNTY"), and the City of Fort Worth ("CFW"). WHEREAS, Tarrant County has a project to reconstruct Wichita Street from IH 20 to Roy C. Brooks Boulevard expected to commence in January 2026; and WHEREAS, CFW is requesting Tarrant County's assistance to: • Include Water and Sanitary Sewer Replacements on Wichita Street from E. Altamesa Boulevard to 400 feet south of Tiffany Meadows Lane in Tarrant County's bid package for the Wichita Street from IH 20 to Roy C. Brooks Boulevard project as shown on Attachment A. Collectively, hereinafter referred to as the "Project" WHEREAS, the Interlocal Cooperation Act contained in Chapter 791 of the Texas Government Code provides legal authority for the parties to enter into this Agreement; and WHEREAS, during the performance of the governmental functions and the payment for the performance of those governmental functions under this Agreement, the parties will make the performance and payment from current revenues legally available to that party; and WHEREAS, Tarrant County and the City Council of the City of Fort Worth make the following findings: a. This Agreement serves the common interests of both parties; b. This Agreement will benefit the public; and C. Tarrant County and CFW have authorized their representatives to sign this Agreement. NOW, THEREFORE, in consideration of the above -stated recitations and covenants below, CFW and Tarrant County agree as follows: OFFICIAL RECORD CITY SECRETARY TERMS AND CONDITIONS FT. WORTH, TX 1 1. TARRANT COUNTY RESPONSIBILITY Tarrant County authorizes the performance of only those Project items of work for which CFW has requested and has agreed to pay for as described in Attachment B — Payment Provision and Work Responsibilities, which is attached to and made a part of this contract, In addition to identifying those items of work to be paid for by payments to Tarrant County, Attachment B — Payment Provision and Work Responsibilities, also specifies those Project items of work that are the responsibility of CFW and will be carried out and completed by CFW, at no cost to Tarrant County. The CFW shall be responsible for costs that are shown on Attachment C, Estimated CFW Cost, which is also attached to and made a part of this agreement. 2. CITY OF FORT WORTH RESPONSIBILITY Tarrant County shall relocate the City of Fort Worth Water and Sanitary Sewer assets at City of Fort Worth expense and City of Fort Worth shall provide funding in the amount of $2,037,650.00. 3. NO WAIVER OF IMMUNITY This Agreement does not waive CFW's rights under the legal theories of governmental or sovereign immunity, 4. OPTIONAL SERVICES I`TO 5. EFFECTIVE DATE This agreement becomes effective when signed by the last party whose signing makes the agreement fully executed, and the County and CFW will consider it to be in full force and effect until the Project described in this agreement has been completed and accepted by all parties or unless terminated, as provided. 6. THIRD PARTY This contract shall not be interpreted to inure to the benefit of a third party not a party to this contract. This contract may not be interpreted to waive any statutory or common law defense, immunity, including governmental and sovereign immunity, or any limitation of liability, responsibility, or damage of any party to this contract, party's agent, or party's employee, otherwise provided by law. 7. JOINT VENTURE & AGENCY The relationship between the parties to this Agreement does not create a partnership or joint venture between the parties. This Agreement does not appoint any party as agent for the other party. B. TIME PERIOD FOR COMPLETION This project is expected to be completed within two years of commencing with construction. 