HomeMy WebLinkAbout025163 - Construction-Related - Contract - Chiang, Patel & Yerby, Inc.C4N R C Na Y�� I C�,�
City Secretary Contract No. 24499
AMENDMENT NO. 1
TO
ENGINEERING AGREEMENT
WITH
CITY OF FORT WORTH
AND
CHIANG, PATEL � YERBY, INC.
FOR
WATER DEPARTMENT EMERGENCY RESPONSE PLAN
STATE OF TEXAS
COUNTY OF TARRANT
WHEREAS, on December 1, 1998, the City of Fort Worth, the "Cit�', and Chiang, Patel & Yerby, Inc.,
the "Engineer", made and entered into City Secretary Contract No. 24499 which was duly authorized
by the City Council by M&C C-17171 on December 1, 1998, and
WHEREAS, the "City" and "Engineer" desire to amend City Secretary Contract No. 24499.
NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS:
That the City of Fort Worth, a municipal corporation situated in Tarrant County, Texas, acting herein
by and through its duly authorized City Manager, hereinafter called "City", and Chiang, Patel & Yerby,
Inc., acting herein by and through its duly authorized President, hereinafter called "Engineer", hereby
make and enter into the following agreement:
ARTICLE VII - ATTACHMENT "E"
AMENDMENT TO SCOPE OF SERVICES
INCLUDING
DROUGHT RESPONSE AND CONSERVATION PLAN REVISIONS,
SECURITY EVALUATION FOR THE WATER TREATMENT FACILITIES, AND
ADDITIONAL WORK ASSOCIATED WITH PREVENTION PROGRAM MANUALS
This amendment to the Attachment "A" Scope of Services for the Emergency Response Plan for the
City of Fort Worth Water Department adds additional task items which provide: 1) amendments to
the City's existing Drought Response and Conservation Plans; 2) a security evaluation for the water
treatment facilities; and 3) additional work relating to the Prevention Program Manual.
J U'�����`%�1� 1�='�s��:, ��1�c��ii
C 6� ��'G��"'� G,�
l"��'y�(`�?�c,iifG-� ",r ,.i
� uJ:J:�_�:''iil� Pµ,:����10
T:IPROJECTS\CFW9826\CORR\FfWPLAN2.WPD „E" -1 August 3, �999
Basic Services Task items
A. DROUGHT RESPONSE AND CONSERVATION PLAN REVISIONS
The amendments are required by Senate Bill 1 provisions. Submittal to the State is required by
September 1, 1999.
Task E-A1 Document Review
Review the City of Fort Worth's current water use control documents including:
March 1989 Water Conservation and Drought Contingency Plan
Undated Emergency Water Management Plan
Water Conservation Ordinance
Water and Sewer Code
Applicable portions of the Plumbing Code
Non-Essential Use Code
Leak Detection Program
Fee Structure
Customer City Contracts
Reservoir Management Documents
Public Education Documents
City Conservation Goals (if available)
The review shall summarize document contents and compliance with current requirements.
DELIVERABLE: DOCUMENT SUMMARY
Task E-A2 Coordinate with Tarrant Regional Water District
Coordinate with the Tarrant Regional Water District (TRWD) with respect to their June 1998 Water
Conservation and Emergency Demand Management Plan and subsequent updates. Coordinate
triggers for emergency water situations as well as conservation goals and measures with TRWD.
Summarize the current document including proposed document changes. Note areas not complying
with the current requirements.
DELIVERABLE: DOCUMENT SUMMARY
Task E-A3 Coordinate with Other Local Major Water Suppliers
Plans requiring public participation for success must consider that the media in our area is shared
considerably. In light of this fact, coordinate plans developed under this Scope with other major
water suppliers in our area including entities such as TRWD (see Task E2), City of Dallas, City of
Denton, Trinity River Authority, Arlington and Upper Trinity Regional Water District. Coordination
with these entities for certain levels of drought response are necessary to minimize public confusion
and irritation. Coordination will consist of document review and correspondence or meetings during
plan development.
T:IPROJECTS�CFW9B261CORR1F7WPUW2.WPD ��E�� � 2 August 3, 1999
Task E-A4 Coordinate with Region C Planning Group
To assure plan(s) are coordinated with the Regional Planning Group, Engineer will attend Regional
Planning Group meetings as necessary, submit plans and discuss plans with the Group Consultant
prior to submission to the City Council for approval. Engineer will document coordination through
meeting summaries and correspondence.
DELIVERABLE: MEETINGS/CORRESPONDENCE
Task E-A5 Public Involvement
Current rules require public involvement. Involve public through public meetings currently scheduled
for July 20 and 22 and August 5 and 9. In each public meeting, present a summary of the
requirements for the plans, a summary o# the work done, and a summary of the draft plans. Public
input will be requested. Document public involvement for inclusion with the plans submitted to the
State.
