HomeMy WebLinkAbout025136 - Construction-Related - Contract - Wade & Associates, Inc.AMENDMENT NO. 1
STATE OF TEXAS CITY SECRETARY CONTRACT NO./3(0
(No M&C Needed)
COUNTY OF TARRANT b
WHEREAS, the City of Fort Worth (City) and Wade & Associates,
Inc., (Engineer) made and entered into City Secretary Contract No.
23763, (the Contract) which was authorized by the City Council by
M&C C-16691 on the 24th day of March, 1998; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Main M-390 Drainage
Area, Sanitary Sewer Rehabilitation and Improvements (Group
6, Contract 1), Part 5 and M -106R Drainage Area Sanitary
Sewer System Rehabilitation and Improvements (Group 4,
Contract 2), Part 7
WHEREAS, it has become necessary to execute Amendment
No. 1 to said Contract to include an increased scope of work
and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated July 13, 1999 a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services
to be performed by Engineer total $7,630.08.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $317,630.08.
OFFIC L RECD D,
CLITY5FC,P Ey
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the 1 Q
1999, in Fort Worth, Tarrant County,
ATT S
G oria Pears n, City Secretary
APPROVAL RECOMMENDED:
A. Douglas Rademaker, P.E.
Director, Department of
Engineering
WADE & ASSOCIATES, INC.
ENGINEER
By:
AMAZ CA
Name: Mark Wade, P.E.
President
213 South Jennings Avenue
Fort Worth, TX 76104
APPROVED AS TO FORM AND LEGALITY:
Gary S inberger
Assistant City Attorney
23763
day ofO�,r,�,
Texas.
Yli) Vi
Contract Author at ion
Date
APPROVED:
Mike Groomer
Assistant City Manager
-2-
WHUE
13 July 1999
Department of Engineering
Integrated Wet Weather Program
ATTN: Mr. Mike Domenech, P.E.
811 Lamar Street, Suite 310
Fort Worth, Texas 76102
RE: Submission of Revised Contract Amendment No. 1,
Main M-390 Drainage Area, Sanitary Sewer Rehabilitation and Improvements
(Group 6, Contract 1), Part 5, DOE 1649, Sewer Project No. PS46-070460410280,
and M -106R Drainage Area Sanitary Sewer System Rehabilitation and
Improvements (Group 4, Contract 2), Part 7, Sewer Project No. PS46-070460410150
WADE File Nos. 9803 & 9804
Dear Mr. Domenech:
We have evaluated the City's comments on the first contract amendment submission and we
have addressed those concerns in the revised contract amendment document being submitted.
The revised amendment will constitute the first formal contract amendment under the
aforementioned agreement. Specifically, we are seeking approval of the following additional
work items in this amendment request as described below:
Phases la & lb — Design Services: Sewer Pipeline Rehabilitation for M-390 (Basin E &
misc. locations) Drainage Areas
• Design Impacts from the Incorporation of the Revised Backfill and Embedment
Detail (Fig. B) into the Part 5 Plans.
Under the above referenced contract element, WADE had to incorporate changes on 29
sheets of M-390, Part 5 project plans that revised the backfill and embedment detail to
"Fig. B". Activities associated with this amendment item included revising plan/profile
sheets (CAD edits), plotting plan sheets, and revising specifications/contract documents.
The table below reflects the staff hours and miscellaneous costs associated with this
work item.
Consulting Engineers
213 South Jennings Avenue
Fort Worth, Texas 76104
8 1 7. 3 3 5. 2 8 7 9
FAX 817.335.1729
Staff/Item
Hours
Labor
Direct
Total
Expenses
Expenses
Expenses
Senior Engineer
4
$ 403.16
$ 403.16
($100.79/hr)
Staff Engineer
18
$1,166.76
$ 1,166.76
($64.82/hr)
Page 2 of 4
Mr. Mike Domenech
7/13/99
Senior Office
Technician ($60.94/hr)
4
$ 243.76
$ 243.76
Printing/PlottingPrinting/Plotting Costs
$ 290.00
$ 290.00
Labor Subtotal:
$ 1,813.68
Direct Expenses Subtotal:
$ 290.00
TOTALS:
$ 2,103.68
• Design Impacts Associated with the Incorporation of Short Bores and Relative
Specification Changes into the M-390 Project Plans:
During the final review of the above referenced project plans, it was approved by City
staff to reinstate the use of short bores for sewer replacements/extensions through tree
roots and for limited utility crossings. This change forced significant modifications to
the plan sheets in order to incorporate the short bores and reduce the footage of the
construction method "By Other Than Open Cut". Additionally, the amendment
addresses the City's requirement to specifically note DIP when utilizing construction
methods "By Other than Open Cut" as well as numerous specification revision
'discovered after the release of the May 1999 version of the City of Fort Worth Standard
Specifications D and DA. This resulted in nearly 60 specific plan edits on 15 plan
sheets. Activities in this amendment item include revising plan/profile sheets (CAD
edits), revising specifications/contract documents and revising the engineer's
construction cost estimate. The table below reflects the staff hours and miscellaneous
costs associated with this work item.
