WHEREAS, the City of Fort Worth (City) and Turner Collie &
Braden, Inc., (Engineer) made and entered into City Secretary
Contract No. 21289, (the Contract) which was authorized by the
City Council by M&C C-14962 on the 15th day of August 1995 and
subsequently revised by five previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Sanitary Sewer Main
126 and 250 Drainage Area Rehabilitation and Sewer
Improvements (Group 3, Contract 3).
WHEREAS, it has become necessary to execute Amendment No. 6
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I, of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated August 2, 1999, a copy of which are is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $10,014.00.
2.
Article III, Section D, of the Contract is amended to provide
for an increase in the maximum fee to be paid to Engineer for all
work and services performed under the Contract, as amended, so
that the total fee paid by the City for all work and services
shall not exceed the sum of $547,660.00.
VV U �1�� h�6 UcISV�WNJ
C0� ����r � � ��
�o �`�'�, ��.
�
0
3.
Al1 other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the ,��' day of �"�
in Fort Worth, Tarrant County, Texas. �
ATT T:
Gloria Pear on, City Secretary
City Secretary
APPROVAL RECOMN�NDED:
-��� c.� ' �
A. Douglas Rademaker, P.E. v
Director, Department of
Engineering
TURNER COLLIE & BRADEN, INC.
Engineer
, 1999,
r "��
Contract I�uthoriz ion
Date
APPROVED:
.
Mike Groomer
Assistant City Manager
By : c�l.R _ �(Y�n.�,v�,
Name: Ste hen R. James, P.E.
Principal
1200 Summit Avenue, Suite 600
Fort Worth, TX 76102 - 4409
APPROVED AS TO FORM AND LEGALITY:
rC�
�
Gary S erger
Assistant City Attorney
21289
TurnerCollie��Braden Inc.
Engineers • Planners • Project Managers
August 2, 1999
Mr. Michael Domenech, P.E.
City of Fort Worth
Department of Engineering
P. O. Box 870
Fort Worth, Texas 76101-0870
1200 Summit Avenue
Suite 600
Fort Worth, Texas 76102-4409
817 332-8977
Fax 817 332-8979
Re: Amendment No. 6(rev. 8/3/99)
Sanitary Sewer Main 126 & 250 Drainage Area
Rehabilitation and Sewer Improvements (Group 3, Contract 3), Part 5
. DOE Nos. 1659, 2233, 2234
Sewer Project No. PS46-070460410110
TC&B Project No. 45-95680-500
Dear Mr. Domenech:
We are providing this letter as our request for additional compensation to 1) address design
modifications requested by the City during the most recent review of the final plans� and 2) to
split out Unit 1 of the project for separate bidding due to delays associated with condemnation
proceedings.
Our estimated fee to complete this work is $11,380. An itemized breakdown of the labor and
non-labor expenses related to this request are listed on the attached sheet. Please see the
Contract Fee Summary below. '
CK���7T�711fy ��.�1���I��
Amendment No. 6
Basic Fee
Response to Review Comments
Sena.rate Unit 1 Plans
Total Proposed Amendment No. 6 Fee
Established in 19a6
Engineering Excellence for Over One-Half Century
$5,877
$4,137
$10,014
TEXAS AUSTIN / DALLAS / FORT WORTH / HOUSTON / RIO GRANDE VALLEY COLORADO DENVER FLORIDA MIAMI / WINTER PARK
�
Mr. Michael Domenech, P.E.
August 2, 1999
Page 2
PROJECT FEE SUMMARY
Contract Item Descrintion
Original Contract M&C C-14962 (Cont. #21289)
Amendment No. 1 Add'1 engineering & survey (2531�
Amendment No. 2 Add'1 engineering & survey (15,3031�}
Amendment No. 3 CPS & survey (5401 fl
Amendment No. 4 Waterline replacement &
. Street overlay (2,3501 fl
Amendment No. 5 Misc, align. revisions & add'1
engineering & survey
Subtotal
Amendment No. 6 Part 5 Revisions
TOTAL PROJECT
If you have any questions, please call me at (817) 332-8977.
Sincerely,
Stephen R. James, P.E.
Project Manager
Attachment
N:�FTW�96680975�CORRESP�amend no S.doc
�.
