HomeMy WebLinkAbout065198 - Construction-Related - Contract - William J. Schultz, Inc. dba Circle C Construction CompanyCSC No. 65198
ORT WO RTH,q
CONTRACT
FOR
THE CONSTRUCTION OF
SANITARY SEWER REHABILITATION— CONTRACT 124
City Project No. 104909
Mattie Parker Jesus "Jay" Chapa
Mayor City Manager
Chris Harder
Director, Water Department
Lauren Prieur
Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
Water Department
2025
DLC I EXCELLERNCEO
T.B.P.E. FIRM REGISTRATION #8997
2501 PARKVIEW DRIVE, SUITE 670, FT WORT, TX, 76102
';
OFFICIAL RECORD �.. DAVID RANKIN :
98312
1 " gyp: • v i
CITY SECRETARY S��NA S�NG���r
FT. WORTH TX Digit-11y1 �AtuibQ��
01/06/2026 David Rankin
Date: 2026.01.06
Addendum 1 12:59:48-06'00'
FORTWORTH,
4*
City of Fort Worth
Standard Construction Specification
Documents
Adopted September 2011
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 1 of 6
SECTION 00 00 00
TABLE OF CONTENTS
Division 00 - General Conditions Last Revised
0005 10
Mayor and Council Communication
07/01/2011
0005 15
Addenda
07/01/2011
0011 13
Invitation to Bidders
02/08/2024
0021 13
Instructions to Bidders
09/01/2025
0035 13
Conflict of Interest Statement
02/24/2020
00 41 00
Bid Form
09/19/2025
00 42 43
Proposal Form Unit Price
09/30/2021
0043 13
Bid Bond
09/30/2021
00 43 37
Vendor Compliance to State Law Nonresident Bidder
09/30/2021
0045 11
Bidders Prequalifications
08/13/2021
0045 12
Prequalification Statement
09/30/2021
0045 13
Prequalification Application
06/13/2025
00 45 26
Contractor Compliance with Workers' Compensation Law
07/01/2011
00 45 41
Small Business Goal
9/01/2025
00 52 43
Agreement
9/19/2025
0061 13
Performance Bond
12/08/2023
0061 14
Paywent Bond
12/08/2023
0061 19
Maintenance Bond
9/19/2025
00 61 25
Certificate of Insurance
07/01/2011
00 72 00
General Conditions
09/01/2025
00 73 00
Supplementary Conditions
9/19/2025
Division 01 - General Requirements
Last Revised
01 11 00
1 Summary of Work
12/20/2012
01 25 00
Substitution Procedures
07/01/2011
01 29 75
Materials On Hand
9/19/2025
01 31 19
Preconstruction Meeting
09/01/2025
01 3120
Project Meetings
07/01/2011
01 32 16
Construction Schedule
10/06/2023
01 3233
Preconstruction Video
07/01/2011
01 3300
Submittals
12/20/2012
01 35 13
S ecial Project Procedures
03/11/2022
01 45 23
Testing and Inspection Services
03/09/2020
01 5000
Temporary Facilities and Controls
09/19/2025
01 55 26
Street Use Permit and Modifications to Traffic Control
03/22/2021
0157 13
Storm Water Pollution Prevention Plan
07/01/2011
0158 13
Temporary Project Si na e
07/01/2011
01 6000
Product Requirements
03/09/2020
01 66 00
Product Storage and Handling Requirements
07/01/2011
01 70 00
Mobilization and Remobilization
11/22/2016
01 71 23
Construction Staking and Survey
02/14/2018
01 74 23
Cleaning
07/01/2011
0177 19
Closeout Requirements
03/22/2021
01 78 23
Operation and Maintenance Data
12/20/2012
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised September 19, 2025
Sanitary Sewer Rehabilitation — Contract 124
City Project No.: 104909
ADDENDUM 1
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 6
01 78 39 1 Project Record Documents 07/01/2011
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
NONE
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's website at:
http://fortworthtexas.2ov/tpw/contractors/
or
https://apps.fortworthtexas.gov/ProiectResources/
Division 02 - Existing Conditions
Last Revised
0241 13
Selective Site Demolition
03/11/2022
0241 14
Utility Removal/Abandonment
12/20/2012
0241 15
Paving Removal
02/02/2016
Division 03 - Concrete
03-30-00 Cast r* Plaeo 9-0 «o,o G694Q02-5
03 34 13 Controlled Low Strength Material (CLSM) 03/07/2025
n� 3^ t� Q1Q0, 0i2
o�-�-ry �-=vrzo�z
8 i in nr�vr 0 Q
Division 26 - Electrical
Division 31 - Earthwork
31 00 00
Site Clearing
03/22/2021
3123 16
Unclassified Excavation
01/28/2013
� t�-3
Beffew
n i io 4�13
31 25 00
Erosion and Sediment Control
04/29/2021
� ,moo
Gabiens,
, 2 �'�lz
3'Ripfap,
2�Iz
Division 32 - Exterior Imnrovements
3201 17
Permanent Asphalt Paving Repair
12/20/2012
3201 18
Temporary Asphalt Paving Repair
12/20/2012
27 i i 2-
�rz�
Flexible Base roiffses
Q1Q0 0i2
�-zvrzv�z
32 11 29
Lime Treated Base Courses
12/20/2012
2 i i z3
��
rVemepA Treated Base r,,ufses
06/10/20
�z
3244-37
n4 io�i-5
CITY OF FORT WORTH Sanitary Sewer Rehabilitation — Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised September 19, 2025 ADDENDUM 1
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 6
32 12 16
Asphalt Paving
6/07/2024
�-3
,-20r2012
324443
06113/2025
32 13 20
Concrete Sidewalks, Driveways and Barrier Free Rams
12/09/2022
32 1373
Concrete Paving Joint Sealants
12/20/2012
2 4 t ti
12QO/201
32 16 13
Concrete Curb and Gutters and Valley Gutters
12/09/2022
3 2i 7 2
��
06,110 202
vvrz vrzv�z
32 17 25
Curb Address Painting
11/04/2013
3231 13
Chain Fences and Gates
12/20/2012
32 31 26
Wire Fences and Gates
12/20/2012
32 31 29
Wood Fences and Gates
12/20/2012
32-3243
Cast in Plaee CeReFete Retaining Wa is
96,10SQ04-9
3291 19
Topsoil Placement and Finishin of Roadway Right-of-ways
03/11/2022
3292 13
Sodding
05/13/2021
2 92 t 4Native-Seediftg05113/202
32-92-475
Native Grass and Wildf , ., e,• coo,t;,,,,
b
i nin �
2 93 n 3
�--��
Trees and ShF bs
i � i�Oi2012
n.-rzvrzv rz
Division 33 - Utilities
33 01 30
Sewer and Manhole Testing
09/07/2018
33 01 31
Closed Circuit Television CCTV Inspection - Sanitary Sewer
03/11/2022
i 2 /n�2-3
3303 10
Bypass Pumpingof Existing Sewer Systems
12/20/2012
3 3 nn t o
�--v�-ry
QA20 201
�rz-vrzv�z
33- 9
G,,,•,•esior C-1 r,,.,.i Tos. Stations
i � i�1-2
3 �
�nn i_
12/20�2012z
,
33 04 30
Temporary Water Services
09/19/2025
33 04 40
Cleaning and Acceptance Testing of Water Mains
02/06/2013
33 04 50
Cleaning of Pipes
03/11/2022
3305 10
Utility Trench Excavation, Embedment, and Backfill
06/13/2025
3305 12
Water Line Lowering
12/20/2012
3305 13
Frame, Cover and Grade Rings
09/09/2022
3305 14
Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to
Grade
03/11/2022
3348546
Ge rote, I.A.Tater v. u4s
12,QOQ012
3305 17
Concrete Collars
03/11/2022
33 05 20
Auger Boring
12/20/2012
3 05 7 t
�--v�-zT
Tlu T: e- Plat-e
i 2 L20/201
�,-�vrzo�z
33 05 22
Steel Casing Pie
12/20/2012
33--05-23
12�Utz
33 05 24
Installation of Carrier Pipe in Casing or Tunnel Liner Plate
12/09/2022
33 05 26
Utility Markers/Locators
12/20/2012
33 05 30
Location of Existing Utilities
12/20/2012
33 1105
Bolts, Nuts, and Gaskets
12/20/2012
33 11 10
Ductile Iron Pie
12/09/2022
33 11 11
Ductile Iron Fittings
09/20/2017
33 11 12
Polyvinyl Chloride PVC Pressure Pie
09/09/2022
334443
Goner-ete Pipe, Steel Gylindep!P�pe
03 in��
-Pressure �
33 i i t o
� �--r-r-rT
�rz-vrzv�z
i2/20Q01-
CITY OF FORT WORTH Sanitary Sewer Rehabilitation - Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised September 19, 2025 ADDENDUM 1
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 6
33 12 10
Water Services 1-inch to 2-inch
02/14/2017
33 1220
Resilient Seated Gate Valve
05/06/2015
3344-24
nn i9
33 1225
Connection to Existing Water Mains
02/06/2013
3 23 nfor-i
2/20/2n i 2
33 1240
Fire Hydrants
01/03/2014
3 Q cn
�v
QA20 2012
�-=vrzv�z
3o
n6/io °�13
3331 12
Cured in Place Pipe (CIPP)
12/20/2012
3 3 t t4Fiber-glass12QO/2012
33 31 15
High Density Polyethylene HDPE Pipe for Sanitary Sewer
04/23/2019
33 31 20
Polyvinyl Chloride PVC Gravity Sanitary Sewer Pie
09/09/2022
n i3pyia ,i !`L,t.,ride Closed Profile &.,yity Samna,=. Sewef
33 3i 2i
(PVG)
i ice.
�rzz
333 2
QA20 2012
n.-rzvrzv rz
33 31 23
Sanitary Sewer Pipe Enlargement
12/20/2012
33 31 50
Sanitary Sewer Service Connections and Service Line
04/26/2013
3-3-�
, 2iz 20/2 z
3339 10
Cast -in -Place Concrete Manholes
12/13/2024
33 39 20
Precast Concrete Manholes
12/13/2024
3 39 4n
i��
33-39-40
12/� 412
33 39 60
Liners for Sanitary Sewer Structures
04/29/2021
33n i t o
ofmewer-min
14
33-4444
High Density Polyethylene (14PPE) Pipe for- Stet:m Dr-ain
i ii
334442-Pelyethylefiepee11113,42
is
3 n i t ZPolypropylene06
/10/2022
33 46 00
Subdraina e
12/20/2012
3 n� nt
�--Tv-vT
07,101420147
�
3 n� rn
�--Tv-vz
mini 20i i
m�z
�Z�o
Gtffb and Dfep4n4ets
n3iio�z
33-49-40
n�in�1 t
Division 34 - Transportation
34 40 n3/io�z
�n n�oT Attachment -A ra4-4-t ,.ii er-Gabifc4 i2ii�l5
� n n�oi 02�2012
iii i-3
�n�-3 n�iio�z
34ni 20 Roadway Mumination Assemblies 12QO/201-
3 n n t 20.0Roadway-L+wainaifes06,115 015
34n t �F-Feeway06,4542015
4 n t 20 03 Resideatia4 LED Roadway Luminaifess 06,1 5/20 c
34n t 3nAlth-Ain-um11/12/2013
34ni cnFiber-02,96, 01-6
3471 13 Traffic Control 03/22/2021
CITY OF FORT WORTH Sanitary Sewer Rehabilitation - Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised September 19, 2025 ADDENDUM 1
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Appendix
GC-4.04
Underground Facilities
GC-6.06.1)
Small Business Utilization Form
GC-6.07
Wage Rates
GR-01 60 00
Product Requirements (Water Std. Products List)
GR-02
TPW Paving Core Report
END OF SECTION
Page 5 of 6
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised September 19, 2025
Sanitary Sewer Rehabilitation — Contract 124
City Project No.: 104909
ADDENDUM 1
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, March 31, 2026
LOG NAME: 60SSRC124-CIRCLEC
REFERENCE NO.: **M&C 26-0219
SUBJECT:
(CD 9) Authorize Execution of a Contract with William J. Schultz, Inc. dba Circle C Construction Company,
in the Amount of $6,057,466.50, for Sanitary Sewer Rehabilitation Contract 124 Project and Adopt
Appropriation Ordinances to Effect a Portion of Water's Contribution to the Fiscal Years 2026-2030 Capital
Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of a contract with William J. Schultz, Inc. dba Circle C Construction Company,
in the amount of $6,057,466.50 for Sanitary Sewer Rehabilitation Contract 124 project; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of $6,839,367.00, from available PayGo
residuals within the Water and Sewer Capital Projects Fund, for the purpose of funding the Sanitary
Sewer Rehabilitation Contract 124, project (City Project No. 104909) and to effect a portion of
Water's contribution to the Fiscal Years 2026-2030 Capital Improvement Program.
DISCUSSION:
This Mayor and Council Communication (M&C) is to authorize execution of a construction contract with
William J. Schultz, Inc. dba Circle C Construction Company, in the amount of $6,057,466.50 for the
replacement of deteriorated sanitary sewer cast iron water mains as indicated on the following streets and
easements:
Street
From
I
To
Scope of
[ Work
Stadium Drive
South Hills Avenue
Worth Hills
Drive
Water/Sewer
Worth Hills Drive
W. Biddison Street �JWestcliff
Road
Water/Sewer
Harwen Terrace
South Hills Avenue
Worth Hills
Drive
Water
West Biddison
Street
Stadium Drive
Bluebonnet
JCircle
Water/Sewer
Park Ridge
Boulevard
Bluebonnet Circle
960 feet
southwest
Water
FLamesa Place
Odessa Avenue
east feet
least
Sewer
Rogers Avenue
W. Biddison Street---]
370 feet
north
Sewer
Rogers Avenue
W. Biddison Street
105 feet
southwest
Water/Sewer
south of
150 feet east of the
215 feet
Sewer
�Easement
Benbrook ��Benlbrook
least
Boulevard
Boulevard/Stadium
Drive intersection
150 feet west of the
Easement south of
Odessa
450 feet
Sewer
Lamasa Place
Avenue/Benbrook
southeast
Boulevard intersection
150 feet east of the
Easement east of
Benbrook
725 feet
Sewer
Stadium Drive
Boulevard/Stadium
south
Drive intersection
Easement between
150 feet east and 150
Benbrook
south of the Benbrook
160 feet
Sewer
Boulevard/ Worth
Boulevard/Stadium
east
Hills Drive
Drive intersection
Easement between
150 feet north and 30
Worth Hills
feet east of the Hilltop
170 feet
Sewer
Drive/West
Road/Stadium Drive
east
Biddison Street
intersection
210 feet south and
Easement west of
125 feet east of the
75 feet
Worth Hills Drive
Worth Hills
southeast
Sewer
Drive/Harwen Terrace
intersection
Easement between
170 feet south and 90
Worth Hills
feet east of the Worth
490 feet
Sewer
Drive/West
Hills Drive/Harwen
east
Biddison Street
Terrace intersection
Easement between
55 feet north of the
West Biddison
Stadium Drive/W
260 feet
Sewer
Street/ South Hills
Biddison Street
east
Avenue
intersection
175 feet east of the
Easement east of
Stadium Drive/South
950 feet
Sewer
Stadium Drive
Hills Avenue
north
intersection
210 feet north and
Easement between
10 eet east of the
Rogers
Rogers
g20 feet
Sewer
Avenue/West
Avenue/Harwen
northeast
Biddison Street
Terrace intersection
170 feet north and 60
Easement between
feet of the Park
Park Ridge
east
Ridgevard/Harwen
925 feet
Sewer
Boulevard/Rogers
BoulTerrace
Northeast
Avenue
intersection
Additionally, asphalt pavement rehabilitation will be conducted on all the roadways curb to curb
subsequent to the water and sanitary sewer main replacement. The project was advertised for bids on
December 10, 2025 and December 17, 2025, in the Fort Worth Star -Telegram. On January 22, 2026, the
following bids were received:
Bidder
William J Schultz, Inc. dba Circle
C Construction Company
Amount
$6,057 466.50
Time of
Completion
450 Calendar
Days
SYB Construction Co. Inc.
