HomeMy WebLinkAbout056504-CO1 - Construction-Related - Contract - The Fain Group, Inc.CSC No. 56504-CO1
FORT WORTH.. City of Fort Worth
Change Order Request
Project Name SW HROM Safety and Closure Improvements 1 City Sec # 56504
Client Project #(s)l HROM Safety and Closure Imrovements Construction Contract- Citywide Various Projects Site Locations and CPNs
Project Description Replacement, extension and/or improvements of existing Hazardous Road Overtopping Mitigation (HROM) construction contractthrough citywide
work orders.
Contractor` The Fain Group, Inc. Change Order #1 1 Date[ 2/26/2026
City Project Mgr.1Jane Weidmer City Inspector N/A
Dept. TPW Contract Time
Totals (CD)
Original Contract Amount $2,000,000.00 $2,000,000.00
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $2,000,000.00 $2,000,000.00
Revised Contract Amount $2,000,000.00 $2,000,000.00
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $2,500,000.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
As the Hazardous Road Overtopping Mitigation (HROM) program has evolved, several new bid items have been identified for the various unique "safety" sites in the
program. The attached bid item list reflects the additional line items. The proposed unit prices are similar to those of recent HROM projects, as well as the TxDOT
Average Bids (see the TxDOT Average Bid Items Price Comparison - Attachment A). The City finds that the contractor's proposed prices are fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name
Contractor (Name)
Contract Signature
Date
The Fain Group, Inc.
Larry Frazier
J—
02/26/26
Inspector/inspection Supervisor
Date
Project and Contract Compliance Manager
Date
02/26/21
02/26/26
Program Manager
Date
Senior Capital Project Officer
Date
02/26/;
" °
02/26/2E
Assistant Director De .
Date
Director, Contracting Department (Dept)
Date
�k (Mar 2, 202615:48:34 CST)
03/02/2(
0212612E
Assistant City Attorney
Date
Assistant City Manager
Date
02/26/2(
03/05/2(
Council Action (if required)
/ATTEST: opT^a°
�d:LM1,nuaca. i4 a
ou= a ap
Jannette Goodall, City Secretary °Q, a;//XpVV5a
n aaoa
M&C Number 25-0524
M&C Date Approved 8/3/2021
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Change Order Additions Page 1 of 4
FORT WORTH City of Fort Worth
Change Order Additions
Project Name SW HROM Saf and Closure Im rovements I City Sec # I 56504
Client Project # I HROM Safety and Closure Imrovements Construction Contract- Cityrdde Various Projects Site Locations and CPNs
Contractorl The Fain Group, Inc. PM Jane Weidmer Inspector N/A
Change Order Submittal # rI Date I 2126/2026
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
1
Remove and Replace Panel and Post
TPW
0
EA
$123.50
$0.00
2
Auxiliary Signs
TPW
0
EA
$187.50
$0.00
3
Install Delineator Sign OM -3R, OM -3L
TPW
0
EA
$236.50
$0.00
4
6-6-6 Triplex Aluminum Conductor
TPW
0
LF
$2.13
$0.00
5
FunishAnstall Single Gardrail Assembly (SGT)
TPW
0
EA
$6,792.50
$0.00
6
FunishAnstall Single Downstream Anchor Terminal (DAT)
TPW
0
EA
$2,678.00
$0.00
7
Remove Single Guardrail Terminal (SGT)
TPW
0
EA
$500.00
$0.00
8
Remove Downstream Anchor Terminal (DAT)
TPW
0
EA
$500.00
$0.00
9
28'-31' Transition
TPW
0
EA
$2,460.00
$0.00
10
REM/REP Timber Post
TPW
0
EA
$160.00
$0.00
11
Install DEL ASSM GF2 S/W
TPW
0
EA
$60.00
$0.00
12
Repair Rai Element
TPW
0
LF
$42.00
$0.00
13
Remove Sign Panel and Post
TPW
0
EA
$123.50
$0.00
14
Tree and Brush Removal
TPW
0
AC
$9,500.00
$0.00
15
Install Concrete Riprap
TPW
0
SY
$101.36
$0.00
16
8" BRK Pvmt Markings HAS (W)
TPW
0
EA
$2.00
$0.00
17
9999.0001 Adjust Sign
TPW
0
EA
$532.38
$0.00
18
TXDOT Spec 480 Clean Out Culvert
TPW
0
EA