Fee
$304,985
$2,900
$143,683
$11,800
$14,750
$59,528
$537,646
$10,014
$547,660
J�
CITY OF FORT WORTH
MAINS 126 AND 250 DRAINAGE AREA
SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS
PART 5
DOE NO'S 1659, 2233, 2234
ADDITIONAL EXPENSES FOR RESPONSE TO CITY COMMENTS AFTER FINAL REVIEW &
PREPARATION OF SEPARATE PLANS & SPECS FOR UNIT 1(DOE NO. 1659)
TC&B LABOR ESTIMATE
Project Project Senior
TASK LISTING I Principal I Manager II Engineer � Technician I Technician I Clerical TOTAL
�tESPONSE TO REVIEW COMMENTS
L-1680 revised alignment @ View St. & Ay, res
M-250 revised aliynment @�erty & Fntg. }�d.
Junction Box Desi,q n
Detete Street Overlay Sheets �
Add Layout Sheet for Abandoned San. Swr. Lines �
Prepare Tem(? orar� Construction Easement
Specification Revis�ons
SEPARATE UNIT 1 PLANS
� Revisions to Delete Unit 1 from Plans & Specs
Pre earation of New Unit 1 Plans & Specs
Bid Opening / Bid Tabulation
� Preconstruc�ion & Final Inspection Meet.
�TOTAL HOURS
�LABOR EXPENSE TOTALS
TC&B NON-LABOR ESTIMATE
CAD
EngdAdmin PC
NON-LABOR TOTAL
SUBCONSULTANT SERVICES
Subconsultant
�Gorrondona & Assoc.
I
�
�SUBCONSULTANT TOTALS
�ITOTAL ESTIMATE
M-126/250 - PT 5
8 4 ' $888
8 4 $888
2 10 12 $1,578
2 $104
1 8 $491
2 2 $248
4 1 � $335
8
8
1 3
4
5
22
2
1
I
$860
$1,744
- $405
$443
I � ) s II so j �� � s� ;—a q �l2
� $1�0 $612 ( 53,750 $7'1i1 � �2,652 $140 � $7,984
61 hours $20 $1,220�
� 15 hours a� $10 $150
� �- -- -- -.. .
ry Task
Surveyin, (L-1680�
Easement�reparation (1) for L-1680
�
II
� $1,370 �
I & �o�r I Markup � Subcontract
10.00% Expense
I 350 II $35 I $385
250 $25 $275
I II � a�sso �
1( _��o,o�d
8/4/99
FOT OTH
R R
�_ �
�_.
� ��`
MEMORANDUM
TO:
FROM:
DATE :
A. Douglas Rademaker, Director DOE and
Mike Groomer, Assistant City Manager
Tony Sholola 7' S
August 6, 1999
RE: DESIGN FEE AMENDMENT NO. 6 TO SANITARY SEWER MAIN
126 AND 250 DRAINAGE AREA REHABILITATION AND SEWER
IMPROVEMENTS (GROUP 5, CONTRACT 3), SEWER PROJECT
NO. PS46-070460410110, DOE NO. 1659
The proposed amendment will reimburse Turner Collie & Braden, Inc., TCB for the ad-
ditional survey and design services they provided on the project as requested by the City.
Due to delay in obtaining some permanent easements needed on the project, staff directed
TCB to break Part 5 of the project into two units so that the unit not requiring easements
could be advertised as soon as possible. Once all necessary easements ha.ve been obtained
the other unit will be advertised. The arnendment will also reimburse TCB for numerous
design changes to the plans by Water Department staff after final design was complete.
Turner Collie & Braden, Inc., has requested reimbursement in the amount of $10,014.00
for the additional survey and design services thereby increasing the contract fee �from
$537,646.00 to $547,660.00. I believe this fee is fair and reasonable for additional serv-
ices that were provided.
Please authorize this additional fee by your signatures on the attached contract amend-
ment form.
cc: Mike Domenech, Project Manager
Berdena Hamilton, Water Department
Dan Pepon, Water Department
`�
t�M01659
J''`'.
:' �.� ,_
:` �'
ENGINEERING DEPARTMENT
THE CITY OF FORT WORTH * lOOO THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311
(81'� 871-7941 * Fnx (81'� 871-7854
� Printed on recycled paper