HomeMy WebLinkAbout025001 - Construction-Related - Contract - RJN Group, INc.AMENDMENT NO. 1
STATE OF TEXAS § CITY SECRETARY CONTRACT NO.
(No M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and RJN Group, Inc. (Engineer) made
and entered into City Secretary Contract No. 24461 (the Contract) which was authorized
by the City Council by M&C C-17156 on the 24th day of November, 1998; and
WHEREAS, the Contract involves engineering services for the following project:
Engineering Contract for the Pavement Reconstruction and Water and Sanitary
Sewer Replacements on Rockwood Drive (Churchill to East Dead End).
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Article I of the Contract is amended to include the additional engineering services
specified in a proposal letter dated April 29, 1999, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services to be performed by
Engineer total $12,614.00.
2.
Article II of the Contract is amended to provide for an increase in the maximum
fee to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of $73,249.00.
3.
All other provisions of the contract, which are not expressly amended herein, shall
remain in full force and effect.
EXECUTED on this the day of , 19 / 11 in
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED:
APPROVED:
O(�f�M L CO
U� l nn%%E(^C�E( �1j Gay
A.Douglas, Rademaker, P.E.
Director, Department of
Engineering
RJN GROUP, INC.
ENGINEER
By: Ii
Name: Hugh M. Kelso
Regional Vice President
RJN Group, Inc.
Mike Groomer
Assistant City Manager
ATTEST:
Glo 'a Pearson, City Secretary
`
APPROVED AS TO FOP$I AND LEGALITY: --- U I �'aD
Contract Authorization
Date
Assistant City Attorney
r6-01-1999 3:10PM FROM RJN FORT WORTH TEXAS 817 595 3375
P. 2
RJN CROUP, INC.
Engineering and Information Technology $ervk as
- . An Employee-OWned Firm
City of Fort Worth April 29, 1999
Department of Engineering
1000 Throckmorton Street
Fort Worth, Texas 76102
ATTN: Gopal Sahu
..;Ipat
~'t"! RE: Rockwood Drive Reconstruction
Churchill Road to East Dead End
Water Project PW77-060770154300
Sewer Project PS46-070460134140
TP & W Project C115-020115040554
D.O.E. No. 2115
K No, 1375
Amendment No. 1
Drainage Design
Dear Mr. Sahu:
As agreed In the original contract negotiations, RJN is pleased to submit a fee proposal for design
of a Storm Drain System on the above referenced project.
The following is a breakdown of the Engineering Cost to provide design services for drainage as
detailed in the Conceptual Design Report.
t a: aj Survey (660' @ $2.92ift) $1,900.00
Easement Documents (2 Q $300/each)
600.00
$ 2,500.00
• 10% Subconsultant Fee $ 250.00
$ 2,750.00
Estimated Construction Cost = J110,517.00 (see attached)
.: 110,517X 10.5% X 86.0% 9$ .864.00
TOTAL AMENDMENT NO.1 $12,614.00
This is a 20.8 % increase to the original Contract Amount of $60,635.00. The revised Contract
Amount will be $73,249.00. Please process ari amendment In the amount of $12,614.00, so that
we may continue to expedite the design of this project. If you require any further information to
process this request, please do not hesitate to contact me.
Very Truly Yours,
RJN Group, Inc.
d� 11'1 il�°l
David L. Cooper, P.E.
Project Manager
t 9
Attachments
cc: Dena Johnson D.O.E.
7524 Mosier View Court, Suite 110 • Ft. Worth, Taxaa 76118
Phone (817) 595-2199 • FAX (817) 595-3375
sett
ESTIMATE - DRAlli� 1144 '
ROCKWOOD DRIVE I -H
STREET RECONSTRUCTION
PROJECT LIMITS: Churchill Road to East Dead End
WATER PROJECTI PW77-060770134300
SEWER PROJECT0 PS46-07046013414
T&PW PROJECT # C1 1 5-0201 15040554
JID.O.E. NO.2115
PAY APPROX.
