HomeMy WebLinkAbout025174 - Construction-Related - Contract - M.E. Burns Construction, Inc.`f ►
�/ 1� Y '`.:.�... '. -...^_ �- ;
�i 1 i ���U:i�� �
a �.�_�.����
��f��;� ;�,����t'S �������� ��' PROJECT MANUAL
� SPECIFICATIONS
�
�`�", �`ti:;���".��i?�i'� a ���':. and
� CONTRACT DOCUMENTS
r{; ��� ;�����r��p� �'�
. . n . a . �`Y ��. .
�
n
CITY SECRETARY � �� � (,�
CONTRACT NO.
for
� • � r�
li MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM
REHABILITATION AND IMPROVEMENTS
r� (GROUP 6, CONTRACT 2), PART 4
MISCELLANEOUS SANITARY SEWER REPLACEMENTS
� Unit 2: L-927, L-5489, L-183 (DOE No. 2718)
F � �
i.
SEWER PROJECT NO. PS46-070460410230
in
l, ,
KENNETH BARR
MAYOR
LEE C. BRADLEY, JR.
DIRECTOR OF �1VATER DEPARTMENT
l,�
THE CITY OF FORT WORTH, TEXAS
A. DOUGLAS RADEMAKER
DIRECTOR OF ENGINEERING DEPARTIIl�ENT
BOB TERRELL
CITY MANAGER
HUGO M. MALANGA, P.E.
DIRECTOR OF TRANPORTATION AND PUBLIC WORKS
�� PREPARED BY:
, Halff Associates, Inc.
Engineers • Scientists • Surveyors
4000 Fossil Creek Boulevard
► Fort Worth, Texas 76137
U
i
�
1
June1999
, � ,� � � sss3
'�'� u u����tn:.� � �C`�
C:��7 Ct���'U�SIL'I�:'
G�o ��� �1��➢ �:�
���: - : t
4 * t;
.. .� �
. . . . . • • � �� �
�t ' � T� o �
�•:� �:��� �
��Ati��� ��
0
�
'
�
�
'
�
�
'
�
�
�
'
�
�
�
�
'
'
�
A
CITY OF FORT WORTH, TEXAS
DEPARTMENT OF ENGINEERING
ADDENDUM NO. 1
for
SANITARY SEWER MAIN C1C4B DRAINAGE AREA
REHABILITATION AND SANITARY SEWER IMPROVEMENTS
(GROUP 6, CONTRACT 2), PART 4
Unit 1: L-1232, M-149, L-976 DOE No. 1829
4�ii`2: L-927, L-5489, L-183 DOE No. 2718
Unit 3: M-398R DOE No. 2719
SEWER PROJECT NO. PS46-070460410230
Bid Receipt Date - July 15, 1999
The Contract Documents for the subject project are hereby revised or amended as follows:
Proposal Modifications/Additions:
1. Add the following sheets to Part B Unit 3(see attached):
B3-7
B3-8
These sheets were omitted from the original project specifications and contract documents.
Please acknowledge receipt of this addendum by placing a signed copy of same into your proposal at the time of
bidding. Failure to return a signed copy of the addendum with this proposal sha11 be grounds for rendering the bid
nonresponsive.
Receipt Aclrnowledged:
BY�.r/�r l'�L.�----,^
Department of Engineering
Rick Trice, PE
Manager, Consulting Services
B : on S�i6 ��G
yT� I
for Rick Trice
/�I
�I
C
L�J
,�
L�J
PART B1 - PROPOSAL (Cont.)
Within ten (10) days after notification by the City, the undersigned�will execute the formal contract
and will deliver an approved Surety Bond and such other bonds as required by the Contract
Documents, for the faithful performance of this Contract. The attached bid security in the amount
of is to become the property of the City of Fort Worth, Texas, in the event the
contract and bond or bonds are not executed and delivered within the time above set forth as
liquidated damages for the delay and additional work caused thereby.
The undersigned bidder certified that he has obtained at least one set of the General Contract
a Documents and General Specifications for Water Department Projects dated January 1, 1978, and
that he has read and thoroughly understands all the requirements and conditions of those General
Documents, and the specific Contract Documents and appurtenant plans.
L1
�!J
I■I
�
u
L�J
L■J
�
C
C
C'�
C'�
The undersigned assures that its employees and applicants for employment and those of any
labor organization, subcontractors, or employment agency in either furnishing or referring
employee applicants to the undersigned are not discriminated against as prohibited by the terms of
City Ordinance No. 7278 as amended by the City Ordinance No. 7400.