9. TERMINATION OF AGREEMENT This Agreement will automatically terminate on December 31, 2026, or on the date the project is completed, whichever occurs last. Notwithstanding the foregoing, or any other language to the contrary, either party may terminate this Agreement without cause upon thirty (30) days' written notice to the other party prior to the intended date of termination. In the event of termination by either party, neither party shall have any further obligations to the other party under this Agreement. This Agreement may be renewed prior to its expiration upon the mutual written consent of the parties. 10. DISCLOSURE The Tarrant County acknowledges that it is a "governmental entity" and not a "business entity" as those terms are defined in Tex. Gov't Code § 2252.908, and therefore, no disclosure of interested parties pursuant to Tex. Gov't Code Section 2252.908 is required. 11. Inspection and Conduct of Work Unless otherwise specifically stated in Attachment B — Payment Provisions and Work Responsibilities, to this contract, the County will supervise and inspect all work performed hereunder and provide such engineering inspection and testing services as may be required to ensure that the Project is accomplished in accordance with the approved plans and specifications. All correspondence and instructions to the contractor performing the work will be the sole responsibility of the County. 12. Maintenance Upon completion of the Project, CFW will assume responsibility for the maintenance of the completed CFW facility unless otherwise specified in Attachment B to this agreement. TARRANT COUNTY, TEXAS Tim O'Hare County Judge Date: Roderick Miles, Jr. Commissioner, Preci 1 Date: APPROVED AS TO FORM* Criminal District Attorney's Office* * By law, the Criminal District Attorney's Office may only approve contracts for its clients. We reviewed this document as to form from our client's legal perspective. Other parties may not rely on this approval. Instead those parties should seek contract review from independent counsel. CITY OF FORT WORTH Jesica McEachern Assistant City Manager Date: 10/03/2025 ChristO 12 heY grder Christopher Narder(Se 30,202513:16:20 CDT) Chris Harder, P.P. Director, Water Department Date: 09/30/2025 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this agreement, including ensuring all performance and reporting requirements, Walter Norwood, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY Douglas Black (Oct 1, 2025 17:50:39 CDT) Douglas W. Black Sr. Assistant City Attorney OFFICIAL RECORD CITY SECRETARY Attest: FT. WORTH, TX 4 QFOgT��dd (����"�!L ddn aaXp5444 Jannette S. Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 7. Consideration of an Interlocal Agreement between Tarrant County and the City of Fort Worth for the Inclusion of Water and Sanitary Sewer Improvements as Part of the Wichita Street Widening Project - 2021 Transportation Bond Program PASSED AND APPROVED on October 14, 2025. COUNTY OF TARRANT STATE OF TEXAS .•n��.�ny:vr�:r � ! R Tim O'Hare County Judge October 23, 2025 11:40 AM APPROVED AS TO FORM: Signed by Mark Kratovil on October 21, 2025 2:51 PM District Attorney's Office* *By law, the District Attorney's Office may only approve contracts for its clients. We reviewed this document as to form from our client's legal perspective. Other parties may not rely on this approval. Instead, those parties should seek contract review from independent counsel. CERTIFICATION OF FUNDS IN THE AMOUNT OF $NfA Signed by Kimberly Buchanan on October 22, 2025 5:36 ?NI County Auditor ATTACHMENT A WICHITA STREET INTERLOCAL AGREEMENT TARRANT COUNTY/ CITY OF FORT WORTH p .t- " kc, PROPOSED WATER MAIN ':.1 + IMPROVEMENTS BY COFW Il�rGir i- AL; Y. I i .` U.'":-+`fie. +., y ,1 rid PROPOSED W4CHITA '� y — 1 � t�� � J� r,� t � ,,,� STREET IMPROVEMENTS BY TARRANT COUNTY #{.ey a ;. E:. i I � ,'+. ��3:;. ten.,. Ir" �.'.t + I ��,'� rK"'=r".••Y'.y r .� �� 1,., r— 1- �4 diI -i ... ' i" r Ir Lr , - 1 + r PROPOSED WATER MAIN IMPROVEMENTS BY COFW 16 r fj f r" �J L'EASTIRD,� �� �►{ ,". •�.� '�'T� it � � � ,d JIB ,r,{ ! y V w,�� !'�,',+t � .�1.�,�,/�•,,� ��Y A , ) PROPOSED SEWER MAIN " IMPROVEMENTS BY COFW + ! (3°f C"l I p. + PROPOSED WATER MAIN IMPROVEMENTS BY COFW 4' l 'i 31 jr ART W( RTH& - - -.. ! ilJ'. j !I+•..