ProjectName:1 VCWRF Primary Clarifiers City Sec No.: 1 62512
Project No,(s): 56023 / 0700430 / 5740010 / 001780 DOE No. n/a City Proj, No.: 103295
Project
ts.
new
each) with necessary site, piping,
Contractor: Eagle Contracting, LLC Change Order # I� Date: 417/2026
City Project Mgr. Farida Goderya Consultant Inspector: I Paul Allison (Carollo)
Phone Number: 817-392-8214 Phone Number: 626-429-4108
Original Contract Amount
Extras to Date
Dept. Sewer Water
$98,319,734.00
$164,505.00
Totals Contract Time
(Calender days)
3,319,734.00 1,187
164,505.00 1022
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $98,484,239.00 $98,484,239.00 11,209
Amount of Proposed Change Order 1 $43,684.00 1 $43,684.00 1026
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
1 $523,733.00 1 1 1 $523,733.00 1
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25916)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
0.21
$122,899,667.50
Change Order No. 2 provides for the installation of a loft storm drain inlet in the primar area to facilitate stormwater drainage for the Primary
Clarifiers 13-19 area while contractor works on Box 1 and the arch-sts pipe relocation.
Staff concurs with the contractor's request for 26 additional calendar days for the change order.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order,
Contractor's Company Name
I Contractor Name
I Contractor Si nature
Date
Eagle Contracting, LLC
Armando Avelar I Andrew Howard
M yH-d z ^: _"� -_,�•,t)]
Inspector
Project Manager
Date
Caroiio RPR
POW
_ ..�,;\'�_i, For Farida Goderya
4/2.4/2.026
Assistant Director Water Dept)
Date
Construction Supervisor
Date
-r� S
04/27/2026
NIA
Assistant City Attorney
Date
I Assistant City Manager
Date
QCW—
04/27/2026
;,n�,_r_'
5/02/2026
Council Action If Required
M&C Number N/A M&C Date Approved NIA
FORT WORTH
City of Fort Worth
Change Order Additions
Project Name VCWRF Primary Clarifiers I City Sec No.: 1 62512
Project No,(s): 56023 / 0700430 / 5740010 1001780 DOE No.[n= City Proj. No,: 103295
Project
Description
Constructing three new Primary Clarifiers (190 fl dia each) with necessary site, piping, electrical, controls and ancilliary
improvements.
Contractor Eagle Contracting, LLC Change Order: = Date: 41712026
City Project Mgr. I Farida Goderya City Inspector Paul Allison (Carollo)
ITEM --DESCRIPTION ADDITIONS
DEPT Qty Unit Unit Cost Total
PCM-01 New Storm Inlet Sewer 1.00 $43,684.0 $43,684.00
Sewer $43,684.00
Water
Page 2 of 4 Additions Sub Total
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name FCWRF Primary Clarifiers City Sec No.: 1 62512
Project No.(s); 1 56023 / 0700430 / 5740010 / 001780 DOE No. EEI City Proj. No.: 103295
Project Description
Constructing three new Primary Clarifiers (190 ft dia each) with necessary site, piping, electrical, controls and
ancilliary improvements.
Contractor Eagle Contracting, LLC Change Order: F2 ] Date 4/7/2026
City Project Mgr. Farida Goderya City Inspector: Paul Allison (Carollo)
DELETIONS
WWBE Breakdown for this Change Order
MWBE Sub
Type of Service
Amount for this CO
Same as Original Contract
Multiple
$43,684.00
Total
$43,684.00
Page 4 of 4
-_f
CapiEh
80, cUrr6 trkkt, nit rA - ltk - 820
Fort± ort6,T9xas—Ur02
W: at.. nn2-8..2.+
January 15, 2026
Farida Goderya, PhD, P.E.
Fort Worth Water Department
200 Texas Street
Fort Worth, Texas 76102
IWIC.- C 03A11F kam
Subject: Village Creek Water Reclamation Facility
CPN 103295 Primary Clarifier Improvements Project
PCM-001 New Storm Inlet
Dear Farida:
Please find a copy of Eagle Contracting's January 9, 2026 REV02 price proposal for adding a new
10-ft storm drain inlet in the primary area to facilitate stormwater drainage for the Primary
Clarifiers (PCs) 13-18 area while Eagle works on Box I and the ARCH-STS pipe relocation. Eagle's
temporary earth retention system (TERS) to protect their construction area during these activities
will block off the existing Box V storm inlet from PCs 13-18 area and Eagle needs to block off Box V
inlet from the construction area to protect them from being flooded by overflows from Box V. CDM
Smith proposed to add a new storm inlet on the east side of the construction area to allow for
stormwater drainage from PCs 13-18 area while this work is taking place. The cost associated with
this work is $43,684 and Eagle has requested a time extension of 26 calendar days.
CDM Smith and Carollo have reviewed the REV02 price proposal and are of the opinion that it is a
fair and reasonable price. CDM Smith and Carollo recommend the City accept this cost and issue a
Change Order in the amount of $43,684 and increase the contract substantial completion and final
completion durations by 26 calendar days. Please advise if the Water Department desires this PCM-
001 be incorporated into a Change Order.
Sincerely,
Amy Robinson, P.E., BCEE, CCM
Project Manager
CDM Smith Inc.
cc: Paul Allison, Carollo
Armando Avelar, Eagle Contracting
C—T:ro Vaman, PE
Project Manager
Carollo
coo
WATER+ ENVIRONMENT +TRANSPORTATION+ ENERGY+ FACILITIES I
« EAGLE
CONTRACTING
January 9, 2026
Farida Goderya, PhD, PE
Fort Worth Water Department
908 Monroe St.
Fort Worth, Tx 76102
Re: CPN 103295 Village Creek WRF Primary Clarifier Improvements
Sub: PCM-01 — Storm Inlet Eagle Proposal
Dear Ms. Goderya,
In accordance with specifications section 012600-1.4 & 007200-10.06, Eagle Contracting
hereby submits this cost proposal for extra work described in PCM-01 Storm Inlet. Eagle
Contracting has prepared this proposal based on the subject PCM documents received.