The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and
to complete the contract within seventy-five (75) calendar days after beginning construction as set
forth in the written work order to be fumished by the Owner.
A. The principal place of business of our company is in the State of
Non-resident bidders in the State of , our principal place of business, are
required to be percent lower than resident bidders by state law. A copy of the statute
is attached.
Non-resident bidders in the State of , our principal place of business, are
not required to underbid resident bidders.
B. The principal place of business of our company or our parent company or majority owner is in
the State of Texas.
Receipt is acknowledged of the following addenda:
Addendum No. 1 (Initialsl
Addendum No. 2 (Initials)
Addendum No. 3 (Initials)
� B3- 7
�
�
�
a
�
�
'
�
�
�I
'
�
'
�
�
�
�
�
�
�
�
(SEAL)
If Bidder is Corporation
Date:
Respectfully submitted,
By:
Title:
Address:
Telephone:
�
B3- 8
07�15/1999 08:13 E175969349 �J�1:-�i �"�!L�_,�v,cids �� P�GE 01
� ...4 r�rfla/I�t94 25:E1� 33:5a�+3 c�. �,p,� P�.M YCH PaGE e�:
�
C�
CI
I�I
l�l
LJ
LJ
�
�
�
�
I■
l■I
L'
L'
[II
C
C7TY OF p'ORT WOR2A, T�S �
D�P'�RTMSM' Of ENGA�ER�V�
D
far
S.ANIT'�lltF 5EW�R M.1IN (:.ICaB DiCAWwG& wR�A
RF.HABU.IiJlTiON AND SANiTARY SEWF,R L�'�tOv�I►�N'I�
(GROUP 6, CO:�%ltJ1CT ?j, PAitT 9
U�ah i; L-j=�2, M-149,'LA76 DOE No. lEl9
Unit 2: L-927, I,.S�34, L.! 33 DOE Na. 211 �
UOir 3: M-398R DOE No. 2719
. S�WF,�t pR0lECTNo. PSa6-014a60a1023o
.-�r,id. �R�c'�ine Da!r - r���r I5. I949
Tt►o Conaoact Ibaum�aa for che subjscc projact att t�enoby ravised or onendsd as foAeva:
k'topora( Modilfiatiooa�Adrliti�na:
i,. 7ite folk�iag comatioas �hou�d b�e msdc to Qfe Hid Aopoeal, psae 82-6. of t�ie Ckioctact I)oaimmts snd
Spetilic�tfOAs:
[t�trp No. 30 - ail neFeret�ca co turitS [or thia i[s� lbrll be par Sqtts� Y�itd; the D�cripaivsi of It� wic� Bid
Rioc �1%ritt� � Wa�ds shsli be chanQtd �roet "per ianw Fc�oC' w"per Squve Yard' :
Itcu► No. 31 - 311(CfCledlGt Lv 6mib fOf $1u3 ate�A aM11 be � Ltrte�t �'ea: tho D�saiptior► of%rt wid� Bid
PricE Wrltota in wolds �haii be cha��ed �'om "Par S9iul�e Xard" to "per l.inaR �uut";
ltemt Nc, 32 - ail ce!'et�nca to wtits fet tDis i�oe� �h.�116e pec �.ineat �oa: thc D�saipiion of imtr� widt �id
Ptice Wiri�sr, in W�da ahatl b�e chyutged &om "per 5q�aate Yar�d" to ,,per Liobar Fau";
lkass nc,l�towledse nc��ipc vf this oQdar�duni i+y P�� s��P7 r.f sa�e inw yout.proposal at 1ba t�e of
bidd�. F�iuco io r�uus� a si�ed wpy af the �ddand�m� wit3� d�is poposs! sl�aU ta� go�ds fnr ra�d�rina du bid
aoure�pa»siv�c.