$6,631,848.26
Venus Construction
$7,315,164.00
DDM Construction Corporation
$7,761,910.70
R & D Burns Brothers, Inc.
$9,924,803.00
In addition to the contract amount, $479,026.50 (water: $214,996.75 and sewer: $264,029.75) is required
for project management, material testing, and inspection. Project contingencies are provided in the
amount of $302,874.00 (water: $135,236.00 and sewer: $167,638.00).
The sanitary sewer component of this project is part of the Sanitary Sewer Overflow Initiative Program of
the Water Department. Approximately 6,622 linear feet of cast iron water and 7,036 linear feet of
deteriorated sanitary sewer pipe will be removed and replaced or rehabilitated as part of this project.
It is the practice of the Water Department to appropriate its Capital Improvement Plan (CIP) plan
throughout the Fiscal Year (FY), instead of within the annual budget ordinance, as projects commence,
additional funding needs are identified, and to comply with bond covenants.
Funding is currently available in the Unspecified All -Funds project within the Water & Sewer Capital
Projects Fund for the purpose of funding the SS Rehab Contract 124 project.
Appropriations for the water and sanitary sewer improvements for the SS Rehab. Contract 124 project by
Fund will consist of the following:
Fund
Existing
Appropriations
Additional
Appropriations
project Total*
W&S Capital
Projects -
Fund 56002
$559,781.00
$6,839,367.00
$7,399,148.00
Project Total
$559,781.00
$6,839,367.00
$7,399,148.00
*Numbers rounded for presentation purposes.
SMALL BUSINESS (SB) GOAL: William J. Schultz, Inc. dba Circle C Construction Company has met the
city's small business goal.
The project is located in COUNCIL DISTRICT 9.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the Unspecified All -Funds project within the
W&S Capital Projects Fund and upon approval of the above recommendations and adoption of the
attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the SS
Rehab Contract 124 project to support the execution of the construction contract. Prior to an expenditure
being incurred, the Water Department has the responsibility of verifying the availability of funds.
FUND IDENTIFIERS (FIDs):
TO
undDepartment Account' Project 'ProgramLActivity Budget Reference # �Amou
ID ID Year (Chartfield 2)
FROM
Fund i Department Account Project ProgramActivity Budget Reference # mount.
ID ID Year (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by_ Jesica McEachern (5804)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Clayton Torrance (8528)
ATTACHMENTS
1. 60SSRC124-CIRCLEC FID TABLE (WCF 02.10.26).xlsx (CFW Internal)
2.60SSRC124-CIRCLEC.pdf (Public)
3. 60SSRC124-CIRCLEC FundsAvail.docx (CFW Internal)
4. Contact 124 1295 Form.pdf (CFW Internal)
5.ORD.APP 60SSRC124-CIRCLEC 56002 A026(R2).docx (Public)
=w)
0t
1.
f»yt
moo
o.
2222§2)
2,,G
°
§22§§§
Mo eel:
_
)
o
ip
I
..
MO-oR
o.
1)\
/o
1\\\
i(\\\\\\\\\\kook
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
000510-1
MAYOR AND COUNCIL COMMUNICATION (M&C)
Page 1 of 1
SECTION 00 05 10
MAYOR AND COUNCIL COMMUNICATION (M&C)
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 2011
Sanitary Sewer Rehabilitation — Contract 124
City Project No.: 104909
FORTWORTH.
ADDENDUM TO INVITATION TO BID NO.26-0065
SANITARY SEWER REHABILITATION CONTRACT 124
WATER DEPARTMENT
ADDENDUM NO. 1
INVITATION TO BID (ITB): 26-0065
BID OPENING DATE (CHANGED): January 15, 2026
REVISED BID OPENING DATE: January 22, 2026
DATE ISSUED: January 14, 2026
ITB No. 26-0065, issued December 10, 2025, is hereby amended as follows:
1. Bid Opening Date is changed from January 15, 2026 at 2:00 PM CST to January 22, 2026 at
2:00 PM CST.
2. Questions Due Date is changed from January 9, 2026 at 5:00 PM CST to January 19, 2026 at
2:00 PM CST
3. Responses to questions are attached to this addendum as Attachment A.
4. Paving Core report is attached to this addendum as Attachment B.
5. The pre -bid meeting is attached to this addendum as Attachment C.
6. PLANS: Replace entire plan set
Replace Sheet With Sheet
f ALL SHEETS ALL SHEETS
SPECIFICATIONS:
Re lace the followin
Replace Sheet
With Sheet
00 00 00 Table of Contents
00 00 00 Table of Contents
00 11 13 Invitation to Bidders
6011 13 Invitation to Bidders
00 41 00 Bid Proposal Workbook
00 4100 Bid Proposal Workbook
00 42 43 Proposal Form
00 42 43 Proposal Form
00 43 13 Bid Bond
00 43 13 Bid Bond
00 45 12 Prequalification Statement
00 45 12 Prequalification Statement
00 52 43 Agreement
00 52 43 Agreement
00 73 00 Su lementa Conditions
00 73 00 Supplementary Conditions
All other term an 7dibons remain unchanged.
u .0 4
Tony Sholola, P.E.
ASSISTANT DIRECTOR, WATER DEPARTMENT
ITB 26-0065 SANITARY SEWER REHABILITATION CONTRACT 124
Addendum No. 1, Page 1 of 2
By the signature affixed below, Addendum No. 1 is hereby incorporated into and made part of the above
referenced Invitation to Bid.
COMPANY NAME:
SIGNATURE:d
NOTE: Company name and signature mu the same as on the original bid documents. Failure to
return this form with your sealed bid ma stitute grounds for rejection of your offer.
ITB 26-0065 SANITARY SEWER REHABILITATION CONTRACT 124
Addendum No. 1, Page 2 of 2
FORT WORTH,
ADDENDUM TO INVITATION TO BID NO. 26-0065
SANITARY SEWER REHABILITATION CONTRACT 124
WATER DEPARTMENT
ADDENDUM NO. 2 DATE ISSUED: January 21, 2026
INVITATION TO BID (ITB): 26-0065
BID OPENING DATE: January 22, 2026
ITB No. 26-0065, issued December 10, 2025, is hereby amended as follows:
1. Responses to questions are attached to this addendum as Attachment A.
2. PLANS:
Replace Sheet
With Sheet
COVER SHEET
COVER SHEET
6" & 8" SEWER LINE L-2418 STA 0+00 to
6" & 8" SEWER LINE L-2418 STA 0+00 to 4+00
4+00 SHEET 24
SHEET 24
6" SEWER LINE L-2418 STA 4+00 to
6" SEWER LINE L-2418 STA 4+00 to 7+58.82
7+58.82 SHEET 25
SHEET 25
8" SEWER LINE L-2418A STA 00+00 TO
8" SEWER LINE L-2418A STA 00+00 TO 73.34
73.34 1 8" SEWER LINE L-2418B STA 0+00
1 8" SEWER LINE L-2418B STA 0+00 TO
TO 0+98.82 SHEET 26
0+98.82 SHEET 26
8" SEWER LINE L-2418C STA 0+00 TO
8" SEWER LINE L-2418C STA 0+00 TO STA
STA 1+50.95 SHEET 27
1+50.95 SHEET 27
8" SEWER LINE L-2419 STA 0+00 TO STA
8" SEWER LINE L-2419 STA 0+00 TO STA
3+51.85 SHEET 28
3+51.85 SHEET 28
8" SEWER LINE L-2419A STA 0+00 TO
8" SEWER LINE L-2419A STA 0+00 TO STA
STA 2+52.34 SHEET 29
2+52.34 SHEET 29
8" SEWER LINE L-2420 STA 0+00 TO STA
8" SEWER LINE L-2420 STA 0+00 TO STA
4+00 SHEET 30
4+00 SHEET 30
8" SS LINE L-2420 STA 4+00 TO STA
8" SS LINE L-2420 STA 4+00 TO STA 4+46.54
4+46.54 1 8" SS LINE L-2420A STA 0+00
1 8" SS LINE L-2420A STA 0+00 TO STA
TO STA 1+27.72 SHEET 31
1+27.72 SHEET 31
8" SEWER LINE M-64 COLLECTOR STA
8" SEWER LINE M-64 COLLECTOR STA 0+00
0+00 TO STA 2+77.21 SHEET 33
TO STA 2+77.21 SHEET 33
8" SEWER LINE L-2665A STA 0+00 TO
8" SEWER LINE L-2665A STA 0+00 TO STA
STA 2+81.91 SHEET 34
2+81.91 SHEET 34
12" & 8" SEWER LINE L-2665 STA 0+00
12" & 8" SEWER LINE L-2665 STA 0+00 TO
TO STA 4+15 SHEET 35
STA 4+15 SHEET 35
8" SEWER LINE L-2665 STA 4+15 TO STA
8" SEWER LINE L-2665 STA 4+15 TO STA
8+42.09 SHEET 36
8+42.09 SHEET 36
8" SEWER LINE L-2680 STA 0+00 TO STA
8" SEWER LINE L-2680 STA 0+00 TO STA
3+96.06 SHEET 37
3+96.06 SHEET 37
8" SEWER LINE L-2829 STA 0+00 TO STA
8" SEWER LINE L-2829 STA 0+00 TO STA
4+00 SHEET 38
4+00 SHEET 38
ITB 26-0065 SANITARY SEWER REHABILITATION CONTRACT 124
Addendum No. 2, Page 1 of 2
8" SEWER LINE L-2829 STA 4+00 TO STA
8" SEWER LINE L-2829 STA 4+00 TO STA
7+68.67 SHEET 39
7+68.67 SHEET 39
8" SEWER LINE L-3187 STA 0+00 TO STA
8" SEWER LINE L-3187 STA 0+00 TO STA
4+00 SHEET 40
4+00 SHEET 40
8" SEWER LINE L-3187 STA 4+00 TO STA
8" SEWER LINE L-3187 STA 4+00 TO STA
8+00 SHEET 41
8+00 SHEET 41
8" SEWER LINE L-3187 STA 8+00 TO STA
8" SEWER LINE L-3187 STA 8+00 TO STA
9+02.24 SHEET 42
9+02.24 SHEET 42
8" SEWER LINE L-3264 STA 0+00 TO STA
8" SEWER LINE L-3264 STA 0+00 TO STA
4+07.83 SHEET 44
4+07.83 SHEET 44
8" SEWER LINE M-64R COLLECTOR STA
8" SEWER LINE M-64R COLLECTOR STA
0+00 TO STA 1+92.53 SHEET 49
0+00 TO STA 1+92.53 SHEET 49
3. SPECIFICATIONS:
Rpnlacp the fnllnwinn-
Re lace Sheet
With Sheet
00 42 43 Proposal Form
00 42 43 Proposal Form
All other terms and c n itions remain unchanged.
�e J
Tony Sholola, P.E.
ASSISTANT DIRECTOR, WATER DEPARTMENT
By the signature affixed below, Addendum No. 2 is hereby incorporated into and made part of the above
referenced Invitation to Bid.
COMPANY NAME: L if C le
SIGNATURE: a
NOTE: Company name and signature must
return this form with your sealed bid may ec
uc f�"
same as on the original bid documents. Failure to
grounds for rejection of your offer.
ITB 26-0065 SANITARY SEWER REHABILITATION CONTRACT 124
Addendum No. 2, Page 2 of 2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
000515-1
ADDENDA
Page 1 of 1
SECTION 00 05 15
ADDENDA
END OF SECTION
CITY OF FORT WORTH Sanitary Sewer Rehabilitation — Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised July 1, 2011
0011 13
INVITATION TO BIDDERS
Page 1 of 3
SECTION 00 1113
INVITATION TO BIDDERS
RECEIPT OF BIDS
Electronic bids for the construction of Sanitary Sewer Rehabilitation — Contract 124, City
Project No.104909 ("Project") will be received by the City of Fort Worth via the
Procurement Portal https:Hfortworthtexas.bonfirehub.com/Aortal/?tab=openOpportunities,
under the respective Project until 2:00 P.M. CST, Thursday, January 15, 2026.
Bids will then be opened publicly and read aloud beginning at 2:00 PM CST in the City
Council Chambers.
Your submissions must be uploaded, finalized and submitted prior to the Project's posted due
date. The City strongly recommends allowing sufficient time to complete this process (ideally a
week prior to the deadline) to begin the uploading process and to finalize your submission.
Uploading large documents may take time, depending on the size of the file(s) and your Internet
connection speed. The Bonfire portal can be accessed using Microsoft Edge, Google Chrome, or
Mozilla Firefox. Javascript must be enabled. Browser cookies must be enabled.
Electronic submission is subject to electronic interface latency, which can result in transmission
delays. All bidders or proposers assume the risk of late transmission/ submission. The City shall
not be held liable if an interested bidder or proposer is unable to submit a complete bid/response
before the published deadline due to transmission delays or any other technical issues or
obstructions. The City strongly recommends allowing sufficient time to complete the submission
process (ideally a week before the deadline) to begin the uploading process and to finalize your
submission to give adequate time in the event an issue arises.
All submissions must be submitted electronically prior to the close date and time under the
respective Project via the Procurement Portal:
https:Hfortworthtexas.bonfirehub.com/portal/?tab=openOpportunities
Failure to submit all completed required information listed in the respective Solicitation will be
grounds for rejection of a bid as non -responsive. No late bids/proposals shall be accepted. Bids
delivered in any other manner than using the Bonfire Platform (Procurement Portal) will not be
accepted or considered.
If, upon being opened, a submission is unreadable to the degree that material conformance to the
requirements of the procurement specifications cannot be ascertained, such submission will be
rejected without liability to the City, unless such bidder provides clear and convincing evidence
(a) of the content of the submission as originally submitted and (b) that the unreadable condition
of the Electronic Bid was caused solely by error or malfunction of the Bonfire Platform
(Procurement Portal). Failure to scan a clear or readable copy of a bid into the system does not
constitute and shall not be considered an error or malfunction of the Bonfire Platform
(Procurement Portal). Bidders are encouraged to fully review each page of every document within
their submission prior to submitting to ensure all documents are clear, legible, and complete.
SUPPORT
For technical questions, visit Bonfire's help forum at https://vendorsupport.gobonfire.com/hc/en-
us
CITY OF FORT WORTH Sanitary Sewer Rehabilitation — Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised 2/08/24
ADDENDUM
0011 13
INVITATION TO BIDDERS
Page 2 of 3
Contact the Bonfire support team at Support@GoBonfire.com or by calling 1-800-354-8010.
To get started with Bonfire, watch this five-minute training video:
Vendor Registration and Submission [VIDEO] — Bonfire Vendor Support (gobonfire.com)
GENERAL DESCRIPTION OF WORK
The major work will consist of the (approximate) following: 6,522 LF OF 6", 8", and 12"
Waterline replacement by open cut, 3,979 LF of 8" and 12" Sanitary Sewer replacement by open
cut, 2,240 LF of 8" Sanitary Sewer replacement by pipe bursting and 414 LF of 6" CIPP Sanitary
Sewer Rehabilitation. Segments crossing streets and within streets will be by open cut, and 6,500
LF of POL Asphalt Street replacement.
