Change Order Request
Facility and Project WRMC Coliseum Burnett & Moncrief Roof Replacements
Description:
CSC No. 63772-CO2
City Sec No. 63772
Funding (FID) No.(s) 34030 0240450 5740010105158 000680 9999 City Project Nc 105157
Contractor: ITrumble Construction LLC, dba RBT Roofing Change Order # 0 Date: 4/28/2026
City Project Mgr. Jackson Jones
Phone Number: 817 269-6578
Original Contract Amount —
City Inspector: lJohn Fowler
Phone Number: 682 201-1918
Contract
Time (CD)
Extrasto Date ----------------------------------------------------------------------------------------------------------------------
Creditsto Date --- —----- _-------------- _------- ____________----- _------- _----- _------- ______------- ______________.
Pending Change Orders (in M&C Process) --- ----------------- ---------------- ---------------- ---------------- ------- ----
Contract Cost to Date ----- --_--- _------- ___________________________________________�__________�___.
Amount of Proposed Change Order ------ —------------ __-------------- _------------ __------------ __------------ —_
Revised Contract Amount ------------------------------------------ ---------------- --------------------------------------------
Original Funds Available for Change Orders -----------------------------------------------------------------------------
Remaining Funds Available for this CO ------------------------------------------------------------------------------------
Additional Funding (if necessary) --------------------------------------------------------------------------------------------
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25% IF APPLICABLE)
The purpose to Change Order #2 will expand the scope of work for the WRMC roof replacement project to include the roof canopy repair at Will Rogers
Memorial Center due to lightning strike. This change includes all necessary materials, labor, supervision, and equipment required to repair the roof canopy,
electrical and structure for the Pioneer Tower.
As a result of this change order, we will use General Contingency Allowance funds remaining in the construction contract for the WRMC Coliseum Burnett
and Moncrief Roof Replacements. The construction contract amount will not increase. However, this change will extend the project timeline by an extra 60
calendar days.
A previous change order #1 was approved to inccude roof replacements of the Welcome Center and Ticket Booths, approved by M&C 26-0202, March 10,
2026.
Trumble Construction was selected as the contractor for this project in August of 2025 and funding for this project is being provided by the Public Events
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to the above Change Order.
Contractor's Company Name
Contractor Name
Trumble Construction LLC
Ryan Campbell (off
05/04/2026
PMD Inspector
ana ementDepaitment
C �� 05/04/2026e
05/04/2026
ert ement Departm
05/04/2026
�)�° �I '°
05/04/2026
Jack on Jones (Ma 4, 2026 07:47:27 CDT)
U
o'ect Manager
e
/�r�o 05/04/2026
05/08/2026
Jack on Jones (Ma 4, 2026 07:48:28 CDT)
Stephen Hines (May 8, 2026 15:50:19 CDT)
Assistant City Manager
Rc '014 stop h
✓a&W�(
ens
05/11 /2026
Valerie Washington May 11, 2026 06:28:12 CDT
Harold Stephens (May a 2026 a:n:ta cor
M&C Number
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Nikita Watts
Sr. Capital Projects Officer
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Trumble Construction LLC, dba RBT Roofing
Subject of the Agreement: Change Order #2 will expand scope of work to the WRMC Coliseum,
Burnett and Moncrief Roof Replacement project to include roof repairs to Pioneer Tower due to lightning strike.
The repairs are to include all scope for roof canopy, electrical and structural.
M&C Approved by the Council? * Yes ❑ No n
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 63772
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
Expiration Date:
If different from the approval date. If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving AM or attached to the contract.
Project Number: If applicable. 105158
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes ✓❑ No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.