Staff/Item
Hours
Labor
Expenses
Direct
Expenses
Total
Expenses
Senior Engineer
($100.79/hr)
10
$ 1,007.90
$ 1,007.90
Staff Engineer
($64.82/hr)
40
$ 2,592.80
$ 2,592.80
Senior Office
Technician ($60.94/hr)
12
$ 731.28
$ 731.28
Printing/Plotting Costs
$ 150.00
$ 150.00
Labor Subtotal:
$ 4,331.98
Direct Expenses Subtotal:
$ 150.00
TOTALS:
$ 4,481.98
• Easement Instrument Revisions:
During the design of this project, we received 5 requests from Real Property for revisions
to permanent and temporary construction easement instruments to reflect changes in
ownership and address property owner conditions to acquiring the easement from the
Wade & Associates, Inc.
Consulting Engineers
Page 3 of 4
Mr. Mike Domenech
7/13/99
property owner. This resulted in numerous design changes and edits on several plan
sheets. At this time, our surveyor, Gorrondona & Associates, Inc. have not requested
additional fees for making these instrument revisions. We will submit their request as
part of another contract amendment as they occur. Activities in this amendment item
include revising plan/profile sheets (CAD edits), revising easement instruments and
easement table/exhibit in the plans. The table below reflects the staff hours and
miscellaneous costs associated with this work item.
Staff/Item
Hours
Labor
Expenses
Direct
Expenses
Total
Expenses
Senior Engineer
($100.79/hr)
2
$ 201.58
$ 201.58
Staff Engineer
($64.82/hr)
12
$ 777.84
$ 777.84
Printing/Plotting Costs
$ 65.00
$ 65.00
Labor Subtotal:
$ 979.42
Direct Expenses Subtotal:
$ 65.00
TOTALS:
$1,044.42
In summary, WADE seeks to recover actual expenses that either have been or are currently
being incurred for all of the work items addressed and itemized in the table below.
Amendment Item
Total Fee Requested
Recovery of Design Impacts from the Incorporation of the
$ 2,103.68
Revised Backfill and Embedment Detail (Fig. B) into the
Plans:
Recovery of Design Impacts from Incorporating Short
$ 4,481.98
Bores and other Standard Specification Changes into the
Plans:
Recovery of Easement Instrument Revision Impacts:
$ 1,044.42
TOTAL AMENDMENT REQUEST:
$ 7,630.08
Therefore, we are requesting Contract Amendment No. 1 in the amount of $7,630.08 to the
original M-390 Agreement. This amendment would increase the total contract amount from
$310,000.00 to $317,630.08, representing an increase of nearly 2.5 percent (2.46%). As is
indicated throughout the above narrative work descriptions, WADE received verbal
authorization prior to performing the services discussed above.
We are prepared to work with you as necessary in order to expedite this request and I would
be pleased to meet with you to discuss this amendment request at your earliest convenience.
Wade & Associates, Inc.
Consulting Engineers
Page 4 of 4
Mr. Mike Domenech
7/13/99
Do not hesitate to contact me should you have any questions or need any background
information concerning this matter. Thank you for your time and consideration.
WADE & ASSOC TES, INC.
Chris Brooks, .E.,
Project Manager
CC: Peter Fu, P.E., FWWD, City of Fort Worth
Tony Sholola, P.E., DOE, City of Fort Worth
Mark Wade, P.E., President, WADE
Wade & Associates, Inc.
Consulting Engineers
FoP,TWoP,TH
MEMORANDUM
TO: A. Douglas Rademaker, Director, DOE and
Mike Groomer, Assistant City Manager
FROM: Tony Sholola, DOE T. S .
DATE: July 27, 1999
RE: DESIGN FEE AMENDMENT NO. 1 TO MAIN M-390 DRAINAGE AREA,
SANITARY SEWER REHABILITATION AND IMPROVEMENTS
(GROUP 6, CONTRACT 1), PART 5 AND M -106R DRAINAGE AREA
SANITARY SEWER SYSTEM REHABILITATION AND IMPROVE-
MENTS (GROUP 4, CONTRACT 2), PART 7, DOE NO. 1649, SEWER
PROJECT NO. PS46-070460410280
The proposed amendment will reimburse Wade & Associates, Inc. (WAI), for the addi-
tional services they provided on the project as requested by the City.
After design was substantially completed, staff directed WAI to revise the project plans
to reflect the latest City details and specifications. It was also necessary to revise the in-
struments for five rights of entry to reflect the latest owners.
Wade & Associates, Inc., has requested reimbursement in the amount of $7,630.08 for
the additional design services thereby increasing the contract fee from $310,000.00 to
$317,630.08. I believe this fee is fair and reasonable for additional services that were
provided.
Please authorize this additional design fee by your signatures on the attached contract
amendment form.
cc: Mike Domenech, Project Manager
Berdena Hamilton, 'Water Department
Dan Pepon, Water Department