+1• r;T 'L 19 I,.I i c� ''."�Il ""ii + ATTACHMENT B PAYMENT PROVISION AND WORK RESPONSIBILITIES Description of the Work Items The parties agree that the existing Water System Facilities shall be relocated and adjustments shall be made in accordance with the project plans. The City of Fort Worth facilities shall be owned, operated, and maintained by CFW from and after completion and final acceptance by the County and CFW. The estimated total construction cost for the relocated and adjusted facilities is $2,037,650.00. The parties agree that it is their intent to complete the relocation improvements within this estimate of cost. 2. Actual Cost Agreement CFW will be responsible for paying all costs associated with the planning, specification, and estimate (PS&E) development, and construction of the proposed utility work. 3. Schedule of Payments A. At least sixty (60) days prior to the date set for receipt of the construction bids, CFW shall remit its remaining financial share for the County's estimated construction oversight and construction costs. CFW must advance to the County one hundred percent (100%) of its share of the estimated Project utility construction costs. The amount to be advanced for the utility improvements is estimated to be $2,037,650.00 . (See Attachment C — Estimated CFW Cost) B. In the event the County determines that additional funding is required by the CFW at any time during the Project, the County will notify CFW in writing. CFW is responsible for one hundred percent (1 00%) of the authorized project cost and any overruns. The CFW will make payment to the County within sixty (60) days from receipt of the County's written notification. C. Upon completion of the Project, the County will perform an audit of the Project costs. 4. Work Responsibilities A. CFW shall provide the following services under this contract: i. Responsible for engaging the services of a Texas Registered Professional Engineer to prepare drawings and technical specifications for Water System Facilities, ILA TA/CFW WICHITA STREET Page 1 of 3 Attachment B ii. Provide the plans and specifications to the County to include in the current planning specifications and estimate package being prepared by representatives of Tarrant County, Texas. iii. Secure all necessary permitting as may be required for the installation of the Water System Facilities. iv. CFW shall arrange and coordinate with the contractor, through the County, materials and equipment testing, review of shop drawings, rejection of all work not conforming to minimum requirements of the construction contract documents, maintenance of the proposed Water System Facilities during construction, and the relocation of Water System Facilities and connection of services to customers. v. Advise the County of work that CFW determines should be corrected or rejected. vi. Arrange, observe, and inspect all acceptance testing and notify the County of the results of these activities. vii. Provide inspection services for the construction of the water and sanitary sewer improvements, notify the County of defects and deficiencies in the work, and observe actions of the contractor to correct such defects and deficiencies. viii. Assume all responsibility for the maintenance of the completed CFW improvements upon completion of the construction contract. ix, Ensure all Texas Commission on Environmental Quality and all other regulatory rules, regulations and laws are strictly adhered to. X. Prepare and submit both a certificate of substantial completion and a list of observed items requiring completion or correction for the relocations and adjustments to the Project Engineer for concurrence. A. Coordinate all construction activities performed by CFW's staff for necessary relocations and adjustments through the Project Engineer. B. The County shall provide the following services under this contract: i. Combine