PREQUALIFICATION
Certain improvements included in this project must be performed by a contractor or designated
subcontractor who is pre -qualified by the City at the time of bid opening. The procedures for
qualification and pre -qualification are outlined in the Section 3 of 00 21 13 — INSTRUCTIONS
TO BIDDERS.
DOCUMENT EXAMINATION AND PROCUREMENTS
The Bidding and Contract Documents may be examined or obtained via the Procurement Portal
https://fortworthtexas.bonfirehub.cQm/portal/?tab=openOpportunities, under the respective
Project. Contract Documents may be downloaded, viewed, and printed by interested contractors
and/or suppliers.
EXPRESSION OF INTEREST
To ensure potential bidders are kept up to date of any new information pertinent to this project, all
interested parties should indicate their intent to bid in the Procurement Portal by selecting "yes"
under the Intent to Bid section. All Addenda will be posted in the Procurement Portal
https:Hfortworthtexas.bonfirehub.cop /portal/?tab=openOpportunities, under the respective
Project.
PREBID CONFERENCE — Web Conference
A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO
BIDDERS at the following date, and time via a web conferencing application:
DATE: December 22, 2025
TIME: 10:30 AM
Invitations with links to the web conferencing application will be distributed directly to those who
have submitted an Expression of Interest.
If a prebid conference is held, the presentation and any questions and answers provided at the
prebid conference will be issued as an Addendum to the call for bids. If a prebid conference is not
being held, prospective bidders should direct all questions about the meaning and intent of the
Bidding Documents electronically through the Vendors discussions section under the respective
Project via the Procurement Portal. If necessary, Addenda will be issued pursuant to the
Instructions to Bidders.
CITY'S RIGHT TO ACCEPT OR REJECT BIDS
City reserves the right to waive irregularities and to accept or reject any or all bids.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation — Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised 2/08/24
ADDENDUM
0011 13
INVITATION TO BIDDERS
AWARD
City will award a contract to the Bidder presenting the lowest price, qualifications and
competencies considered.
ADVERTISEMENT DATES
December 10, 2025
December 17, 2025
END OF SECTION
Page 3 of 3
CITY OF FORT WORTH Sanitary Sewer Rehabilitation — Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised 2/08/24
ADDENDUM
0021 13
INSTRUCTIONS TO BIDDERS
SECTION 00 2113
INSTRUCTIONS TO BIDDERS
1. Defined Terms
Page 1 of 9
1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in
Section 00 72 00 - GENERAL CONDITIONS.
1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the
meanings indicated below which are applicable to both the singular and plural
thereof.
1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation
acting directly through a duly authorized representative, submitting a bid for
performing the work contemplated under the Contract Documents.
1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or
corporation acting directly through a duly authorized representative, submitting
a bid for performing the work contemplated under the Contract Documents
whose principal place of business is not in the State of Texas.
1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom
City (on the basis of City's evaluation as hereinafter provided) makes an award.
2. Copies of Bidding Documents
2.1. Neither City nor Engineer shall assume any responsibility for errors or
misinterpretations resulting from the Bidders use of incomplete sets of Bidding
Documents.
2.2. City and Engineer in making electronic Bidding Documents available do so only for
the purpose of obtaining Bids for the Work and do not authorize or confer a license
or grant for any other use.
3. Prequalification of Bidders (Prime Contractors and Subcontractors)
3.1. Bidders or their designated subcontractors are required to be prequalified for the
work types requiring prequalification as per Sections 00 45 11 BIDDERS
PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT.
Firms seeking pre -qualification, must submit the documentation identified in Section
00 45 11 on Section 00 45 13 PREQUALIFICATION APPLICATION at least
seven (7) calendar days prior to Bid opening for review and, if qualified,
acceptance. The subcontractors listed by a Bidder on 00 45 12 must be prequalified
for the appropriate work types. Subcontractors must follow the same timelines as
Bidders for obtaining prequalification review. Bidders or Subcontractors who are not
prequalified at the time bids are opened and reviewed may cause the bid to be
rejected.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation —Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised/Updated September 1, 2025
0021 13
INSTRUCTIONS TO BIDDERS
Page 2 of 9
Prequalification requirement work types and documentation are available by accessing all
required files through the City's website at:
hgps://www. fortworthtexas. gov/departments/tpw/development/cfw-departments-tpw-
contractors under Division 00 - General Conditions and as follows:
3.1.1. Paving — Requirements document located at:
https://app-us3.e-
builder.net/public/publicLanding.aspx?QS=4d008O4b 133b408a85a69323548dda25
3.1.2. Roadway and Pedestrian Lighting — Requirements document located at:
https://app-us3.e-
builder.net/public/publicLanding.aspx?QS=e43c4239775f4b25 83 552cO29c6a 1 ed2
3.1.3. Water and Sanitary Sewer — Requirements document located at:
https://app-us3.e-
builder.net/public/publicLanding.aspx?QS=4fc66ff8c36c4c029d542d4e55 l l4c8d
3.2. Each Bidder, unless currently prequalified, must submit to City at least seven (7)
calendar days prior to Bid opening, the documentation identified in Section 00 45
11, BIDDERS PREQUALIFICATIONS.
3.2. 1. Submission of and/or questions related to prequalification should be addressed
to the City contact as provided in Paragraph 6.1.
3.3. The City reserves the right to require any pre -qualified contractor who is the
apparent low bidder for a project to submit such additional information as the City,
in its sole discretion may require, including but not limited to manpower and
equipment records, information about key personnel to be assigned to the project,
and construction schedule to assist the City in evaluating and assessing the ability of
the apparent low bidder to deliver a quality product and successfully complete
projects for the amount bid within the stipulated time frame. Based upon the City's
assessment of the submitted information, a recommendation regarding the award of
a contract will be made to the City Council. Failure to submit the additional
information, if requested, may be grounds for rejecting the apparent low bidder as
non -responsive. Affected contractors will be notified in writing of a
recommendation to the City Council.
3.4. In addition to prequalification, additional requirements for qualification may be
required within various sections of the Contract Documents.
4. Examination of Bidding and Contract Documents, Other Related Data, and Site
4.1. Before submitting a Bid, each Bidder:
4.1.1. Shall examine and carefully study the Contract Documents and other related
data identified in the Bidding Documents (including "technical data" referred to
in Paragraph 4.2. below). No information given by City or any representative of
the City other than that contained in the Contract Documents and officially
promulgated addenda thereto, shall be binding upon the City.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation —Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised/Updated September 1, 2025
0021 13
INSTRUCTIONS TO BIDDERS
Page 3 of 9
4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the
general, local and site conditions that may affect cost, progress, performance or
furnishing of the Work.
4.1.3. Shall consider federal, state and local Laws and Regulations that may affect
cost, progress, performance or furnishing of the Work.
4.1.4. Omited
4.1.5. Shall study all: (i) reports of explorations and tests of subsurface conditions at
or contiguous to the Site and all drawings of physical conditions relating to
existing surface or subsurface structures at the Site (except Underground
Facilities) that have been identified in the Contract Documents as containing
reliable "technical data" and (ii) reports and drawings of Hazardous
Environmental Conditions, if any, at the Site that have been identified in the
Contract Documents as containing reliable "technical data."
4.1.6. Is advised that the Contract Documents on file with the City shall constitute all
of the information which the City will furnish. All additional information and
data which the City will supply after promulgation of the formal Contract
Documents shall be issued in the form of written addenda and shall become
part of the Contract Documents just as though such addenda were actually
written into the original Contract Documents. No information given by the City
other than that contained in the Contract Documents and officially promulgated
addenda thereto, shall be binding upon the City.
4.1.7. Should perform independent research, investigations, tests, borings, and such
other means as may be necessary to gain a complete knowledge of the
conditions which will be encountered during the construction of the project. For
projects with restricted access, upon request, City may provide each Bidder
access to the site to conduct such examinations, investigations, explorations,
tests and studies as each Bidder deems necessary for submission of a Bid.
Bidder must fill all holes and clean up and restore the site to its former
conditions upon completion of such explorations, investigations, tests and
studies.
4.1.8. Shall determine the difficulties of the Work and all attending circumstances
affecting the cost of doing the Work, time required for its completion, and
obtain all information required to make a proposal. Bidders shall rely
exclusively and solely upon their own estimates, investigation, research, tests,
explorations, and other data which are necessary for full and complete
information upon which the proposal is to be based. It is understood that the
submission of a proposal or bid is prima -facie evidence that the Bidder has
made the investigations, examinations and tests herein required.
4.1.9. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies
in or between the Contract Documents and such other related documents. The
Contractor shall not take advantage of any gross error or omission in the
Contract Documents, and the City shall be permitted to make such corrections
or interpretations as may be deemed necessary for fulfillment of the intent of
the Contract Documents.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation —Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised/Updated September 1, 2025
0021 13
INSTRUCTIONS TO BIDDERS
Page 4 of 9
4.1.10. Indicate their intent to bid by selecting "yes" in the Procurement
Portal under the Intent to Bid section. You must indicate your intent to bid
to be able to submit a bid to the City.
4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for
identification of:
4.2.1. those reports of explorations and tests of subsurface conditions at or
contiguous to the site which have been utilized by City in preparation of the
Contract Documents. The logs of Soil Borings, if any, on the plans are for
general information only. Neither the City nor the Engineer guarantee that the
data shown is representative of conditions which actually exist.
4.2.2. those drawings of physical conditions in or relating to existing surface and
subsurface structures (except Underground Facilities) which are at or
contiguous to the site that have been utilized by City in preparation of the
Contract Documents.
4.2.3. copies of such reports and drawings will be made available by City to any
Bidder on request. Those reports and drawings may not be part of the Contract
Documents, but the "technical data" contained therein upon which Bidder is
entitled to rely as provided in Paragraph 4.02. of the General Conditions has
been identified and established in Paragraph SC 4.02 of the Supplementary
Conditions. Bidder is responsible for any interpretation or conclusion drawn
from any "technical data" or any other data, interpretations, opinions or
information.
4.2.4. Standard insurance requirements, coverages and limits.
4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder:
(i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that
without exception the Bid is premised upon performing and furnishing the Work
required by the Contract Documents and applying the specific means, methods,
techniques, sequences or procedures of construction (if any) that may be shown or
indicated or expressly required by the Contract Documents, (iii) that Bidder has
given City written notice of all conflicts, errors, ambiguities and discrepancies in the
Contract Documents and the written resolutions thereof by City are acceptable to
Bidder, and when said conflicts, etc., have not been resolved through the
interpretations by City as described in Paragraph 6., and (iv) that the Contract
Documents are generally sufficient to indicate and convey understanding of all terms
and conditions for performing and furnishing the Work.
4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos,
Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive
Material covered by Paragraph 4.06. of the General Conditions, unless specifically
identified in the Contract Documents.
5. Availability of Lands for Work, Etc.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation —Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised/Updated September 1, 2025
0021 13
INSTRUCTIONS TO BIDDERS
Page 5 of 9
5.1. The lands upon which the Work is to be performed, rights -of -way and easements for
access thereto and other lands designated for use by Contractor in performing the
Work are identified in the Contract Documents. All additional lands and access
thereto required for temporary construction facilities, construction equipment or
storage of materials and equipment to be incorporated in the Work are to be obtained
and paid for by Contractor. Easements for permanent structures or permanent
changes in existing facilities are to be obtained and paid for by City unless otherwise
provided in the Contract Documents.
5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are
listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the
necessary right-of-way, easements, and/or permits are not obtained, the City reserves
the right to cancel the award of contract at any time before the Bidder begins any
construction work on the project.
5.3. The Bidder shall be prepared to commence construction without all executed right-
of-way, easements, and/or permits, and shall submit a schedule to the City of how
construction will proceed in the other areas of the project that do not require permits
and/or easements.
6. Interpretations and Addenda
6.1. All questions about the meaning or intent of the Bidding Documents are to be
directed to City electrically through the Vendor Discussions section under the
respective Project via the Procurement Portal
https:Hfortworthtexas.bonfirehub.com/portal/?tab=openOpportunities on or
before 2 p.m., the FRIDAY prior to the Bid opening. Questions received after this
day may not be responded to. Interpretations or clarifications considered necessary
by City in response to such questions will be issued by Addenda. Only questions
answered by formal written Addenda will be binding. Oral and other interpretations
or clarifications will be without legal effect.
6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable
by City.
6.3. Addenda or clarifications shall be posted under the respective Project via the
Procurement Portal
https://fortworthtexas.bonfirehub.com/portal/?tab=openOpTortunities
6.4. A prebid conference may be held at the time and place indicated in the
Advertisement or INVITATION TO BIDDERS. Representatives of City will be
present to discuss the Project. Bidders are encouraged to attend and participate in
the conference. City will transmit to all prospective Bidders of record such Addenda
as City considers necessary in response to questions arising at the conference. Oral
statements may not be relied upon and will not be binding or legally effective.
7. Bid Security
CITY OF FORT WORTH Sanitary Sewer Rehabilitation —Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised/Updated September 1, 2025
0021 13
INSTRUCTIONS TO BIDDERS
Page 6 of 9
7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of
five (5) percent of Bidder's maximum Bid price, on the form attached or equivalent,
issued by a surety meeting the requirements of Paragraph 5.01 of the General
Conditions.
7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the
Notice of Award have been satisfied. If the Successful Bidder fails to execute and
return the Contract Documents within 14 days after the Notice of Award conveying
same, City may consider Bidder to be in default, rescind the Notice of Award and
act on the Bid Bond. Such action shall be City's exclusive remedy in the event
Bidder is deemed to have defaulted.
8. Contract Times
The number of days within which, or the dates by which, Milestones are to be achieved in
accordance with the General Requirements and the Work is to be completed and ready
for Final Acceptance is set forth in the Agreement or incorporated therein by reference to
the attached Bid Form.
9. Liquidated Damages
Provisions for liquidated damages are set forth in the Agreement.
10. Substitute and "Or -Equal" Items
The Contract, if awarded, will be on the basis of materials and equipment described in the
Bidding Documents without consideration of possible substitute or "or -equal" items.
Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or -
equal" item of material or equipment may be furnished or used by Contractor if
acceptable to City, application for such acceptance will not be considered by City until
after the Effective Date of the Agreement. The procedure for submission of any such
application by Contractor and consideration by City is set forth in Paragraphs 6.05A.,
6.05B. and 6.05C. of the General Conditions and is supplemented in Section 0125 00 of
the General Requirements.
11. Subcontractors, Suppliers and Others
11.1. In accordance with the City's Small Business Ordinance No. 27832-08-25, the
City has established a goal for the participation of small businesses for City
contracts $100,000 or greater. See Section 00 45 41 for the Project Goal and
additional requirements. Failure to comply may render the Bidder non-
responsive.
11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other
person or organization against whom Contractor or City has reasonable objection.
12. Bid Form
12.1. The Bid Form is included with the Bidding Documents.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation —Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised/Updated September 1, 2025
0021 13
INSTRUCTIONS TO BIDDERS
Page 7 of 9
12.2. All blanks on the Bid Form must be completed and the Bid Form signed
electronically or signed in ink and scan. A Bid price shall be indicated for each Bid
item, alternative, and unit price item listed therein. In the case of optional
alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered.
Bidder shall state the prices for which the Bidder proposes to do the work
contemplated or furnish materials required.
12.3. Bids by corporations shall be executed in the corporate name by the president or a
vice-president or other corporate officer accompanied by evidence of authority to
sign. The corporate seal shall be affixed. The corporate address and state of
incorporation shall be shown below the signature.
