HomeMy WebLinkAbout064404-CO1 - Construction-Related - Contract - Thalle Construction Company, Inc.FORT WORTH City of Fort Worth
Change Order Request
CSC No. 64404-COl
Project Name: I
Northside III - Phase I- 54-Inch Water Transmission Main (EMWTP to Boat Club Road) City Sec No.:
Project No.(s); 104940-1 DOE No. N/A City Pro). No.
Project Description: Installation of a 54" water transmission main from Eagle Mountain Treatment Plant to Boat Club Rd
64404
104940.1
Contractor: Thalle Construction Company, Inc. Change Order # 0 Dale: 1 4/15/2026
CityProject Mgr. Preeli l<C, P.E. City Inspector: I Carmen Drake
Phone Number: 817-392-5467 Phone Number: 682-432-5486
Dept. Water - Part I Totals Contract Time
(Calendar days)
Original Contract Amount
Extras to Dale
Credits to Dale
Pending Change Orders (in M&C Process)
Contract Cost to Date
$25,317,617,00
$25,317,617,00.
500
$25,317,617.00
$25,317.617.00
500
Amount of Proposed Change Order
$0,00
$0.00
Revised Contract Amount $25,317,617,00
Original Funds Available for Change Orders $329,129.00
Remaining Funds Available for this CO $329,129.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%)
$26,317,617,00
500
$329,129.00
$329,129.00
$31,647,021,25
JUSTIFICATION r(REASONS).FOR CHANGE ORDER
In accordance with Section 0129 75 of the City's Standard Construction Specification Documents, Change Order No.1 will provide the Water
Department to make Material on Hand (MOH) payment for the 54-Inch water pipe to be utilized on the project and establishes unit prices that will
facilitate MOH Payments. The contractor has met all the requirements for MOH payments.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It Is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
time and money) for all costs arising out of, or incidental to, the above Change Order,
Contractor's Com an Name
Contractor Name
Contractor Signature
lz4
Date
Thalia Construction Company, Inc,
Chase Randall
— Anti, SQA 74-
Atf uL Zh
,ins aGlar
Data
ta�aJa4 _ anagar -
Date .
4/22/2026
Director (Vyater Dept)'
fitete
C s(ru0tton perJlsor(Weler;Dept)
Date
cAF .dear 5
04/27/2026
-- A
Senior Assistant City Attorney
Dale
Assistant City Manager
Date.
04/27/2026
1 rn ''
05/02/2026
M&C Number NIA M&C Date Approved N!A
FORTWWOO RTH City of Fort Worth
Change Order Additions
Project Name Norlhside III -Phase I.54-Inch Water Transmission Main (EMWTP to Boat Club Road) City Sec No.: 64404
Project No.(s): 104940-1 1 DOE No, N/A City Proj, No.: 104940.1
Project Installation of a 54" water transmission main from Eagle Mountain Treatment Plant to Boat Club Rd
Description
-Gon Fraces 'f halFe-Cons ruc on-Company,lnc.-Change Order = Dale: - _ -_ 411512026 --
City Project Mgr. I Preeli KC, P.E. City Inspector F Carmen Drake
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
1.046
Furnished 54" Pipe
Water - Part 1
13,181.00
LF
$240.00
$3,163,440.00
1.013.1
INSTALLED-3305.2012 54" Water Carrier Pipe
Water - Part 1
673.00
LF
$280.00
$188,440.00
1,tA'.1
INSTALLED-3311.1161 54" Steel AWWA C200 Water Pipe
Water - Part 1
730.00
LF
$380.00
$277,400.00
1.2A'.1
INSTALLED-3311.1144 54"Steel AWWA C200 Water Pipe (Restrained Joints)
Water - Part 1
1376.00
LF
$420,00
$577,920.00
UW.1
INSTALLED-3311,1143 54" Steel AWWA C200 Water Pipe, Select Backfill
Water - Part I
3525.00
LF 1
$840.00
$2,961.000.00
1.4A'.1
