Loading...
HomeMy WebLinkAbout025178 - Construction-Related - Contract - Ratnala & Bahl, Inc.' � aq og "� STATE OF TEXAS 3 COUNTY OF TARRANT 3 CITY SECRETARY CONTRACT (No M&C Needed) WHEREAS, the City of Fort Worth (City) and Ratnala & Bahl, Inc. Associates, (Engineer) made and entered into City Secretary Contract No. 24462, (the Contract) which was authorized by the City Council by M&C C- 17151 on the 24 day of November, 1998; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of 16-inch water line on Morningside Drive form Bryan Avenue to I8-35. WHEREAS, it has become necessary to execute Amendment No.l to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 9, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $14,678.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $67,458.00 CITY SECRETARY p CONTRACT NO . r7i � � �O AMENDMENT NO. 1 � �(��� 0�� �'����D � B�l ���cG� � ° °�� �0 01'1'�y �:�G UYp �t',W. 1 ' ' 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the ��� day of , 1999, in Fort Worth, Ta�rant County, Texas. APPROVAL RECOMMENDED: ���� ,� A. Douglas Rademaker, P.E. Director, Department of Engineering APPROVED: Mike Groomer �/ Assistant City Manager Ratnala & Bahl, Inc. ENGINEER ATTE e J � Gl ria Pears , City Secretary By : Vl �,�... . Name: Rao Ratnala, P.E. 3950 Fossil Creek Blvd., Suite 202 Fort Worth, Tx. 76137 � `Y�� f�'�,f�G Contract Autho 'zation APPROVED AS TO FORM AND LEGALITY: t Gary Steiiiberger Assistant City Attorney 1?at� 2 `1 �6 0 _ i RATNALA & BAHL, INC. Engineers • Architects • Surveyors tiugust 9, 1 y99 MI•. Frerl Ehia, P.E. Department of Engineering City of Fort Worth ] 0(1�J Thr�ckrnrn-ton Str. Fo�r Worth, �exa� ?6;�? RE: 1998 Capital Improvement Program Projects: Reconstruction with New Asphalt Pavement of 1) St�lart Drive (Morningside to E. Ramsey) and 2) Jones Street �iVlorningside to Lowden) - Contract 13 Dear Mr. Ehia: Houston Fort Worth New Orleans 3950 Fossil Creek Blvtl., Suite 202 Fort Worth, Texas 76137 Office (8171232-8809 Fax(817�232-5144 City of Fort Worth has requested that ffatnala & Bahl, Inc. add a 16 inch �.�°ater line �n Morningside Drive from Biyan Avenue to IH35 to the engineering plans for ttiis project. We have visited the site and have made an evaluation of the additional engineering, drafting, surveying and reproduction services that will be required. W� believe that t?1e addiCional work can be completed in a timel�� rnanner as an addendum to our existing contract for this project. We propose an additional lump sum fee of $14,6?8.00 for the add�tional work. Please approve this addi!:en to the fee for our contract and issue a written Notiee to HY(�(•PL�:Y `'`;P ._,} ,,.-�:1P.r�`'_":., �Yu'Jlfit:::: j �^. �.C`.:;i" �;:.^. " n � SF;�V'^.cc tt� rha l�:r; . f:��.;Sf . - - ,�, � . � _ _. f„s�i na, . -- _ , ., w orth. Sincereiy, � .� ���-, �°� � �� ���'s �ay G. Helmer, P.F. Senior Project Manager 9$6 6 _ > . .. Estimate of Fee for Professional Services to Add Drawin�s for 16 Inch Water LinE on Morningside Drive irom Brvan Avenue to IH35 En�ineerin� and Draftin� � Cost ner Drawin�: C`ADl� 1:3rai��: Design Engineer - :L�"a �it'�. � s; ii.�:iiJJIIi`. n :}. ; ;1'; - 4 hrs x$30.00/hr. x 3.105 Cost per Drawing Total Cost for 3 plan and 3 profile sheets Survevin�: 40 Survey Crew Hours x$75.00/hr. Reproduction: _ ,i i , � )�,i. =�: _ $ 372.60 _ $1,863.00 = 6 x $1,863.00 _ $11,178.00 _ $3,000,00 Original reproduction fee was $2,500.00 for Water and $2,500.00 for Paving = $5,000.00. Assume that addition of drawings for Morningside will increase reproduction cost by 10%. Then the additional cost for reproduction is: $5,000.00 x 10% _ $500.00 �i��AL ADDITIOI�Ai, pR�"�FESSION��, SERVICE �FEE _ $14,678.00 cc:file RGH/slk FoT oT� � �. _ � � _ _�. TO: A. Douglas Rademaker, P.E. FROM: Fred Ehia, P.E. DATE: August 20,1999 RE: 1998 CAPTTAL IlVIPROVEMENT PROGRAM PROJECT, RECONSTRUCTION OF STUART DRIVE AND JONES STREET, CONTRACT # 13, DOE# 2174 & 2175 As requested by the Wat� Depaziment Ratnala & BaW, Inc., has submitted a proposal to provide additional services for design of existing 16-inch water line located in Morningside Drive. Ratnala & Bahl, Inc, has requested to perform these additional services for a fee not to exceed $14,678.00 increasing the contract fee to $67,458.00 Staff considers this fee to be fair and reasonable for the scope of services proposed. Please authorize this additional design by your signature on the attached Contract Amendment form. � Xc: Rick Trice i .�' / / � ENGINEERING DEPARTMENT THE CITY OF FORT WORTH '* lOOO THROCKMORTON STREET * FORT WORTH, T�cas 76102-6311 (81'� 871-7941 * Fax (81� 871-7854 � Printed on recycled paper