NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Deer Creek Meadows Phase 4
City Project No.: 105624
Improvement Type(s): Water 0 Sewer 0
Original Contract Price:
$1,751,571.09
Amount of Approved Change Order(s):
$5,300.07
Revised Contract Amount:
$1,756,871.16
Total Cost of Work Complete:
$1,756,871.16
is Md<ibUFn (Apr 2��_ 2026 10'.41.58 CDT)
Contractor
Project Manager
Title
L.H. Lacy Company
Company Name
xx
MicFAe rkins (Apr 29, 2026 10:43:49 CDT
Project Inspector
Project Manager
J��
CFA Manager
A. iR.:..n.
Lauren Prieur (May 1. 2026 13:53:03 CDT)
TPW Director
04/29/2026
Date
04/29/2026
Date
04/30/2026
Date
05/01 /2026
Date
05/01 /2026
Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: Deer Creek Meadows Phase 4
City Project No.: 105624
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Pipe Report: ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 175 WD Days Charged: 228 WD
Work Start Date: 1/1/2025 Work Complete Date: 4/7/2026
Completed number of Soil Lab Test: 1309
Completed number of Water Test: 10
Page 2 of 2
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name DEER CREEK MEADOWS, PHASE 4
Contract Limits
Project Type WATER & SEWER
City Project Numbers 105624
DOE Number 5624
Estimate Number 1 Payment Number 1
City Secretary Contract Number
Contract Date
Project Manager NA
Contractor L.H. LACY COMPANY
P.O. BOX 541297
For Period Ending 4/7/2026
WD
Contract Time 17WD
Days Charged to Date 228
Contract is 100.00 Complete
DALLAS, TX 75354
Inspectors M.GLOVER / M.PERKINS
Tuesday, April 7, 2026 Page 1 of 5
City Project Numbers 105624
Contract Name DEER CREEK MEADOWS, PHASE 4
Contract Limits
Project Type WATER & SEWER
Project Funding
UNIT I: WATER IMPROVEMENTS
Item Description of Items
No.
-----------------
1 4" - 12" PRESSURE PLUG
2 8" WATERLINE LOWERING
3 TRENCH SAFETY
4 20" CASING BY OPEN CUT
5 DUCTILE IRON WATER FITTINGS w/
RESTRAINT
6 8" WATER PIPE(CO#1)
7 FIRE HYDRANT
8 CONNECTION TO EXISTING 4" - 12" WATER
MAIN
DOE Number 5624
Estimate Number 1
Payment Number I
For Period Ending 4/7/2026
Estimated Unit
Unit Cost
Estimated
Completed
Completed
Quanity
Total
Quanity
Total
----------------------
6 EA
$201.87
$1,211.22
6
$1,211.22
7 EA
$5,170.16
$36,191.12
7
$36,191.12
6029 LF
$0.37
$2,230.73
6029
$2,230.73
55 LF
$231.59
$12,737.45
55
$12,737.45
1 TN
$35,340.35
$35,340.35
1
$35,340.35
6152 LF
$43.09
$265,089.68
6152
$265,089.68
10 EA
$6,114.41
$61,144.10
10
$61,144.10
4 EA
$1,488.04
$5,952.16
4
$5,952.16
9 1" WATER SERVICE
188 EA
$1,428.64
$268,584.32
188
$268,584.32
10 1 1/2" WATER SERVICE
1 EA
$2,916.95
$2,916.95
1
$2,916.95
11 1 1/2" WATER SERVICE (IRRIGATION)
2 EA
$2,407.25
$4,814.50
2
$4,814.50
12 8" GATE VALVE
17 EA
$2,094.88
$35,612.96
17
$35,612.96
13 PVC IRRIGATION SLEEVES
200 LF
$12.49
$2,498.00
200
$2,498.00