12.4. Bids by partnerships shall be executed in the partnership name and signed by a
partner, whose title must appear under the signature accompanied by evidence of
authority to sign. The official address of the partnership shall be shown below the
signature.
12.5. Bids by limited liability companies shall be executed in the name of the firm by a
member and accompanied by evidence of authority to sign. The state of formation of
the firm and the official address of the firm shall be shown.
12.6. Bids by individuals shall show the Bidder's name and official address.
12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated
on the Bid Form. The official address of the joint venture shall be shown.
12.8. All names shall be typed or printed in ink below the signature.
12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of
which shall be filled in on the Bid Form.
12.10. Postal and e-mail addresses and telephone number for communications regarding the
Bid shall be shown.
12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of
Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance
to State Law Non Resident Bidder.
13. Submission of Bids
Bids shall be submitted electronically in the Procurement Portal on the prescribed Bid
Form, provided with the Bidding Documents, prior to the time indicated in the
Advertisement or INVITATION TO BIDDERS.
14. Withdrawal of Bids
14.1. Bids submitted electronically may be withdrawn prior to the time set for bid opening
via the Procurement Portal
https://fortworthtexas.bonfirehub.com/portal/?tab=openOpTortunities.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation —Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised/Updated September 1, 2025
0021 13
INSTRUCTIONS TO BIDDERS
Page 8 of 9
15. Opening of Bids
Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids
and major alternates (if any) will be made available to Bidders after the opening of Bids.
16. Bids to Remain Subject to Acceptance
All Bids will remain subject to acceptance for a minimum of 90 days or the time period
specified for Notice of Award and execution and delivery of a complete Agreement by
Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid
security prior to that date.
17. Evaluation of Bids and Award of Contract
17.1. City reserves the right to reject any or all Bids, including without limitation the rights
to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids
and to reject the Bid of any Bidder if City believes that it would not be in the best
interest of the Project to make an award to that Bidder. City reserves the right to
waive informalities not involving price, contract time or changes in the Work and
award a contract to such Bidder. Discrepancies between the multiplication of units of
Work and unit prices will be resolved in favor of the unit prices. Discrepancies
between the indicated sum of any column of figures and the correct sum thereof will
be resolved in favor of the correct sum. Discrepancies between words and figures
will be resolved in favor of the words.
17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists
among the Bidders, Bidder is an interested parry to any litigation against City,
City or Bidder may have a claim against the other or be engaged in litigation,
Bidder is in arrears on any existing contract or has defaulted on a previous
contract, Bidder has performed a prior contract in an unsatisfactory manner, or
Bidder has uncompleted work which in the judgment of the City will prevent or
hinder the prompt completion of additional work if awarded.
17.2. In addition to Bidder's relevant prequalification requirements, City may consider the
qualifications and experience of Subcontractors, Suppliers, and other persons and
organizations proposed for those portions of the Work where the identity of such
Subcontractors, Suppliers, and other persons and organizations must be submitted as
provided in the Contract Documents or upon the request of the City. City also may
consider the operating costs, maintenance requirements, performance data and
guarantees of major items of materials and equipment proposed for incorporation in
the Work when such data is required to be submitted prior to the Notice of Award.
17.3. City may conduct such investigations as City deems necessary to assist in the
evaluation of any Bid and to establish the responsibility, qualifications, and financial
ability of Bidders, proposed Subcontractors, Suppliers and other persons and
organizations to perform and furnish the Work in accordance with the Contract
Documents to City's satisfaction within the prescribed time.
17.4. Contractor shall perform with his own organization, work of a value not less than
35% of the value embraced on the Contract, unless otherwise approved by the City.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation —Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised/Updated September 1, 2025
0021 13
INSTRUCTIONS TO BIDDERS
Page 9 of 9
17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and
responsive Bidder whose evaluation by City indicates that the award will be in the
best interests of the City.
17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award
contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than
the lowest bid submitted by a responsible Texas Bidder by the same amount that a
Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a
comparable contract in the state in which the nonresident's principal place of
business is located.
17.7. A contract is not awarded until formal City Council authorization. If the Contract is
to be awarded, City will award the Contract within 90 days after the day of the Bid
opening unless extended in writing. No other act of City or others will constitute
acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by
the City.
17.7.1. The contractor is required to fill out and sign the Certificate of Interested
Parties Form 1295 and the form must be submitted to the Project Manager
before the contract will be presented to the City Council. The form can be
obtained at https://www.ethics.state.tx.us/data/forms/1295/1295.pdf
17.8. Failure or refusal to comply with the requirements may result in rejection of Bid.
18. Signing of Agreement
18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied
by the required number of unsigned counterparts of the Project Manual. Within 14
days thereafter, Contractor shall sign and deliver the required number of counterparts
of the Project Manual to City with the required Bonds, Certificates of Insurance, and
all other required documentation.
18.2. City shall thereafter deliver one fully signed counterpart to Contractor.
END OF SECTION
CITY OF FORT WORTH Sanitary Sewer Rehabilitation —Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No.: 104909
Revised/Updated September 1, 2025
00 35 13
CONFLICT OF INTEREST STATEMENT
Page 1 of 10
SECTION 00 35 13
CONFLICT OF INTEREST STATEMENT
Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a
Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's
Office pursuant to state law.
If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant
City Managers, or an agent of the City who exercise discretion in the planning, recommending,
selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then
a Local Government Officer Conflicts Disclosure Statement (CIS) may be required.
You are urged to consult with counsel regarding the applicability of these forms and Local
Government Code Chapter 176 to your company.
The referenced forms may be downloaded from the links provided below.
Form CIQ Conflict of Interest Questionnaire) (state.tx.us)
hftps://www.ethics.state.tx.us/data/f`orms/conflict/CIS.i)df
❑ CIQ Form does not apply
0 CIQ Form is on file with City Secretary
❑ CIQ Form is being provided to the City Secretary
❑ CIS Form does not apply
121 CIS Form is on File with City Secretary
❑ CIS Form is being provided to the City Secretary
BIDDER:
William J Schultz Inc dba Circle C Construction Comp By: Teresa S Skelly
500 W Trammell Ave Signature:
PO Box 40328
Fort Worth, TX 76140 Title: President
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Contract 124 Bid Proposal.xlsx
Revised September 19, 2025
00 4100
BID FORM
Page 2 of 10
SECTION 00 4100
BID FORM
TO: The Purchasing Manager
c/o: The Purchasing Division
200 Texas Street
City of Fort Worth, Texas 76102
FOR: Sanitary Sewer Rehabilitation Contract 124 City Project No. 104909
City Project No.: CPN - 104909
Units/Sections: 1. Water Improvements
2. Wastewater Improvements
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form
included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions
of the Contract Documents.
2. BIDDER Acknowledgements and Certification
2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and
INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will
provide a valid insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed
individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,
association, organization, or corporation.
2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract.
For the purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to
influence the action of a public official in the bidding process.
b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the
bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive
levels, or (c) to deprive City of the benefits of free and open competition.
c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without
the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive
levels.
CITY OF FORT WORTH Contract 124 Bid Proposal.xlsx
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS ADDENDUM 1
Revised 9/19/2025
00 41 00
BID FORM
Page 3 of 10
d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their
property to influence their participation in the bidding process or affect the execution of the
Contract.
3. Prequalification
The Bidder acknowledges that the following work types must be performed only by prequalified contractors and
subcontractors:
a. - Water Distribution, Urban/Renewal, 12-inches and smaller
b. - Sewer Collection System, Urban/Renewal, 12-inches and smaller
c. - Sewer Collection System, Pipe Enlargement 8-inches and smaller
d. - Sewer Collection System, CIPP 6-inches and smaller
e. - Sanitary Manhole/Structure Interior Lining - Warren or Chesterton Coating
f. - CCTV, 8-inches and smaller
g. - Asphalt Paving Construction/Reconstruction (Less than 15,000 SY)
h. -
4. Time of Completion
4.1. The Work will be complete for Final Acceptance within 450 days after the date when the
the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions.
4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete
the Work {and/or achievement of Milestones) within the times specified in the Agreement.
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Section 00 41 00
b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph
5.01 of the General Conditions.
c. Proposal Form, Section 00 42 43
d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37
e. Small Business Forms (required at time of bid)
f. Prequalification Statement, Section 00 45 12
g. Conflict of Interest Affidavit, Section 00 35 13
*If necessary, CIQ or CIS forms are to be provided directly to City Secretary
h. Any additional documents that may be required by Section 12 of the Instructions to Bidders
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Contract 124 Bid Proposal.xlsx
Revised 9/19/2025 ADDENDUM 1
00 41 00
BID FORM
Page 4 of 10
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the
space provided below, please enter the total bid amount for this project. Only this figure will be read publicly
by the City at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is
subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective
estimated quantities shown in this proposal and then totaling all of the extended amounts.
Total Bid
7. Bid Submittal
This Bid is submitted on January 22, 2026
Respectfully submitted,
By:
(Signa r )
Teresa S Skelly
(Printed Name)
Title: President
Company: William J Schultz Inc dba Circle C Construction Compa
Address: 500 W Trammell Ave
PO Box 40328
Fort Worth, TX 76140
State of Incorporation: Texas
Email: t.skelly@circlecconstruction.com
Phone: 817-293-1863
END OF SECTION
#REF! Al,, DS7, 41-6d, s-a
by the entity named below.
Receipt is acknowledged of the
following Addenda:
Initial
Addendum No. 1:
%SS
Addendum No. 2:
ss
Addendum No. 3:
Addendum No. 4:
Corporate Seal:
CITY OF FORT WORTH Contract 124 Bid Proposal-Asx
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS ADDENDUM 1
Revised 9/19/2025
004243
BID PROPOSAL
Ago 5 of to
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID
Bidder's Application
Project ltern Infonnation Bidder's Proposal
13id1isi Item Dtscription Specification Unit of Bid Quantity Unit Price Bid Value
No. Soction No. Measwc
Unit 1 - Water
Replacement
1
3311.0464 12" PVC Water Pipe DR14 By Open Cut (Restrained Joints)
3311 12
LF
955
135
$128 925.00
2
3311.0261 8" PVC Water PipeDR14 B n Cut
3311 12
LF
5450
95
5517 750.00
3
3305.2002 8" Water Carrier Pipe, DIP
30524
LF
60
i5o
$9 000.00
4
3311.0161 6' PVC Water Pi DR14 By Open Cut
3311 12
LF
57
85
$4 845.00
5
3305.1003 20" Casing By OPM Cut
33 05 22
LF
60
250
$15 000.00
6
3312.0001 Fire Hydrant
33 12 40
EA
7
6500
$45 500.00
7
0241.0401 Remove Concrete Driveway
0241 13
SF
2958
10
$29,580.00
8
0241.0100 Remove Concrete Sidewalk
0241 13
SF
I 401
to
$4 010.00
9
0241.13DO Remove Conc Curb & Gutter
0241 15
LF
730
15
$10.950.00
10
0241.1400 Remove Existing Valley Gutter
0241 15
SY
190
15
$2 850.00
11
3349.5005 Remove & Replace Inlet To 5'
33 49 20
EA
6
3500
$21,000.00
12
3349.5006 Remove & Replace Inlet Top, 10'
33 49 20
EA
4
4500
S18,000,00
13
3216.0102 6' Conc Curb and Gutter
32 16 13
LF
730
55
$40,150.00
14
3213.0401 6" Concrete Driveway
32 13 20
SF
2958
28
$82,824.00
15
3213.0301 4" Concrete Sidewalk
32 13 20
SF
401
25
$10 025.00
16
3216.0301 Install New 7" Concrete Valley Gutter
32 16 13
SY
190
125
$23.750.00
17
3312.011 T Connection to Existing 4%12" Water Main
33 12 25
EA
22
3000
$86 000.00
18
3312.2004 1" Private Water Service
33 12 10
LF
329
125
$41,125.00
19
3312.2DO1 1' Water Service Meter Reconnection
33 12 10
EA
91
1500
$136 500.00
20
3312.2003 1"Water Service
33 12 10
EA
91
800
$72,800.00
21
3312.3002 6' Gate Valve
33 12 20
EA
7
1800
$12 600.00
22
3312.3003 8" Gate Valve
33 12 20
EA
19
2500
$47 500.00
23
3312.3DD5 12' Gate Valve
33 12 20
EA
3
3500
$10 500.DO
24
3311.0001 Ductile Iron Water Fittin wl Restraint
3311 11
TON
2
14500
$29,000.001
25
0241.1218 4"-12" Water Abandonment Plug
0241 14
EA
6
1500
S9,000.00
26
3305.0003 8" Waterline Lowering
330512
EA
1
5800
$5 800.00
27
0241.1302 Remove and Salv 6' Water Valve
0241 14
EA
1 12
5D0
$6.000.00
28
_
0241.1303 Remove and Salvage 8" Water Valve
02 41 14
EA
7
500.00
500.00
29
0241,1305 Remove and Salver 12' Water Valve
024114
E4
2
$500.00
$1.DDO.00
30
0241.1510 Salvage Fire Hydrant
02 41 14
EA
7
$1 200.0D
$8,40D.00
31
0241A700 I v Pavement Pulverization
024115
SY
11095
$14.251
$158103.75
32
3211.06DO Cement Stabilization 26 Ibs/SY
321129
TON
160
S365.001
$58.400.00
33
3211.3300 8" Cem-Lime Stabilization 321bs1SY
331129
TON
45
$550.00
24 750.00
34
3212.0303 3" Asphalt Pvmt T D 0 D
32 12 16
SY
11095
$33.50
371 682.50
35
3305.0111 Valve Box Adiustment w/Conc Collar
330514
EA
27
$350.001
$9,450.00
36
3305.0117 Concrete Collar for Valve
33 05 17
EA
1 26
$450.00
$11.7D0.00
37
3201.0400 Temporary Asphalt Paving Repair 2' HMAC on 6" Flexbase
32 01 18
LF
7069
$32.00
$226.208.00
38
3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential
3201 17
SY
5DO
$65.D0
$32,500.00
39
3305.01 'IFUtitity Markers
330526
LS
1
$150D.00
$1500.00
40
3305.0207 Imported Embedment/Back ill Select Fill
33 05 10
CY
1000
$35.00
$35 000.00
41
3304.0101 Temporary Water Services
33 04 30
LS
1
$125 000.00
$125 00.00
42
3305.0103 ExlAoralory Excavation of Existing Utilities
330630
EA
15
$1.500.00
22,500.00
43
3291.0100 To 1
32 91 19
CY
137
$65.00
S8.905.00
44
3292.0100 Block Sod Placement
32 92 13
SY
602
15.00
$9 030.00
45
3217.5()01 PaintingCurb Addresses
32 17 25
EA
28
$200.00
$5 600.00
46
3471.0001 Traffic Control34
71 13
MO
10
3.500.00
$35 D00.00
47
3441.4110 Remove and Reinstall Sign Panel and Post
34 41 30
EA
3
$4.500.00
$13 500.00
48
0241.0300 Remove ADA Ram
0241 13
EA
2
$1 500.00
$3 000.00
49
3213.0606 Barrier Free Ram T P-1
321320
EA
2
$4 500.00
$9 000.00
50
3125.0101 SWPPP - 1 acre
312500
LS
1
$5,000.00
$5,ODO.00
51
0171.0101 Construction Staking
01 71 23
LS
1
15.000.00
$15.000.00
52
0171.0102 As -Built Surve Redline Survey)
01 71 23
1 LS
I 7
1 $10 000.00
$10.000.00
53
9999.0001 Construction Allowance(Water)
017123
1 LS
1
1 $100,000.00
$100,000.00
Sub -Total Unit I - 2 7 71 2
Unit 2 - Sanitary Sewer Replacement
1
3331.55D4 12" PVC Sewer Pi SDR 26) V to 8' (By Open Cut
3331.20
LF
144
150
$21600.00
2
3331.5304 8' PVC Sewer Pipe (SDR 26 6' TO flft Open Cut)
33 31 20
LF
3523
130
5457 990.00
3
3331.1102 8' Pipe Enlargement
33 31 23
LF
2240
130
$291-100.00
4
3331.4120 8" DIP Sewer Pipe, CLSM Backfill
3331 15
LF
715
200
$143 D00.00
5
3331.2101 6" CiPP
333115
LF
414
130
$53.820.00
6
0241.0401 Remove Concrete Driveway
0241 13
SF
2958
to
S29,580.00
7
0241.2001 Line Grouting
0241 14
CY
28
250
VP00.00
8
-Sanitary
0241.5001 Abandon Manhole
0241 14
EA
7
8D0
$5.600.00
9
3110.0102 6"-12" Tree Removal
31 10 DO
EA
1
1500
$1.500.00
10
3110.0103 12"-18' Tree Removal
31 1000
EA
3
2500
S7,500.00
11
3110.0105 24' and LarW Tree Removal
31 1000
EA
1
4500
$4 500.00
12
3201.0400 Temporary Asphalt Paving Repair 2" HMAC on 6" Flexbase
32 01 18
LF
901
32
$28 832.00
13
3201.0201 Asphall Pvmt Repair Beyond Defined Width, Residential
32 01 17
SY
1000
65
S65,000.00
14
3213.0401 6" Concrete Driveway32
13 20
SF
28
S82,824.00
CITY OF FORT WOR711
STANDARD CONSTRUCTION SPECHWATfON DOCUMENTS (:uolna 124 Bid P.P-1 41x
Revived 9119l2025
00424.
