HomeMy WebLinkAbout025180 - Construction-Related - Contract - Transystems Corporation�- ��- 4Y
CITY SECRETARY
AMENDMENT NO. 2 CONTRACT NO. �����
STATE OF TEXAS § CITY SECRETARY CONTRACT NO.
(No M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and Transystems Corporation
(Engineer) made and entered into City Secretary Contract No. 24820 (the Contract)
which was authorized by the City Council by M&C C-17327 on the 16th day of March,
1999; and amended by the City Council on May 25, 1999, by M&C G17445 to revise the
original contract amount to $234,225.00 (Amendment No. 1).
WHEREAS, the Contract involves engineering services for the following project:
Engineering Contract for Construction Management and Inspection Services
for Sanitary Sewer Main 253A Rehabilitation Near the Village Creek Wastewater
Treatment Plant.
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Article I of the Contract is amended to include the additional engineering services
specified in a proposal letter dated July 15, 1999, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services to be performed by
Engineer total $4,548.00.
2.
Article II of the Contract is amended to provide for an increase in the maximum
fee to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of $238,773.00.
�
All other provisions of the contract, which are not expressly amended herein, shall
remain in full force and effect.
� �,,, � ��
������: Ol�,�s G'���g�,� �
� �� � ��GG�C�G?�
�o L� �-�N�, ����� ,
EXECUTED on this the � day of (�(�C/� ,r/1�
Fort Worth, Tarrant County, Texas. V
APPROVAL RECOMNIENDED: APPROVED:
�-��C� � ��-j .
A.Douglas Rademaker, P.E.
Director, Department of '
Engineering
ENGINEER
r
By: ` v� --.-
Name: Raul Pena, III, P.E.
Principal
Transystems Corporation
APPROVED AS TO FORM AND LEGALITY:
. 19�, in
�
Mike Groomer
Assistant City Manager
ATTEST:
,
� _ �e��
Gloria Pearson, City Secretary
y1 � %vl���; 2e .
Contract Author zation
Date
Gary Stein erger
Assistant City Attorney
; - . /9 ����.�
' F��.�
�'?AIvSYSTF�v�►s ��
C�?PO/?A�/ON �,/=
C O N 5 U L T A N T S
IJ
July 15,1999 (Revised)
Mr. Gopal Sahu, P.E.
. City of Fort Worth
� Department of Engineering
- �' • 1000 Throckmorton Street
� Fort Worth, Texas 76142
. Re: Sanitary Sewer Main M-253-A Rehabilitation
.� Project No. PS46-070460140270
�. D.O.E. No. 2593 � � .
Deaz Mr. Sahu:
This letter is intended to serve as our proposal to amend our original contract ta include
the performance of construction materials testing services for the referenced project� -
(primarily coordination arid transportation of test samples). Attached yau will fmd 'a
breakdown of our fee and expenses to provide these services. Our total proposed fee is a
lump sum amount of $4,548.00. � �
As you are aware, we are already performing these services. As such, anything you can
do to help expedite approval and execution of this amendment to our contract would be
appreciated. . ' �
We trust that this praposal meets with the City's approval. If you have any comments or
�•' questions, please do not hesitate to call us. �
Sincerely,
TranSy tems Corporation ,
:
:
Frank G. Payne, P.E.
Proj ect Manager
c.c.: Liam Conlon, City of Fort Worth
\�F'f WORTH�PROJECTS\199\00149\proposalU.-Sahu2A.doc
NattonsBank Building, 500 West Seventh Street, Suite 600 • Fort Worth, Texas 76102 •(81 7j 339-8950�Fax: (817) 336-2247
.
. � t . -
Sanitary Sewer Main M-253-A Renabilitation
Project No. PS46-070460140270
D.O.E. No. 2593
TranSystems Project No. 19900149
7115/99
Construction Inspection Services
Fee Proposal
. Team Member
Inspector
0
HrslMonth No. Months HourlylSalary Total
35 1.5 $80.00. $4,200.00
Expenses �
Telephone Services �
(1) Transportation Mileage 800 miles
Printing and Postage
Office Supplies
Office Furnishings
Subtotal Expenses
Totat TranSystems Labor and Expenses Construction Materials Testing
(1) Fee is based on a total of 4 trips per week at 30 miles per trip.
P:\199100149�proposatl[AmendFee3xts]Sheetl
�
$0.31
$0.00
$248.00
$100.00
$0.00
$0.00
$348.00
$4,548.00
,