025015 - Construction-Related - Contract - Dannenbaum Engineering Corporation, Inc.
AMENDMENT NO. 1 STATE OF TEXAS 6 CITY SECRTARY CONTRACT NO.50/5 (No M&C Needed) COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation, Inc., (Engineer) made and entered into City Secretary Contract No. 24419, (the Contract) which was authorized by the City Council by M&C C-17125 on the 17th day of November 1998; and WHEREAS, the Contract involves engineering services for the following project: Pavement Reconstruction and Water and Sanitary Sewer Replacements on Sanborn Avenue (Scott to East Lancaster) ; Camila Street (Conner to South Beach); Koch Street (Conner to South Beach); Parkdale Street (Koch to North Dead End) and Sargent Avenue (East Lancaster to Meadowbrook). WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 4, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $4,654,97 (T&PW: $-0-, Water Deprtment $4,654.97 (Water: $4,654.97, Sewer: $-0-)). 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $136,159.13. XNA 1C© O lira iri x0 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 1999, in Fort Worth, Tarrant County, Texas. AT ST: J} Gloria Pearson, City Secretary APPROVAL RECOMMENDED: A. Douglas Rademaker, P.E. Director, Department of Engineering Name: Louis H. Jotes, P.E. Principal 6421 Camp Bowie Blvd., Fort Worth, TX 76116-5421 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney 24419 APPROVED: Mike Groomer Assistant City Manager -2- Contract Authorization Date DANNENBAUM ENGINEERING CORPORATION 6421 CAMP BOWIE BLVD., SUITE 400 FORT WORTH, TEXAS 76116,5421 (817) 763-8883 Y°°n f SExecolimce June 4, 1999 Ms. Dena Johnson, P.E. Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: - 1998 Capital Improvement Street Projects, Sanborn Street, Sargent Avenue, Koch Street, Camilla Street & Parkdale Street, D.O.E. Nos. 2178 through 2182 Dear Ms. Johnson, This letter is to provide information regarding the change in scope on the Water Department work on the above referenced project. The water department has decided to loop the water main in Parkdale Street to the water main in Hawkins Street at the north ends of the streets and replace the 2 -inch water main in Hawkins to Camilla. We have visited the project site and determined the most suitable location for the water main. Permanent and temporary construction easements will be required from two property owners as well as additional surveying and engineering design. For your use, the Supplemental Fee Summary and the Engineer's Opinion of Construction Cost are attached. Our opinion of construction cost is $33,940.00 with additional surveying and engineering costs of $4,654.97. The costs associated with the acquisition of the utility easements are not included. Please inform us of the City's approval of the contract changes. If you have any questions in the meantime, please do not hesitate to call. Sincerely, Marceline J. Newman, P.E. Project Manager cc: Wayne H. Ahrens, P.E. Louis H. Jones, P.E. Brian D. O'Neill, P.E. file 3243-01 EXHIBIT "B - 3B2" SUPPLEMENTAL FEE SUMMARY CAPITAL IMPROVEMENTS PROJECT DOE NOS. 2178, 2179, 2180, 2181, and 2182 * * *WATER ON PARKDALE STREET* * * OPINION OF PROBABLE CONSTRUCTION COSTS $33,940.00 CURVE "A" 8.3% X 0.85 = 7.055% ENGINEERING DESIGN $ 2,394.47 SURVEY DESIGN (700 L.F. @ 1.65/L.F.) $ 1,155.00 ADDITIONAL SERVICES $ 900.00 TOTAL WATER AND SEWER FEE $ 4,449.47 10% FOR SUB ($2,055.00) $ 205.50 TOTAL ADDITIONAL FEE $ 4,654.97 ENGINEER'S OPINION OF CONSTRUCTION COST 1998 Capital Improvement Program Streets Parkdale/Hawkins Water Main ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL AMOUNT 1 8 -inch PVC LF 700 $24.00 $16,800.00 2 Ductile Iron Fittings TONS 0.45 3,000.00 1,350.00 3 8 -inch Gate Valve EACH 3 650.00 1,950.00 4 Fire Hydrant EACH 1 1,200.00 1,200.00 5 1 -inch Water Service Tap EACH 4 400.00 1,600.00 6 - 1 -inch Copper Pipe LF 60 24.00 1,440.00 7 Asphalt Pavement Repair LF 320 $30.00 $9,600.00 Total Construction Cost $33,940.00 Engineering Design (7.055%) $2,394.47 Surveying Costs (700 L.F. @ 1.65/LF) 1,155.00 Easement Preparation 900.00 10% for Sub 205.50 Total Engineering and Surveying $4,654.97 FoP,TWoF,TH MEMORANDUM TO: A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager FROM: Dena Johnson, P.E. DATE : June 8, 1999 RE: DESIGN FEE AMENDMENT NO. 1 TO PAVEMENT RECONSTRUC- TION AND WATER AND SANITARY SEWER REPLACEMENTS ON SANBORN AVENUE (SCOTT TO EAST LANCASTER); CAMILA STREET (CONNER TO SOUTH BEACH); KOCH STREET (CONNER TO SOUTH BEACH); PARKDALE STREET (KOCH TO NORTH DEAD END) AND SARGENT AVENUE (EAST LANCASTER TO MEADOW - BROOK) DOE NOS. 2178 THROUGH 2182, WATER PROJECT NO. PW77-030770154170 The proposed amendment will allow Dannenbaum Engineering Corporation to provide addi- tional services on the project as requested by City. The Water Department has determined it is necessary to loop the water line in Parkdale Street and to replace the 2 inch water line in Hawkins. These additional services will require additional survey and engineering design as well as the acquisition of two permanent and temporary con- struction easements. Dannenbaum Engineering Corporation has submitted a proposal in the amount of $4,654.97 (T&PW; $-0-, Water Department; $4,654.97 (Water: $4,654.97, Sewer $-0-)) for the additional services to be provided thereby increasing the contract fee from $131,504.16 (T&PW; $73,584.79, Water Department; $57,919.37 (Water: $26,642.91, Sewer: $31,276.46)) to $136,159.13 (T&PW: $73,580.79, Water Department; $62,574.34 (Water: $31,297.88, Sewer: $31,276.46)). I believe this fee is fair and reasonable for the additional services. Please authorize the additional design fee by your signatures on the attached contract amendment form. Dena Johnson Attachment cc: Berdena Hamilton, Water Department Dan Pepon, Water Department Suzie Wagner, Transportation and Public Works Department MEMO2178 ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 (817) 871-7941 * FAx (817) 871-7854 Printed on recycled paper