DELIVERABLE: PRESENTATION MATERIALS AND PRESENTATION
DOCUMENTATION FOR PUBLIC INVOLVEMENT
Task E-A6 Revision/Development of Plan(s)
Develop plans in accordance with Title 30 Texas Administrative Code Chapter 288. Subchapter A
requires Water Conservation Plan development and Subchapter B requires Drought Contingency
Plan development. These may be developed as one document and must be adopted by the City
Council prior to submission. . Task E-A5 involves compiling data collected and analyzed under
previous Tasks, developing new plan(s) (or revising old - to be decided at start of project or at the
direction of the City Project Manager), submission of draft for review and comment, and
incorporation of comments and notes. Because the Plans may require some changes to the City's
current Ordinances a summary of how the Ordinances are impacted and suggested changes will be
submitted.
DELIVERABLE: PLAN(S) FOR SUBMISSION TO CITY COUNCIL
SUMMARY OF SUGGESTED ORDINANCE CHANGES
Task E-A7 Submission of Plan(s) to the State
Compile plan(s) in appropriate format(s) for submission to the State.
DELIVERABLE: COMPILED PACKAGE FOR STATE SUBMITTAL
Probable Cost For Drought Response and Conservation Plan Revisions
Task
Task E-A1
Task E-A2
Document Review
Coordinate with Tarrant Regional Water
District
Probab/e Cost
$5, 775
$1,433
T:�PROJECTSICFW9826�CORR\FTWPUW2.WPD ��E" - 3 August 3, 1999
Task E-A3
Task E-A4
Task E-A5
Task E-A6
Task E-A7
Total
Coordinate with Other Local Major Water
Suppliers
Coordinate with Region C Planning Group
Public Involvement
Revision/Development of Plan(s)
Submission of Plan(s) to the State
$2,593
$1,879
$2,655
$9, 395
$750
$24,480
B. SECURITY EVALUATION FOR THE WATER TREATMENT FACILITIES
Purpose of this evaluation is to review existing security procedures and recommend additional
improvements or procedures at the water treatment plants.
Task E-B1 Meetings
Meet with City of Fort Worth Water Department management and plant personnel to document
current security procedures for each facility. City personnel's opinion of existing security and
possible remedies will also be documented.
DELIVERABLE: MEETINGS/CORRESPONDENCE
Task E-B2 Evaluation of Perimeter Fencing
Engineer will perform a site reconnaissance at each facility that will include walking around the
fencing perimeter to determine if repairs are required and if gaps exist. After observing existing
conditions, Engineer will evaluate improvements and develop probable costs for the repairs and/or
improvements. Engineer will prepare a drawing for each facility showing extent and type of fencing
at each facility.
DELIVERABLE: EVf�LUATION, PROBABLE COSTS, AND DRAWING
Task E-B3 Evaluation of Lighting
Engineer will perform a site reconnaissance at each facility that will include walking around the
facility at night with a new moon to evaluate lighting. During the reconnaissance, Engineer will
measure night time light readings and determine locations that have insufficient lighting. After
observing existing conditions, Engineer will evaluate improvements and develop probable costs for
the repairs and/or improvements. Engineerwill prepare a drawing for each facility showing locations
and types of existing and recommended exterior lighting.
DELIVERABLE: EVALUATION, PROBABLE COSTS, AND DRAWING
Task E-64 Evaluation of Surveillance Equipment
Engineer will document existing surveillance equipment type and location. Engineer will provide
recommendations for additional surveillance equipment and develop probable costs. After
T:IPROJECTS�CFW9826{CORRIFTWPLAN2.WPD ��E" - 4 August 3� � 999
completing the evaluation, Engineer will prepare a drawing for each facility showing locations of
existing and proposed surveillance equipment.
DELIVERABLE: EVALUATION, PROBABLE COSTS, AND DRAWING
Task E-B5 Evaluation of Gate and Entry Procedures
Engineer will review and document existing gates and entry procedures at each facility. After
performing the initial review, Engineer will develop recommendations for upgrading gates and
revising entry procedures. Entry procedures and gate operation scenarios will be based on a
minimum of three different levels of security. Engineer will include methods on how to determine
which level of security is appropriate and how to implement the procedures.
DELIVERABLE: EVALUATION, PROBABLE COSTS, AND DRAWING
Task E-66 Findings and Recommendations Report
Engineer will provide a comprehensive report discussing evaluations and recommendations
developed in Tasks E-61 through E-64. The report will include drawings and probable costs for
each task. Engineer will provide draft and final copies of the report.
DELIVERABLE: DRAFT REPORT AND FINAL REPORT
Probable Cost For Security Evaluation for the Water Treatment Facilities
Task
Task E-B1
Task E-B2
Task E-B3
Task E-64
Task E-B5
Task E-66
Total
Probable Cost
Meetings
Evaluation of Perimeter Fencing
Evaluation of Lighting
Evaluation of Surveillance Equipment
Evaluation of Gate and Entry Procedures
Findings and Recommendations Report
$1,820
$3, 580
$4,820
$4,010
$3, 800
$4, 785
$22,815
C. ADDITIONAL WORK RELATING TO THE PREVENTION PROGRAM MANUAL
Task E-C1 Additional Writing for Prevention Program Manual
Engineer will write introductory material for each section of the manual and provide typical forms
required for compliance. The City will maintain responsibility for writing operating and maintenance
procedures. Engineer will work with City personnel to develop safety information. City will provide
in electronic format any additional information desired for inclusion in the manual. Engineer may
reformat City's submittal for formatting consistency.