the Water System Facilities relocation and adjustment plans and contract documents and specifications with the plans being prepared for the Project. ii. Review and approve the final construction plans prior to any construction -related activities. In order to ensure federal and/or state funding eligibility, projects must be authorized by the State prior to advertising for construction. iii. Advertise for construction bids, issue bid proposals, receive and tabulate the bids, and award and administer the contract for construction of the Project. The County's contractor shall meet the Fort Worth Water Department's pre -qualification requirements appropriate for the size and scope of work the contractor(s) shall perform. The pre -qualified contractor shall warrant the Water Systems Facilities constructions under this Agreement for a period of 2 years against defects in materials and workmanship. iv. Negotiate and administer all field changes and change orders required for the Project. All proposed plan modifications and change orders increasing construction costs for CFW's Project shall be submitted to CFW for review and approval together with an evaluation. In return, CFW agrees to review and either approve or disapprove all ILA TA/CFW WICHITA STREET Page 2 of 3 Attachment B change orders within fourteen (14) business days after receipt of such order unless CFW City Council approval is necessary in which case CFW shall bring the item to CFW City Council as soon as reasonably possible. v. Provide overall project management to supervise the day-to-day activities of the construction and monitor the activities of the contractor to promote the timely and efficient completion of the Project in accordance with the approved Plans and Specifications and construction schedule. vi. Conduct field observations and coordinate with CFW's inspectors and the contractor to cure defects and deficiencies in the construction prior to final acceptance. vii. Make timely payment to the contractor for work performed in connection with the Project. viii, Ensure access and permit CFW's inspectors and other authorized representatives to inspect the waterline construction at all times. ix. Conduct and coordinate final inspection of the Project in the presence of CFW's Engineer and Inspector, transmit final list of items to be completed or repaired and observe contractor correction of same. x. Maintain job file. A. Allow CFW to conduct final inspection and accept the completed water and sanitary sewer improvements before commencing with its paving improvements, ILA TA/CFW WICHITA STREET Page 3 of 3 Attachment B ATTACHMENT C ESTIMATED CFW COST The total estimated costs amount to $2,037,650.00, as detailed in Exhibits C1 and C2. Page 1 of 1 Attachment C OPINION OF PROBABLE CONSTRUCTION COST WICHITA STREET - UNIT I - WATER PROJECT-, Wafer Line ExlenslansCPWITarrantCourtly ILA EXHIBIT CI CLIENT: Oly of Fart Worl6 CITY JOB# 104021 ITEM DESCRIPTION SPEC # QTY. UNIT UNIT COST TOTAL 1 3311.0161 6" PVC WoIor Plpa DR-14 _ 33 11 12 71 LF $125.00 $8,873.00 2 331 1.0261 B" PVC Water Plea DR-14 33 11 12 40 LF $145,00 $5,800.00 3 331 1.0461 12- PVC Woser Poe DR-14 33 11 12 1935 LF $225.00 $435,375.00 4 13311.0654 24' DIP Water (Roslroined lainis) 33 It 10 170 IF $40040 $68000,00 5 330S,1004 12' Water Coerlor Pipe 3305 24 198 LF $250,00 $49 500.00 6 3305.1104 24" Costno By Other Thor Open Cul 32 O5 22 198 LF $ Y 750.00 $346 500.00 7 331 1.0001 Duaila Iran Water Fillings w/ Restraint 33 11 11 9 TON $7,000.00 $63 000.00 8 3312.2201 2' Water Service, Molar Reconnocilan 33 12 10 2' EA $565,00 $1 130.00 9 3312.2202 1" Bored Wafer Servic4 33 12 10 2 EA $2 800,00 $5 600.00 10 3312.3002 6" Gala Valve 33 12 20 4 EA $1460.00 _ $7,900.00 11 3312.3002 8' Gala Valve 33 1220 31 EA $2 800.00 $8,400.00 12 13312.3005 12' Gota Volvo 33 1220 8 EA $5,000.00 $40 000.00 13 3312.3008 24' Gala Valve w Vovll 33 1220 _ _ _ _ 1 EA $80 000.00 $80 000.00 14 3312.0001 fire H drat 