Permanent Contracts
Advanced Funding Agreements
Architect Service
Community Facilities
Completion Agreement
Construction Agreement
Credit Agreement/ Impact Fees
Crossing Agreement
Design Procurement
Development Agreement
Drainage Improvements
Economic Development
Engineering Services
Escrow Agreement
Interlocal Agreements
Lake Worth Sale
Maintenance Agreement/Storm Water
Parks/Improvement
Parks/Other Amenities
Parks/Play Equipment
Project Development
Property/Purchase (Property owned by the City)
Property/Sales (Property owned by the City)
Property/Transfers (Property owned by the City)
Public Art
Sanitary Sewer Main Replacements
Sanitary Sewer Rehabilitations
Settlements (Employees Only)
Streets/Maintenance
Streets/Redevelopment
Streets/Repairs
Streets/Traffic Signals
Structural Demolition (City owned properties)
Utility Relocation
Water Reclamation Facility
Water/Emergency Repair
Water/Interceptor
Water/Main Repairs
Water/Main Replacement
Water/Sanitary Sewer Rehabilitation
Water/Sewer Service
Water/Storage Tank
LRBTS�1\
N
8619 W 71h St
Texarkana, TX 75501
Phone: (903) 691-0931
www.rbtroofing.com
• Project Name: City of Fort Worth Moncrief & Burnett -Pioneer Tower Investigative Proposal
• Project Number: 105158
• Date:412912026
• Proposal: For site investigation purposes
1. The cost breakdown below reflects all pricing necessary for a thorough on -site investigation of
Pioneer Tower Damages. RBT plans to provide the City of Fort Worth with safe access to assess all
damage by means of crane and crane basket. RBT will also provide manpower and all necessary
tools to remove and discard "loose" debris, without creating additional damages.
• Crane: $7,659.30
• Manpower: $800.00
• Profit (10%): $845.00
• Overhead (10%): $845.00
• Total: $10,149.30
Temporary RepoirAllowance: $20,318. 60
o Crane (2 days): $15,318.60
o Temporary Repair (Materials & Labor): $5,000.00
Attached is the proposed staging plan, along with data for the man -basket to be utilized forsite
inspection.
Note: Crane lead time is 14 days from notice to proceed.
X
Ryan Campbell
Operations Director
11Pagc
/RBT\\OFNG
Proposed Staging Plan:
8619 W 7ch St
Texarkana, TX 75501
Phone: (903) 691-0931
www.rbtroofing.com
2 1 i,1-
Annual / Periodic Big G Inspection Service Personnel Platform
Inspection Report Joe @ 512-789-7877
Big.ginspection@gmail.com
Owner: Tatum Crane
Contact Person: Ty Tatum
Date: 11/1/2025
Location: Fort Worth, TX
Project: yard
Unit ID: N/A
Max Capacity: 15001bs
Serial #: J6166
Make: Lakeshore
Model: M466
Inspector: Joe Galbraith
Annual / Periodic Big G Inspection Service Personnel Platform
Inspection Report Joe @ 512-789-7877
Big.ginspection@gmail.com
IInspection Status: S = Satisfactory
D = Deficiency R = Recommendation
N/A = Not Applicable
Rigging Requirements
1
Each bridle leg is connected to the master link, or shackle in a way that ensures the load is evenly
S
distributed between all the bridle legs.
2
All rigging, wire rope, shackles, rings, master links, and other rigging hardware, have a minimum safety
s
Factor of 5:1
3
All rigging equipment for the man basket is exclusively for it's use only.
S
4
All rigging has been inspected for kinks or damage of any kind.
s
5
IThe maximum rated load and maximum capacity is posted on a permanently affixed plate on the man basket.
s
6
10ther
Man basket Requirements
7
The basket has been designed with a 5.1 safety factor by a qualified engineer and welded by a qualified
welder.
s
8
A permanently affixed identification plate is present on the man basket. Required information includes;
basket weight capacity and occupancy limit, self weight, I.D. number, manufacturer.
S
9
The guardrail designed to enclose the platform is provided and is enclosed from the toe board to the
mid -rail with either solid construction or expanded metal, having openings no greater than 112 inch. The
toe board must be 4 inches to 6 inches high and the top rail 42 inches high.
S
10
A grab rail has been provided inside the entire perimeter.
S
11
Body harness anchorage has been provided.
S
12
The access gate has been designed to open in only and has a positive locking system to prevent
accidental opening during operation.
s
13
The design allows enough headroom for employees to stand upright.
S
14
There are no rough edges on any man basket surface.
s
15
In addition to hard hats, overhead protection is provided when employees are exposed to falling objects.
s
16
Smooth interior surfaces.
S
17
Number of workers permitted for work.
2
18
Total weight of basket, rigging, workers and materials.
685lbs
19
Other
20
Other
Inspection Result: Pass
Inspector Name: Joe Galbraith
Annual / Periodic Big G Inspection Service Personnel Platform
Inspection Report Joe @ 512-789-7877
Big.ginspection@gmail.com
Inspection Status:
S = Satisfactory D = Deficiency R = Recommendation
N/A = Not Applicable
Deficiencies & Recommendations
Items Status Comments
There where no dediciencies found at the time of inspection.
