Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
025060 - Construction-Related - Contract - Turner Collie & Braden, Inc.
AMENDMENT NO. 3 STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. bO(p O (No M&C Needed) COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (City) and Turner Collie & Braden, Inc., (Engineer) made and entered into City Secretary Contract No. 23127, (the Contract) which was authorized by the City Council by M&C C-23127 on the 8th day of August 1997; and subsequently revised by two previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Mains BR and 279 Drainage Area Sanitary Sewer System Evaluation Study and Improvements (Group 7, Contract 1). WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 28, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $7,400.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $1,241,021.00. G[�FOCCOA©© C BT' 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the l day of , 1999, in Fort Worth, Tarrant County, Texas. ATTEST: for a Pearson, City Secretary APPROVAL RECOMMENDED: A. Douglas Rademaker, P.E. Director, Department of Engineering TURNER COLLIE & BRADEN INC. Contract AutFioriza on Date APPROVED: Mike Groomer Assistant City Manager ENGINEER By: jz Name: Robert C. Reach, P.E. Vice President, 1200 Summit Avenue, Suite 600 Fort Worth, TX 76102-4409 APPROVED AS TO FORM AND LEGALITY: c4ZJ Gary St inberger Assistant City Attorney 23127 -2- Turner Collie Braden Inc. Engineers • Planners • Project Managers May 24, 1999 Mr. Michael Domenech, P.E. City of Fort Worth Department of Engineering P.O. Box 870 Fort Worth, Texas 76101-0870 Re: - Supplemental Authorization Request (revised 6/28/99) Sanitary Sewer Main BR and 279 Drainage Areas Rehabilitation and Sewer Improvements Sewer Project No. PS58-070580410060 TC&B Project No. 47-97680-875 Dear Mr. Domenech: 1200 Summit Avenue Suite 600 Fort Worth, Texas 76102-4409 817 332-8977 Fax 817 332-8979 This letter is a request for supplemental authorization to provide for additional engineering design services requested by the City. On 4/30/99, Peter Fu asked us to investigate extending lateral L-1650 approximately 250 feet east to re-route service for a house that has had some recent back-ups. The rehabilitation of L- 1650 is part of MBR/279, Part 3, Unit 3. The additional survey, easement preparation and design work can be done quickly, but acquisition of easements would probably delay the advertisement date. Therefore, in accordance with the direction you gave me in our telephone conversation last week, we have prepared a fee estimate to remove Unit 3 from the Part 3 plans and prepare contract documents to bid Unit 3 separately. CONTRACT FEE SUMMARY Amendment No. 3 Basic Fee • Provide additional topographic survey (approx. 2501.f.) • Prepare at least 2 additional permanent easements. • Remove Unit 3 plans from Part 3 • Prepare contract documents to bid Unit 3 separately. Total Proposed Amendment No. 3 Fee $7,400. (A detailed breakdown and summary of estimated fees are attached) Es[abli shed in 1946 Engineering Excellence for Over One -Half Century. TEXAS AUSTIN / DALLAS / FORT WORTH / HOUSTON / RIO GRANDE VALLEY COLORADO DENVER FLORIDA MIAMI / WINTER PARK Mr. Michael Domenech, P.E. City of Fort Worth Department of Engineering Page 2 PROJECT FEE SUMMARY Contract Item Description Fee Original Contract M&C No. 23127 $1,212,995. Amendment No. 1 Add'l.' SSES Engineering Services (M&C 24683) $11,595. Amendment No. 2 Add'!. Design & Surveying (M&C 24695) $9,031. Subtotal $1,233,621. Amendment No. 3 Add'l. Design & Surveying $7,400. TOTAL PROJECT $1,241,021. If you have any questions or need additional information concerning this request, please call me at 332-8977. Sincerely, Stephen R. James, P.E. Project Manager Attachments cc: Peter Fu, P.E. - FWWD File 2.1 N:\Fr97680875\ORRBSp\FTW\Addcndwn\jnend 3, 5.18.99.doc CITY OF FORT WORTH MAIN BR AND 279 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS PART 3- DOE # 2465 ADDITIONAL EXPENSES FOR DELETING UNIT 3 FROM PART 3 AND PREPARATION OF SEPARATE BIDDING DOCUMENTS FOR UNIT 3 TC&B LABOR ESTIMATE I I Project Project I Senior I Ii TASK LISTING Principal Manager Engineer Technician Technician Clerical IITOTAL PART 3 PLAN & SPEC REVISIONS Revise Cover Sheet 2 $144 Revise Proj. Layout Sheet 4 $288 Revise Esmt. & Permit Layout Sheet 4 $288 Revise Sheet #'s & Cross References 4 $288 Revise Specs (delete ref. to Unit 3, revise 4 $300 bid proposal, & CCE) Reviews & City Coordination 4 2 $404 PREP. OF SEPARATE BIDDING DOCS. Revise Cover Sheet 2 $144 Revise Proj. Layout Sheet 4 $288 Revise Esmt. & Permit Layout Sheet 4 $288 Revise Sheet Vs & Cross References 4 $288 Prepare new Spec Book 6 2 $520 Survey Coordination 1 2 2 $384 Easement & ROE Preparation 2 $150 Reviews & City Coordination 2 8 3 $960 Bid Tabulation & Recomm. Letter 1 3 2 $416 TOTAL HOURS 2 4 27 28 5 6 72 LABOR EXPENSE TOTALS $220 $408 $2,025 $2,016 $260 $221 $5,150 TC&B NON -LABOR ESTIMATE TOTAL ESTIMATE H II $7,400 M-126/250 - PT 5 6/28199 FoP,TWOP,TH MEMORANDUM TO: A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager FROM: Tony Sholola / s DATE: July 1, 1999 RE: DESIGN FEE AMENDMENT NO. 1 TO MAINS BR AND 279 DRAIN- AGE AREA SANITARY SEWER SYSTEM EVALUATION STUDY AND IMPROVEMENTS (GROUP 7, CONTRACT 3) SEWER PROJECT NO. PS46-070460410290, DOE NO. 1717 The proposed amendment will pay Turner Collie & Braden, Inc., for the additional sur- vey and design services to be provided on the project as requested by the City. Part 3 of this project was scheduled to be advertised in three units. However, in order to allow for the design of an additional 250 linear feet without overly disrupting the project schedule, it is necessary to remove Unit 3 from the project and readvertise it for bid at a later date. The poor condition of the identified sewer line was unknown prior to award of the original contract. Turner Collie & Braden, Inc., has submitted a proposal in the amount of $7,400.00 for the additional survey design and printing services thereby increasing the contract fee from $1,233,621.00 to $1,241,021.00. I believe this fee is fair and reasonable for the additional services to be provided. Please authorize this additional design fee by your signatures on the attached contract amendment form. TS cc: Mike Domenech, P.E., Project Manager Berdena Hamilton, Water Dept. Dan Pepon, Water Dept MEMO 1717 ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TExns 76102-6311 (817) 871-7941 * Fax (817) 871-7854 QJ Printed on recycled paper