331240 4 EA $7000.00 $28000.00 is 3312.01 17 Connadion to Eslsling 4"-12" Wafer Malin 33 1223 5 EA $6 250,00 $31 25 = 16 3312,0100 Connedlon to Exhlln 24' Wolor Moln 33 1225 2 EA 516,000.00 17 0241.1001 Wafer Llne Grouting 0241 14 _ 18 CY S525.00 18 0241,1116 12' Pressure Plug 0241 14 3 EA $2,000.00 Z$48,7,50,00 19 0241.1209 24' Watar Abondonmem Plug 01 41 14 2 EA $5 000.00 20 0241.1014Romova10"WoterUna 024114 1219 LF $40.00 21 0241.1302 Remova & Salvage 2" Wafer Molar 02 41 14 2 EA $150.00 $300,00 22 02-11.1514 Remove & Salvage 6" Waior Valve 02 41 14 3 EA $200.00 $600,00 23 0241.1303 Remove & Solve a 6" Wolar Volva 02 41 14 3 EA MOM $690.00 24 0241.1305 Ramoya 12' Water Volvo 02 41 14 1 EA $300.00 $300.06 25 0241.1354 Ramovo & Selvage 14" Wnt4e VoNo 02 41 14 1 EA $750.00 $760.00 26 0241.1510 Solvago Nee Hydrom 02 41 14 3 EA $500.00 $ 1500.00 27 3205.0003 8" Wolorllno Lowaring 3305 12 2 EA $13000.44 $26000.00 28 13341.0105 24" RCP Clost 111 _ 33 41 10 20 LF $270.00 $5 400,00 29 3304,0002 Colhodlc Proladlen Desf n for DIP, Steel, Concrala 3304 12 _ 1 IS $3 500.00 $3,S00.00 30 3304,0002CathadicProtection lndallalion(for DIP, $kee1 Cona4lo) _ 330412 1 LS $2250040 $22,500.00 31 3292.0400 Seeding, F3 dromulch 3192 13 50 Sy $6.00 $300.00 32 9999.9999 Sowcul Exhl Ccnc Pavamaml 0 40 LF $100.00 $4 00.00 33 _ 0241.1000 Remove Como ml 0241 15 12 Sy $30,00 $360.00 34 3201.0101 Asphalt Pvml Repair Beyond Oaflnod Width, Rasldenlial 3201 17 119 Sy S135,00 $16 063.00 35 3201.0400 Temporary AsphaB Paving Repair (2' HMAC on 6" Flexible Bosa Couno) 3201 18 543 LF S40.00 $21 720.04 36 3201.0616 Cone Pvml Repair, Arierloi nduoilol 3201 29 1311 _ SY $275,00 $36,025.00 37 3217.2001 Raised Marker TY W 32 17 23 III EA $12,50 $137.50 38 3217.2104 R€FL Raised Marker TY II-C-R 32 1723 41 FA $ 12,50 $50.00 39 3125.0101 SWPPP> I aaa 31 2500 1 LS $3,200.00 $3,200.00 40 3105.0109 TrenchSafaly 3305 fo 2216 LF S2.00 $4,432.00 41 3305.01 LO U 11hy Mockers 33 03 26 1 LS $800,00 $800.00 42 3304.0101 remparary Water Services 3304 30 L LS $10,0M00l $10 00040 43 3471.0001 TrafflcConirol 347113 3 Mo $9,600.001 $28,800.00 44 0171.0101 Construdlon Sfaklr 0171 23 1 LS $8,000.001 $8,000,00 45 0171.0102 M-801 Survey _ 0171 23 1 LS $4,800.00 $4,8C0.00 46 9999A001 MhceTloneout Uillity Adlusimeni Orrlgationl 00 00 00 11 LS $4,800.00 $41800.00 46 9999.0002ConstrudianAlioworca 000000 0 LS $32,000.00 $0.00 47 9999.0003 6" Pressure Relief Valve 00 00 00 3 LS $10,000.00 $10,000.00 SUBTOTAL $1,504,4691.60 CONTINGENCY %,+ _ 5 $75,223.48 TOTAL CONSTRUCTION COST (ACUAD49) $1,579,690-00 Pogc 1 of 2 OPINION OF PROBABLE CONSTRUCTION COST WICNITA STREET - UNIT 2 - SANITARY SEWER PROJECT. Wafer UneExfewiomCMITarrantCounty ILA EXHIBITC2 CLIENT., City al Fort Worth , CITY JOB 9 104021 1Tfh1 DESCRIPTION SPEC A 4TY. UNIT UNIT COST TOTAL 1 3331..4115 8' Sewcr Pipe PVC SDR-26 33 11 10, 3331 12,33 31 20 35 LF $180.00 $6,300.00 2 3331.4119 8' DIP Sewer Pipe 3311 10 119 LF $235.00 $27,965.00 3 3331.4120 8' DIP Sewer Pipe, CSS BoMiil_ _ 3311 10 29 LF $270.00 $7 830.00 4 3305.3002 8' Sewer Carrier Npo 33 05 24 150 LF $300.00 $45,000.00 5 3.305.0112 Conaale Collar for A4onlsale 3305 17 4 FA S5,000.00 $20,000.00 6 3305.1003 20"Caging ByOpanCut 330522 70 LF $9100.00 S77,000.00 7 3305,1103 20' Casing By Olhar Shan Open Cut 3305 22 80 LF $1 500.00 $120,000.00 8 3339.1001 4' Manhola 33 39 10, 33 39 20 3 EA $8,000.00 S24,000.00 9 33-39.1002 4' Drop hionli la 33 39 10, 33 3120 1 EA $14,500.00 $1 4 500.00 10 3139.1003 4' Bxrra Dapih Maft,el0 33 39 10,33 39 20 17 VF $280,00 $4,760.00 11 0241AM Sanitary Una GroWng 0241 14 _ 21 CY $525.00 $1 050.00 12 0241..2103 8' Sewer Abandonment Plug 0241 14 2 EA $1 650.00 $3 300.00 13 0241.2201 Remove 4' Sewer Manhole 0241 14 3 FA. _ $2 000.00 $6 000.00 14 3301.000i Pre -CCTV Inspection _ 3301 31 332 LF $7.00 $2 324.00 15 3301.0002 Post -CCTV fns ectfon 3301 31 332 LF $8.50 $2 822,00 16 3301,0003 Flnal-CCTV Inspection 330131 332 LF $8.50 $2822.00 17 