HomeMy WebLinkAbout059846-AR1 - Construction-Related - Contract - Winston Electric, Inc. dba Acme Electric CompanyFORT WORTH City of Fort Worth CSC No. 59846-AR1
Construction Allowance Request
ProjectNamel Backup Power at Four Pump Stations City Sec No. 1 59846
Project No.(s) 1 56021 / 0600430 / 5740010 / 103410 M&C 23-0500 City Proj. Nol 103410-2
Project Description:
Backup Power and Electrical Improvements at Four Pump Stations
Contractor: 1 Winston Electric, Inc. dba ACME Electric Company Allowance No: 0 Date: 1 4/23/2026
City Project Mgr.1 David R. Townsend, P.E. City Inspector: I Ronnie Cardenas
Phone Number: (817) 392-8430 Phone Number: (682) 309 3761
Dept. I Water I I I Totals I Contract Time
(Calender days)
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$23,119,632.00
$23,119,632.00
1,090
$23,119,632.00
$23,119,632.00
1,090
Amount of Proposed Allowance Allocation
$180,657.66
$180,657.66
Revised Contract Amount $23,300,289.66
Original Allowance Available for Allocation $200,000.00
Allowance Funds Previously Allocated $200,000.00
Remaining Allowance Funds
CHANGE ORDERS to DATE AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$23,300,289.66
1,090
$200,000.00
$200,000.00
0.78%
$28,899,540.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
CP-006R Edwards Ranch PS Pipe Replacement Modifications to accelerate the schedule and allow Holly Water
Treatment Plants to go out of service
RCP-007 Change Electrical Buildings Door Height from 7 feet to 9 feet to allow switchgears to be
installed/removed with remaining door frame/wall portions
RCP-008 Lead Paint Abatement for Existing Pipe - Edwards Ranch Pump Station
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction
and represents payment in full for all costs arising out of, or incidental to, the above Construction Allowance Request.
Contractor's Company Name
Contractor Name
Contractor Signature
Date
Acme Eleciric Company
R, Brad Hibbets, P.E.
Inspector
bate
Pro WManager
Date
Ronnie Cardenas II
-29-2026
Assistant Director Water Dept)
Date
C n ruction Su erv's irWater Dept)
Date
Chnstonner Har .r IMa 1 2 26 13 iN 12 CDT)
05/01/2026
2t7�- _
Assistant City Attomey
Date
Assls and Mana er
Date
Douglas Black (May 8, 2026 '16.52 57 CDT)
05/08/2026
( ������_'
05/19/2026
_
F" RT WO RT H City of Fort Worth
Construction Allowance Request
Project Name Backup Power at Four Pump Stations City Sec No. 1 59846
Project No.(s) 56021 / 060043015740010 / 103410 DOE No. 23-0500 CityProj.No.1 103410 2
Project Description
Backup Power and Electrical Improvements at Four Pump Stations
Contractor Winston Electric, Inc. dba ACME Electric Company Allowance No: 0 Date: 4123/2026
City Project Mgr. David R. Townsend, P.E. City Inspector FRonnie Cardenas
CONSTRUCTION ALLOWANCE ITEMS TO BE ADDED
i i tm
utZ)L;rur i wry
DEPT
Qty JUnit
Unit Cost I
Total
CP-006R
Edwards Ranch PS Pipe Replacement Modification
Water
1.00
LS
$103,565.66
$103,565.66
AR-1.2
RCP-007 Change Electrical Buildings Door Height from 7 feet to 9 Feet
Water
1.00
LS
$17,538.15
$17,538.15
AR-1.3
RCP-008 Lead Paint Abatement for Existing Pipe - Edwards Ranch PS
Water
1.00
LS
$59,553.85
$59,553.85
Page 1 of 1
Water
$180,657.66
Additions Sub Total
$180,657.66
City of Fort Worth
PENDING CHANGE REQUEST COST ANALYSIS
To be completed by General Contractor or Subcontractor
as outlined in the Uniform General Conditions Section 6.6.1
PROJECT: Four PS Edwards
Work performed by:
JOB NO. 2699
( X ) General Contractoi ( ) Subcontractor CONTRACTOR: Acme Electric
If subcontractor, give Co. name: ACME ELECTRIC COMPANY PCM#:
CPR#: 6r
Time Extension (if any). RFI#:
ASI#:
0
Description of Change: Edwards PS pipe replacement split into two phases in order to meet Ft Worth shut down windows.