Rec�ipt Acknowte�dgod:
� ��-� /
0
A• 1
II .,,..�, W . , .. � �� of �u�9ue21ftg
Rick Tr,ios, PE
Mans�. Canmloog Servixs
�
gy, p �! S a �
A�r Rlck Z'rice
�
�
L
�
�
�
ll
�
�
�
�
�
�
�
�
�
�
�
�
�
a
PART A
PART B
PART C
PART D
PART E
PART F
PART G
APPENDIX A
TABLE OF CONTENTS
Notice to Bidders
Detailed Notice to Bidders
Special Instructions to Bidders
Unit 1: L-1232, M-149, L-976
Minority/Women Business Enterprise (M/WBE) Specifications
Proposal
Unit 2: L-927, L-5489, L-183
Minority/Women Business Enterprise (M/WBE) Specifications
Proposal ,
Unit 3: M-398R
Minority/Women Business Enterprise (M/WBE) Specifications
Proposal
General Conditions
Supplementary Conditions
Special Conditions
General Specifications for Water Department Projects
(not bound herein)
Certificate of Insurance
Contractor Compliance with Worker's Compensation Laws
Performance Bond
Payment Bond
Maintenance Bond
Contract
Easement Documents and Permits
L]
L�l
�
L;
�
u
�
�
u
L�
�
�
�
!�1
�
�
�
PART A
Notice to Bidders
Detailed Notice to Bidders
Special Instruction to Bidders
�
�
�
Seated proposals for the following:
NOTICE TO BIDDERS
�
L�J
Main C1C4B Drainage Area Sanitary Sewer System Rehabilitation and Improvements
(Group 6, Contract 2), Part 4
Units 1, 2, � 3
Sewer Project No. PS46-070460410230
Unit 9: L-1232, M-149, L-976 (DOE No. 1829)
� Unit 2: L-927, L-5489, L-183 (DOE No. 2718)
Unit 3: M-398R (DOE No. 2719)
u
Unit 1: L-1232, M-149, L-976 (DOE No. 1829)
13 Manholes, 40 LF 6" SS, 1,791 LF 8" SS, 179 LF 8" DIP SS, 72 LF 8" DIP SS BY OTHER
THAN OPEN CUT, 652 LF 6" to 8" Pipe Enlargement, 7 VF INTERIOR MANHOLE COATING,
& 67 LF 8" water
Unit 2: L-927, L-5489, L-183 (DOE No. 2718)
j"� 6 Manholes, 4 Shallow Cone Manholes, 13 LF 6" SS, 10 LF 6" DIP SS, 1,393 LF 8" SS, 598
�,� LF 8" DIP SS, 178 LF 8" DIP SS BY OTHER THAN OPEN CUT
L!i
�
Unit 3: M-398R (DOE No. 2719)
1 Std. 4' dia. Manhole, 2 Std. 5' dia Manholes, 33 VF additional depth for 5' dia Manholes (>
6'), 5 LF 8" SS, 206 LF 18" SS, 700 LF 18" DIP SS BY OTHER THAN OPEN CUT, 10 LF 24"
SS
Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the
j7 Purchasing Office until 1:30 p.m. Thursday, July 15, 1999 and then publicly opened and read aloud at 2:00
�.� p.m. in the Council Chambers. Plans, specifications, and contract documents for this project may be
obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton
j�"f Street, Fort Worth, Texas. A fifty (50) dollar deposit is required for the first set of documents and additional
1.1 sets may be purchased on a non-refundable basis for fifty (50) dollars for each set.
�
�
�
�
�
Li
�
Bidders shall not separate, detach, or remove any portion, segment(s), or sheets from the contract
documents at any time. Bidders must complete the proposal section(s) and submit the complete
specifications book or face rejection of bid as non-responsive.
For additional information, please contact Mr. Michael Moya, P.E., Halff Associates, at 847-1422, or Mr.
Miguel Domenech, P.E., Project Manager, at 332-5474 (ext. 39).
ADVERTISING DATES:
June 24, 1999
July 1, 1999
NTB-1
!�i
LJ
L■l
DETAILED NOTICE TO BIDDERS
Sealed proposals for the following:
Main C1C4B Drainage Area Sanitary Sewer System Rehabilitation and Improvements
� (Group 6, Contract 2}, Part 4
Units 1, 2, & 3
Sewer Project No. PS46-070460410230
u
�
�
�
�
�
�
�
Unit 1: L-1232, M-149, L-976 (DOE No. 1829)
Unit 2: L-927, L-5489, L-183 (DOE No. 2718)
Unit 3: M-398R (DOE No. 2719)
Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas will be received at the
Purchasing Office until 1:30 p.m. Thursday, Jufy 15, 1999, and then publicly opened and read aloud at 2:00
p.m. in the Council Chambers. Plans, specifications and contract documents for this project may be
obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton
Street, Fort Worth, Texas. A fifty (50.00) dollar deposit is required for the first set of documents and
additional sets may be purchased on a non-refundable basis for fifty (50.00) dollars for each set.