3301.0004 Final Mnn4Ma.CCTV Ins aatan 3301 31 4 EA $725.00 $2 900,00 18 3301.0101 Monhola Vacuum_ Tas_tfi 3301 30 4 EA $273,00 $ l 100,00 19 3303,0001 gyposiPum fng 330310 1 LS 530,000.00 930000,00 20 3201.0400 Temporary Asphalt Paving Repair (2' HMAC an N' Flexible Bose Coursa) 1201 18 84 LF $40.00 $3 360.00 21 3217,2001 RalsadMo,kcrTVW 321723 II EA. $12.50 $137.50 22 3217.2104 RM Raised Marker TY 11-C-R 32 1723 4 EA $12.50 � $50.00 23 _ 3125.0101 SWPPP> 1 oao 31 2500 1 LS $800100 $800.00 24 3305.0109 Trends Safely 3105 10 252 LF $2.00 $504.00 25 3305..0110 ulitir Makers 3305 26 1 LS $200.00 $200.00 26 3471.0001 TrofftcConlral _ _ 3471 13 3 Me _ $2 400.00 $7 200.00 27 0171.0101 CcrisifuctionSlakIng 0171 23 1 LS $2 000.00 $2 000.00 28 0171.0102 Ai -Bull Survey 0171 23 11 LS $ 1200.00 $ 1200.00 29 9999.0001 Miscalloodous Utility Adusimenl krl orlon 000000 1 LS $1,200.00 $1,200.00 SUBTOTALI $416,324.30 CONTINGENCY $41,632,45 TOTAL CONSTRUCTION COST (RODNptl)j.. $457,960.00 P.0e 2 al 2 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, August 26, 2025 REFERENCE NO.: **M&C 25-0804 LOG NAME: 60WICHITASTREET ILA TARRANT COUNTY SUBJECT: (CD 8) Authorize Execution of an Interlocal Agreement with Tarrant County in the Amount of $2,037,650.00 for Voluntary Utility Relocation Contributions for Tarrant County's Wichita Street Reconstruction Project, and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2025- 2029 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an Interlocal agreement in the amount of $2,037,650.00 for Voluntary Utility Relocation Contributions for Tarrant County's Wichita Street reconstruction project (Water Line Extension Wichita Street Deduct Meter, Part 1); and 2. Adopt the attached Appropriation Ordinance adjusting estimated receipts and appropriations in the Water and Sewer Revenue Bond Series 2024 Fund in the amount of $2,224,310.00 by increasing receipts and appropriations in Water Line Extension Wichita Street Deduct Meter project (City Project No. 104021) and decreasing receipts and appropriations in the Water & Sewer Commercial Paper project (City Project No. UCMLPR) by the same amount, to effect a portion of Water's contribution to the Fiscal Years 2025-2029 Capital Improvement Program. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize execution of an Interlocal Agreement (ILA) with Tarrant County. The Interlocal Agreement provides City funding to the county for the construction of water and sanitary sewer mains in conjunction with Tarrant County's reconstruction project on Wichita Street from Interstate Highway 20 to Roy C. Brooks Boulevard. The estimated construction cost for the water and sanitary sewer main installation is $2,037,650.00. In addition to the City's construction cost, $186,660.00 (Water: $143,383.00; Sewer: $43,277.00) is required for project management, material testing and inspection. This project will have no impact to the Water Department's operating budget when complete. This M&C will appropriate the required funding for the project. On January 10, 2023, Mayor and Council Communication (M&C) 23-0055, the City Council authorized an engineering agreement in the amount of $573,536.00 with Teague Nall & Perkins, Inc. for the Water Line Extension Wichita Street Deduct Meter project which included water main extension on Wichita Street from Joel East Road to Bell Street. It is the practice of the Water Department to appropriate its Capital Improvement Program plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2025-2029 Capital Improvement Program. Funding is budgeted in the Commercial Paper project within the W&S Rev Bonds Series 2024 Fund for the purpose of funding the WL EXT. WICHITA ST. DEDUCT METER project. Appropriations for the water, sanitary sewer, and paving improvements for the WL EXT. WICHITA ST. DEDUCT METER project by Fund will consist of the following: Existing Additional Fund Appropriations I Appropriations project Total* W&S Capital