HomeMy WebLinkAbout059627-CO1 - Construction-Related - Contract - McKee Utility Contractors, LLCCSC No. 59627-COl
FO RT WO RT H City of Fort Worth
Change Order Request
Project Name: Westside IV Transmission Main - Aledo Rd to WSIV EST City Sec No.: 59627
Project No.(s): 56022 / 0600430 / 5740010 / 103292 / 001480 DOE No. N/A City Proj. No.: 103292-3
Project Description:
Construction of the Westside IV 36-Inch Transmission Main
Contractor: 1 McKee Utility Contractors, LLC Change Order # 0 Date: 1 4/17/2026
City Project Mgr.1 James McDonald, PE City Inspector: Stephen Martinez
Phone Number: 1 817-392-4982 Phone Number: 682-432-5485
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Water
Sewer
Totals
Contract Time
(Calender days)
$11,624,937.00
$11,624,937.00
325
$11,624,937.00
$11,624,937.00
325
Amount of Proposed Change Order
$0.00
$0.00
90
Revised Contract Amount $11,624,937.00
Original Funds Available for Change Orders $290,624.00
Remaining Funds Available for this CO $290,624.00
Additional Funding (if necessary)
4ANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$11,624,937.00
415
$290,624.00
$290,624.00
0.00%
$14,531,171.25
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 1 provides compensation for a confined space rescue team to be on standby during the
time the contractor will be on site to complete the remaining work on valve vaults so that the project can
be finalized and closed out.
Staff concurs with the contractor's request for an additional 90 calendar days for the change order. The
contract was paused on 6/13/2025 with work resumption on 4/06/2026. The new contract final
completion date will be 7/05/2026.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
it is understooa and agreed tnat the acceptance of this Uhange Urder by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order,
Contractor's Company Name
Contractor Nam�:�
C ntractor Signature
Date
McKee UtilityContractors, LLC
Tori Ferguson
0g11 1 2
Ins ec,cr
Date
Pro e t Manage
Date
Ir
4/25/26
D rea'ar (Water Dept)
Date
C truction Supervisor
Date
CGt�IJto�kel- lfa�der
4/27/2026
�
,a: r ,z-7 �/vi
Assistant0ityAtiorney
ate
Assistant City Manager
Da
—_
04/27/2026
05/02/2026
- -
_ Council Action (If Required)_
M&C Number- WA M&C Da`e Approved
FORT WO R'r H City of Fort Worth
Change Order Additions
Project Name Westside IV Transmission Main - Aledo Rd to WSIV EST City Sec No.: 1 59627
Project No.(s): 56022 / 0600430 / 5740010 / 103292 / 001480 DOE No. N/A City Proj. No.: 103292-3
Project
Description
Construction of the Westside IV 36-Inch Transmission Main
Contractor McKee Utility Contractors, LLC I Change Order:= Date: 4/17/2026
City Project Mgr. James McDonald, PE City Inspector Stephen Martinez
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
28 Confined Space Rescue Team Water 1.00 LS $18,913.37 $18,913.37
Water $18,913.37
Sewer
Page 1 of 1 Additions Sub Total $18,913.37
Fo3 RT Wc) Y2T H City of Fort Worth
Change Order Deletions
Project Name Westside IV Transmission Main - Aledo Rd to WSIV EST City Sec No.: 59627
Project No.(s): 56022 / 0600430 / 5740010 / 103292 / 001480 DOE No. N/A City Proj. No.: 103292 3
Project Description
Construction of the Westside IV 36-Inch Transmission Main
Contractor McKee Utility Contractors, LLC Change Order:= Date 4/17/2026
City Project Mgr. James McDonald, PE City Inspector: F7Stephen Martinez
DELETIONS
ITEM IDESCRIPTION I DEPT I Qty JUnit I Unit Cost Total
27 19999.0004 Construction Allowance lWater I 0.12608913 LS 1 $150,000.00 $18,913.37
$18,913.37
Sewer
Page 1 of 1 (Deletions Sub Total 1$18,913.37
MKCC
a MasTec company
Owner. City of Fort Worth
Engineer. Kimley-Horn
Contractor. MCKEE UTILITY CONTRTACTORS, LLC
Description of Work: Addition
McKee Utility Contractors, TLC
2319 West Main, Prague, OK 74864
(405) 567-3666
Date: 9-Apr-26 Work Authorization Number.
Project Name: Westside IV Transmission Main -Aledo Rd to WSN EST
Location: Fort Worth. TX
Labor Costs
Owner's Tracking Number. 103292-3
Engineers Tracking Number.
