Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
024948 - Construction-Related - Contract - Transystems Corporation
CITY SECRETARY AMENDMENT NO. 1 CONTRACT NO. 9g STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (With M&C) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Transystems Corporation (Engineer) made and entered into City Secretary Contract No. 24820 (the Contract) which was authorized by the City Council by M&C C-17327 on the 25th day of May, 1999; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for Construction Management and Inspection Services for Sanitary Sewer Main 253A Rehabilitation Near the Village Creek Wastewater Treatment Plant. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 12, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $59,595.00. ►'1 Articleof the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $234,225.00. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. UDCIAL G'[ C©&D COY EXECUTED on this the / (a day o , 19�, Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: A.Douglas Rademaker, P.E. Director, Department of Engineering ENGINEER By: Name: Raul Pena, III, P.E. Principal Transystems Corporation APPROVED AS TO FORM AND LEGALITY: Gary Stein erger Assistant City Attorney APPROVED Mike Groomer Assistant City Manager AT ST: loria Pears n City Secretary C-/7q,q-, Contract Authorization Date in ! +! r E __1 TIT 7- t•i y' Oj r uri rr 0Tri., Texas mayor ana ounc1i Communication I\ATr5/25/99 '"+i��nrn 1 f\1' h1ARlI I I P.r+r vt1ctYtOCR LL i'U- IV G I of 2 SUBJECT j AMENDMENT NO. 1 TO ENGINEERING AGREEMENT WITH TRANSYSTEMS CORPORATION FOR CONSTRUCTION MANAGEMENT AND INSPECTION OF SANITARY SEWER MAIN 253A REHABILITATION NEAR THE VILLAGE CREEK I WASTEWATER TREATMENT PLANT RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 24820 for construction management and inspection services with TranSystems Corporation for additional work related to sanitary sewer Main M253A rehabilitation near the Village Creek Wastewater Treatment Plant (VCWWTP) for a fee of $59,595.00, increasing the total fee to $234,225.00. DISCUSSION: On March 16, 1999 (M&C C-17327), the City Council authorized the execution of an engineering agreement with TranSystems Corporation for the design of the rehabilitation of sanitary sewer Main 253A near the VCWWTP. On May 18, 1999 (M&C C-1 7429), the City Council awarded an contract to S.J. Lewis Construction, Inc. for sanitary sewer Main 253A near the Village Creek Wastewater Treatment Plant. This project has an aggressive schedule to allow the sewer work to be completed prior to the development of a new golf course on the City's east side. Due to heavy construction activity in the City and the limited availability of City inspectors who could respond at this time, the City requested that TranSystems Corporation prepare a proposal to provide construction management services for the project. TranSystems Corporation proposes to provide construction inspection and management services for a fee not to exceed $59,595.00. Staff considers this fee to be fair and reasonable for the work involved. The construction management services will include inspection and construction survey of approximately 1,664 linear feet of 54 -inch sewer; 983 linear feet of 42 -inch sewer; 1,330 linear feet of 30 -inch sewer; 255 linear feet of 24 -inch sewer; three manholes and four junction boxes. The Department of Engineering will require an additional $3,000.00 for the coordination of this project. TranSystems Corporation is in compliance with the City's M/WBE Ordinance by committing to an additional 13% M/WBE participation on this amendment. The City's goal on this amendment is 10%. This project is located in COUNCIL DISTRICTS 4 and 5. r r*. _ _-A rrr_ _.1 I_ J_ _ -- k-.iiy uj run rr uri", l mayor and Council L;Conitnunication DATE REFERENCE AMBER PAGE LJ/'11C f�Cf Cf�CIVI�C NUMBER LW �`:�"'I J/LJ1.7r -. r.