Loading...
HomeMy WebLinkAbout025160 - Construction-Related - Contract - Conatser Construction, Inc.City of Fort Worth, Texas �1►�Ayar And Caunc�l Cammun�cAt�an DATE REFERENCE NUMBER LOG NAME PAGE 8/10/99 **C-17575 30VICKER 1 of 2 SUBJECT AWARD OF CONTRACT TO CONA i �ER CONSTRUCTION, INC. FOR MAIN 390 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 1) PART 7, UNIT 4 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with Conatser Construction, Inc. in the amount of $642,696.00 for Main 390 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 6, Contract 1) Part 7, Unit 4. DISCUSSION: On February 17, 1998 (M&C C-16611), the City Council authorized the City Manager to execute an engineering agreement with Baird, Hampton & Brown, Inc. to prepare plans and specifications for the reduction of inflow/infiltration in sanitary sewer Main 390. The project is part of the City's Integrated Wet Weather Wastewater Management Program to comply with an administrative order from the US Environmental Protection Agency to eliminate sewer overflows from the City's wastewater collection system. The project is generally bound on the north by Vickery Boulevard, on the south by Rosedale Street, on the east by Nashville Street and on the west by Beach Street. The proposed improvements consist of the replacement of approximately 4,600 linear feet of primarily 8, 1 G and 12-inch sewer pipe. The project is located in COUNCIL DISTRICT 8, Mapsco 78J and K. The project was advertised for bid June 3 and 10, 1999. On July 8, 1999, the following bids were received: BIDDER AMOUNT TIME OF COMPLETION Conatser Construction. Inc. $642.696.00 130 Calendar Days Circle "C" Construction, Inc. 691,847.00 B&H Utilities, Inc. 718,211.00 Texas-Sterling Construction, Inc. 777,140.60 In addition to the contract cost, $45,000.00 is required for inspection and survey and $25,000.00 is provided for project contingencies. Conatser Construction, Inc. is in compliance with the City's M/WBE Ordinance by committing to 9% M/WBE participation and documenting good faith effort. Conatser Construction, Inc. identified several opportunities. However, the M/WBE's contacted in the identified areas did not respond. The City's goal on this project is 18%. City of Fo�t Worth, Tezas �►�Ayar And C,aunc�l C,ammun�cAt�an DATE REFERENCE NUMBER LOG NAME PAGE $�'���99 **C-17575 I 30VICKER I 2 of 2 SUBJECT AWARD OF CONTRACT TO CONATSER CONSTRUCTION, INC. FOR MAIN 390 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 1) PART 7, UNIT 4 FISCAL INFORMATION/CERTIFICATION: � The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the State Revolving Loan Fund. MG:j �,.. 6 r s Submitted for City Manager's Office by: ' Mike Groomer Originating Department Head: A. Douglas Rademaker Additional Information Contact: A. Douglas Rademaker L I FUND � ACCOUNT '� i (to) G140 I � 6157 � (from) PE42 541200 6157 I a CENTER I AMOUNT � � 070420417320 $642,696.00 � � CITY SECRETARY APPROVED ClTY CaUNCPL e��G 10 1999 �� �� City Secretary ot the C[t}* uf Fort Worth,'Pexas