$1,040.00
$0.00
19
Install Sign on Exist Gate
TPW
0
EA
$399.00
$0.00
20
9999.0005 Retoriective Red and White Conspicuity Supplied and Installed
TPW
0
LF
$10.00
$0.00
21
Furnish and Install Flash/Master Assembly
TPW
0
EA
$9,775.00
$0.00
22
Remove Guardrail (MBGF)
TPW
0
LF
$17.25
$0.00
23
Install Thrie Beam Transition (TL2)
TPW
0
EA
$3,300.00
$0.00
24
Install Guardrail End Trt (MSKT)
TPW
0
EA
$6,792.50
$0.00
25
Install Guardrail End TRT (MSKT) TL2
TPW
0
EA
$9,792.50
$0.00
26
Install DEL ASSM (CTB) D/W
TPW
0
EA
$61.00
$0.00
27
9999.0003 lostall D ineaoter Sticker on Exist Guard Rail
TPW
0
EA
$0.00
TPW
$0.00
Sub Total Additions
$0.00
Change Order Additions Page 2 of 4
FOR Woiu I City of Fort Worth
Change Order Deletions
Project Name I SW HROM Safety and Closure Improvements I City Sec # 56504
Client Project# HROM Safety and Closure Imrovements Construction Contract- Citywide Various Projects Site Locations and CPNs
Contra The Fain Group, Inc. PM Jane Weidmer Inspector N/A
Change Order Submittal # I Date I 2/26/2026
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
TPW $0.00
Sub Total Deletions $0.00
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub
Type of Service
Amount for this CO
N/A
Total
$0.00
Change Order Additions Page 4 of 4
TxDOT Average Bid Items Price Comparison - Attachment A
Project Name I SW HROM Safety and Closure Improvements pity Sec # I 56504
Client Project # I HROM Safety and Closure Imrovements Construction Contract- Citywide Various Projects
Contractorl The Fain Group, Inc. Inspector N/A
I Price Comparison I ate 2126/2026
TxDOT Bid Average Price Comparison
ITEM
DESCRIPTION
Unit
UnitCost
TxDOT Bid
Average*
P'Bid
Code
1
Remove and Replace Panel and Post
EA
$123.50
$ 110.00
P
636-7004
2
Auxiliary Signs
EA
$187.50
$ 175.00
P
636-7004
3
Install Delineator Sign OM -3R, OM -3L
EA
$236.50
$ 119.00
P
658-091
4
6-6-6 Triplex Aluminum Conductor
LF
$2.13
$ 11.00
P
614-7021
5
FunishMstall Single Gardrail Assembly (SGT)
EA
$6,792.50
$ 2,500.00
P
540-7015
6
FunishMstall Single Downstream Anchor Terminal (DAT)
EA
$2,678.00
$ 2,500.00
P
540-7015
7
Remove Single Guardrail Terminal (SGT)
EA
$500.00
$ 500.00
P
542-7003
8
Remove Downstream Anchor Terminal (DAT)
EA
$500.00
$ 500.00
P
542-7003
9
28-31' Transition
EA
$2,460.00
$ 875.00
540-7031
10
REM/REP Timber Post
EA
$160.00
$ 120.00
770-7016
11
Install DEL ASSM GF2 S/W
EA
$60.00
83.68
P
658-7038
12
Repair Rail Element
LF
$42.00
$ 100.00
P
770-7027
13
Remove Sign Panel and Post
EA
$123.50
$ 110.00
636-7004
14
Tree and Brush Removal
AC
$9,500.00
$ 2,000.00
752-7003
15
Install Concrete Riprap
SY
$101.36
$ 2,000.00
432-7027
16
8" BRK Pvmt Markings HAS (W)
EA
$2.00
$ &75
666-7024
17
Adjust Sign
EA
$532.38
$ 175.00
P
636-7004
18
TXDOT Spec 480 Clean Out Culvert
EA
$1,040.00
$ 500.00
764-7004
19
Install Sign on Exist Gate
EA
$399.00
$ 175.00
636-7004
20
Retorflective Red and White Conspicuity Supplied and Installed
LF
$10.00
$ 202.35
Retail Item Only Per Roll, Installation
Not Inddued
21
Furnish and Install Flash/Master Assembly
EA
$9,775.00
$ 13,125.00
P
685-7004
22
Remove Guardrail (MBGF)
LF
$17.25
$ 5&70
542-7001
23
Install Thrie Beam Transition (TL2)
EA
$3,300.00
$ 23,020.00
540-7039
24
Install Guardrail End Td (MSKT)
EA
$6,792.50
25
Install Guardrail End TRT (MSKT) TL2
EA
$9,792.50
26
Install DEL ASSM (CTB) D/W
EA
$61.00
$ 85.00
658-7012
27
Install Delineaoter Sticker on Exist Guard Rail
EA
$250.00
$ 60.00
Retail Item Only, Installation Not
Included
b00,435.0 b 4'5,113.45
TxDOT Bid Average* Much of the work for The Fain Contractor, Inc is completed by subcontractors, the typical 15% is added to
subcontractor pricing.