BID PROPOSAL.
1x4c6of10
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID
Bidder's Application
e
Biddds Proposal
Project Item Infomration
Bidlist Item
)-criPtion
Specification
Section No.
Unit of
Measure
Bid Quantity
Unit Price
Bid Value
No.
15
0241.1400 Remove Existing Valle Gutter
02 41 15
SY
190
15
S2.850.00
$23 750.00
16
3216,0301 install New 7" Concrete Valle Gutter
0241.1700 11- Pavement Pulverization
3212.0303 3" Asptatt Pvmt T D (DG-D)
3211.0600 Cement Stabilization 26 IbsISY
3211.3300 8' Cam -lime Stabilization 321bslSY
0241.0too Remove Sidewalk
3213.0301 4" Concrete Sidewalk
0241.1300 Remove Cure Curb & Gutter
321613
02 41 15
3212 16
3211 29
331129
0241 13
32 13 20
0241 15
SY
SY
SY
TON
SFN
SF
LF
190
11095
11095
160
401
401
730
730
125
l25
33.5
365
10
25
15
55
5$23,750.00
$371,682.50
S58 aoo.00
$24,750.
S4,010.00
$10,o25.Do
$10.950.00
S40.150.00
17
18
19
20
21
22
23
24
3216.0101 6" Conc Curb and Gutter
3292.0400 Hydro Mulch Seeding
3291.0100 T oil
3292.0 000 Black Sod Placement
32 16 13
32 92 13
3291 19
32 92 13
33 01 31
LF
SY
CY
SY
LF
3244
21
235
5490
10
65
15
l0
$32,440.00
$l 365.00
$3,525.00
S54 900.00
25
26
27
28
3301.0001 Pre -CCTV Inspection
3301.0002 Post -CCTV Inspection
3301.0101 Manhole Vacuum Testin
3303.0001 B Pum n
3305.010) Trench Safe
33 01 31
330130
33 03 10
33 05 10
33 05 10
LF
FA
LS
LF
CY
6795
55
1
3841
3
7
200
35000
1
250
S47 565.00
S11 0m.00
S35.000.00
$3 750.00
$750,00
29
30
31
32
33
0330.0001 Concrete Encase Sewer Pipe
Service Reinstatement. Pipe Enlargement including 4" 2-way
31 23
FA
3331.1201
33
67
1800
$120,600.00
34
Geanout
3331.2201 Service Reconnection, CIPP including4" 2-waycleanout
3331.3311 4' Sewer Service, Includin 4" 2 wa clean out
6" Sewer Service, includin 6" 2-wa clean out
3331 12
33 31 50
33 31 50
EA
FA
10
76
1
1500
I500
2200
$15,000.00
S114.000.00
S2 200 00
35
36
37
3331.3312
T339 0-003 Epoxy Manhole Liner 4' Sewer MH
3339.0004E x Manhole Liner 5' Sewer MH
3339.1001 4' Manhole
33 39 60
33 39 60
333910
3 39 2
VF
VF
E4
170
6
500
600
7500
s85,000.00
S4•800'00
S255 000.00
38
39
40
3339.1002 4' Drop Manhole
33 39 10
3339205
EA
8500
542500.00
41
3339.1 D04 4' Shallow Manhole
33 39 10
3339 2
EA
15
7500
$112 500.00
42
3339.1003 4' Extra Depth Manhole
333 10
33 39 40
VF
75
450
f33,750.00
43
3339.1101 5' Manhole
33 39 10
333920
EA
1
10000
Sto 000.00
44
3339.1103 5' Extra Depth Manhole
33 39 10
33 39 20
VF
2
500
$l 000.00
45
3305.0106 Manhole Adjustment With Concrete Collar, Frame, and Cover
33 05 14
EA
11
Y500
S27 .00
46
3305.0107 Manhole Adjustment, Minor
33 05 14
EA
14
2500
$35,000.00
$27 500.00
47
48
3306.0112 Concrete Collar for Manhole
3305.0113 Trench Water Stops
3471.0001 Traffic Control
33 05 17
33 0510
34 71 13
01 71 23
E4
FA
MO
LS
55
15
4
1
500
1500
3500
I5000
$22 500.00
514,000.00
S15,000.00
49
50
51
0171.0101 ConslnwtJdon Staldn
0171.0102 As Suitt Survey333150
Sewer Service wl4' 2-way cleanout
017123
LS
LF
1
ill
1118
10000
150
S10000.00
$167700.00
52
53
3331.3105 4" Private
0241.2201 Remove 4' Sewer Manhole
02 41 14
E4
1200
5800.00
522,800.00
59.600.0'
54
5�9999.B003
9999.0001 Remove Cleanout
Miscellaneous Utili Adjustment llrri ation)
Construction Allowance Sanity Sewer
02 41 14
01 71 23
01 71 23
FA
LS
LS
12
7
Sub
$10.000.00
-MHRM$
Told Unit 2 -
S 10 000.00
100,000.00
S3 52 3 25
59999.0002
5
Total = Sub -Total Unit 1 F Sub -Total Unit 2: S S6,057,466.50
M Y OF FORT WORTH
STANDARD CONSTRuCTIDN SPECU rATTON DOCUMENTS
Revised 9/1913025
Cmd 124 Bid Prgmel xltx
MERCHANTS
%-k
BONDING COMPANY -
MERCHANTS BONDING COMPANY (MUTUAL) P.O. Box 14498, DES MOINES, IOWA 50306-3498
PHONE: (800) 678-8171 FAX: (515) 243-3854
BID BOND
PUBLIC WORK
KNOW ALL PERSONS BY THESE PRESENTS:
Bond No. N/A
That William J. Schultz Inc dba Circle C Construction Company. P. O Box 40328. Fort Worth, TX 76140
(hereinafter called the Principal) as Principal, and the Merchants Bonding Company (Mutual)
(hereinafter called Surety), as Surety, are held and firmly bound to Citv of Fort Worth. 1000 Throckmorton Street.
Fort Worth. Texas 76102
(hereinafter called the Obligee) in the full and just sum of (
5% of Greatest Amount Bid
Five Per Cent of Greatest Amount Bid Dollars
good and lawful money of the United States of America, to the payment of which sum of money well and truly to be
made, the Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents.
Signed and dated this
15th
day of
2026
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Obligee shall make any award to the Principal for
Construction of Sanitary Sewer Rehabilitation - Contract 124
City Project No. 104909
according to the terms of the proposal or bid made by the Principal therefore, and the Principal shall duly make and
enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award, and shall give
bond for the faithful performance thereof with the Merchants Bonding Company (Mutual) , as Surety, or with
other Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure to do so, pay to the Obligee
the damages which the Obligee may suffer by reason of such failure, not exceeding the penalty of this bond, then this
obligation shall be null and void; otherwise it shall be and remain in full force and effect.
IN TESTIMONY WHEREOF, the Principal and Surety have caused these presents to be duly signed and sealed.
Witness:
tWitnes;27
John A. Miller
William J. Schultz, Inc. dba Circle C Construction Company
Principal
By . -��
Teresa S. Skelly, President
Merchants Bon in Company (Mutual)
Sheryl A. KluttsrAttorney-in-Fact
CON 0333 (2/15)
MERCHANT�S�
BONDING COMPANY.
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the
"Companies") do hereby make, constitute and appoint, individually,
John A Miller; Sheryl A Klutts
their true and lawful Attomey(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of
persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions
or proceedings allowed by law.
This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of
Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and April 27, 2024 and adopted by the Board of
Directors of Merchants National Bonding, Inc., on October 16, 2015 and amended on April 27, 2024.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attomeys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto,
bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the
Company, and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the
Attomey-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction
contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department
of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of
its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 29th day of July 2024 -
�•••"""••., •••"'••. MERCHANTS BONDING COMPANY (MUTUAL)
''�.•�Pt1pONq� •�... ��\Nr�..... MERCHANTS NATIONAL BONDING, INC.
y :.0k/P4.,.o �O; �RP09q.9y d/bla MERCHANTS NATIONAL INDEMNITY COMPANY
2003 y 1933 c: By
:d'••. . � � : : mob• .;s`<•.
•. a .• ..� \1 . President
STATE OF IOWA •.. �••• •... • ..
COUNTY OF DALLAS ss.
On this 29th day of July 2024 before me appeared Lary Taylor, to me personally known, who being by me duly swom
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf
of the Companies by authority of their respective Boards of Directors.
OpRtAts
� Penni Miller %
Commission Number 787952
• • My Commission Expires
IOWPI January 20, 2027 Notary Public
(Expiration of notary's commission does not invalidate this instrument)
I, Elisabeth Sandersfeld, Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do
hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still
in full force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 15th day of January 12026 .
OG
=•� LPO��' o� APO .09• 1.fl
1933 C: Secretary
v : 2003 -- p • cti.
POA 0018 (6124) •••'""""'•••' • • • •
MERCHANTS
BONDING COMPANY.
MERCHANTS BONDING COMPANY (MUTUAL) • MERCHANTS NATIONAL BONDING, INC.
P.O. Box 14498 , DES MOINES, IOWA 50306-3498 - (800) 678-8171 - (515) 243-3854 FAX
Please send all notices of claim on this bond to:
Merchants Bonding Company (Mutual) / Merchants National Bonding, Inc.
P.O. Box 14498
Des Moines, Iowa 50306-3498
(515) 243-8171
(800) 678-8171
Physical Address: 6700 Westown Parkway, West Des Moines, Iowa 50266
SUP 0073 TX (2/15)
00 43 37
VENDOR COMPLIANCE TO STATE LAW
Page 9 of 10
SECTION 00 43 37
VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law
provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors
whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction,
improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the
same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a
comparable contract in the State which the nonresident's principal place of business is located.
The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet
specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders
must check the box in Section B.
A. Nonresident bidders in the State of , our principal place of business,
are required to be percent lower than resident bidders by State Law. A copy of the
statute is attached.
Nonresident bidders in the State of
are not required to underbid resident bidders.
, our principal place of business,
B. The principal place of business of our company or our parent company or majority owner is
in the State of Texas. C
BIDDER:
William J Schultz Inc dba Circle C Construction
Company
500 W Trammell Avenue
PO Box 40328
Fort Worth, TX 76140
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/19/2025
By: Teresa S Skelly
(Si ure)
Title: President
Date: January 22. 2026
Contract 124 Bid Proposal.xlsx
004511-1
BIDDERS PREQUALIFICATIONS
Pagel of 3
1 SECTION 00 45 11
2 BIDDERS PREQUALIFICATIONS
4 1. Summary. A Bidder or their designated subcontractors are required to be prequalified or
5 have applied for prequalification by the City for the work types requiring prequalification
6 prior to submitting bids. To be considered for award of contract the Bidder must submit
7 Section 00 45 12, PREQUALIFICATION STATEMENT for the work type(s) listed with
8 their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed
9 must submit Section 00 45 13, PREQUALIFICATION APPLICATION in accordance with
10 the requirements below. The information must be submitted seven (7) days prior to the
11 date of the opening of bids. Subcontractors must follow the same timelines as contractors
12 for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at
13 the time bids are opened and reviewed may cause the bid to be rejected.
14
15
16 The prequalification process will establish a bid limit based on a technical evaluation and
17 financial analysis of the contractor. For example, a contractor wishing to submit bids on
18 projects to be opened on the 7th of April must file the information by the 31 st day of March
19 in order to eligible to work on these projects. In order to facilitate the approval of a Bidder's
20 Prequalification Application, the following must accompany the submission.
21 a. A complete set of audited or reviewed financial statements.
22 (1) Classified Balance Sheet
23 (2) Income Statement
24 (3) Statement of Cash Flows
25 (4) Statement of Retained Earnings
26 (5) Notes to the Financial Statements, if any
27 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles
28 of Incorporation, Articles of Organization, Certificate of Formation, LLC
29 Regulations, and Certificate of Limited Partnership Agreement).
30 c. A completed Bidder Prequalification Application.
31 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas
32 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification
33 number visit the Texas Comptroller of Public Accounts online at the
34 following web address www.window.state.tx.us/taxpermit/ and fill out the
35 application to apply for your Texas tax ID.
36 (2) The firm's e-mail address and fax number.
37 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number
38 is used by the City for required reporting on Federal Aid projects. The DUNS
39 number may be obtained at www.dnb.com.
40 d. Resumes reflecting the construction experience of the principles of the firm for firms
41 submitting their initial prequalification. These resumes should include the size and
42 scope of the work performed.
43 e. Other information as requested by the City.
44
45 2. Prequalification Requirements
46 a. Financial Statements. Financial statement submission must be provided in
47 accordance with the following:
48 (1) The City requires that the original Financial Statement or a certified copy
49 be submitted for consideration.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation — Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised August 13, 2021
00 45 11 - 2
BIDDERS PREQUALIFICATIONS
Page 2 of 3
1
(2)
To be satisfactory, the financial statements must be audited or reviewed
2
by an independent, certified public accounting firm registered and in
3
good standing in any state. Current Texas statues also require that
4
accounting firms performing audits or reviews on business entities within
5
the State of Texas be properly licensed or registered with the Texas State
6
Board of Public Accountancy.
7
(3)
The accounting firm should state in the audit report or review whether
8
the contractor is an individual, corporation, or limited liability company.
9
(4)
Financial Statements must be presented in U.S. dollars at the current rate
10
of exchange of the Balance Sheet date.
11
(5)
The City will not recognize any certified public accountant as
12
independent who is not, in fact, independent.
13
(6)
The accountant's opinion on the financial statements of the contracting
14
company should state that the audit or review has been conducted in
15
accordance with auditing standards generally accepted in the United
16
States of America. This must be stated in the accounting firm's opinion.
17
It should: (1) express an unqualified opinion, or (2) express a qualified
18
opinion on the statements taken as a whole.
