Loading...
HomeMy WebLinkAbout025168 - Construction-Related - Contract - Turner Collier & Bradenu AMENDMENT NO. 4 STATE OF TEXAS S COUNTY OF TARRANT b CITY SECRETARY CONTRACT NO. .� � � � (No M&C Needed) WHEREAS, the City of Fort Worth (City) and Turner Collier & Braden, (Engineer) made and entered into City Secretary Contract No. 22523, (the Contract) which was authorized by the City Council by M&C C-15264 on the llth day of February 1997; and subsequently revised by three previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Main 207R Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 5, Contract 3), Part 3. WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 30, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $1,220.00. 2. Article II of the Contract is amended to provide for an inerease in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $489,800.00. ����C�B�d G'[�C���D �6�'( ���GG�C��G?�� �o P�II�JU:'U U'Jy U�G��a r 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. E�CUTED on this the / � 1999, in Fort Worth, Tarrant County, T A EST: �� ..P,P�.c.�,.sY\ � f�loria Pearson;�ity Secretary APPROVAL RECONa�NDED : ���� ��t A. Dou las Rademaker P.E. " g . Director, Department of Engineering day of exas. �� I�'1 �,G �,E�� � �2.�`� . Contract Authorization Date APPROVED: . 1. Mike Groomer ` Assistant City Manager TURNER COLLIER & BRADEN, INC. ENGINEER By : � j�y�� "� � � Nam�:Robert C. Reach, P.E. Vice President 1200 Summit Avenue, Suite 600 Eort Worth, TX 76102-4409 APPROVED AS TO FORM AND LEGALITY: � Gary Steinberger Assistant City Attorney 22523 . -2- e Turn�rCollie��Braden Inc. ' Engineers • Planners • Project Managers July 30, 1999 Mr. Rakesh Chaubey, P.E. City of Fort Worth Department of Engineering P. O. Box 870 Fort Worth, Texas 76101-0870 Re: Amendment No. 4 Main 207R Drainage Area Sanitary Sewer Rehabilitation and Improvements (Group 5, Contract 3), Part 8 DOE Nos. 1972, 1973, 1978 Sewer Project No. PS46-070460410270 TC&B Project No. 47-96680-975 Dear Mr. Chaubey: 1200 Summit Avenue Suite 600 Fort Worth, Texas 76102-4409 817 332-8977 Fax 817 332-8979 We �are providing this letter as our request for additional compensation to address miscellaneous construction phase design modifications on plan sheets 38, 40, and 41 requested by the City. We propose to complete this work for a lump sum amount of $1,220. An itemized breakdown of the labor and non-labor expenses related to this request are listed on the attached sheet. Please see the Contract Fee Summary below. CONTRACT FEE SUMMARY Amendment No. 4 Basic Fee Revise construction nlan Sheet No's. 38. 40 & 41 Total Proposed Amendment No. 4 Fee PROJECT FEE SUMMARY Contract Item Description Original Contract 24,7461.f. of sewers Amendment No.l 9,3201.f. of sewers Amendment No. 2 9801.f. of sewers and Misc. changes to Part 4 Amendment No. 3 Misc. changes to Part 5— Line Replacements Subtotal Amendment No. 4 Misc. Constxuction Phase Revisions TOTAL PROJECT Eslablizhed in 79a6 Engineering Excellence for Over One-Half Centary $1,220.00 Fee $361,800.00 $99,000.00 $13,303.00 $14,477.00 $488.580.00 $1.220.00 $489,800.00 TEXAS AUSTIN / DALLAS / FORT WORTH / HOUSTON / RIO GRANDE VALLEY COLORADO DENVER FLORIDA MIAMI / WINTER PARK Mr. Rakesh Chaubey, P.E. July 30, 1999 Page 2 If you have any questions, please call me at (817) 332-8977. Sincerely, �,�.�.l� Stephen R. James, P.E. Project Manager Attachment N:�FTW�9668097SCORRESP�amend no S.doc � CITY OF FORT WORTH MAIN 207R DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND SEWER IMPROVEMENTS (GROUP 5, CONTRACT 3), PART 8 ADDENDUM NO. 4 ITEM 1 REVISE PLAN AND PROFILE OF LATERAL L-6085 (SHEET NO'S 38,40 & 41) TC&B LABOR ESTIMATE ProJect Project Senlor — � I TASK LISTING Principal Manager Engineer II Technician I Technician I Clerical I TOTAL CONSTRUCTION PLAI�S Revise elan and profile I 1 2 8 $670 � Review Mee6ngs w/City 2 $150 � Field Co-ordina6on 1 $75 Chedc stortn drain conflicts 1 $75 � I I I I I I I I 1 I I i 1 I �rdTA� HouRs �LABOR EXPENSE TbTALS TC&B NON-LABOR ESTIMATE CAD Nlileage .4dminlPGPrinting I� I I II II I� I N 0 1 6 0 S 0 N Ea s�os saso 3o sa�a so $ hours @ $25 30 miles �$0.325 a no�r� a�o NON-LABOR TOTAL J SUBCONSULTANT SERVICES �ubconsultant N 1 �SUBCONSULTANTTOTALS kTOTAL ESYIMATE (L-6085 REALIGNMENT► addm5 work est 7.30.99.x1s I � I I I I I I I I I i I I 15� 5970 � $20� ( $10 � Sao i I I szso —��BaExp. II 1A0. 0%. Expenseract I I I � - - -• - �- -- _�r_ � ' — �� s, �o� 7/30/99 FoT oTH R � _- �. -_ �- _�- MEM4RA1oTDUM TO: A. Douglas Rademaker, Director, DOE and Mike Groomer, Assistant City Manager FROM: Tony Sholola, DOE %' � • DATE: July 26, 1999 RE: DESIGN FEE AMENDMENT NO. 4 TO MAIN 207R DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 5, CONTRACT 3), PART 3, DOE NO. 1558, SEWER PROJECT NO. PS46-070460410270 The proposed amendment will reimburse Turner Collier & Braden, Inc. (TCB) for addi- tional design services on the project as requested by the City. Subsequent to award of contract, staff directed TCB to redesign the profile of Lateral L- 6085 to reduce it's depth by 8-10 feet on the average. The design change is desirable be- cause several sewer services were encountered at a higher elevations than expected. The redesign will result in significant cost savings to the City since the line will now be in- stalled by open cut instead of by other than open cut. . � Turner Collier & Braden, Inc. has requested reimbursement in the amount of $1,220.00 for the additional design services they performed thereby increasing the contract fee from "$488,580.00 to $489,800.00. I believe this fee is fair and reasonable for the additional ,� i � services that were provided. � Please authorize this additional fee by your signatures on the attached contract amend- ment form. cc: Rakesh Chaubey, Proj ect Manager Berdena Hamilton, Water Department Dan Pepon, Water Department MEMO 1558 �� ENGINEERING DEPARTMENT . THE CITY OF FORT WORTH * lOOO THROCKMORTON STREET * FORT WORTH, Texas 76102-6311 (81'� 871-7941 * Fnx (81'� 871-7854 �J Printed on recycled paper