Sub -Total of Previous Unit
$734,323.54
$734,323.54
UNIT II: SANITARY SEWER IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
---------------------------------------
14
4" -12" PRESSURE PLUG
4 EA
$56.28
$225.12
4
$225.12
15
POST -CCTV INSPECTION
6886 LF
$2.41
$16,595.26
6886
$16,595.26
16
MANHOLE VACUUM TESTING
39 EA
$136.25
$5,313.75
39
$5,313.75
17
TRENCH SAFETY
6886 LF
$0.89
$6,128.54
6886
$6,128.54
18
TRENCH WATER STOPS
15 EA
$1,381.07
$20,716.05
15
$20,716.05
19
20" CASING BY OPEN CUT
140 LF
$217.57
$30,459.80
140
$30,459.80
20
4" SEWER SERVICE
188 EA
$1,270.80
$238,910.40
188
$238,910.40
21
6" SEWER PIPE
40 LF
$51.46
$2,058.40
40
$2,058.40
22
8" SEWER PIPE
6284 LF
$61.36
$385,586.24
6284
$385,586.24
23
8" SEWER PIPE, CSS BACKFILL
171 LF
$141.03
$24,116.13
171
$24,116.13
24
8" DIP SEWER PIPE
287 LF
$147.87
$42,438.69
287
$42,438.69
25
8" DIP SEWER PIPE, CSS BACKFILL
138 LF
$201.41
$27,794.58
138
$27,794.58
Tuesday, April 7, 2026 Page 2 of 5
City Project Numbers 105624
Contract Name DEER CREEK MEADOWS, PHASE 4
Contract Limits
Project Type WATER & SEWER
Project Funding
DOE Number 5624
Estimate Number 1
Payment Number I
For Period Ending 4/7/2026
26 4' MANHOLE 31 EA $5,934.64 $183,973.84 31 $183,973.84
27 4' EXTRA DEPTH MANHOLE 171 VF $215.16 $36,792.36 171 $36,792.36
28 CONNECT TO EXISTING 8" S.S. 1 EA $1,438.46 $1,438.46 1 $1,438.46
--------------------------------------
Sub-Total of Previous Unit $1,022,547.62 $1,022,547.62
Tuesday, April 7, 2026 Page 3 of 5
City Project Numbers 105624
Contract Name DEER CREEK MEADOWS, PHASE 4
Contract Limits
Project Type WATER & SEWER
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number
Change Order Number 1
DOE Number 5624
Estimate Number 1
Payment Number 1
For Period Ending 4/7/2026
$1,751,571.09
$5,300.07
Total Contract Price $1,756,871.16
Total Cost of Work Completed $1,756,871.16
Less % Retained $0.00
Net Earned $1,756,871.16
Earned This Period $1,756,871.16
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$1,756,871.16
Tuesday, April 7, 2026 Page 4 of 5
City Project Numbers 105624 DOE Number 5624
Contract Name DEER CREEK MEADOWS, PHASE 4 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER & SEWER For Period Ending 4/7/2026
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors M.GLOVER / MYERKINS Contract Date
Contractor L.H. LACY COMPANY Contract Time 175 WD
P.O. BOX 541297 Days Charged to Date 228 WD
DALLAS, TX 75354 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $1,756,871.16
Less % Retained $0.00
Net Earned $1,756,871.16
Earned This Period $1,756,871.16
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$1,756,871.16
Tuesday, April 7, 2026 Page 5 of 5
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECTNAME:
Deer Creek Meadows - Phase 4
CHANGE
CONTRACT:
A Water/Sewer/Stone Drain, B Paving, C Street Li his
ORDER No:
CFA #
24.0152 1 CITY PARTICIPATION: NO
CITY PROJECT#
105624
CITY SECRETARY CONTRACT#
62415
1
FID #
30114-02DO431-105624-EO7685
X #
X-28233
FILE #
W-3066
INSPECTOR: Michael Perkins Phone No: 682-715-7010
PROJECT MANAGER: Sandlp Adhlkad, P.E. Phone No: 817-392-8424
REVIEWED
By Sandip Adhikari at 2:06 pm, May 12, 2025
CONTRACT UNIT
CONTRACT
DAYS
WATER
SEWER
DRAINAGE
PAVING
STREETLIGHTS
neveloper
Cost
er Cost
CllyCost
Develo erCost
CltyCost
DeveloperCost
City Cost
Developer
CostCityCostORIGINAL
CONTRACT
$729,023.47,022,547.62
$0.00
$2.126.365.29
$0.00
$1,590,689.53
$0.00
S/96,947.03
$0.00
175
EXTRAS TO DATE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
$0.00
$0.00
CREDITS TO DATE
50.00
$0.00
$0.00
$0.00
$0.00
$0.00
$area
$0.00
$0.00
CONTRACT TO DATE
$729,027.47,022,547.62
$CostDevelaperveto
$0.00
$2.126.365.29
$0.00
$1,590,659.53
$0.00
$196,947.03
$0.00
175
AMOUNT OF PROP. CHANGE ORDER
$6.300.07$0.00
$0.00
$0.00
$0.00
$461.62
$0.00
($1,530.53)
$0.00
0
REVISED CONTRACT AMOUNT
$734.323.54,022,547.62
$0.00
$2.126.365.29
50.00
51,591,15/.1s
$0.00
$195.416.50
$0.00
175
TOTAL REVISEDCONTRACT AMOUNT PERUNIT$734,3$7
022,547.62
$2.126.365.29
$1.591,151.15
1 $195,416.50
REVISED COST SHARE
Dev. Cast: $5,669,804.10 City Cost: $0.00
TOTAL REVISED CONTRACT
$5,669,804.10
You are directed to make the folloving changes in the contract documents
CITY BID REM
I
Developer
PAY ITEM #
#
QUANTITY
UNIT
ITEM DESCRIPTION CFW Unit Pnce
UNIT PRICE
Cost
C Cost
TOTAL
58
3213.0501
2
EA
Banner Free Ramp. Type R-1
32,596.1
$5.192.08
$0.00
$5.192.06
59
3213.0508
(2)
EA
Barney Free Ramp, Type P-1
$2,365.22
(54.730.44)
$0.00
(54.730.44)
TOTAL UNIT IV: PAVING IMPROVEMENTS
$461.62
]NIT V- STRFFT 1IGH
PAY ITEM #
CITY BID ITEM
#
QUANTITY
UNIT
ITEM DESCRIPTION CFW Unit Pnce
UNIT PRICE
Developer
Cost
City Cost
TOTAL
1
1 2805.3211
1 (43)
1 LF
1 2-CONDT PVC SCH 40 (T)
520.4E
(5080.64)
$0.00
(5880.64)
2
3441.1405
(162)
LF
NO 2 Insulated Elec Condr
54.5E
(S741.96)
$0.00
(5741.96i
3
1 3441.1408
1 33
1 LF
NO 6 Insulated Elec Condr 1
$2.791
$92.07
$0.00
$92.07
TOTAL UNIT V: STREET LIGHT IMPROVEMENTS
$1,530.53
TOTAL CHANGE ORDER$4
231.16
Revised: 12-17-2018 Page 1
Asterisk( -)hug— Na Pay llem
REASONS FOR CHANGE ORDER }. Re>tiednmp yPebR-1 far Mae 4,..y �wer.xdon
2 AaMd%*Wh*
d MoMdsfreat RlArPa'e budon roevoM weferdro corm
RECORMENOFD:
APPROVED:
[cmerNar:wsd area
APPROVED; APPROVED:
GMdttl�
Lend and Conf/fiKtl/o/n�f
WLery 7ar7'. fld IMa UUClljy}Cyy/��
/�
—y f
J rf
BY:
Nerve: Mefl Beedre
Name: Kyle Olddnoa
Nerve; PiNmin Dmew Name:_Hk�erd Wolfe
T>Uwft).d.Enofro
TIM: VPof Lend O—I.p m
n0a: VlaeP—WN A Title: PleeLlad
By:
APPROVAL RECOUMENOED: APPROVED: APPROVED AS TO FORM AN0 LEGAUTY:
CFW-I ,'P _--.. ,1 CFW-A.dV..tcy^.r., CFW-Ans4WCAy A.9 y
BY By.