�+w �f r.. A I n r i44D I JVIVILJJl1 I L UI L I SUBJECT AMENDMENT NO. 'i TO ENGINEERING AGREEMENT WITH TRANSYSTEMS CORPORATION FOR CONSTRUCTION MANAGEMENT AND INSPECTION OF SANITARY SEWER - MAIN 253A REHABILITATION NEAR THE VILLAGE CREEK 1 I WASTEWATER TREATMENT PLANT FISCAL iNFORMATIONICERTIF1CATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper -Sewer Fund. MG:j I Submitted for City Manager's I ...u__. I viaia.c uy: I I Mike Groomer 6140 Originating Department Head: FUND I ACCOUNT (w) CENTER I AMOUNT I CITY SECRETARY A. Douglas Raddemuaker 6157 1 (from) - - i APPROVED 5/25199 TT7- --1 l- /T -- - -- [_.-luy of -ruri fYUriri, 1 eVU Mayor and Council Communication 1 rwTr 1 rrrrnr.nr u.nr� 1 i O-. .w..r i VA! I._ 1\LI LI\LItVL I YVIYILJLI\ L.%..'\.)L.%..'\.)IYA7Y7L t I AVL 7445 I JUIVILJJ/1 I J UI L I SUBJECT AMENDMENT NO. I TO ENGINEERING AGREEMENT WITH TRANSYSTEMS CORPORATION FOR CONSTRUCTION MANAGEMENT AND INSPECTION OF SANITARY SEWER MAIN 253A REHABILITATION NEAR THE VILLAGE CREEK WASTEWATER TREATMENT PLANT I nnwn I I n7nwn-nAwnn7n I w./ -n l:nc nn I rs tV I JJ IGVV I VI VYVV ItVGIV I I I Additional Information Contact: A. Douglas Radetmaker 6157 Tov'SYSTEMS A\ C O N S U L T A N T S May 12, 1999 Mr. Gopal Sahu, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Sanitary Sewer Main M -253-A Rehabilitation Project No. PS46-070460140270 D.O.E. No. 2593 Dear Mr. Sahu: TranSystems Corporation is pleased to have the opportunity to provide construction management services to the City of Fort Worth on the referenced project. The construction management team will consist primarily of myself, serving as construction/project manager, and Mr. Yearby Shahan of our firm, serving as the on -site representative (resumes for each are attached). In addition, as you are aware, A.N.A. Consultants, L.L.C. will perform construction staking to fulfill the requirements for MBE participation. We trust that the structure of the team meets with the City's approval. If you have any comments or questions, please do not hesitate to call us. Sincerely, Tran ystems Corporation Frank G. Payne, P.E. Project Manager NationsBank Bldg., 500 West Seventh Street, Suite 600 • Fort Worth, TX 76102 • Phone: (817) 339-8950 Fax: (817) 336-2247 T o .SYsTEnvs , COY?PO/T I\ C O N S U L T A N T S June 7, 1999 (Revised) Mr. Gopal Sahu, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Sanitary Sewer Main M -253-A Rehabilitation Project No. PS46-070460140270 D.O.E. No. 2593 Dear Mr. Sahu: This letter is intended to serve as our proposal to amend our original contract to include the performance of construction representation services for the referenced project. Attached you will fmd a breakdown of our fee and expenses to provide these services, as well as construction staking. Our total proposed fee is a lump sum amount of $59,595.00. Please note that it is our intent to utilize A.N.A. Consultants, L.L.C. to provide MBE participation. . The amounts shown in our breakdown are predicated on the Contractor completing construction in the allotted 60 calendar days, working six days per week. It is our understanding that the City desires full-time representation for the project. We trust that this proposal meets with the City's approval. If you have any comments or questions, please do not hesitate to call us. Sincerely, TranSystems Corporation Frank G. Payne, P.E. Project Manager \\FTWORTH\PROJECTS\199\00149\proposa - u NationsBank Bldg., 5OO West Seventh Street, Suite 6OO • Fort Worth. TX 761O2 • Phone: (817) 339-895O Fax: (817) 336-2247 Sanitary Sewer Main M -253-A Rehabilitation Project No. PS46-070460140270 D.O.E. No. 2593 TranSystems Project No. 19900149 6/7/99 Construction Inspection Services Fee Proposal Team Member HrslMonth No. Months Hourly/Salary Total (1) Construction Manager 22 2.5 $90.00 $4,950.00 (2) Inspector (6 days/wk) 210 2.5 $80.00 $42,000.00 Survey Manager 2 2.5 $75.00 $375.00 Survey