Construction Allowance Request
ProjectNamel 2026 Asphalt Resurfacing Contract 3 City Sec# 1 64597
Client Project 106175
#(s)
Project Pavement rehabilitation, select curb & gutter, ADA ramp, and sidewalk replacement in the Handley NA
Description
Contractor Peachtree Construction, Ltd. CA#1 1 Date 4/20/2026
ty Project Mgr. Tariqul Islam City Inspector I Kevin Jackson
UNIT or DEPT
Original Contract Amount
Extras to Date
Credits to Date
Current Contract Amount
Amount of Proposed Allocation
Original Allowance Available to Allocal
Allowance Funds Previously Allocated
Revised Allowance Balance
TP W
Totals
$2,998,544.50
$2,998,544.50
$0.00
$0.00
$2,998,544.50
$2,998,544.50
999.70
2 999.70
'000.00
$150,000.00
$0.00$000
r
,000.30
$147 000.30
IF JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE
This construction allowance will add a new bid item for the removal and replacement of existing water meter boxes located within the sidewalk and a
driveway approach. The removal and replacement of these water meter boxes were not included in the original contract, as utility appurtenances such as
water meter boxes are typically outside the scope of Pavement Management projects. However, field conditions during construction indicated that the
existing water meter boxes within the sidewalk and driveway areas are in a deteriorated condition and are not suitable for reuse following repairs to these
areas. As a result, installing new concrete water meter boxes is necessary to ensure proper functionality and meet current standards.
Cost Impact: Recent bid data for this specific work is not available for direct price comparison. However, the contractor has provided a detailed cost
breakdown for the proposed work and, at the City's request, has agreed to reduce the unit price by 50%. Based on the supporting cost information and the
negotiated price reduction, the staff has determined that the proposed cost is fair and reasonable.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and
satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance
Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Nam
Contractor (Name
r Contractor Signature
Date
Peachtree Construction, Ltd.
Sam Braack
�-
04/30/2026
Date
Project and Contract Compliance Manager
Date
04/29/2026+-
04/30/2026
r
7A,sistantMirector
Date
Senior Capital Project Officer
Date
04/30/2026
04/30/2026
(Dept)
Date
Director, Contracting Department (Dept)
Date
P riciq L wq sank
-
05/05/2026
P'+-i- 7� •h .
05/05/2026
Assistant City Attorney
Date
Assistant City Manager
Date
05/08/2026
05/15/2026
4.-"Dannn
ATTEST: pF F�RTaO
o
Jannette Goodall, City Secretary ov0 o= i
dp * 00 *�d
o b
aaan �xvsaaa
bnaaa4�'
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Construction Allowance SUMMARY
Page 1 of 3
FORT WORTH City of Fort Worth
Construction Allowance Additions
Project Name 2026 Asphalt Resurfacing Contract 3 City Sec # 64597
Client Project # 106175
Contractor Peachtree Construction, Ltd. PMJ Tariqul islam Inspectorl Kevin Jackson
Construction Allowance Submittal # Date 4 20 2026
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
New - 39 Remove and Replace Concrete Water Meter Box TPW 3.00000000 EA $999.90 $2,999.70
TPW $2,999.70
Total Additions $2,999.70
Construction Allowance Additions
Page 2 of 3
FORT WORTH„ City of Fort Worth
Construction Allowance Value
Project Name 1 2026 Asphalt Resurfacing Contract 3 City Sec # 64597
Client Project# 10 1175
Contractor Peachtree Construction, Ltd. PM Tariqul islam Inspectorl Kevin Jackson
Construction Allowance Submittal # Date 4 0
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM
DESCRIPTION
Qty
Unit
Unit Cost
Total
38
Paving Construction Allowance
0.02
1
$150,000.00
$2,999.70
Construction Allowance Value
3of3
FORT WORTH6,.,
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: 2026 Asphalt Resurfacing Contract 3, CA 1
M&C CPN 106175 CSO # 64597 DOC#
DATE:
INITIALS
DATE OUT
To: 1. Seidi Tovar (Business Support)
ST
04/29/2026
2.Peachtree Construction Ltd.- Sam
Braack
SJB
04/30/2026
3. Kevin Jackson (Inspector)
Kevin Jackson
04/29/2026
4. Lorrie Pitts (Sr. Inspector)
jowPitts
04/30/2026
5.Tariqul Islam (PM)
-r'
Tariqul Islam
04/30/2026
6.Zelalem Arega (PGM)
Z-1&-
04/30/2026
7 Mary Hanna (SCPO)
�9 �/,%
04/30/2026
8. Patricia Wadsack (AD)
05/05/2026
9, Lauren Prieur (Director)flPr;e�r
05/05/2026
10. Doug Black (ACA)
.09
Douglas Black
05/08/2026
11. Jesica McEachern (ACM)
05/15/2026
12. Jannette Goodall (CS)
JaTinette Goodall
05/15/2026
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: UYes ❑✓ No
RUSH: ❑ Yes ❑✓ No SAME DAY: ❑ Yes �✓ No NEXT DAY: Yes 2 No
ROUTING TO CSO: ❑✓ Yes LNo
Action Required:
❑ As Requested ❑ Attach Signature, Initial and Notary Ta
■ Signature/Routing and or Recording
❑ Comment
❑ File
Return to: Please call at ext. for pick up when completed. Thank you.
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Peachtree Construction, Ltd.
Subject of the Agreement: Construction Allowance No. 1 to CSC No. 64597, a Contract for the 2026
Asphalt Resurfacing Contract 3 Project
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 8
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 106175
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.