T:IPROJECTS�CFW9B26\CORRIFTWPLAN2.WPD ��E" - 5 August 3� � 999
Task E-C2 Reproduction and Assembly of Prevention Program Manual
Engineer will reproduce and assemble draft and final copies of each Prevention Program Manual.
Probable Cost For Additional Work Relating to the Prevention Program Manual
Task Probab/e Cost
Task E-C1 Additional Writing for Prevention Program $14,500
Manual
Task E-C2 Reproduction and Assembly of Prevention
Program Manual
Total I
D. AUTHORIZATION
$2,500
$17,000 �
EXECUTED in the City of Fort Worth, this ��day of , A.D., 1 9.
ATTEST: � CIT'f O FORT O T
B ��Q / �/.Y B
Y -�z'u,�� Y
Gloria Pear�son, City Secretary Mike Groomer, Assist City Manager
APP.ROVED:
By �.. �:Yi,R�� .
Lee C. Bradle Jr. P. Director
Y, . .
Water Department
CHIANG, PATEL & RBY, INC.
By �
�
Michael F. Graves, P.E.
APPROVED AS TO FORM AND LEGALITY
ATTEST:
✓��
Gary S einberger
Assistant City Attorney
Secretary
C�- � 7 ..�5
Contract Authorization
�' �- 99
Date �
T:IPROJ ECTSICF W9B261CORRIFT W PLAN2.W PD
"E"-6
August 3, 1999
City of Fort Worth, Texas
�1►�Ay�� �nd Caunc�l C,an�mun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
$�3�99 **C-17565 � 60PLAN , 2 of 2
SUB.iECT AMENDMENT NO. 1 TO THE ENGINEERING AGREEME WITH CHIANG, PATEL &
YERBY, INC. FOR ENGINEERING SERVICES RELATED TO DEVELOPMENT OF THE
WATER DEPARTMENT EMERGENCY RESPONSE PLAN AND� OUTDOOR WARNING
SYSTEM EVALUATION
FISCAL INFORMATION/C�RTIFICATION:
The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of
the Commercial Paper-Water and Sewer Funds.
MG:k
Submitted for City Manager's
Office by:
Mike Groomer
Originating Department Head:
Lee Bradley, Jr.
Additional Information Contact:
Lee Bradley, Jr. �
I FUND I ACCOUNT I
� (to)
�
6140
�
8207 I (from)
IPS46 531200
PW77 531200
8207 �
CENTER I AMOUNT
070460230010 $32,147.50
060770230010 $32,147.50
�
CITY SECRETARY
APPROVED
CITY COUNC�L
AUG 3 1999
�� ��
City Seczetary of the
City ci Fort Wortl�,:eXas
City of Fort Worth, Texas
�►�Ayar Af1d Caunc�l Cammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
$�3�99 **C-17565 60PLAN 1 of 2
SUBJECT AMENDMENT NO. 1 TO TH ENGINEERING AGREEME WITH CHIANG, PATEL &
YERBY, INC. FOR ENGINEERING SERVICES RELATED TO DEVELOPMENT OF THE
WATER DEPARTMENT EMERGENCY RESPONSE PLAN AND OUTDOOR WARNING
SYSTEM EVALUATION
�FCOMM�NDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to an
engineering agreement with Chiang, Patel & Yerby, Inc., City Secretary Contract No. 24499, for
engineering services related to development of the Water Department emergency response plan and
outdoor warning system evaluation, increasing the total fee by $64,295 for a total of $189,070.
DISCUSSION:
On December 1, 1998 (M&C C-17171), the City Council authorized the execution of an engineering
agreement with Chiang, Patel & Yerby, Inc. for engineering services related to development of the
Water Department emergency response plan and outdoor warning system evaluation for a total fee not
to exceed $124,775. The original contract included updating/development of chemical spill response
plans, review and update of management programs, preparation of chemical accidental release
prevention programs and risk management plans, incorporation of plans for other emergency situations,
preparation of an emergency response program manual, inclusion of public participation in program
development and preparation of an emergency warning system study report for the water and
wastewater treatment plants.
The proposed Amendment No. 1 is for the engineer to assist the City by compiling a prevention
program manual for each treatment plant, by performing a security evaluation for each water treatment
facility, and by revising the existing water conservation and drought contingency plan. The flrst two
items are additional work that will enhance the emergency response plans. Updating of the water
conservation and drought contingency plans is required by regulations that were recently revised by the
Texas Natural Resource Conservation Commission. All plans in this contract requi�e the inclusion of
public participation.
Chiang, Patel & Yerby, Inc. is in compliance with the City's M/WBE Ordinance by committing to an
additional 13% M/V1/BE participation. The City's goal on this amendment is 13%.