Projects - Fund $822,680.00 $0.00 $822,680.00 56002 W&S Rev Bonds Series $0.00 $2,224,310.00 $2,224,310.00 2024 Fund 56022 Project Total $822,680.001 310.00 $3,046,990.00 *Numbers rounded for presentation purposes. This project is located in COUNCIL DISTRICT 8. FISCAL INFORMATION 1 CERTIFICATION: The Director of Finance certifies that funds are available in the Commercial Paper project within the W&S Rev Bonds Series 2024 Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Rev Bonds Series 2024 Fund for the WL EXT. WICHITA ST DEDUCT METER project to support the above recommendations and execution of the interlocal agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of validating the availability of funds. FUND IDENTIFIERS (FIDs).: TO Fund Department ccoun Project Program ctivity Budget Reference # moun ID ID Year (Chartfield 2) FROM und Department ccoun Project Program ctivity Budget Reference # I �mounl r ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by_ Jesica McEachern (5804) Originating Department Head: Chris Harder (5020) Additional Information Contact: Walter Norwood (5026) ATTACHMENTS 1. 60WICHITASTREET ILA TARRANT COUNTY FID TABLE (WCF 07.30.25).xlsx (CFW Internal) 2. 60WICHITASTREET ILA TARRANT COUNTY funds ayailabilitypdf (CFW Internal) 3. Agreement.pdf (CFW Internal) 4. ILA Wichita St. Map.pdf (Public) 5. ORD.APP 60WICHITASTREET ILA TARRANT COUNTY 56022 A025(r2).doCx (Public) 6. PBS CPN 104021.pdf (CFW Internal) 60WICIIITASTREET IL,\ TARRANY COUNTY RID TO& r_pt # Account Project ID'Activity 3 56022 0600430 4905158 104021 Budget Year 2025 r ..-, CF 2 ProgramPurpose $1,723,073.00 3 56022 0700430 4905158 104021 2025 $501,237.00' 3 56022 0600430 4905158 UCMLPR 2025 ($2,224,310,00) 3 56022 0600430 104021 2025 $1,723,073.00 3 56022 0700430 104021 2025 $501,237.00 3 56022 0600430 UCMLPR 2025 ($2,224,310.00) iec 4 Fund 'Dept# !Account Proj ect I D Activi ty Budget Year r CF2 'Program Amount ($1,723,073.00} Purpose Xfer 3 56022 0600430 4905158 104021 001780 9999 3 56022 0700430 4905158 104021 001780 9999 ($501,237.00) 3 56022 0600430 4905158 UCMLPR UNSPEC 9999 $2,224,310.00 f 2 56022 r..pt # ;Account 0600430 5110101 r or :Projectr Activity 104021 001780 9999 or Program.Purpose •-! $23,695.00 Water - Staff 2 56022 0600430 5550102 104021 001790 9999 $2,000.00 Water - Public Outreach 1 56022 0600430 5740010 104021 001780 9999 $1,579,690.00 To pay Tarrant County 2 56022 0600430 5330500 104021 001784 9999 $31,594.00 Water - Soil Lab Consultant 2 56022 0600430 53103SO 104021 001784 9999 $7,109.00 Water - Soil Lab TPW Staff 2 56022 0600430 5310350 104021 1 001785 9999 $78,985.00 Water -Water Inspection 2 56022 0700430 5110101 104021 001780 9999 $9,159.00 Water - Staff 1 56022 0700430 S740010 104021 001780 9999 $457,960.00 To pay Tarrant County 2 56022 0700430 5330500 104021 001784 9999 $9,159.00 Water - Soil Lab Consultant 2 1 56022 1 0700430 1 5310350 1 104021 001784 9999 $2,061.00 Water - Soil Lab TPWStaff 2 56022 0700430 5310350 1 104021 1 001785 9999 $22,898.00 Water - Water inspection 2 56022 2060000 104021 1 RETAIN Combo Code for Retainage FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Tarrant County Subject of the Agreement: Interlocal Agreement between Tarrant County and the City of Fort Worth for the Inclusion of Water and Sanitary Sewer Improvements as Part of the Wichita Street Widening Project - 2021 Transportation Bond Program M&C Approved by the Council? * Yes 0 No ❑ If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No 0 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see backpage for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Effective once last party signs Expiration Date: If different from the approval date. 2 Years from construction date If applicable. Is a 1295 Form required? * Yes ❑ No 21 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104021 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 0 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.