Name: Nerve:
Trite: Tf%:
RECOMMENDED;
GFW•lC-A'ecl Cor>eend At —per ATTEST
•Conlydd ComPllanca MAUpar lProlect Manayerj:
By:
By.ipnlry l vd—Aadpe But I am fM pmm ntpd %4
tot the—HWnp and admyflaeelloa fM colMracl, Indde
JwW * S. Goodd
amuinp an Perfw"ma and npoAYp ro¢Anmenh.
nx: dy m seay
O+ Tlura an NO City F ,,& mod.",dl Bi. Conoad
Them am City F ids umd.tcd wM fHe Conoad
MdC NamCer:
MdC Date ApW—d:
REVIEWED
By Sandip Adhikari at 2:06 pm, May 12, 2025
Revised: 1247.2018
Pape 2
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Deer Creek Meadows Phase 4
CITY PROJECT NUMBER: 105624
WATER
PIPE LAID
SIZE
TYPE OF PIPE
LF
C900
8"
PVC
6,029
FIRE HYDRANTS: 10
VALVES (16" OR LARGER)
0
PIPE ABANDONED
SIZE
TYPE OF PIPE
LF
DENSITIES:
yes
NEW SERVICES:
1"
Copper
188
1 1/2"
Copper
3
SEWER
PIPE LAID
SIZE
TYPE OF PIPE
LF
SDR-26
6"
PVC
40
SDR-26
8"
PVC
6284
American Fastite Pipe (Bell Spigot)
8"
Ductile Iron
287
PIPE ABANDONED
SIZE
TYPE OF PIPE
LF
DENSITIES:
yes
NEW SERVICES:
4"
PVC
188
TRANSPORTATION AND PUBLIC WORKS
The Cit}, of Fort Worth • 1000 Throckmorton Street • Fort Worth, T176012-6311
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
April 7, 2026
L H Lacy Company LTD
1880 Crown Dr #1200
Dallas, TX 75234
RE: Acceptance Letter
Project Name: Deer Creek Meadows Phase 4
Project Type: Water, Sanitary Sewer
City Project No.: 105624
To Whom It May Concern:
On February 23, 2026 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on April 7, 2026. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on April 7, 2026, which is the date of the
punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning.this letter of acceptance, please feel free to contact me at 817-
392-7830.
Sincerely,
01��
Sandip Adhikari, Project Manager
Cc: Michael Perkins, Inspector
Mike Glover, Inspection Supervisor
Randy Horton, Senior Inspector
Andrew Goodman, Program Manager
GM Civil, Consultant
L H Lacy Company, Contractor
Lennar, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF Texas
COUNTY OF Dallas
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Bobby Gordon,
President Of L.H. Lacy Company, Ltd, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
City Project 4105624 - Deer Creek Meadows Phase 4
BY -
Bobby W 90ron, Partner/CEO
Subscribed and sworn before me on this date 29 of April, 2026.
Dallas County, State of
Texas
DARLENE CONEY
Notary ID #10317301
4P My Commission Expires
^�°FFI March 9, 2028
CONSENT OF SURETY
t]lY1=wER
TO FINAL. PAYMENT
ARCHITECT
0
Docuit7ent G707
CONTRACTOR
.ALA
SURM'
�7
Bond No. 5826369
Q`1HPR
Q
'IX-) O%RNER:
ARCHITECT'S PROJECT NO.:
(Alawe zwdad€fre j
City of Fort Worth & Lennar Homes of Texas Land
and Construction, Ltd.
1231 Greenway Dr., Suite 800
CONTRACTEt�It; Construction
Irving, TX 75038
PROJECT CONTRACT DATRD)
(Alame and ac (Jdw l
Deer Creek Meadows Phase 4
In aec'ordanee vAth the provisions of the Contract bemeen the Owner and the Contractor as indicated abcwe, the
fJlrs¢!tlrarue arrrl rrt7�%�� efS'ie�ryl
Great American Insurance Company
301 East Fourth, Street
Cincinnati, OH 45202RE�y
on bond of
(ln cri17aint,andaddreken(Contivau )
L.H. Lacy Company, Ltd.
1880 Crown Dr., Suite 1200
Dallas, TX 75234 CONTRAMR,
hereby ap?s-o'ves of The fatal payment to the Contractor, and agrees that final paymont to the Contractor shall not relleve the Surety of
any of its obligations to
(dr>.xw nomerxnd oforlwar)
City of Fort Worth & Lennar Homes of Texas Land and Construction, Ltd.
1231 Greenway Dr., Suite 800
Irving, TX 75038
as set ford) in said Surety's bond.