ITEM QUANTITY UNITS
DRAINAGE 1 6.0 A.
2 1.0 EA.
3 - 3.0 EA.
4 177.0 L.F,
5 937.0 L.F.
6 2.0 EA.
665.0 C.Y.
DESCRIPTION OF ITEM
STANDARD 10' STORM DRAIN INLET
STANDARD 4' SQUARE MANHOLE
STORM DRAIN MANHOLE, TYPE 1
RCP SEWER PIPE, 21" DIAMETER, CLASS III
RCP SEWER PIPE, 24 DIAMETER, CLASS III
CONCRETE SLOPEWALL,1811
TRENCH EXCAVATION AND BACKFILL FOR STORM DRAINS
I
UNIT
PRICE
2,250.00
2,500.00
3,250.00
50.00
60.00
1,500.00
10.00
TOTAL
AMOUNT
13,500.00
2,500.00
9.750.00
8,850.00
56,220.00
3,400.O0
6,650.00
SUBTOTAL -DRAINAGE
$100,470.00
10•!. CONTINGENCY
TOTAL DRAINAGE CONSTRUCTION COST
$10,047.00
$110.517.00
NOTE:
CONSTRUCTION OF PROPOSED STORM DRAINAGE SYSTEM WILL REQUIREACQUISITION
TWO (2) PERMANENT UTILITY EASEMENTS, TWO (2) TEMPORARY CONSTRUCTION
OF
EASEMENTS,
AND A PERMIT FROM TARRANT REGIONAL WATER DISTRICT.
SUBMITTED BY:
RJN GROUP, I C.
BY
_____
_____
-
+DAVID
L. COOPER P.E.
m
co
w
v
Page 1 w
-1999 3: 11 PM FROM RJN FORT WORTH TEXAS 817 595 3375 P. 4
...r... 06:49A Gorrandana and Associates $17-496-1766 P.02
-7o Pa .eC.
CORRONDONA & ASSOCIATES, INC.
REGISTERED PROFESSIONAL LAND SURVEYORS
4737 ettwtwOOO STNR ROM SUCTE 224 , FORT NOR7„. T X $ 76112 - Xro 417496»1474 FAK 017/496-17 $
April 27. 1999
RJN Group. Inc.
Attn: Mr. Jeffrey M. Hawkins, PE
7524 Mosier Valley Court, Suite 110
Fort Worth, Texas 76118
Re: RECONSTRUCTION OF ROCKWOOD DR. PROM CHURCHHILL DR. TO EAST
DEAD END, CITY IF FORT WORTH,1998 CAPITAL IMPROVEMENT PROJECT'
Dear Mr. Hawkins.
Gorrondona & Associates. Inc. is pleased to submit this proposal for professional land surveying
services for the above referenced project. The total linear feet of route surveying required is
approximately 650 linear feet. The following itemized surveying services are to be provided by
Gorrondona & Assoc. Inc.:
1.) Tie all improvements X. Y & Z (water valves, fire hydrants, storm drains, manholes.
streets, driveways, curbs, trees, signs, etc.) along the proposed route. Provide flowline
elevations of all storm drainage inlets and manholes along the route. The area of topo is a 50
foot wide strip being 25 feet left and right of the proposed route.
2.) Provide benchmark data on each section based on the City of Fort Worth vertical datum. Set
temporary benchmarks located so they will not be destroyed during the construction project.
4_) Provide all field work in a digital form field sketches, and vertical field notes. All existing
features shall be shown on the digital Autocad file.
5.) Prepare 2 permanent easements with legal descriptions and exhibits. The cost per easements
is S300.00/easement.
Gorrondona & Associates, Inc. can complete the above itemized surveying tasks for an hourly
not -to -exceed fee of 52.5.00. If you have any questions or need additional information please
contact me at (817)496-1424
Sincerely.
GORRONDO. A & ASSOCIATES. INC.
B JPorrondona. RPLS
President