Loading...
HomeMy WebLinkAbout025135 - Construction-Related - Contract - Wade & Associates, Inc.AMENDMENT NO. 1 STATE OF TEXAS b CITY SECRETARY CONTRACT NO. 5/35 (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Wade & Associates, Inc., (Engineer) made and entered into City Secretary Contract No. 22266, (the Contract) which was authorized by the City Council by M&C C-15708 on the 15th day of October, 1996; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Sanitary Sewer Main C1C4B Drainage Area Sanitary Sewer Evaluation Study and Improvements (Group 6, Contract 2). WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 13, 1999 a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $11,976.07. 2. Article III, Section D of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $1,193,953.07. 0-IMCOad RECORD core cQ( Qy 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the !0 yL day o£ 1999, in Fort Worth, Tarrant County, Texas. ATT . Gloria Pearson, City Secretary APPROVAL RECOMMENDED: -A�t J L ¢ A. Douglas Rademaker, P.E. Director, Department of Engineering WADE & ASSOCIATES, INC. ENGINEER By: (7>)4e Name: Mark Wade, P.E. President 213 South Jennings Avenue Fort Worth, TX 76104 APPROVED AS TO FORM AND LEGALITY: �4J Gary Steinberger Assistant City Attorney 22266 11L Contract AuthorizMtion Date APPROVED: Mike Groomer Assistant City Manager -2- WHUE 13 July 1999 Mr. John Boyer, Project Manager Fort Worth Department of Engineering Integrated Wet Weather Program 811 Lamar Street, Suite 310 Fort Worth, Texas 76102 RE: Submission of Revised Contract Amendment No. 1, Main C1C4B Drainage Area, Sanitary Sewer System Rehabilitation and Improvements Project, Group 6, Contract 2, Project No. PS46-07046041230 - WADE File No. 9627 Dear Mr. Boyer: We have addressed the City comments concerning the previously submitted contract amendment and we are pleased to submit the revised contract amendment for your consideration and approval. The revised amendment will constitute the first formal contract amendment under the aforementioned agreement. Specifically, we are seeking the approval of the following additional work items in this amendment as described below: Contract Reference: Attachment A-3 to the Contract, Phase III — Design Services: Supplemental Field Operations Lines • Design Impacts Resulting from the Removal of L-563 from the Part 3 Construction Documents: Under the above referenced contract element, WADE's sub -consultant, Garcia & Associates, recently submitted a request for a contract amendment to recover costs associated with the removal of L-563 from the construction documents for the Part 3 project plans as directed by the City. An easement needed to be acquired for this sewer lateral and the property owner refused to cooperate as the attached Garcia's letter explains. This created an extensive delay in bidding this project and it was decided to pull this lateral from the plans in order to finalize the contract documents for bidding. We have included a copy of Garcia's amendment request letter for your review and approval. WADE has not endorsed the fee amount requested, but we believe that their amendment request is justified. We have also included our costs associated with this amendment item, including a 10% administrative fee. Please advise us immediately if there is a problem with this request. Consulting Engineers 213 South Jennings Avenue Fort Worth, Texas 76104 8 1 7. 3 3 5. 2 8 7 9 FAX 817.335.1729 Page 2 of 4 Mr. John Boyer 7/13/99 Staff Hours Labor Direct Total Expenses Expenses Expenses Senior Engineer 4 $403.16 $ 403.16 ($100.79/hr) Garcia & Associates $2,873.00 $ 2,873.00 Amendment No. 1 10 % Admin. Fee to $ 287.30 $ 287.30 WADE TOTALS: $ 3,563.46 Contract Reference: Attachment A-6 to the Contract, Phase VI — Design Services: Pipeline Rehabilitation • Design Impacts Associated with the Issuance of Addendum Nos. 1, 2, & 3. to the Part 5 Project: WADE was asked to issue 3 Addenda on the Part 5 project that rescheduled the bid opening date, incorporated "Fig. B" as the new backfill and embedment specification, and issued 3 revised plan sheets for L-556 to respond to City Staff's design revision requests for trenchless methods in an alley. Additionally, WADE