IN WITNESS WHERIaO , the Snrety has bereunto set its band on this elate: April 2 3, 2026
Hesse:rSanjoV1lrgrAx!laowbfotlouvw1;vdx,wailedLdrevcar(l3va )
David T. Miclette, Witness
Great American Insurance Comnan
(Snlrrs) °'
(SYr{rrcrtrn�ofuru r�zrdlrjlr rr tit
Ashley Britt, Attorney -in -Fact
(t'rit) tecilroureurlcI idt,)
, OWNM,
G707-1994
GREAT AMERICAN INSURANCE COMPANY@
Administrative Office: 301 E 4TH STREET • CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than FOURTEEN
No.() 22621
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY, a corporation organized and existing; under
and by virtue of the laws of the State of Ohio, does hereby nominate, constitute and appoint the person or persons named below, each individually if more than
one is named, its true and lawful attorney -in -fact, for it and in its name, place and stead to execute on behalf of the said Company, as surety, any and all bonds,
undertakings and contracts of suretyship, or other written obligations in the nature thereof; provided that the liability of the said Company on any such bond,
undertaking; or contract of suretyship executed under this authority shall not exceed the limit stated below.
Name Address Limit of Power
STACEY BOSLEY NIKOLE,JEANNETTE AARON HAWLEY ALL
ASHLEY BRITT DAVID T. MICLETTE SANDRA ViLLEGAS ALL OF HOUSTON, TEXAS $100,000,000
LUCAS LOMAX NANCY RIOS
WILL DUKE STACY OWENS
RITA G. GULIZO BARRY K MCCORD
ROBERT C. DAVIS KATHLEEN CUCKLER
This Power of Attorney revokes all previous powers issued on behalf of the attomey(s)-in-fact named above.
IN WITNESS W14EREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriatc
officers and its corporate seal hereunto affixed this 17TH day of OCTOBER 1 2025
Attest GREAT AMERICAN INSURANCE COMPANY
f
V .
Asmstarrt se .11'rarl'
1XVisioea1 terror plee Areviderrn
STATE OF OHIO. COUNTY OF HAMiLTON - ss: JOHN K. WEBSTER (877-377 24051
On this 17TH day of OCTOBER 2025 , before me personally appeared JOHN K. WEBSTER, to me
known, being; duly sworn, deposes and says that he resides in Cincinnati, Ohio, that he is a Divisional Senior Vice President of the Bond Division of Great
,American Insurance Company, the Company described in and which executed the above instrument; that he knows the seal of the said Company; that the seal
affixed to the said instrument is such corporate seal; that it was so affixed by authority of his office under the By -Laws of said Company. and that he signed his
name thereto by like authority.
�lt7 •� SUSAN A KOHORST
` Notary Public
Y* o. State of Ohio
My Comm, Expires
May 18, 7030
This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company
by unanimous written consent dated June 9, 2009.
RESOLVED: That the Divisional President, the several Divisional Senior Ifce Presidents. Divisional Fee Presidents and Divisonal Assistant Dice
Presidents, or any one pf them, be and hereby is authorized, fnrrrrr time to tune, to appoint one or more Attorne.us-ins-Fact to execute ore behalf (gf'the Cornpapv.
as surety, anv and all bonds, undertakings and contracts ofsitreti=ship, or other written obligations in the nature theregJ to prescribe their respective duties and
the raipective limits trj'their authority: and to revoke any sctch appointment at ar?y time.
RESOLVED FURTHER: That the Compatty seal and the signature of airy of the aforesaid officers arrd anti Secretary or As,sisrant Secreiaty oj'ihe
Conrpanrs, rrrav be ggixed by facsinrile to any poster of attorney or cenifcate yf either given firm the execution of any bond, undertaking, contract oj'surettship,.
or other n-ritten obligation in the mature thereof such signature and .seal when so used being hereby adopted by the Cowparry as the original signature p/',such
aj}icer and the original seat of the Cornpam', to he valid and binding upon the Cornpanl' with the ,sarne jiirce and qlfect as though inanually affixed,
CERTIFICATION
1, STEPHEN C. BERAHA, Assistant Secretary of Great American Insurance Company, do hereby certify that the foregoing Power of Attorney and
the Resolutions of the Board of Directors of June, 9, 2008 have not been revoked and are now in full force and effect.
Signed and sealed this r day of44,
p
-
4-
R
i.rvrstanP Secx+rrrr�.- , -
S1029AJ (04/25)