Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
025103 - General - Contract - J.B. Davies, Inc.
AMENDMENT NO. 2 STATE OF TEXAS 3 CITY SECRETARY CONTRACT NO. IC3 (No M&C Needed) COUNTY OF TARRANT 3 WHEREAS, the City of Fort Worth (City) and J.B. Davies, Inc., (Engineer) made and entered into City Secretary Contract No. 23667, (the Contract) which was authorized by the City Council by M&C C-16626 on the 24th day of February 1998 and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Main 390 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 6, Contract 1), Part 8. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 28, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $10,905.19. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $438,540.44. [iici c©u1 (DTU UI y 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the , day of1Jk 1999, in Fort Worth, Tarrant County, Texas. AT ST : I i 1, ,Lrj . _ contract+Autho ization loria Pea son, City Secretary Date APPROVAL RECOMMENDED: CX Lit A. Douglas Rademaker, P.E. Director, Department of Engineering J.B. DAVIES, INC. ENGINEER By: l 1�► Name: Edward 1. Green, P.E. Vice President 1412 West Magnolia Avenue Fort Worth, TX 76104-4249 APPROVED AS TO FORM AND LEGALITY: Gary Stnberger Assistant City Attorney APPROVED: Mike Groomer Assistant City Manager -2- J.B. DAVIES INC., ENGINEERS & SURVEYORS June 28,1999 Mr. Mike Domenech, P.E. Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102-6311 RE: Ammendment No. 2, Design Fee for replacement of additional L-2533 segments Main 390 Drainage Area Sanitary Sewer System Rehabilitation & Sewer Improvements (Group 6, Contract 1,) Part 8, Unit 4 Sewer Project No. PS46-070460410280 D.O.E. No. 2528 Dear Mike: We appreciate the opportunity to present this proposal and fee schedule for you consideration. Attached please find construction cost estimates and exhibits depicting the additional sewer lines to be rehabilitated. Attachment (1) contains a location summary for: L-2533 867 LF Opencut Pipe Replacement from Sta. 0+00 to 3+66 and 8+00 to 13+01 Estimated Construction Costs, Attachment (1) contains a detailed Cost Estimate: L-2533 Additional pipe replacement $ 124,359.00 Basic Engineering Design Services: (TSPE Curve for original contract: 7.71 %x 0.85=6.55%) 6.55% x Total Estimated Construction Cost = Subtotal Basic Design Fee $8,145.51 this includes M/WBE Drafting Services to be provided by E.C.D.S. (25.0%) $2,725.00 - 10% of M/WBE Design & Drafting Subconsultant work: $272.50 TOTAL BASIC DESIGN FEE $8,418.01 * Included in Basic Engineering Design Services fee per Attachment (3) FW E98011 amendment2 M-390 revl.xis 1412 West Magnolia Avenue / Fort Worth, Texas 76104-4249 / 817-335-3154/ Fax 817-870-1503 Amendment No. 2 M-390 Basin Cont. Letter to Mr. Mike Domenech, P.E. June 28,1999 Page 2 Total Basic Design Fee (from previous page) Special Services Design Surveys at 2.0% of Estimated Const. Cost Temporary Const. Easement (None) Temporary right -of -entry (none) Construction Services Pre and Post Construction from Attachment (4) Reproductions"' None Subtotal MBE printing 10% for MBE Printing Subcontractor "*Funding remains in the printing budget for the original contract TOTAL NOT -TO -EXCEED AMENDMENT NO.2 $8,418.01 $2,487.18 $0.00 $0.00 Total= $2,487.18 We will be using Elder's Computerized Drafting Service for drafting. This will result in 25% of the contract amendment that will be preformed by approved M/WBE