Technician 2 2.5 $65.00 $325.00 Secretary 22 2.5 $35.00 $1.925.O0 Subtotal Labor $49,575.00 Expenses Telephone Services Transportation Mileage 2000 miles Printing and Postage Office Supplies Office Furnishings Subconsultant Management Subtotal Expenses (3) Total Labor and Expenses Construction Inspection Services (4) Total Labor and Expenses Construction Staking Services (MBE) MBE Cost as Percent of Inspection Fee $300.00 $0.31 $620.00 $100.00 $100.00 $100.00 $800.00 $2.020.00 $51,595.00 $8,000.00 Total $59,595.00 16.0% (1) Bi-weekly meetings at site and office administration (2) 6-8 hour days each week (Contractor projected to be on site 68 hours per week) (3) Fee is based on contractor meeting 60 calendar day schedule (4) This fee does not include staking of easements or property lines P:\199\00149\proposal\[Fee.xls]Sheet1 City of Fort Worth, Texas "agor And Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 5/25/99 **C-1 7445 30M253A 1 of 2 SUBJECT AMENDMENT NO. 1 TO ENGINEERING AGREEMENT WITH TRANSYSTEMS CORPORATION FOR CONSTRUCTION MANAGEMENT AND INSPECTION OF SANITARY SEWER MAIN 253A REHABILITATION NEAR THE VILLAGE CREEK WASTEWATER TREATMENT PLANT RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 24820 for construction management and inspection services with TranSystems Corporation for additional work related to sanitary sewer Main M253A rehabilitation near the Village Creek Wastewater Treatment Plant (VCWWTP) for a fee of $59,595.00, increasing the total fee to $234,225.00. DISCUSSION: On March 16, 1999 (M&C C-17327), the City Council authorized the execution of an engineering agreement with TranSystems Corporation for the design of the rehabilitation of sanitary sewer Main 253A near the VCWWTP. On May 18, 1999 (M&C C-17429), the City Council awarded an contract to S.J. Lewis Construction, Inc. for sanitary sewer Main 253A near the Village Creek Wastewater Treatment Plant. This project has an aggressive schedule to allow the sewer work to be completed prior to the development of a new golf course on the City's east side. Due to heavy construction activity in the City and the limited availability of City inspectors who could respond at this time, the City requested that TranSystems Corporation prepare a proposal to provide construction management services for the project. TranSystems Corporation proposes to provide construction inspection and management services for a fee not to exceed $59,595.00. Staff considers this fee to be fair and reasonable for the work involved. The construction management services will include inspection and construction survey of approximately 1,664 linear feet of 54 -inch sewer; 983 linear feet of 42 -inch sewer; 1,330 linear feet of 30 -inch sewer; 255 linear feet of 24 -inch sewer; three manholes and four junction boxes. The Department of Engineering will require an additional $3,000.00 for the coordination of this project. TranSystems Corporation is in compliance with the City's M/WBE Ordinance by committing to an additional 13% M/WBE participation on this amendment. The City's goal on this amendment is 10%. This project is located in COUNCIL DISTRICTS 4 and 5. City of Fort Worth, Texas 'Agar and Council Communication DATE REFERENCE NUMBER LOG NAMEPAGE 5/25/99 **C=17445 30M253A 2 of 2 SUBJECT AMENDMENT NO. 1 TO ENGINEERING AGREEMENT WITH TRANSYSTEMS CORPORATION FOR CONSTRUCTION MANAGEMENT AND INSPECTION OF SANITARY SEWER MAIN 253A REHABILITATION NEAR THE VILLAGE CREEK WASTEWATER TREATMENT PLANT FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper -Sewer Fund. MG:j Submitted for City Manager's Office by: Mike Groomer ' 6140 Originating Department Head: A. Douglas Rademaker 6157 Additional Information Contact: A. Douglas Rademaker 6157 FUND ACCOUNT CENTER AMOUNT (to) (from) PS46 I 531200 I 070460140270 I $59,595.00 CITY SECRETARY APPROVED CITY COUNCIL MAY 25 1999 City Secretary of the City of Fort Worth, Tezae