Loading...
HomeMy WebLinkAbout025051 - Construction-Related - Contract - Ned K. Burleson & Associates, Inc.AMENDMENT NO. 1 STATE OF TEXAS b CITY SECRETARY CONTRACT NO. (4? 5O51 (No M&C Needed) COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (City) and Ned K. Burleson & Associates, Inc., (Engineer) made and entered into City Secretary Contract No. 24918, (the Contract) which was authorized by the City Council by M&C C-17440 on the 25th day of May, 1999; and WHEREAS, the Contract involves a reduction in engineering services for the following project: Main 195AR Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 4), Part 4. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include a reduced scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include a reduction in the original scope of engineering services to be provided as specified in a proposal letter dated July 7, 1999, a copy of which is attached hereto and incorporated herein. The cost savings to the City for the reduced scope of services total $26,311.94. 2. Article II of the Contract is amended to provide for an decrease in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $31,650.00. )IllUM CO cell ��E"I EREV 3. All other provisions of the Contract which are not expressly amended herein shall remain in full forceandeffect. EXECUTED on this the / day of 1999, in Fort Worth, Tarrant County, Texas. AT ST: " Contract Auth ization Gloria Person, City Secretary Date APPROVAL RECOMMENDED: A. Douglas Rademaker, P.E. Director, Department of Engineering NED K. BURLESON & ASSOCIATES, INC. ENGINE Name: Ned K. Burleson, Ph.D., P.E. President 2822 West Lancaster Avenue Fort Worth, TX. 76107 APPROVED AS TO FORM AND LEGALITY: Gary "Stetherger Assistant City Attorney 24918 APPROVED: AA1 Mike Gro mer Assistant City Manager -2- NED K. BURLESON & ASSOCIATES,-INC. CONSULTING ENGINEERS 2822 West Lancaster Avenue • Fort Worth, Texas 76107.817-335-6203 July 7, 1999 Mr. Rakesh Chaubey, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Amendment No. I M-195AR Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 4) , Part 4, D.O.E. Project No. 2495, Sewer Project No. PS46-070460410320 Dear Mr. Chaubey: In response to your instructions, Ned K. Burleson and Associates, Inc., herewith presents this Amendment No. 1 for the reduction in engineering services that have been deleted from our original scope of services due to duplicate design work by D.O.E. in-house design. A summary of the proposed budget for this amendment is as follows: 1. Amended Engineering Design Fee 2. Amended Design Survey Fee (M/WBE) 3. Amended Sub -Consultant Fee 4. Amended Reproduction Costs Total Amount, Amendment No. 1 A summary of the total project fees are as follows: Original Contract Amount Amendment No. I Proposed Amended Contract Amount ($ 22,136.94) (3,500.00) (350.00) (325.00) ($ 26,311.94) $ 57,962.80 ($ 26,311.94) $ 31,650.86 Please find attached an amended summary of the design fee and an amended summary of MJWBE participation. Please review the enclosed information and do not hesitate to contact me if you have any questions or need additional information. Si erely, Steven E. Eubanks, P.E. .-Project Engineer Attachments cc: Tony Sholola Peter Fu AMENDED MIWBE PARTICIPATION M-195AR Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 4) , Part 4 D.O.E. Project No. 2495, Sewer Project No. PS46-070460410320 Exhibit Engineer's Fee MIWBE (Fee) M/WBE% A-1 $ 31,650.86 $ 6,500.00 20.5% Total $ 31,650.86 $ 6,500.00 20.5% MIWBE% Proposed M/WBE Services MIWBE fee of total fee 1. Brown & Maclin Consultants, Inc. Design Survey $ 6,500.00 20.5% Total $ 6,500.00 20.5% AMENDED SUMMARY OF DESIGN FEE M-1 95AR Drainage Area Sanitary_Sewer System Rehabilitation and Improvements (Group -7, Contract 4) , Part 4 --- -- -_._ D.O.E. Project No. 2495, Sewer Project No. PS46-070460410320 Total Original Engineering Fee: Total Amount, Amendment No. 1: 1. Engineering Design Fee • Amended Opinion of Probable Cost: $ 196,867.00 • NSPE Curve A Fee: 8.75% • Amended Engineering Design Fee $ 17,225.86 • Original Engineering Design Fee ($ 39,362.80) 2. H.M.A.C. Surface Overlay - Plans & Specs. ($ 22,136.94) Unchanged 3. Public Meetings, including exhibits Unchanged 4. Design Survey (MIWBE Sub -Consultant) ($ 3,500.00) • Amended Design Survey Fee $ 6,500.00 • Original Design Survey Fee ($ 10,000.00) 5. Sub -Consultant Fee ($ 350.00) • Amended Engineering Design Fee $ 650.00 • Original Engineering Design Fee ($ 1,000.00) 6. Construction Services 7. Reproduction (estimate at 10 sheets per plan) • Amended Prelim. Plans (16 Sets) $ 250.00 • Original Prelim. Plans (16 Sets) ($ 350.00) • Amended Final Plans (40 Sets) $ 625.00 • Original Final Plans (40 Sets) ($ 850.00) • Other Reproduction Unchanged Total Amended Engineering Fee: Unchanged (325.00) $ 57,962.80 (S 26,311.94) $ 31,650.86 FoF,TW0F,TH MEMORANDUM TO: A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager FROM: Tony Sholola 7' . DATE: July 7, 1999 RE: AMENDMENT NO. 1 TO MAIN 195AR DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 4), PART 4, SEWER PROJECT NO. PS46-070460410320 DOE NO. 2495 The proposed amendment will reduce the consultant's (Ned K. Burleson & Associates, Inc.) fee from $57,962.80 to $26,311.44 due to a reduction in the original scope of serv- ices. Subsequent to award of contract, it was determined that Water Department staff had in- advertently included some lines which are currently under design by the In -House Design Division of DOE on the list of lines to be designed by the consultant. Consequently, staff requested that the consultant revise the scope of services as appropriate and submit a new proposal fee for the remaining work. The new contract amount is $31,650.86 resulting in a reduction of $26,311.94 from the original contract amount. Please authorize this reduction in the contract fee by your signatures on the attached amendment form. Attachments cc: Rakesh Chaubey, Project Manager Berdena Hamilton, Water Dept. Dan Depon, Water Department Gail Scott, M/WBE Office MEMO 2495 ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 (817) 871-7941 * Fax (817) 871-7854 QJ Printed on recycled paper