The purpose of PCM-01 is to eliminate the flooding potential at the Primary Clarifiers 13-
18 area during the relocation of the ARCH-STS pipe & the D/L/B of the 78" PCE-FRP from
sta.2+10 to sta.3+89, which requires the temporary decommission of the only storm inlet
that services the area. The new inlet proposed in PCM-01 will allow for the existing storm
inlet to be decommissioned to perform the original work while also providing storm
drainage to the Primary Clarifier 13-18 area.
Schedule Impacts
Eagle implemented the changes from PCM-01 into the December 2025 Progress
Schedule. To avoid the flooding potential of the existing Primary Clarifiers, PCM work is
required to be installed prior to activities- ARC1000-Remove & Relocate Existing ARCH-
STS sta.3+45 to sta.2+72 & PCE1010-D/L/B 78" PCE-FRP from sta.2+10 to sta.3+89.
The driving activity for this work to start is the Owners approval of this proposal, currently
projected - 01/15/2026. The majority of the PCM-01 impact comes from the submittal and
material procurement durations which we'll try and expedite to the best of our abilities.
PCM 015torm Inlet
PCM1000 PCM0lOmer RevlandAppmval
PCM1010 PCM41 ExpedRod Submltla's
PCM1020 PCM01Wet 4MatedalPmeulemeol
PCM1030 PCMW Polhola Exlsl" d 11" 30. RCP
PCMIn40 PCM01ExruveteE6PrepInlet Subgrade
PCM1(AU 15CM01 Inslel5lomr Inlel
PCM7(160 PCM-01 FIWP Inlet CUd1
PCM1070 PCM-01 Instal Plug on Exwtng Inht tE111101 Proposed Inlet)
61.0-1 01,0126
04127126
34.A5
100 OVUM
01115126
•3A00
20.00 01/1626
07JI3126
•34.00
40.00 02116/20
04110.126
34.00
2.00 04113120 -
— 04114126
-34 00
2.00 0411WO
0411020
•3400
4.00 04 ING
04122126
-31.00
2.00 04123120
041240
M.00
1.00 04121126
0412t126
-34.00
I
PCM No.: 01
PCM - 01 Storm Inlet
DESCRIPTION OF WORK ACTIVITY
CITY
UNIT
UNITPRICE'
TOTA
Installing Concrete Plug
Labor
Pothole & Demo Existing/ DIL/B & Tie -In 30"1 Install Inlet/ F/R/P Curb
Pipe Layer 3
240.00
HR
$
32.00
$
7.680.00
Foreman(i)
40.00
HR
$
70.00
$
2,800.00
Field Englneer(1)
16.00
HR
$
62.00
$
992.00
Operator(l)
40.00
HR
$
32.00
$
1,280.00
Install Tamp Plug on Face of Existing Inlet East of Proposed Inlet
Pipe Layer(3)
24.00
HR
$
32.00
$
768.00
Foreman(1)
8.00
HR
$
70.00
$
56050
Subtotal - Lab -or
360.00
$
14.080.00
Equipment
Owned -
Mini Excavator
20.00
HR
$
36.41
$
728.20
Loader
20.00
HR
$
07.20
$
1,344.OD
Rented -
Subtotal - Rented Equipment
$
Subtotal - Equipment
$
2,072.20
Materials
30" Pipe & WYE
1.00
LS
$
890.00
$
89D.00
1D'X3' Curb Inlet w/ Ring & Covers
1.00
LS
$
8,625.00
$
8,625,00
Reber & Concrete for FIR/P Curb
1.OD
LS
$
525.00
$
525.00
4x8x.5'THK Steel Plate for Plug of Exsiing Inlet East of Proposed Inlet
2.00
EA
$
555.05
$
1,110.10
Dewall Concrete Anchors Pack of 50
1,00
EA
$
110.43
$
110.43
Subtotal • Materials
$
11,260.53
Subtotal
$
27,412.73
Subcontractor
Demolished Material Haul Off
1.00
LS
$
51)0.0D
$
500.00
Subtotal
$
500.00
LABOR & EQUIPMENT BURDEN
Labor Burden @ 55%
1.00
LS
$
7,744.00
$
7,744.00
Fuel, 011, Grease for Rented Equipment 45% of Rented Equipment)
1.00
LS
$
$
Subtotal
5
7,744.00
GENERAL CONDITIONS
Small Tools 5%Labor
1.00
LS
$
704.00
$
704.00
Safety Equipment $2.00 per Manhour
1.00
LS
$
736.00
$
736.OD
Subtotal
$
1,440.00
OVERHEAD AND. PROFIT,
Overhead & Profit-15% Self Perform Work
$
4,962.68
Overhead & Profit- 5% Subcontracted Work
$
25.00
Subtotal
$
4,987.68
BONDS AND INSURANCE
Insurance @ 1.8%
$
757.52
Bonds @ 2%
$
841.69
Subtotal
$
1,599.21
Total
$
43,684,01)
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery
Title
4d44U�nb
a FfoRT�na
ATTEST:
q Pva o=d°
dQa TEX ASoQ'p
bllpo444
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Eagle Contracting, LLC
Subject of the Agreement: VCWRF Primary Clarifiers
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 62512-CO2
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes 0 No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 103295
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.