firms. If you have any questions or require additional information, please give me a call. A summary of the total project fees are as follows Total = $0.00 $0.00 $0.00 $0.00 Total = $0.00 $10,905.19 Contract Description $/ft (computed) Fee Original Contract 33,158 LF of ewer $11.85 $392,914.64 Amendment No. 1 3,431 - $10.12 $34,720.61 Amendment No. 2 867 LF of Sewer $12.58 $10,905.19 Total Project 37,456 $11.71 ' $438,540.44 Sincerely, Edward L. Green, P.E. Vice President cc Peter FU, P.E. Water Dept FWE98011 amendment2 M-390 revl.xls Attachment (2) - ESTIMATED CONSTRUCTION COST AMENDMENT 2 M-390 G6, C1, P8 Main 170 Sanitary Sewer System Rehabilitation and Improvements Group 6, Contract 1, Part 8 Sewer Project No. PS46-070460410280 DOE No. 2528 MAIN 170 Basin Lateral - 2533 ITEM UNIT TOTAL NO. Description QTY. UNITS PRICE AMOUNT 1 8" OPEN CUT 831 LF $ 54.00 $ 44,874.00 2 8" OPEN CUT, DIP 36 LF $ 60.00 $ 2,160.00 3 CONSTRUCT MANHOLE 0 EA $ 1,700.00 $ - 4 MANHOLE INSERT 0 EA $ 77.00 $ - 5 CONCRETE COLLAR 0 EA $ 200.00 $ - 6 VACUM TEST MANHOLE 0 EA $ 110.00 $ - 7 EXTRA DEPTH MANHOLE 0 VF $ 125.00 $ - 8 RE -INSTALL SERVICES 22 EA $ 400.00 $ 8,800.00 9 INSTALL 4" SERVICES 550 LF $ 32.00 $ 17,600.00 10 STREET REPAIR 1161 LF $ 41.00 $ 47,601.00 11 PRE -TELEVISION 831 LF $ 2.50 $ 2,077.50 12 POST -TELEVISION 831 LF $ 1.50 $ 1,246.50 13 TRENCH SAFTEY 0 LF $ 2.00 $ - Subtotal $ 124,359.00 Grand Total $ 124,359.00 The unit prices shown were taken from the actual bids for unit 4 of this project. FWE98011 amendment2 M-390 rev1.xls Attachment (3) - MIWBE SUMMARY AMENDMENT 2 M-390 G6, Cl, P8 Sanitary Sewer System Rehabilitation and Improvements Group 6, Contract 1, Part 8 Project No. PS46-070460410280, DOE No. 1828 DESIGN FEE COST SUMMARY Phase Scope of Services Fee MWBE % I — Design Services Pipe Rehabilitation $10,905.19 $2,725.00 25.0% (Parts A and B) II — Pre -Construction Assistance (Part C) TOTAL $0.00 $ - 0% $10,905.19 $2,725.00 25.0% Proposed MWWBE Subconsultants Services Fees % Elder's Computerized Drafting Service Drafting/Research $2,725.00 25.0% Jim's Reproduction Service, Inc. Printing $0.00 0.0% TOTAL $2,725.00 25.0% FWE98011 amendment2 M-390 rev1.xls FOF,TWOF,TH MEMORANDUM TO: A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager FROM: Tony Sholola 1 •$ DATE: July 19, 1999 RE: DESIGN FEE AMENDMENT NO. 2 TO MAIN 390 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 1), PART 8 SEWER PROJECT NO. PS46-070460410280, DOE NO. 1828 The proposed amendment will reimburse J.B. Davies, Inc., for the additional survey and design services they provided on the project as requested by the City. It has been determined that an additional 867 linear ft. of severely deteriorated sanitary sewer lines within the project area must be replaced. The deteriorated condition of the identified sewer line was unknown prior to beginning construction of the project. J.B. Davies, Inc., has requested reimbursement in the amount of $10,905.15 for the additional survey and design services thereby increasing the contract fee from $427,635.25 to $438,540.44. I believe this fee is fair and reasonable for additional services that were provided. Please authorize this additional fee by your signatures on the attached contract amendment form. cc: Mike Domenech Berdena Hamilton Dan Depon, Water Department ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TExAS 76102-6311 (817) 871-7941 * Fax (817) 871-7854 O Printed on recycled paper