was also asked to design a short (115 LF) sewer line extension of M32R in Cantey Street. The information below reflect costs incurred for this work: Staff Hours Labor Direct Total Expenses • Expenses Expenses Senior Engineer 10 $1,007.90 $ 1,007.90 ($100.79/hr) Senior Office 18 $1,096.92 $ 1,096.92 Technician ($60.94/hr)) Printing Costs, $ 214.59 $ 214.59 (Includes a 10% Administrative Fee) Labor Subtotal: $ 2,104.82 Direct Expenses Subtotal: $ 214.59 TOTALS: $ 2,319.41 • Design Impacts Associated with the Final Review of the Part 8 Project: During the final review for the Part 8 project, several additional work items arose that are presently being addressed by WADE during final edits to the contract documents. Specifically, WADE was asked to re -incorporate the rehabilitation of a portion of L-510 that was eliminated previously from the project. We are rehabilitating the portion of L-510 located on the Lilly B. Clayton Elementary School property that will now become a private sewer line. Overall, WADE is designing the trenchless rehabilitation of about 420 LF of L-5 10. Wade & Associates, Inc. Consulting Engineers Page 3 of 4 Mr. John Boyer 7/13/99 WADE was also asked to re-examine the design for approximately 1,050 LF of M-32 in 8`s Ave. from W. Arlington Street to south of Mitchell Ave. to existing Sta. 15+00 due to contradictions in as -built information being represented by TCB -and Halff for the existing 20 -inch waterline along this portion of 80' Ave. Additionally, WADE was asked to delete the proposed storm sewer junction box at the crossing of M-32 and the 84 -inch storm sewer near W. Arlington Street in order to reduce project costs. Lastly, WADE also incorporated the appropriate changes to the contract documents associated with the utilization of the latest version of City's Standard Specifications, including the inclusion of Fig. B as the new backfill and embedment specification for sanitary sewer pipes that required multiple edits on 18 plan sheets. The information below reflect costs incurred for all of this work: Staff Hours Labor Direct Total Expenses Expenses Expenses Senior Engineer 16 $1,612.64 $ 1,612.64 ($100.79/hr) Senior Office 20 $1,218.80 $ 1,218.80 Technician ($60.94/hr)) Office Technician 64 $3,061.76 $ 3,061.76 ($47.84/hr) Printing/Plotting $ 200.00 $ 200.00 Costs Labor Subtotal: $ 5,893.20 Direct Expenses Subtotal: $ 200.00 TOTALS: $ 6,093.20 In summary, WADE seeks to recover actual expenses that either have been or are currently being incurred for all of the work items addressed and itemized in the table below. Amendment Item Total Fee Requested Design Impacts Resulting from the Removal of L-563 from the Part 3 Construction Documents: $ 3,563.46 Design Impacts Associated with the Issuance of Addendum Nos. 1, 2, & 3. to the Part 5 Project: $ 2,319.41 Design Impacts Associated with the Final Review of the Part 8 Project: $ 6,093.20 TOTAL AMENDMENT REQUEST: $11976.07 Wade & Associates, Inc. Consulting Engineers Page 4 of 4 Mr. John Boyer 7/13/99 Therefore, we are requesting revised Contract Amendment No. 1 in the amount of $ 11,976.07 to the M-C1C4B Agreement. This amendment would increase the total contract amount from $1,181,977.00 to $1,193,953.07, representing an increase of approximately one percent (1.01%). We are prepared to work with you as necessary in order to expedite this request. We would be pleased to meet with you to discuss this amendment request at your earliest convenience. Please do not hesitate to contact me should you have any questions or need any background information concerning this matter. Thank you for your time and consideration. WADE & ASSOC TES, INC. Chris Brooks, P.E., Project Manager ATTACWvIENT CC: Peter Fu, P.E., FWWD, City of Fort Worth Tony Sholola, P.E., DOE, City of Fort Worth Jody Zabolio III, P.E., Project Manager, Fort Worth Water Department Mark Wade, P.E., President, WADE Wade & Associates, Inc. Consulting Engineers (1L), ft fAY.,191999 May 17, 1999 ¢uaa a asaoaarc OKIM[GUN. I. Transportation Chris Brooks, P.E. AvWion Wade & Associates, Inc. Water/Wastewater 213 S. Jennings Ave. Traffic Surveying Fort Worth, TX 76104 Environmental RE: G&A # 97-021 Main C1C4B Drainage Area Sanitary