ADDITIONS AND/OR [CREDITS]
iption Quantity Unit I Cost/Unit
r Western I EA 1$86,055.63
ination Efforts 1 EA 1 $8,500.00
Subtotals
Line 1: Enter total of Columns A+B+C+D+E
Line It: Enter 49% of Col B for Workman's
Comp. Social Security, and like taxes
Line III: Enter total Col E (Storage)
Line IV: If Line I indicates an ADD, Enter 5% of Line I.
If Line I indicates CREDIT, enter -0-
Line V: Total Line I thru Line IV
Enter here and on Summary Sheet
SIGNATURE:
SIGNATURE:
CONTRACTOR
City of Ft Worth
EXTENSION
A
B
C
D
E
Material
Labor
Equip.
Trans.
Storage
$86,055.63
$0.00
$0.00
$8,500.00
$86,055.63
$8,500.00
$0.00
$0.00
DATE:
DATE:
$94,555.63
$4,165.00
$0
$4,936.03
$103,656.66
City of Fort Worth
PENDING CHANGE REQUEST COST ANALYSIS
To be completed by General Contractor or Subcontractor
as outlined in the Uniform General Conditions Section 6.6.1
Work performed by:
( X ) General Contractor ( ) Subcontractor
If subcontractor, give Co. name: ACME ELECTRIC COMPANY
Time Extension (if any):
PROJECT:
JOB NO.
CONTRACTOR:
Description of Change: Provide full height doors in lieu of removable transom.
ADDITIONS AND/OR FCREDITSI
Four PS Edwards
2699
Acme Electric
PCM#:
CPR#: 7
RFI#:
ASI#:
EXTENSION
A
B
C
D
Description
Quantity
Unit
Cost/Unit
Material
Labor
Equip.
Trans.
Archer Western
1
EA
$12,978.00
$12,978.00
$0.00
Coordination Efforts
1
EA
$2,500.00
$0.00
$2,500.00
1
Subtotals
j $12,978.00
$2,500.00
1 $0.00
$0.00
Line L Enter total of Columns A+B+C+D+E
Line II: Enter 49% of Col B for Workman's
Comp. Social Security, and like taxes
$15,479.00
$1,225.00
Line III: Enter total Col E (Storage) $0
Line IV: If Line I indicates an ADD, Enter 5% of Line I.
If Line I indicates CREDIT, enter -0-
Line V: Total Line I thru Line IV
Enter here and on Summary Sheet
SIGNATURE: DATE:
CONTRACTOR
SIGNATURE:
City of Ft Worth
10.1vi I
$835.15
$17,538.15
City of Fort Worth
PENDING CHANGE REQUEST COST ANALYSIS
To be completed by General Contractor or Subcontractor
as outlined in the Uniform General Conditions Section 6.6.1
PROJECT: Four PS Edwards
Work performed by:
JOB NO. 2699
( X ) General Contra( )
Subcontractor CONTRACTOR: Acme Electric
If subcontractor, give Co. name: ACME ELECTRIC COMPANY PCM#:
CPR#: 8
Time Extension (if any):
RFI#:
ASI#:
0
Description of Change:
Lead Base Paint abatement for existing piping located at Ewards PS
ADDITIONS AND/OR (CREDITS]
EXTENSION
A
B
C
D
Description
Quantity
Unit
Cost/Unit
Material
Labor
Equip.
Trans.
Archer Western
1
EA
$47,032.95
$47,032.95
$0.00
Coordination Efforts
1
EA
$6,500.00
$0.00
$6,500.00
Subtotals
$47,032.95
$6,500.00
$0.00
$0.00
Line L• Enter total of Columns A+B+C+D+E
Line II: Enter 49% of Col B for Workman's
Comp. Social Security, and like taxes
$53,532.95
$3,185.00
Line III: Enter total Col E (Storage) $0
Line IV: If Line I indicates an ADD, Enter 5% of Line I.
If Line I indicates CREDIT, enter -0- $2,835.90
Line V: Total Line I thru Line IV
Enter here and on Summary Sheet $59,553.85
SIGNATURE: DATE:
CONTRACTOR
SIGNATURE: DATE:
City of Ft Worth
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Digitally signed by David R. Townsend,
David R. Townsend, PE PE
Date: 2022.12.28 16:43:46-06'00'
Signature
David Townsend
Name of Employee
Engineering Manager
Title
ATTEST:
=d0
(/VI aaQGpaE%Psaa
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Winston Electric, Inc. dba ACME Electric Company
Subject of the Agreement: Backup Power and Electrical Improvements at Four Pump Stations
M&C Approved by the Council? * Yes ❑ No
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If dierent from the approval date.
Expiration Date:
N/A
If applicable.
Is a 1295 Form required? * Yes ® No ❑
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 103410-2
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes B No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.