19
(7)
The City reserves the right to require a new statement at any time.
20
(8)
The financial statement must be prepared as of the last day of any month,
21
not more than one year old and must be on file with the City 16 months
22
thereafter, in accordance with Paragraph 1.
23
(9)
The City will determine a contractor's bidding capacity for the purposes
24
of awarding contracts. Bidding capacity is determined by multiplying the
25
positive net working capital (working capital = current assets — current
26
liabilities) by a factor of 10. Only those statements reflecting a positive
27
net working capital position will be considered satisfactory for
28
prequalification purposes.
29
(10)
In the case that a bidding date falls within the time a new financial
30
statement is being prepared, the previous statement shall be updated with
31
proper verification.
32
b. Bidder Prequalification Application. A Bidder Prequalification Application must be
33
submitted along with audited or reviewed financial statements by firms wishing to be
34
eligible to bid on all classes of construction and maintenance projects. Incomplete
35
Applications
will be rejected.
36
(1)
In those schedules where there is nothing to report, the notation of
37 "None" or "N/A" should be inserted.
38 (2) A minimum of five (5) references of related work must be provided.
39 (3) Submission of an equipment schedule which indicates equipment under
40 the control of the Contractor and which is related to the type of work for
41 which the Contactor is seeking prequalification. The schedule must
42 include the manufacturer, model and general common description of
43 each piece of equipment. Abbreviations or means of describing
44 equipment other than provided above will not be accepted.
45
46 3. Eligibility for Award of Contract
47 a. The City shall be the sole judge as to a contractor's prequalification.
48 b. The City may reject, suspend, or modify any prequalification for failure by the
49 contractor to demonstrate acceptable financial ability or performance.
50 c. The City will issue a letter as to the status of the prequalification approval.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation — Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised August 13, 2021
0045 11 - 3
BIDDERS PREQUALIFICATIONS
Page 3 of 3
1 d. If a contractor has a valid prequalification letter, the contractor will be eligible to
2 perform the prequalified work types until the expiration date stated in the letter.
3
8 END OF SECTION
CITY OF FORT WORTH Sanitary Sewer Rehabilitation — Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised August 13, 2021
00 45 12
PREQUALIFICATION STATEMENT
Page 10 of 10
SECTION 00 45 12
PREQUALIFICATION STATEMENT
Each Bidder for a City procurement is required to complete the information below by identifying the prequalified
contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed.
Prequalification
Major Work Type
Contractor/Subcontractor Company Name
Expiration Date
- Water Distribution,
Urban/Renewal, 12-inches and
Circle C Construction
4/30/2026
smaller
- Sewer Collection System,
Urban/Renewal, 12-inches and
Circle C Construction
4/30/2026
smaller
- Sewer Collection System,
Pipe Enlargement 8-inches
Circle C Construction
4/30/2026
and smaller
- Sewer Collection System,
Ace Pipeline
4/30/2026
CIPP 6-inches and smaller
- Sanitary Manhole/Structure
Interior Lining - Warren or
Ace Pipeline
4/30/2026
Chesterton Coating
- Asphalt Paving
Construction/Reconstruction
Stabile & Winn
9/30/2026
(Less than 15,000 SY)
- Asphalt Paving
Construction/Reconstruction
Stabile & Winn
9/30/2026
(Less than 15,000 SY)
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are
currently prequalified for the work types listed.
BIDDER:
William J Schultz Inc dba Circle C Construction By: Teresa S Skelly
Company
500 W Trammell Ave
PO Box 40328 (Signs )
Fort Worth, TX 76140
Title: President
Date: ,jpnaa 0y ZZ' Zvz (o
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Contract 124 Bid Proposal.xlsx
Revised 09/19/2025 ADDENDUM 1
FORTWORTH.
SECTION 00 45 13
PREQUALIFICATION APPLICATION
Date of Balance Sheet
Name under which you wish to qualify
Post Office Box
City
Mark only one:
Individual
Limited Partnership
General Partnership
Corporation
Limited Liability Company
State Zip Code
Street Address (required) City State Zip Code
Telephone Fax Email
Texas Taxpayer Identification No.
Federal Employers Identification No.
DUNS No. (if applicable)
Email/mail this questionnaire along with financial statements to the appropriate group below. A separate
submittal is required for water/sewer, paving, and lighting:
Work Category — Water Dept - Water/sewer
Work Category — TPW Paving
Work Category — TPW Ped/Rdwy Lighting
john.kasavich(u)FortWorthTexas.gov
TPW _Prequalification(a)fortworthtexas. og_v
clint.hoover(_fortworthtexas.gov
Fort Worth Water Department Engineering and
City of Fort Worth Transportation and Public
City of Fort Worth TPW Transportation
Fiscal Services Division 200 Texas St. Fort
Works Dept. 3741 SW Loop 820, Fort Worth,
Management Attn: Clint Hoover, P.E. 5001
Worth, TX 76102
Texas 76133 Attn: Alicia Garcia
James Ave. Fort Worth, TX 76115
*Financial Statements must be mailed. Mark the envelope: "Bidder Prequalification Application"
004513-2
BIDDER PREQUALIFICATION APPLICATION
Page 2 of 8
BUSINESS CLASSIFICATION
The following should be completed in order that we may properly classify your firm:
(Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is
checked)
Has fewer than 100 employees
and/or
❑ Has less than $6,000,000.00 in annual gross receipts
OR
❑ Does not meet the criteria for being designated a small business as provided in Section
2006.001 of the Texas Government Code.
The classification of your firm as a small or large business is not a factor in determining eligibility to
become prequalified.
Select major work categories for which you would like to be prequalified (City may deem you are not
qualified for selected category or may approve you at a lesser size/length and maximum size may
not be listed specifically under a major work category):
MAJOR WORK CATEGORIES
Water Department
Augur Boring - 24-inch diameter casing and less
Augur Boring - Greater than 24-inch diameter casing and greater
Tunneling — 36-Inches — 60 —inches, and 350 LF or less
Tunneling - 36-Inches — 60 —inches, and greater than 350 LF
Tunneling — 66 and greater, 350 LF and greater
Tunneling — 66" and greater, 350 LF or Less
Cathodic Protection
Water Distribution, Development, 8-inch diameter and smaller
Water Distribution, Urban and Renewal, 8-inch diameter and smaller
Water Distribution, Development, 12-inch diameter and smaller
Water Distribution, Urban and Renewal, 12-inch diameter and smaller
Water Transmission, Development, 24-inch and smaller
Water Transmission, Urban/Renewal, 24-inch and smaller
Water Transmission, Development, 42-inches and smaller
Water Transmission, Urban/Renewal, 42-inches and smaller
Water Transmission, Development, All Sizes
Water Transmission, Urban/Renewal, All Sizes
Sewer Bypass Pumping, 18-inch and smaller
Sewer Bypass Pumping, 18-inch — 36-inch
Sewer Bypass Pumping 42-inch and larger
CCTV, 8-inch and smaller
CCTV, 12-inch and smaller
CCTV, 18-inch and smaller
CCTV, 24-inch and smaller
CITY OF FORT WORTH Sanitary Sewer Rehabilitation— Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised June 13, 2025
004513-3
BIDDER PREQUALIFICATION APPLICATION
Page 3 of 8
MAJOR WORK CATEGORIES, CONTINUED
CCTV, 42-inch and smaller
CCTV, 48-inch and smaller
Sewer CIPP, 12-inch and smaller
Sewer CIPP, 24-inch and smaller
Sewer CIPP, 42-inch and smaller
Sewer CIPP, All Sizes
Sewer Collection System, Development, 8-inches and smaller
Sewer Collection System, Urban/Renewal, 8-inches and smaller
Sewer Collection System, Development, 12-inches and smaller
Sewer Collection System, Urban/Renewal, 12-inches and smaller
Sewer Interceptors, Development, 24-inches and smaller
Sewer Interceptors, Urban/Renewal, 24-inches and smaller
Sewer Interceptors, Development, 42-inches and smaller
Sewer Interceptors, Urban/Renewal, 42-inches and smaller
Sewer Interceptors, Development, 48-inches and smaller
Sewer Interceptors, Urban/Renewal, 48-inches and smaller
Sewer Pipe Enlargement 12-inches and smaller
Sewer Pipe Enlargement 24-inches and smaller
Sewer Pipe Enlargement, All Sizes
Sewer Cleaning, 24-inches and smaller
Sewer Cleaning, 42-inches and smaller
Sewer Cleaning, All Sizes
Sewer Cleaning, 8-inches and smaller
Sewer Cleaning, 12-inches and smaller
Sewer Siphons 12-inches or less
Sewer Siphons 24-inches or less
Sewer Siphons 42-inches or less
Sewer Siphons All Sizes
Facility Construction of Lift Stations
Sanitary Sewer Manhole/Structure Interior Lining — Warren Coating
Sanitary Sewer Manhole/Structure Interior Lining — Chesterton Coating
Transportation Public Works
Asphalt Paving Construction/Reconstruction (LESS THAN 15,000 square yards)
Asphalt Paving Construction/Reconstruction (15,000 square yards and GREATER)
Asphalt Paving Heavy Maintenance (UNDER $1,000,000)
Asphalt Paving Heavy Maintenance ($1,000,000 and OVER)
Concrete Paving Construction/Reconstruction (LESS THAN 15,000 square yards)*
Concrete Paving Construction/Reconstruction (15,000 square yards and GREATER)*
Roadway and Pedestrian Lighting
NOTE *There is not a prequalification requirement for installation of concrete sidewalk, curb & gutter,
driveways, and panel replacement, only concrete paving
CITY OF FORT WORTH Sanitary Sewer Rehabilitation— Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised June 13, 2025
004513-4
BIDDER PREQUALIFICATION APPLICATION
Page 4 of 8
1. List equipment you do not own but which is available by renting
DESCRIPTION OF EQUIPMENT I NAME AND DETAILED ADDRESS OF OWNER
2. How many years has your organization been in business as a general contractor under your present
name?
List previous business names:
3. How many years of experience in
had:
(a) As a General Contractor:
construction work has your organization
(b) As a Sub -Contractor:
4. *What projects has your organization completed in Texas and elsewhere?
CONTRACT
AMOUNT
CLASS
OF
WORK
DATE
COMPLETED
LOCATION
CITY -COUNTY-
STATE
NAME AND DETAILED
ADDRESS OF OFFICIAL TO
WHOM YOU REFER
*If requalifying only show work performed since last statement.
5.Have you ever failed to complete any work awarded to you?
If so, where and why?
6. Has any officer or owner of your organization ever been an officer of another organization that failed to
complete a contract?
If so, state the name of the individual, other organization and reason.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation— Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised June 13, 2025
004513-5
BIDDER PREQUALIFICATION APPLICATION
Page 5 of 8
7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her
name?
If so, state the nalne of the individual, name of owner and reason.
8. In what other lines of business are you financially interested?
9. Have you ever performed any work for the City?
If so, when and to whom do you refer?
10. State names and detailed addresses of all producers from whom you have purchased principal
materials during the last three years.
NAME OF FIRM OR COMPANY I DETAILED ADDRESS
11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship
to this person or firm.
12. What is the construction experience of the principal individuals in your organization?
NAME
PRESENT
POSITION OR
OFFICE
YEARS OF
EXPERIENCE
MAGNITUDE
AND TYPE OF
WORK
IN WHAT
CAPACITY
CITY OF FORT WORTH Sanitary Sewer Rehabilitation— Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised June 13, 2025
004513-6
BIDDER PREQUALIFICATION APPLICATION
Page 6 of 8
13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the
same household with a City employee, please list the name of the City employee and the relationship. In
addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or
director who does not live in the same household but who receives care and assistance from that person as
a direct result of a documented medical condition. This includes foster children or those related by
adoption or marriage.
CORPORATION BLOCK
PARTNERSHIP BLOCK
If a corporation:
Date of Incorporation
Charter/File No.
President
Vice Presidents
If a partnership:
State of Organization
Date of organization
Is partnership general, limited, or registered limited
liability partnership?
File No. (if Limited
Partnership)
General Partners/Officers
Secretary
Treasurer
Limited Partners (if applicable)
LIMITED LIABILITY COMPANY BLOCK
If a corporation:
State of Incorporation
Date of organization
File No.
Officers or Managers (with titles, if any)
Individuals authorized to sign for Partnership
Except for limited partners, the individuals listed in the blocks above are presumed to have full
signature authority for your firm unless otherwise advised. Should you wish to grant signature
authority for additional individuals, please attach a certified copy of the corporate resolution,
corporate minutes, partnership agreement, power of attorney or other legal documentation which
grants this authority.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation— Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised June 13, 2025
14. Equipment
004513-7
BIDDER PREQUALIFICATION APPLICATION
Page 7 of 8
TOTAL
Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment,
you may show these 30 types and show the remainder as 'various". The City, by allowing you to show
only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment.
The equipment list is a representation of equipment under the control of the firm and which is related to
the type of work for which the firm is seeking qualification. In the description include, the manufacturer,
model, and general common description of each.
ITEM
QUANTITY
ITEM DESCRIPTION
BALANCESHEET
VALUE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Various -
TOTAL
CITY OF FORT WORTH Sanitary Sewer Rehabilitation— Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised June 13, 2025
004513-8
BIDDER PREQUALIFICATION APPLICATION
Page 8 of 8
BIDDER PREQUALIFICATION AFFIDAVIT
STATE OF
COUNTY OF
The undersigned hereby declares that the foregoing is a true statement of the financial condition of the
entity herein first named, as of the date herein first given; that this statement is for the express purpose of
inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who
prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency
herein named is hereby authorized to supply each party with any information, while this statement is in
force, necessary to verify said statement.
, being duly Sworn, deposes and says that he/she
is the of the entity described
in and which executed the foregoing statement that he/she is familiar with the books of the said entity
showing its financial condition; that the foregoing financial statement taken from the books of the said
entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification
Application are correct and true as of the date of this affidavit.
Firm Name:
Signature:
Sworn to before me this
day of
Notary Public
Notary Public must not be an officer, director, or stockholder or relative thereof.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation— Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.: 104909
Revised June 13, 2025
004526-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of 1
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its employees employed on
City Project No. 104909. Contractor further certifies that, pursuant to Texas Labor Code,
Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of
compliance with worker's compensation coverage.