Contractors Tracking Number: 2303
Description
Operations Manager
Weeks
0.0
I Week Rate
$3,500.00
SubtotalI
$0.00
N/A
N/A
Subtotal
Subsistence
$0.00
Burden
Subtotal
$0.00
Superintendent
0.0
$5,000.00
$0.00
$0.00
$0.00
Project Manager
0.0
$2,500.00
$0.00
$0.00
A$0
$0.00
Safe Director
0.0
$3,500.00
$0.00
$0.00
$0.00
Descri lion
RG Hours
RG Rate/HR
Subtotal
OT Hours
OT Rate/Hour
Subtotal
Subsistence
Burden
Subtotal
Payroll Administrator
0.0
$20.00
$0.00
0.0
$30.00
$0.00
$0.00
$0.00
$0.00
Foreman
0.0
$45.00
$0.00
0.0
$67.50
$0.00
$0.00
$0.00
$0.00
Main Line Excavator Operator
0.0
$40.00
$0.00
0.0
$60.00
$0.00
$0.00
$0.00
$0.00
Support Excavator Operator
0.0
$35.00
$0.00
0.0
$52.50
$0.00
$0.00
$0.00
$0.00
Loader Operator
0.0
$30.00
$0.00
0.0
$45.00
$0.00
$0.00
$0.00
$0.00
Pipe Layer 2
0.0
$26.00
$0.00
0.0
$39.00
$0.00
$0.00
$0.00
$0.00
Top Man
0.0
$30.00
$O.00
0.0
$45.00
$0.00
$0.00
$0.00
$0.00
Surveyor
0.0
$28.00
1 0.00
0.0
$42.00
$0.00
$0.00
$0.00
$0.00
Pipe layer helper
0.0
$22.00
$0.00
0.0
$33.00
$0.00
$0.00
$0.00
$0.00
Mechanic & Truck
0.0
$125.00
$0.00
0.0
$187.50
$0.00
$0.00
$0.00
$0.00
Fuel/Luba Man
0.0
$25.00
$0.00
0.0
$37.50
$0.00
$0.00
$0.00
$0.00
CDL Truck Driver
0.0
$35.00
$0.00
0.0
$5250
$0.00
$0.00
$0.00
$0.00
Labor Costs Subtotal
$0.00
Equipment Costs
Description
Hours
I Rate/Hour
Total
KOM PC490LC
0.0
$222.43
$0.00
CAT-336 Excavator
0.0
$142.76
$0.00
CAT-730 Articulated Truck
0.0
$191.31
$0.00
Komatsu 380 Loader
0.0
$78.15
$0.00
CAT-390 EX
0.0
$383.96
$0.00
Super -Truck 1
0.0
$16.84
$0.00
Trench Boxes (2)
0.0
$48.32
$0.00
Survey -Truck 1
0.0
$16.84
$0.00
Heavy Haul Truck w/ Trailer
0.0
$465.00
$0.00
Dodge Ram 3500
0.0
$26.52
$0.00
Gooseneck Trailer
0.0
$13.60
$0.00
Fuel Truck
0.0
$27.24
$0.00
Steel Trench Plates (8) 52,004#
0.0
$B.OD
$0.00
Spanning & Support Beams W/ Matting
0.0
$250.00
$0.00
Water Truck
0.0
$39.01
$0.00
CAT-390 EX(Stand-by)
0.0
$79.99
$0.00
KOM - PC490LC (Stand-by)
0.0
$69.33
$0.00
CAT-950K Loader (Stand-by)
0.0
$27.55
$0.00
Water Truck (Stand-by)
0.0
$7.04
$0.00
CAT-06 Dozer
0.0
$134.99
$0.00
CP-04 Compactor
0.0
$55.17
$0.00
Survey Equipment
0.0
$31.28
$0.00
JD-35G
OA
$22.95
$0.00
CAT- 289 Skid Steer
0.0
$42.23
Equipment Cost Subtotal
Material Cost
Quan'
Description
Unit cost
Amount
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
Material Cost Subtotal
$OAO
Subcontractor Cost
Quan'
Description
Unit cost
Amount
9
Rescue Team(DAY)
$ 1,952.60
$17,573.40
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
$
$0.00
Subtotal
$17,573.40
Miscellaneous Costs
Description %of Labor Subtotal Subtotal
Small Tools and'9upplies
Safety Su lies
Traffic Signs & Barricades
Miscellaneous Costs Subtotal $0.00
Extra Work Cost Summary
Labor Costs Subtotal
$0.00
Equipment Costs Subtotal
$0.00
Material Subtotal
$0.00
15 % - O&P
$0.00
Subtotal PC
$0.00
Subcontractor Cost
$17.573.40
5% Commission
$878.67
Subtotal PC
$18,452.07
Miscellaneous Costs Subtotal
$0.00
Subtotal
$18,452.07
8.25%- Rental Tax
$0.00
2.5% - Bond & Ins.
$461.30
Total
$18,913.37
Contract Duration Extension
Contract Extension (DAYS) resulting from extra work performed 90
'Contract paused 6113/25. Contract resumed 4/626.
New contract final with requested additional days: 7/5126.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
N
Signature
_J A M E S M e r), O N LA�,
Name of Employee
�R • GA? � 7 AL Ptt. � F ��S o Ft. c.E1�
Title qoF Foprda
o'a° �9p0
ATTEST:
QdOn nEaa g�4o
Jannette S. Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: McKee Utility Contractors, LLC
Subject of the Agreement: Westside IV Transmission Mains - Aledo Rd. to WS IV Elevated Storage Tank
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 59627-COl
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 103292-3
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.