Loading...
HomeMy WebLinkAbout025159 - Construction-Related - Contract - Turner Collie & Braden, Inc.� � 0 AMENDMENT NO. 6 STATE OF TEXAS b CITY SECRETARY CONTRACT NO. J�� COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Turner Collie & Braden, Inc., (Engineer) made and entered into City Secretary Contract No. 21289, (the Contract) which was authorized by the City Council by M&C C-14962 on the 15th day of August 1995 and subsequently revised by five previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Sanitary Sewer Main 126 and 250 Drainage Area Rehabilitation and Sewer Improvements (Group 3, Contract 3). WHEREAS, it has become necessary to execute Amendment No. 6 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 2, 1999, a copy of which are is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $10,014.00. 2. Article III, Section D, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $547,660.00. VV U �1�� h�6 UcISV�WNJ C0� ����r � � �� �o �`�'�, ��. � 0 3. Al1 other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the ,��' day of �"� in Fort Worth, Tarrant County, Texas. � ATT T: Gloria Pear on, City Secretary City Secretary APPROVAL RECOMN�NDED: -��� c.� ' � A. Douglas Rademaker, P.E. v Director, Department of Engineering TURNER COLLIE & BRADEN, INC. Engineer , 1999, r "�� Contract I�uthoriz ion Date APPROVED: . Mike Groomer Assistant City Manager By : c�l.R _ �(Y�n.�,v�, Name: Ste hen R. James, P.E. Principal 1200 Summit Avenue, Suite 600 Fort Worth, TX 76102 - 4409 APPROVED AS TO FORM AND LEGALITY: rC� � Gary S erger Assistant City Attorney 21289 TurnerCollie��Braden Inc. Engineers • Planners • Project Managers August 2, 1999 Mr. Michael Domenech, P.E. City of Fort Worth Department of Engineering P. O. Box 870 Fort Worth, Texas 76101-0870 1200 Summit Avenue Suite 600 Fort Worth, Texas 76102-4409 817 332-8977 Fax 817 332-8979 Re: Amendment No. 6(rev. 8/3/99) Sanitary Sewer Main 126 & 250 Drainage Area Rehabilitation and Sewer Improvements (Group 3, Contract 3), Part 5 . DOE Nos. 1659, 2233, 2234 Sewer Project No. PS46-070460410110 TC&B Project No. 45-95680-500 Dear Mr. Domenech: We are providing this letter as our request for additional compensation to 1) address design modifications requested by the City during the most recent review of the final plans� and 2) to split out Unit 1 of the project for separate bidding due to delays associated with condemnation proceedings. Our estimated fee to complete this work is $11,380. An itemized breakdown of the labor and non-labor expenses related to this request are listed on the attached sheet. Please see the Contract Fee Summary below. ' CK���7T�711fy ��.�1���I�� Amendment No. 6 Basic Fee Response to Review Comments Sena.rate Unit 1 Plans Total Proposed Amendment No. 6 Fee Established in 19a6 Engineering Excellence for Over One-Half Century $5,877 $4,137 $10,014 TEXAS AUSTIN / DALLAS / FORT WORTH / HOUSTON / RIO GRANDE VALLEY COLORADO DENVER FLORIDA MIAMI / WINTER PARK � Mr. Michael Domenech, P.E. August 2, 1999 Page 2 PROJECT FEE SUMMARY Contract Item Descrintion Original Contract M&C C-14962 (Cont. #21289) Amendment No. 1 Add'1 engineering & survey (2531� Amendment No. 2 Add'1 engineering & survey (15,3031�} Amendment No. 3 CPS & survey (5401 fl Amendment No. 4 Waterline replacement & . Street overlay (2,3501 fl Amendment No. 5 Misc, align. revisions & add'1 engineering & survey Subtotal Amendment No. 6 Part 5 Revisions TOTAL