P "` denotes that this item, with same price, has been used on previous HROM projects, since the cobtract inception
Signature: Signature:
Email: katherine.cenicola@fortworthtexas.gov Email: allison.tidwell@fortworthtexas.gov
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 08/03/21 M&C FILE NUMBER: M&C 21-0524
LOG NAME: 20SWM HROM SAFETY AND CLOSURE IMPROVEMENTS CONSTRUCTION
SUBJECT
(ALL) Authorize Execution of a Contract with The Fain Group, Inc. in the Amount of $2,000,000.00 for the Construction of Stormwater Hazardous
Road Overtopping Mitigation Safety and Closure Improvements Citywide Project
RECOMMENDATION:
It is recommended that the City Council authorize execution of a contract with The Fain Group, Inc. in the amount of $2,000,000.00 for the
construction of Stormwater Hazardous Road Overtopping Mitigation Safety and Closure Improvements Citywide Programmable project (City
Project No. P00120) with the option to renew the contract up to two times.
DISCUSSION:
This Mayor and Council Communication (M&C) is to provide for a work order based, unit price construction contract for high priority citywide
Hazardous Road Overtopping Mitigation (HROM) safety or closure improvement projects to better protect drivers from life -threatening road
flooding. These projects may involve safety improvements such as guardrails, lighting, signage, and road markings at a stream crossing or low-
lying area of a road. In some cases, the closure of a road based on recommendations from an engineering analysis and considering feedback
from City staff and community members may be the preferred alternative for mitigating the risk. These safety improvement projects will not reduce
road flooding but will better protect the life safety of drivers through better warning of roadway flood risks or the closure of the section of road
subject to hazardous flooding.
The price of each work order will be based on the unit prices bid. The cumulative amount of all work order tasks in the initial term of this contract is
expected to be $2,000,000.00, funded from both 2020 Stormwater Revenue Bonds and Stormwater Capital Projects Funds. The bid amounts
cited below were based on hypothetical quantities for the purpose of establishing unit prices for each work item. Actual payments will be made
based on actual measured quantities at those bid prices. Funding will be verified individually for each work order task prior to its release. This
contract may be renewed up to two times at the City's sole discretion. The term of the contract, inclusive of any renewals, will not exceed five years.
This project was advertised for bid in the Fort Worth Star -Telegram on April 15, 2021 and April 22, 2021. On May 13, 2021, two responses were
received as follows:
Bidders Bid Amount
The Fain Group, Inc. $3,037,379.57
Fort Worth Civil Constructors, LLC $3,588,700.00
Business Equity - THE FAIN GROUP, INC., is in compliance with the City's Business Equity Ordinance by committing to 14% Business Equity
participation on this project. The City's Business Equity goal on this project is 14%.
This project is located in ALL COUNCIL DISTRICTS.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Stormwater Capital
Projects Fund for future identified task order projects related to the SW Hazardous Rd Overtopping programmable project to support the approval
of the above recommendation and execution of the construction contract. Prior to any expenditure being incurred, the Transportation & Public
Works Department has the responsibility to validate the availability of funds.
Submitted for City Manager's Office by: Dana Burghdoff 8018
Originating Business Unit Head: William Johnson 7801
Additional Information Contact: Linda Young 2485
Signature: C.NU9`uut Ck4'ez
Cris[ian Chavez (Feb 26, 202610'.45'.15 CST)
Signature:
Email: cristian.chavez@fortworthtexas.gov Email: aL1ison.tidwe11@fortworthtexas.gov
FORT WORTH..:
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: HROM Safety and Closure Improvements Citywide Construction Contract
M&Ce 25-0524 CPN: P00120 CSN: 56504 Change Order #1
Date: 2/26/2026
To:
Name
Department
Initials
Date Out
1.
Larry Frazier
Ifrazier@faingp.com
Contractor
4F
F
02/26/26
2.
Mike Glover
TPW-Inspector
. Glover
02/26/26
3.
Jane Weidmer
TPW - Project Manager
-
02/26/26
4.
Thanaa Maksimos
TPW — Program Manager
V
02/26/26
5.
Lissette Acevedo
TPW — Interim Sr. CPO
02/26/26
6.
Patricia Wadsack
TPW —Assistant Director
PL.i' '
03/02/26
7.
Lauren Prieur
TPW - Director
v
Laker, Pre r
02/26/26
8.
Doug Black
Legal - Assistant City Attorney
oougsBlack
02/26/26
9.
Jesica McEachern
CMO — Assistant City Manager
D.
03/05/26
10.
Katherine Cenicola
CSO — City Secretary
cc
02/26/26
11.
Jannette Goodall
CSO — City Secretary
ay
02/27/26
12.
Allison Tidwell
CSO — City Secretary
AllssonTdwell
02/26/26
13.
TPW—SW—Contract
TPW Stormwater
NEEDS TO BE NOTARIZED: LIVES No
RUSH: LIVES No SAME DAY: ❑ YES ❑No NEXT DAY: LIVES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required: LI Signature/Routing and/or Recording