Sewer System Rehabilitation & Improvements, (Group 6, Contract 2), Part 2 Sewer Project No. PS46-070460410230, D.O.E. No. 1805 Amendment No. 1 Dear Mr. Brooks: Garcia and Associates Engineering, Inc. is pleased to present the following Amendment No. 1 to our existing Sub -consultant Services Agreement for additional services requested by the City of Fort Worth for the above referenced project. The requested changes are as follows: 1. Remove L-563 from the project due to lack of authorized right of entry and easement documents. This line segment requires re -alignment and modifications to an existing packaged lift station. Unfortunately, the property owner will not cooperate with City staff or Sub -consultant for right of entry and easement documents required for construction. Owner: The Goodrich Center for the Deaf Home of Tarrant County Services for the Hearing - Impaired 2500 Lipscomb Street Fort Worth, TX 76110-2625 (817) 926-4101 Contact: Joan Lathrope, Executive Director *Basic Services a. Revise plan/profile sheets $1,583.00 b. Revise specifications/contract documents $670.00 c. Revise sheet quantity estimate $380.00 d. Revise engineers' opinion of probable construction cost $240.00 Total Fee for Amendment No. 1 $2,873.00 *See Attachment "A". A summary of the total project fee is as follows: Contract Description Fee Original Contract 4200 LF of Sanitary Sewers $34,174.00 Amendment No. 1 Revisions to plans/specifications $2,873.00 Total Project $37,047.00 6850 Manhattan Blvd. + Suite 300 + Fort Worth, TX 76120 + Phone: 817 • 446 • 1800 + Metro: 817 • 429 • 9620 + Fax: 817 • 446 • 1113 Chris Brooks, P.E. May 17, 1999 Page 2 of 2 Please review this Amendment No. 1 and contact me if you have any questions or require additional information. Sincerely, Garcia and Associates Engineering, Inc. Robert J. Roth Project Director Attachment cc: Richard Aillet, P.E., Manager, Water/Wastewater Services Joan Horton, Manager, Engineering Support Services ATTACHMENT "A" Supplement to Amendment No. 1 for Main C1C4B Drainage Area Sanitary Sewer System Rehabilitation & Improvements, (Group 6, Contract 2), Part 2 Sewer Project PS46-07()460410230 D.O.E. No. 1805 Key Personnel & Manhours ADDITIONAL SERVICES PRINCIPAL PROJECT MANAGER PROJECT DIRECTOR CADD TECHNICIAN CLERICAL SUBTOTAL 1. Revise plan/profile sheets 1 2 8 16 $ 1583.00 2. Revise specifications/contract documents 1 6 2 4 _ $670.00 3. Revise sheet quantity estimate 1 4 1 $380.00 4. Revise engineersopinion of probable construction cost 1 2 1 S240.00 TOTAL S2873.00 FoF,TWOF,TH MEMORANDUM TO: A. Douglas Rademaker, Director, DOE and Mike Groomer, Assistant City Manager FROM: Tony Sholola, DOE / • S . DATE: July 27, 1999 RE: DESIGN FEE AMENDMENT NO. 1 TO SANITARY SEWER MAIN C1C4B DRAINAGE AREA SANITARY SEWER EVALUATION STUDY AND IMPROVEMENTS (GROUP 6, CONTRACT 2), DOE NO. 1805, PROJECT NO. PS46-070460410230 The proposed amendment will reimburse Wade & Associates, Inc. (WAI), for the addi- tional survey and design services they provided on the project as requested by the City. In order to advertise the Part 3 plans on schedule, staff directed WAI to remove Lateral L-563 from the project plans. Staff has not been able to obtain a permanent easement necessary to construct the lateral. It was also necessary to revise the project plans and specifications to reflect the latest City details and specifications which were developed after the project was advertised for bid. In addition, the Water Department requested that WAI prepare plans for Lateral L-5 10 which had been previously eliminated from the project. Wade & Associates, Inc., has requested reimbursement in the amount of $11,976.07 for the additional survey and design services thereby increasing the contract fee from $1,181,977.00 to $1,193,953.07. I believe this fee is fair and reasonable for additional services that were provided. Please authorize this additional design fee by your signatures on the attached contract amendment form. cc: John Boyer, Project Manager Berdena Hamilton, Water Department Dan Pepon, Water Department MEMO 1805 ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TExAS 76102-6311 (817) 871-7941 * Fnx (817) 871-7854 O Printed on recycled paper