PROJECT If you have any questions, please call me at (817) 332-8977. Sincerely, Stephen R. James, P.E. Project Manager Attachment N:�FTW�96680975�CORRESP�amend no S.doc �. Fee $304,985 $2,900 $143,683 $11,800 $14,750 $59,528 $537,646 $10,014 $547,660 J� CITY OF FORT WORTH MAINS 126 AND 250 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS PART 5 DOE NO'S 1659, 2233, 2234 ADDITIONAL EXPENSES FOR RESPONSE TO CITY COMMENTS AFTER FINAL REVIEW & PREPARATION OF SEPARATE PLANS & SPECS FOR UNIT 1(DOE NO. 1659) TC&B LABOR ESTIMATE Project Project Senior TASK LISTING I Principal I Manager II Engineer � Technician I Technician I Clerical TOTAL �tESPONSE TO REVIEW COMMENTS L-1680 revised alignment @ View St. & Ay, res M-250 revised aliynment @�erty & Fntg. }�d. Junction Box Desi,q n Detete Street Overlay Sheets � Add Layout Sheet for Abandoned San. Swr. Lines � Prepare Tem(? orar� Construction Easement Specification Revis�ons SEPARATE UNIT 1 PLANS � Revisions to Delete Unit 1 from Plans & Specs Pre earation of New Unit 1 Plans & Specs Bid Opening / Bid Tabulation � Preconstruc�ion & Final Inspection Meet. �TOTAL HOURS �LABOR EXPENSE TOTALS TC&B NON-LABOR ESTIMATE CAD EngdAdmin PC NON-LABOR TOTAL SUBCONSULTANT SERVICES Subconsultant �Gorrondona & Assoc. I � �SUBCONSULTANT TOTALS �ITOTAL ESTIMATE M-126/250 - PT 5 8 4 ' $888 8 4 $888 2 10 12 $1,578 2 $104 1 8 $491 2 2 $248 4 1 � $335 8 8 1 3 4 5 22 2 1 I $860 $1,744 - $405 $443 I � ) s II so j �� � s� ;—a q �l2 � $1�0 $612 ( 53,750 $7'1i1 � �2,652 $140 � $7,984 61 hours $20 $1,220� � 15 hours a� $10 $150 � �- -- -- -.. . ry Task Surveyin, (L-1680� Easement�reparation (1) for L-1680 � II � $1,370 � I & �o�r I Markup � Subcontract 10.00% Expense I 350 II $35 I $385 250 $25 $275 I II � a�sso � 1( _��o,o�d 8/4/99 FOT OTH R R �_ � �_. � ��` MEMORANDUM TO: FROM: DATE : A. Douglas Rademaker, Director DOE and Mike Groomer, Assistant City Manager Tony Sholola 7' S August 6, 1999 RE: DESIGN FEE AMENDMENT NO. 6 TO SANITARY SEWER MAIN 126 AND 250 DRAINAGE AREA REHABILITATION AND SEWER IMPROVEMENTS (GROUP 5, CONTRACT 3), SEWER PROJECT NO. PS46-070460410110, DOE NO. 1659 The proposed amendment will reimburse Turner Collie & Braden, Inc., TCB for the ad- ditional survey and design services they provided on the project as requested by the City. Due to delay in obtaining some permanent easements needed on the project, staff directed TCB to break Part 5 of the project into two units so that the unit not requiring easements could be advertised as soon as possible. Once all necessary easements ha.ve been obtained the other unit will be advertised. The arnendment will also reimburse TCB for numerous design changes to the plans by Water Department staff after final design was complete. Turner Collie & Braden, Inc., has requested reimbursement in the amount of $10,014.00 for the additional survey and design services thereby increasing the contract fee �from $537,646.00 to $547,660.00. I believe this fee is fair and reasonable for additional serv- ices that were provided. Please authorize this additional fee by your signatures on the attached contract amend- ment form. cc: Mike Domenech, Project Manager Berdena Hamilton, Water Department Dan Pepon, Water Department `� t�M01659 J''`'. :' �.� ,_ :` �' ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * lOOO THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 (81'� 871-7941 * Fnx (81'� 871-7854 � Printed on recycled paper