Annual / Periodic Big G Inspection Service Personnel Platform
Inspection Report Joe @ 512-789-7877
Big.ginspection@gmail.com
Owner: Tatum Crane
Contact Person: Ty Tatum
Date: 11/1/2025
Location: Fort Worth, TX
Project: yard
Unit ID: N/A
Max Capacity: 1500lbs
Serial #: SN-03
Make: Tatum Crane
Model: MB03
Inspector: Joe Galbraith
Annual / Periodic Big G Inspection Service Personnel Platform
Inspection Report Joe @ 512-789-7877
Big.ginspection@gmail.com
IInspection Status: S = Satisfactory
D = Deficiency R = Recommendation
N/A = Not Applicable
Rigging Requirements
1
Each bridle leg is connected to the master link, or shackle in a way that ensures the load is evenly
S
distributed between all the bridle legs.
2
All rigging, wire rope, shackles, rings, master links, and other rigging hardware, have a minimum safety
S
Factor of 5:1
3
All rigging equipment for the man basket is exclusively for it's use only.
S
4
All rigging has been inspected for kinks or damage of any kind.
s
5
The maximum rated load and maximum capacity is posted on a permanently affixed plate on the man basket.
S
6
Other
Man basket Requirements
7
The basket has been designed with a 5.1 safety factor by a qualified engineer and welded by a qualified
welder.
S
8
A permanently affixed identification plate is present on the man basket. Required information includes;
basket weight capacity and occupancy limit, self weight, I.D. number, manufacturer.
S
9
The guardrail designed to enclose the platform is provided and is enclosed from the toe board to the
mid -rail with either solid construction or expanded metal, having openings no greater than 1/2 inch. The
toe board must be 4 inches to 6 inches high and the top rail 42 inches high.
S
10
A grab rail has been provided inside the entire perimeter.
S
11
Body harness anchorage has been provided.
S
12
The access gate has been designed to open in only and has a positive locking system to prevent
accidental opening during operation.
S
13
The design allows enough headroom for employees to stand upright.
S
14
There are no rough edges on any man basket surface.
S
15
In addition to hard hats, overhead protection is provided when employees are exposed to falling objects.
S
16
Smooth interior surfaces.
S
17
Number of workers permitted for work.
2
18
Total weight of basket, rigging, workers and materials.
685lbs
19
Other
20
Other
Inspection Result: Pass
Inspector Name: Joe Galbraith
Annual / Periodic Big G Inspection Service Personnel Platform
Inspection Report Joe @ 512-789-7877
Big.ginspection@gmail.com
Inspection Status:
S = Satisfactory D = Deficiency R = Recommendation
N/A = Not Applicable
Deficiencies & Recommendations
Items Status Comments
There where no dediciencies found at the time of inspection.
Iwo
CRANE
7341 W Vickery Blvd
Fort Worth, TX 76116
www.talumcraneinc.com
Adam Diaz: 817-357-5699
Adam(@ tat um crane inc.com
M��
RBT Roofing
Frank:903-556-5087
frank@rbtroofing.com
419
Qt'arr H PO H
4/9/2026
TBD
Will Rodgers Tower Repair
3401 Lancaster Ave Fort Worth, TX
nomogroTmiEizffxm
WORK: Fly hanging manbasket to the top oftower to assist in repairing lighting damage to the roof
#S10,7OP'EF
210, 15, 85' 1,500 lbs
44,100 Ibs 214'
r r
62'
Mobilization In and Up
1.00
$1,089.00
$1,089.00
135 Ton Crane (8) hours onsile
8.00
$495.00
$3,960.00
Permit
1.00
$200.00
$200.00
Manbasket
1.00
$175.00
$175.00
3DLill Plan
1.00
$450.00
$450.00.
Mobilization Down and Out
1.00
$1,089.00
$1,089.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
S0 00
$0.00
$0.00
$0.00
10%Surchar e
I
$696.30
_ $696.30
TOTAL
$7 659.30
Overtime Rate $55/Hr Per Man onsile applies after 8 Hrs AI-F and all Hours Sal -Sun
AUTHORIZED REPRE.SENTA TIVE PLEASE SIGN AND RETURN
MGM TURE
If cou have any questions about this quote, please contact
7p Tin-, 936-645-1 Y44, (,CaClawn-aneinccnm
*Quote is based on estimated time, additional time will be extra"