CONTRACTOR-
Cii e li C Cea,s�ia+�: on CIO
i01P41r y By: e a a e
Company / (Please Print)
c3'a- o 4./i'!!/l x",e1%e&e Signature:��-
Address
Tx4s 7GIV6
City/State/Zip
THE STATE OF TEXAS §
COUNTY OF TARRANT §
Title: �,eif-1;71,0417-1
(Please Print)
BEFORE ME, the and rsiigned authority, on this day personally appeared
osa sc�.i//"y known to me to be the person whose name is
subscribed to the foregoing instrument, and acknowledged to me that he/she executed the
same as the act and deed of �i isi'c���f for the purposes and
consideration therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this /7 day of
14�1I"/ , 20_Z.G
*�'►fie, AMANDA S JObUNKERS
STATE OF TEXAS
Notary ID # 13464 M
r�yComm b*'Deoember21,2W Notary Public in and for the State of Texas
39 END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT
Revised July 1, 2011
Sanitary Sewer Rehabilitation — Contract 124
City Project No.: 104909
LO
- -
0
a�
@
c
IL
c
E
i
O
O
u
W
C
C
:
:3
°
O
_
c
N
E
y
(U
U)
-a
•C
U
. =
o
cc
E
= L
� U
�
C�
!C 6w%'
� C
W
3 O�
W W W
W m
LL
Z Z
oW
fo I aLU bQ
0 E
co 0
M
a)
cn m
W
�
•R
L
O
L
f0
00
to
'a
Iaam0�
Iv
Ul)
0
IN
C
9
13
m
Y
o
'd
L
O
a)
@
O
L )
M
>
N
O
COLD)c
ul
C O
O
N
W
a
N
yy�
— lA
Y
fn
L
(YU6
co
m
,
—
c
L O
a)
E
U
'Q
p
~
fn
X
°
@
O
O
O
O
�
u
N
E cL io
Z
O
o+
C
U
y
a
_
c=
E
Y
@
U)
L
•cn .G U
-p
a)
C
O
s
m o
E
++
Y o
m
a
a)
m
E
c
++
E L m
O >
m
Y
(p
a) : �
@
E
a)
m
@ o
n
0
r @ In
N
@
ca
@
CO a)
�
_
U
>
x
C °
G7
E
c
.0
m
m
m
d
@76
a
p
4a
E U
�
a)L
�j
@ c
5
E
LL
3
° o
cm
C+
C U '°
—
• V
G
@ m
a)
OL
7
O
7
m
C O )
a)
a
N
U
c
O O C
a)�_
@
U
C
_
o
m
E
7
m U. y
Oy
0
m
0
E
o
x a)
L
°�
E
L
;o
c
@ —
G -
3
a)
E
c
o
LL
a)
>
a)
�U
o COL
Co
�
a)
L
a)
c
C @
:° G
@
3
N
c:
y
Q
£
o
0
o
m .,
�
OU
'co-
—
@
m
_s
m `E
O
T
Y
'^
�+
E o a
m
GUS
c
a Y y
E
m
o
g
o CJ
m
s
E 'AG
°
vi
~
C
O
o
o
a)
w
aa)
m
G
N
W
E
o
C
m
L
a)
) LL
r_ c
-
r
co
m
a
U
UT in
H U. °
cn
a
NA
E
w
E
N N
0 0
.c U)
W aU)
m -p
@ @
E (OD)
L
T L
m a
U 7
T �
C O
O `'
0
s CO
a
E
a 0
N L
N
mO
U
� a
7
E
c� E
a L O
0 ° am
v N C co
@ C ,O C
G j N V
U m
''E O
0) V/ w V
N (D O d
y
E y to
-22Lco
U m
L ++
•_
0 ' a) E
ca LL O
O y y
a a) E 3
t
U)
L a) CL +d+
@ d
C Q O V
C U Z, d
U
@ 47
U �
.9 3
0 rn N d
U @ N C1
@ co .C+
C C
O' @
U o w
m O
L Q:
O V a)
N @
0,,7
`m c
O
a -0 O U
O
m T U E
E Z d
a00) a
in E w
C U
L
z a K
E a) a
(n U) y N_
O cn
0) C t
� L
U � cOi t
U
v
U
C
U
CY)Q
U 0 O
¢
U 0 0
p
U LL X
a
Of U cl
U
Z ~
U
N
z C]
U U
X
U
U
X
U
aL
CL m
.(D
U H
U H
0
p
N
O
O
O
O
O
w
d C'
�
O
d
O
N
v
fq
w
k
o
J N
IL U
CL
y
a
:3
w
a
Vi
a
.0
U _
V a O
V
Q
G
P1
Q)
O
N
U
LL OC
O
z
LL m
O
z
O N
o
U
y
as
�?
Q
as
a
z
z
O
U
U
C
Q
O
U
a
0.�
v;
�
�
L@
T DC
o0
0
c
'T'
m
C F"
W
oo
M
U_
•�
rs.
:CQ
�
LL
ON w
LL
W
O
c
OCO
Q
u) w
U) w
N a
J
C
wa
wa
a�E
w
o
E
F-
ao
�z
z
a
Q Q y
N
.
Q �
Cn
m
N
N
a
U
w C
a)
C
co
w H
C
N
N
—
M
Q O 7
a
L
E
O
Q O
7
O
-
E
O
z U m
Q
a
w
U
z U
in
Q
m
w
U
L
a)
Q
Q
U)
a
C
N
0
C
O
U
M
O
a
a�
a
()
a)
C
t7i
M
Q
O
N
Q
O
U
a)
Q
a)
a
U
C
N
cn
ns
N
0
N
0
N
O)
a
a)
N
a)
il,
0
U
c
U
O
N
cA
N
U)
Q
U 0
Qw
(n O
o
LL
o
a
LL
rW
Z o
Z o
e
w
Z
x ❑ ❑ 0
❑ ❑ ❑
❑ ❑ ❑
c(D
LS IL)
(S)
(S)
^
a a�r,
a- SD
O
Q
,O
13
W
W
Q
U
o
a
O
o
O
o
0
0
C
M
N
M
00
O
C)
C
a
N
O
O
coV
W
M
N
vi
o
W
N
a
o�i
W
o
J
;b
J
a
°�
a
a
vi
IL CA
?
c�
CL
a
(aU
C
_ar
w
=
N
F
O
a
N
W Cr
d
O
W Q
G1
W=
Gf
LL w
OU
U)
�."
C
U
Z
LL � (n
O �
C
V
Z
LL LL'
Dy
CA
O
V
Z
W U
as
O
Q
v)
U
O
W V O
m
d Q a
m
U
O
W U
aQ
O
O
a
vi
U
O
g
U
00
C
DO l0
ate+
cbd M
pp
pac
U
3ON
i�
N
�3
o
U
g o
�
U F"
rn
>
>
M
O
O M
N
a�i
a�
00CNLL
Ow
"'
0w LL U)o
❑
0mu
F
mW
uOW
mw
W J
W J
W J
W a
CO a
7
W a
a o
0
¢ W
0
o
°a Ir
E
o
Z
Z
Z Z
Z V
Z
U
y
U
9
CL
Q ga
d
W H
C
—
. a
W F- C
C
-_
(U6
W
C
Z
Q O
y
p
-O
O
t
N
E
C
O
Z N
Q O 7
O
o
O
L
N
E
C
O
Z
Q O
m
7
i7
0
O
z
f0
E
C
O
Z U
m
Q
d
W
0
Z U m
Q
a.
W
U
Z U
m
Q
W
U
..
0
U
U
U
c
U
c
U
c
U
¢
c
❑
O
Q
O
UU O
o
v
V
O
'0
Qv
m❑ o°
❑
m
z ❑
0v
z
ci
U U
❑ ❑ ❑
U U
x ❑ ❑ ❑
U
U
❑ ❑ ❑
U
U
H
U) F-
F-
LU
Wp
0
0
0
o
0
o
c
00
0
0
0
a
°:
kn
a
=
a
M
o
W
W')01
v-,
U
W
N
Vl
0
CAm
W
`D
IL
h
IL
a 0
N
U
IL fn
N
V)
a
c.
p
a
Q
rL
NCL
w
Q
W 3
Ua y
W =
U a N
W ..
V o
3
>�
w
j
jai
y
LU
N a)
Ix
y Z
d
g
W 6
a)
d
U)
f
Z
N
M
O v)
U
0
V
O (0
V
U
O
0
U
o
QU
❑
0
C
?H
d C
Z�HH
w
a Q
aCL
Z
44
0
U
c
3
Q
�
o
00
cv,
00
vo
N
O
N W
W W
J
w
N W
LU J
w a
w a
w a
-
aW
o
¢W E
o
Ix
o
00
L
o0m
O
E
Q V w
a
Q 0 y
a
Z 0
Z
d
W c
—
W F- c
a)
-
mW
F-
c
N
c
-
m
Z
¢0
°a
E
o
¢ O
v
r
E
o
a 0
s
E
o
z L) m
¢
0-
w
U
z 0 m
Q
CL
w
U
z U
m
Q
a
w
U
LO
N
O
N
co
rn
a
a�
..I
T
0
�
m
7
a-
2
a
\
\
0
6
6ck 6c. m
m
(L) 0 2
k / / ) 2
0
S # ° ®
LL
-a Eo
% q = 2 /
\
f
k\m/2
0 % / \ M
o
�
0
\//\�\
= n o co<
0
§ 0 k
•
k\
.0
CLM m
E
/ -0 E
f %
- c o -
0 2
a)§ 2 ° 0
F 7
3g
£ m 0
0 0 d)
73
�2$§kf
2\
{p2025
F
e k R } .0
j k
/ \
0 m
m
®� $
0
a \
� £
0
a ® ° ® 2
$� d k t e
%
% 0
@ k f 2
0
-C cnm
\
k
®
= @ 3 0
(\
/ ) E m \
C
@ _
§ 2 I c § _
E
f 0 = 2 £ /
\ m
/ 5/ G S 5
= m
a) cn m
( m
I- E k r- E
5
c
\:
m .0E £ 2 $
E
E ƒ \ / k
e a)o
0
a) CD
CD
E
o
E£ ke
§ � =
t
_
-o
wo E
-02
% m
ƒ 2 cn o g 5
_
= 2 a E F
ca 'a§ \ 0
t `
e o M
/ 2
� q
: 2 a f
7 2 2 m 2
c o
7
a
7 2 § %
E
<
m / >,
Do)
E
kkk\0
CL
\ {
M [ 2 ' k
0
/
0 » c e
'm
�
m t 2 f
7
k
/
k
2
k
�
�
k
0
\
El
k
w
E
§
2
�
m
Z
2
04
cm
2
2
-
�
�
co
ƒ
I
r
a
E m
2 2
x
c 0
CL
e m
E 2
0
U
k
2
al
U
\
00
k
k
.$
9
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
00 45 41 - 1
SMALL BUSINESS ENTERPRISE GOAL
Page 1 of 1
SECTION 00 45 41
SMALL BUSINESS GOAL
APPLICATION OF POLICY
If the total dollar value of the contract is $100,000 or more, the Small Business goal is applicable.
POLICY STATEMENT
It is the policy of the City of Fort Worth to foster competition, expand the supplier base, and
promote and encourage the participation of small business firms in the City's contracting
opportunities.
SMALL BUSINESS GOAL
The City's Small Business goal is 30% of the amount bid (if bid alternates are requested, the goal shall
be applied to the total bid amount inclusive of any selected alternates).
COMPLIANCE
Bidders shall comply with the Small Business Goal by meeting or exceeding the small business goal
through self -performance and/or Small Business subcontracting participation.
Small businesses are based on SBA definitions and must be located within the five Fort Worth
counties: Tarrant, Denton, Wise, Parker and Johnson.
Small businesses shall be certified via one of the following certifying agencies:
• North Central Texas Regional Certifying Agency (NCTRCA)
• Dallas/Fort Worth Minority Supplier Development Council (DFW MSDC)
• Women's Business Council — Southwest (WBCS)
• Texas Department of Transportation (TxDOT)
SUBMITTAL OF REQUIRED DOCUMENTATION
The following documents must be submitted with the bid documents at the time of bidding:
• Completed Small Business Utilization form
• Certificates identifying themselves or subcontractors as Small Businesses
FAILURE TO COMPLY WITH THE CITY'S SMALL BUSINESS ORDINANCE WILL
RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE.
38 END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised September 1, 2025
Sanitary Sewer Rehabilitation - Contract 124
City Project No.: 104909
00 52 43 - 1
Agreement
Page 1 of 6
SECTION 00 52 43
AGREEMENT
THIS AGREEMENT, authorized on March 31, 2026, is made by and between the City of Fort
Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager,
("City"), and William J. Schultz, Inc. dba Circle C Construction Company, authorized to do
business in Texas, acting by and through its duly authorized representative, ("Contractor"). City
and Contractor may jointly be referred to as Parties.
City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:
Article 1. WORK
Contractor shall complete all Work as specified or indicated in the Contract Documents for the
Project identified herein.
Article 2. PROJECT
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
Sanitary Sewer Rehabilitation Contract 124 OFFICIAL RECORD
104909 CITY SECRETARY
FT. WORTH, TX
Article 3. CONTRACT PRICE
City agrees to pay Contractor for performance of the Work in accordance with the Contract
Documents an amount, in current funds, of Six Million Fifty -Seven Thousand, Four Hundred
Sixty -Six and 501100 Dollars ($6,057,466.50). Contract price may be adjusted by change orders
duly authorized by the Parties.
Article 4. CONTRACT TIME
4.1 Final Acceptance.
The Work shall be complete for Final Acceptance within 450 days after the date when the
Contract Time commences to run, as provided in Paragraph 2.02 of the General Conditions,
plus any extension thereof allowed in accordance with Article 12 of the General Conditions.
4.2 Liquidated Damages
Contractor recognizes that time is of the essence for completion of Milestones, if any, and
to achieve Final Acceptance of the Work and City and the public will suffer from loss of
use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The
Contractor also recognizes the delays, expense and difficulties involved in proving in a
legal proceeding, the actual loss suffered by the City if the Work is not completed on time.
Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated
damages for delay (but not as a penalty), Contractor shall pay City Six Hundred Fifty
Dollars ($650.00) for each day that expires after the time specified in Paragraph 4.1 for
Final Acceptance until the City issues the Final Letter of Acceptance.
Article 5. CONTRACT DOCUMENTS
5.1 CONTENTS:
A.The Contract Documents which comprise the entire agreement between City and
Contractor concerning the Work consist of the following:
CITY OF FORT WORTH Sanitary Sewer Rehabilitation Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 104909
Revised September 19, 2025 (effective September 1, 2025)
00 52 43 - 2
Agreement
Page 2 of 6
1. This Agreement.
Attachments to this Agreement:
a. Bid Form
1) Proposal Form
2) Vendor Compliance to State Law Non -Resident Bidder
3) Prequalification Statement
4) State and Federal documents (project specific)
b. Current Prevailing Wage Rate Table
c. Insurance Certification Form (ACORD or equivalent)
d. Payment Bond
e. Performance Bond
f. Maintenance Bond
g. Power of Attorney for the Bonds
h. Worker's Compensation Affidavit
i. Small Business Utilization Form
3. General Conditions.
4. Supplementary Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment or,
if not attached, as incorporated by reference and described in the Table of Contents
of the Project's Contract Documents.
b. Drawings.
7. Addenda.
8. Documentation submitted by Contractor prior to Notice of Award.
The following which may be delivered or issued after the Effective Date of the
Agreement and, if issued, become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
I CY 103 1:1 0iu lei 12[KTI I DWI
6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense, the city, its officers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
under this contract. This indemnification provision is specifically intended to operate
and be effective even if it is alleged or proven that all or some of the damages being
sought were caused, in whole or in part, by any act, omission or negligence of the city.
This indemnity provision is intended to include, without limitation, indemnity for costs,
expenses and legal fees incurred by the city in defending against such claims and causes
of actions.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 104909
Revised September 19, 2025 (effective September 1, 2025)
005243-3
Agreement
Page 3 of 6
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
the city, its officers, servants and employees, from and against any and all loss, damage
or destruction of property of the city, arising out of, or alleged to arise out of, the work
and services to be performed by the contractor, its officers, agents, employees,
subcontractors, licensees or invitees under this contract. This indemnification provision
is specifically intended to operate and be effective even if it is alleged or proven that all
or some of the damages being sought were caused, in whole or in part, by any act,
omission or negligence of the city.
Article 7. MISCELLANEOUS
7.1 Terms.
Terms used in this Agreement which are defined in Article 1 of the General Conditions will
have the meanings indicated in the General Conditions.
7.2 Assignment of Contract.
This Agreement, including all of the Contract Documents may not be assigned by the
Contractor without the advanced express written consent of the City.
7.3 Successors and Assigns.
City and Contractor each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, in respect to all covenants, agreements and
obligations contained in the Contract Documents.