INSTALLED-3311.1146 54" Steel AWWA C200 Water Pipe Select Backfill (Restrained Joints)
Water - Part 1
2906.00
LF
$910.00
$2,643,550.00
1.6A'.1
INSTALLED-3311.1142 54" Steel AWWA C200 Water Pipe, CSS Backfill
Water - Part 1
105,00
LF
$990.00
$103,950.00
1.6A'.1
INSTALLED-3311.1145 54" Steel AWWA C200 Water Plpe CSS Backfill (Restrained Joints)
Water - Part 1
825.00
LF
$1,280.00
$1,056,000.00
1.7A'.1
INSTALLED-3311.1147 54" Steel AWWA C200 Water Pipe, CLSM Backfill
Water - Part 1
50.00
LF
$1,040.00
$52,000.00
1.8A'.1
INSTALLED-3311.1148 54" Steel AWWA C200 Water Pipe CLSM Backfill (Restrained Joints)
Water - Part 1
25.00
LF
$1,140,00
$28,500.00
1.9A'.1
INSTALLED-9999.0007 54" Steel AWWA C200 Water Pipe, Deep Trench Backfill
Water - Part 1
1630.00
LF
$390.00
$635,700.00
2.1A'.1
INSTALLED-9999.0009 54' Steel AWWA C200 Water Pipe, Deep Trench Backfill (Restrained Joints)
Water - Part 1
1337.00
LF
$470.00
$628,390.00
1.013
3305,2012 54" Water Carrier Pipe
Water - Part 1
-673.00
LF
$520.00
-$349,960.00
1 AA'
3311 A 141 54" Steel AWWA C200 Water Pipe
Water - Part 1
-730.00
LF
$620.00
-$452,600.00
1,2A'
3311.1144 54"Steel AWWA C200 Water Pipe (Restrained Joints)
Water - Part 1
-1376.00
LF
$660.00
-$908,160.00
1.3A'
3311.1143 54" Steel AWWA C200 Water Pipe, Select Backfill
Water - Part 1
-3525.00
LF
$1,080.00
-$3,807,000.00
1.4A'
3311.1146 54" Steel AWWA C200 Water Pipe Select Backfill (Restrained Joints)
Water - Part 1
-2905.00
LF
$1,150.00
-$3,340,750.00
1.5A'
3311.1142 54" Steel AWWA C200 Water Pipe, CSS Backfill
Water - Part 1
-105.00
LF
$1,230.00
-$129,150.00
1.6A'
3311.1145 54" Steel AWWA C200 Water Pipe CSS Backfill (Restrained Joints)
Water - Part 1
-825.00
LF
$1,620.00
-$1,254,000.00
1.7A'
3311.1147 54" Steel AWWA C200 Water Pipe, CLSM Backfill
Water - Part 1
-50.00
LF
$1,280.00
-$64,000.00
1.8A'
3311.1148 54" Steel AWWA C200 Water Pipe CLSM Backfill (Restrained Joints)
Water - Part 1
-25.00
LF
$1,380.00
-$34,500.00
1.9A'
9999.0007 54" Steel AWWA C200 Water Pipe, Deep Trench Backfill
Water - Part 1
-1630.00
LF
$630.00
-$1,026,900.00
2.1A'
9999.0009 54" Steel AWWA C200 Water Pipe, Deep Trench Backfill (Restrained Joints)
Water - Part 1
-1337.00
LF
$710.00
-$949,270.00
Water - Part 1
$0.00
Additions Sub Total
$0.00
rage J. or i
F01 R--F (-> IZ•g• H City of Fort Worth
Change Order Deletions
orlhsi e III - Phase I- 54-Inch Water Transmission Main E T-P to Boat Club
Project Name Road
Project No.(s): 104940-1 DOE No.
Project Description
City Sec No.: 64404
City Proj. No.: 104940 1
Installation of a 54" water transmission main from Eagle Mountain Treatment Plant to Boat Club Rd
Contractor Thalle Construction Company, Inc. Change Order: 0 Date 4/15/2026
City Project Mgr. Preeli KC, P.E. City Inspector: Fcarmon Drake
DELETIONS
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Preeti KC
Name of Employee
Sr. Professional Engineer
Title
pONtn�paA
ATTEST: ° V0.
o'we °sd
dpQ* *p
1
�a4pbnEXa54ov
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Thalle Construction Company, Inc.
Subject of the Agreement: Northside III, Phase I - 54 in Water Transmission Main (EMWTP to Boat Club Road)
M&C Approved by the Council? * Yes 0 No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 64404-COl
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes 0 No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 104940-1
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.