7.4 Severability/Non-Waiver of Claims.
Any provision or part of the Contract Documents held to be unconstitutional, void or
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
remaining provisions shall continue to be valid and binding upon City and Contractor.
The failure of City or Contractor to insist upon the performance of any term or provision of
this Agreement or to exercise any right granted herein shall not constitute a waiver of City's
or Contractor's respective right to insist upon appropriate performance or to assert any such
right on any future occasion.
7.5 Governing Law and Venue.
This Agreement, including all of the Contract Documents is performable in the State of
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
Northern District of Texas, Fort Worth Division.
7.6 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement if signed by someone other
than the duly authorized signatory of the Contractor.
7.7 Non -appropriation of Funds.
In the event no funds or insufficient funds are appropriated by City in any fiscal period for
any payments due hereunder, City will notify Vendor of such occurrence and this Agreement
shall terminate on the last day of the fiscal period for which appropriations were received
without penalty or expense to City of any kind whatsoever, except as to the portions of the
payments herein agreed upon for which funds have been appropriated.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 104909
Revised September 19, 2025 (effective September 1, 2025)
00 52 43 - 4
Agreement
Page 4 of 6
7.8 Prohibition On Contracts With Companies Boycotting Israel.
Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of
the Texas Government Code, if Contractor has 10 or more full time -employees and the
contract value is $100,000 or more, the City is prohibited from entering into a contract with
a company for goods or services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of
the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to
those terms in Section 808.001 of the Texas Government Code. By signing this contract,
Contractor certifies that Contractor's signature provides written verification to the
City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract.
7.9 Prohibition on Boycotting Energy Companies.
Contractor acknowledges that in accordance with Chapter 2276 of the Texas Government
Code, the City is prohibited from entering into a contract for goods or services that has a
value of $100,000 or more, which will be paid wholly or partly from public funds of the City,
with a company (with 10 or more full-time employees) unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will
not boycott energy companies during the term of the contract. The terms "boycott energy
company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the
Texas Government Code. To the extent that Chapter 2276 of the Government Code is
applicable to this Agreement, by signing this Agreement, Contractor certifies that
Contractor's signature provides written verification to the City that Contractor: (1)
does not boycott energy companies; and (2) will not boycott energy companies during
the term of this Agreement.
7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries.
Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code, the City is prohibited from entering into a contract for goods or services
that has a value of $100,000 or more which will be paid wholly or partly from public funds
of the City, with a company (with 10 or more full-time employees) unless the contract
contains a written verification from the company that it: (1) does not have a practice, policy,
guidance, or directive that discriminates against a firearm entity or firearm trade association;
and (2) will not discriminate during the term of the contract against a firearm entity or firearm
trade association. The terms "discriminate," "firearm entity" and "firearm trade association"
have the meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code. To the extent that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, Contractor certifies that Contractor's signature
provides written verification to the City that Contractor: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or firearm
trade association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 104909
Revised September 19, 2025 (effective September 1, 2025)
005243-5
Agreement
Page 5 of 6
7.11 Immigration Nationality Act.
Contractor shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (I-9). Upon request by City, Contractor shall provide City with copies of all I-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Contractor shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Contractor
employee who is not legally eligible to perform such services. CONTRACTOR SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS,
AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right
to immediately terminate this Agreement for violations of this provision by Contractor.
7.12 No Third -Party Beneficiaries.
This Agreement gives no rights or benefits to anyone other than the City and the Contractor
and there are no third -party beneficiaries.
7.13 No Cause of Action Against Engineer.
Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their
sureties, shall maintain no direct action against the Engineer, its officers, employees, and
subcontractors, for any claim arising out of, in connection with, or resulting from the engineering
services performed. Only the City will be the beneficiary of any undertaking by the Engineer.
The presence or duties of the Engineer's personnel at a construction site, whether as on -site
representatives or otherwise, do not make the Engineer or its personnel in any way
responsible for those duties that belong to the City and/or the City's construction contractors
or other entities, and do not relieve the construction contractors or any other entity of their
obligations, duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for coordinating and
completing all portions of the construction work in accordance with the Contract Documents
and any health or safety precautions required by such construction work. The Engineer and
its personnel have no authority to exercise any control over any construction contractor or
other entity or their employees in connection with their work or any health or safety
precautions.
7.14 Small Business Utilization.
Contractor shall not make any unjustified changes to its small business utilization as
presented on the Small Business Utilization Form. Contractor's failure to abide by the
commitments presented on the form or intentional and/or knowing misrepresentation of
material facts regarding small business utilization shall be disallowed from bidding on future
City of Fort Worth public works contracts for a period of time of not less than one year.
CITY OF FORT WORTH Sanitary Sewer Rehabilitation Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 104909
Revised September 19, 2025 (effective September 1, 2025)
005243-6
Agreement
Page 6 of 6
fN WITNESS WHBRI30F, City and Contractor have each executed this Agreement to be effective
as of the date subscribed by the City's designated Assistant City Manager ("Effective Date").
Contractor: William J. Schultz, Inc. dba
Circle C Construction Company
By:
a ss�
Signature —- ^- --
Teresa S. Skelly
(Printed Name)
President
Title
500 W. Trammell
P. O. Box 40328
Address
Fort Worth, TX _L( 140
City/State/Zip
,. / 17, ZOe
Date -
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth
By:
�
Jesica McEachern
Assistant City Manager
05/14/2026
inn
Date o FORro�ado
�e
Attest:
oa°nnnExob54
Jannette Goodall, City Secretary
(Seal)
M&C: 26-0219
Date: March 31, 2026
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements. _
Clayton Torrance, P.E.
Professional Engineer
Approv dv d morn and Legality:
Douglas Black (May 8, 2026 08:03:24
Douglas W. Black
Sr. Assistant City Attorney
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised September 19, 2025 (effective September 1, 2025)
APPROVAL RECOTMNDED:
--7trstophw-H,rd,r{4ify4i2A26A9:'2Z'�. F-
Christopher Harder, P.E.
Water Director
Saniiaiy&nrerRekabililatioirContract 124
104909
0061 13- 1
PERFORMANCE BOND
Pape I oft
BOND NO. 101698443
1 SECTION 00 61 13
2 PERFORMANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY 'THESE PRESENTS:
6 COUNTY OF TA.RRANT §
7
8 That we, William J. Schultz, Inc. dba Cu'cle C Construction,Cona.p n known as
9 "Principal" herein and _Merchants Bonding Company Mutual___—, a corporate
10 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as
11 "Surety" herein (whether one or more), are held and firmly bound unto the City of fort Worth, a
12 municipal corporation crea ed ivant to the laws of Tcxas, known as "City" herein, in the penal
�1x 1fv11lslion, Fifty -Seven Thousand, Four Hundred S1xty-
13 sure of, Six and 50/100*****_******************_********** Dollars
14 ( *6,057.466.,.Q* lawful money of the United States, to be paid in Fort Worth,
15 Tarrant County, Texas for• the payment of which sum well and truly to be made, we bind ourselves,
16 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
17 presents.
18 WHEREAS, the Principal has entered into a certain written contract with the City awarded
19 the 31 St day of __.._ March , 20 26, which Contract is hereby referred to and made a part
20 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other
21 accessories defined by law, in the prosecution of the Work, including any Change Orders, as
22 provided for u1 said Contract designated as Sanitary .SelVer Rehabilitation Conlraca 124, City
23 .Project No. 104909
24 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
25 shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully
26 perform the Work, including Change Orders, under the Contract, according to the plans,
27 specifications, and contract documents therein referred to, and as well during any period of
28 extension of the Contract that may be granted on the part of the City, then this obligation shall be
29 and become null and void, otherwise to remain in full force and effect.
30 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
31 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
32 Worth Division.
CITY OF FORT WORTI,i SYuiitarp Scher helrabi(itatio» Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 164909
Revised December 8, 2023
0061 13 -2
PERFORly"CE BOND
Page 2 oF2
I This bond is made and executed in compliance with the provisions of Chapter 2253 of the
2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
3 accordance with the provisions of said statue.
4 IN WITNESS WHEREOI+, the Principal and the Surety have SIGNED and SEALED this
5 instrument by duly authorized agents and officers on this the _ 1_4th day of April
6 52026 .
7
8
9
10
12
13 ATTEST:
14
16 (Principal) Secretary Mt lele S. Lankford
17
18
19
20
21
22 Witness as to Principal
23
24
25
26
27
28
29
30
31
32
33
34
35
36 X :
37 Witness as to Surety John A. ler
38
39
PRINCIPAL:
William J. Schultz,_l.x--d]ba__......_M—
Circle C�Consti-LI Q.n ,oml2&tly ._-.__
BY: A cScS�ls,�i(
Signature
Teresa S. Skelly, President
Name and Title
Address: 500 W. Trammell _ _
P. O. Box 40328
Fort Worth TX 76140
SURETY:
Merc11a.l ondi_ng-C. 1 Pal ... tttlal)
BY: _
Signatlu e
Shelyl A. KluttS,_Attorney-ili=Fact
Name and Title
.Address: 6700 Westown Parkway
West Des Moines, IA 50266-7754
Telephone Number: (800 678-8171 _
E-mail Address: sheryl { johnaniillerassocinc.com
40 :kNotc: If signed by an officer of the Surety Company, there must be on file a certified extract
41 from the by-laws showing that this person has authority to sign such obligation. If
42 Surety's physical address is different from its mailing address, both must be provided.
43 The date of the bond shall not be prior to the date the Contract is awarded.
44
CITY OF FORT WORTH Sa nitaty Sewer Rehabilitation Contract 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 100 i9
Remised December 8, 2023
MERCHANT
BONDING COMPANYr„
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the
"Companies") do hereby make, constitute and appoint, individually,
John A Miller; Sheryl A Klutts
their true and lawful Altomey(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of
persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions
or proceedings allowed by law.
This Power-of-Atlomey is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of
Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and April 27, 2024 and adopted by the Board of
Directors of Merchants National Bonding, Inc., on October 16, 2015 and amended on April 27, 2024.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto,
bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the
Company, and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the
Atlorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction
contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department
of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of
its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 291h day of July 2024
(10 N . •'' • MERCHANTS BONDING COMPANY (MUTUAL)
q< e&" •.•* .., ... j4 MERCHANTS NATIONAL BONDING, INC.
ham: µPORq• �0(�P094% .X. • d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY
v' 2003 y. 1933 c: By
d��, . ���,;' ••�y�;� • dam. '
�1 President
STATE OF IOWA .,���t ��.•` ••.• • �� •,.•
COUNTY OF DALLAS ss. ""-
On this 29th day of July 2024 before me appeared Larry Taylor, to me personally known, who being by me duly sworn
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf
of the Companies by authority of their respective Boards of Directors.
�p�tA�S� Penni Miller '
Z o P Commission Number 787952 ' --
• • My Commission Expires \ `
IOWA January 20, 2027 ,�Jz
Notary Public
(Expiration of notary's commission does not invalidate this instrument)
I, Elisabeth Sandersfeld, Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do
hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies,which is still
in full force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 14th day of April 2026 .
_ 2003 1933 .c Secretary
�'.
:,�y; .........•; Via; � •.''iv • ��.. , •``°••.
POA 0018 (6/24) • •���'"'
0061 14 - 1
PAYNI) NT BOND
Page 1 of
BOND NO. 101698443
1 SECTION 00 6114
2 PA.YN4 [,NT BOND
3
4 THE STATE OF TEXAS 5
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, William 1_Schultz, Inc._clba Circle C Cons :tlwc iuCotnpany, known as
8 "Principal" herein, and Merchants Bondin , Compan Mutual , a
9 corporate surety (sureties), duly authorized to do business in the State of Texas, known as "Surety"
10 herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal
I 1 corporation created pur pant t, the laws of the State of Texas, known as "City" herein, in the penal
Six Mi lion, Fifty -Seven Thousand, Four Hundred Sixty -Six
12 sum of and 50/10 *Q************************************* Dollars
13 ($ "6,057,466_50* _), lawfiil money of the United States, to be paid in Fort Wolth,
14 Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves,
15 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
16 presents:
17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the
18 31 st day of._,___ March 20_2L0, which Contract is hereby referred to and made
19 a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor
20 and other accessories as defined by law; in the prosecution of the Work as provided for in said
21 Contract and designated as Sanitcny Sewer Rehahilitation Contract 124, City Project No. 104909.
22 NOW, THEREFORE, THT CONDITION OF TUTS OBLIGATION is such that if
23 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
24 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
25 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
26 force and effect.
27 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
28 "texas Government Code, as amended, and all liabilities on this bond shall be determined in
29 accordance with the provisions of said statute.
30
CITY OF FORT WORTH Sanitaq Sewer Rehu ililrtlion Canlrarx 124
STANDARD CONSTRUCTION SPFCIFICA,riON DOCUMENTS 104909
Revised December 8, 2023
0061 lh-2
PAYMENTBOND
Page 2 of 2
1 1N WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
2 this instrument by duly authorized agents and officers on this the l4th day of
3 April , 2U26
4
5
6
7
8
9
to
0
12
A'1" TE ST:
(Pri Secretary Michele . Lank oia
Witness as to Principal
ATTEST:
(Surety) Secretar
X
Witness as to Surety John 1 ler
PRINCIPAL:
William J. Schultz. Inc. dba
Circle C CQalstawti9m—Cmipany
BY:
Signature
Teresa S. Skelly, President
Name and Title
Address: 500 W. Tranuiiell
P. O. Box 40328
Fort Worth, TX 76140
SURETY:
Mercha
Sheryl A. Klutts, Attorney -in -Fact
Name and Title
Address: 6700 Westown Parkway --
West Des Moines, IA 50266-7754
Telephone Number: ffl0), 678-8171
Email Address: sliery�johnamillerassocine.com
Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws
showing that this person has authority to sign such obligation. If Surety's physical address is
different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
CITY OP FORT WORTH SanifivyS'euer RebabiNation Curatoo 124
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 104909
Revised December 8, 2023
MERCHANT
BONDING COMPANY,,,
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of [lie State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the
"Companies") do hereby make, constitute and appoint, individually,
John A Miller; Sheryl A Klutts
their [rue and lawful Attomey(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of
persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions
or proceedings allowed by law.
This Power-of-Altomey is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of
Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and April 27, 2024 and adopted by the Board of
Directors of Merchants National Bonding, Inc., on October 16, 2015 and amended on April 27, 2024.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto,
bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the
Company, and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the
Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction
contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department
of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of
its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 291h day of July 2024
"''•. . • " MERCHANTS BONDING COMPANY (MUTUAL)
•'�P���•Nq< •••N�.���jA.• MERCHANTS NATIONAL BONDING, INC.
ham; �pRPop q��oCo.. 2 ; : 0(\POg4 -A - d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY
J: 2003 1933 �; By
STATE OF IOWA
,•%:�11j "' `J?� ' •'b;��y......... �1�•• President
COUNTY OF DALLAS ss."""'•.
On this 29th day of July 2024 before me appeared Larry Taylor, to me personally known, who being by me duly sworn
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf
of the Companies by authority of their respective Boards of Directors. --�,
.P�kIA(S� Penni Miller
o o P Commission Number 787952 -
• • My Commission Expires
IOWA January 20, 2027
Notary Public
(Expiration of notary's commission does not invalidate this instrument)
I, Elisabeth Sandersfeld, Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do
hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies,which is still
in full force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 14th day of April 2026
..-IPZ 10 N4
�:
CN,A \NG %
• V ••
Co
�•�O•.�RP099.9y.•
=��PORq'.2,
Ul
�'
y 2003
1933 c; Secretary
.tip. :'y.