All bidders will be required to comply with provision 5159 of "Vernon's Annotated Civil Statues" of the Sate
of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended
by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-a-29), prohibiting
discrimination in employment practices.
Bid security is required in accordance with Paragraph 2 of the Special Instruction to Bidders.
The major work on the project shall consist of the following:
Unit 1: L-1232, M-149, L-976 (DOE No. 1829)
13 Manholes, 40 LF 6" SS, 1,791 LF 8" SS, 179 LF 8" DIP SS, 72 LF 8" DIP SS BY OTHER
THAN OPEN CUT, 652 LF 6" to 8" Pipe Enlargement, 7 VF INTERIOR MANHOLE COATING,
& 67 LF 8" water
� Unit 2: L-927, L-5489, L-183 (DOE No. 2718)
6 Manholes, 4 Shallow Cone Manholes, 13 LF 6" SS, 10 LF 6" DIP SS, 1,393 LF 8" SS, 598
LF 8" DIP SS, 178 LF 8" DIP SS BY OTHER THAN OPEN CUT
�
L�
�
�
�
�
Unit 3: M-398R (DOE No. 2719)
1 Std. 4' dia. Manhole, 2 Std. 5' dia Manholes, 33 VF additional depth for 5' dia Manholes (>
6'), 5 LF 8" SS, 2D6 LF 18" SS, 700 LF 18" DIP SS BY OTHER THAN OPEN CUT, 10 LF 24"
SS
Included in the above will be all other miscellaneous items of construction as outlined in the Plans and
Specifications.
The City reserves the right to reject any and/or all bids and waive any and/or all formalities. AWARD OF
CONTRACT: No bid may be withdrawn until the expiration of ninety (90) days from the date bids are
opened. The award of the contract, if made, will be within ninety (90) days after the opening of bids, but in
no case will the award be made until all necessary investigation are made as to the responsibility of the
bidder to whom it is proposed to award the contract.
DNTB-1
�
LJ
�
�
�!
�
I�
�
�
�
�
�
LJ
�
�
�
�L�J'
�
4,�
Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of
the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge
receipt of all addenda may be rejected as being non-responsive. Information regarding the status of
addenda may be obtained by contacting the Department of Engineering at (817) 871-7910.
Bidders shall not separate, detach, or remove any portion, segment(s), or sheets from the contract
documents at any time. Bidders must complete the proposal section(s) and submit the complete
specifications book or face rejection of bid as non-responsive.
SUBMISSION OF BID(S) AND AWARD OF CONTRACT(S): This document is designed as three (3)
separate contract documents and shall not be construed as being a single contract. The proposal sections
are provided as three (3) individual proposals with three (3) individual M/WBE specifications and are
arranged in units to allow prospective bidders to submit bids on one unit, some of the units, or all of the
units. Award of contract(s), if made, shall be to the responsive low bidder for each individual unit. If a
contractor is the responsive low bidder on finro units or more, a single set of contract documents consisting
of all applicable units will be created and one single award ofr contract shall be made. The Contractor shall
comply with the City's M/WBE Ordinance on each unit.
Construction time on all units will run concurrently. For situations involving approved contracts with multiple
units, the total allowable construction completion time period for all the units shall be the same as the unit
with the longest construction time period.
In accord with the City of Fort Worth Ordinance No. 11923, The City of Fort Worth has goals for the
participation of Minority and Women Business Enterprises in City contracts. A copy of the Ordinance can
be obtained from the Office of the City Secretary. The Bidder shall submit the M/WBE UTILIZATION
FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM
("Documentation°) as appropriate. The documentation must be received by the contracting department no
later than 5:00 P.M., five (5) business days after the bid opening date. The bidder shall obtain a receipt
from the appropriate employee of the contracting department to whom the delivery was made. Such
receipt shall be evidence that the Documentation was received by the City.
The Managing Department for this project is the Department of Engineering. For additional information,
please contact Mr. Michael Moya, P.E., Halff Associates, at 847-1422, or Mr. Miguel Domenech, P.E.,
Project Manager, at 332-5474 (ext. 39). �
BOB TERRELL
CITY MANAGER
GLORIA PEARSON
CITY SECRETARY
A. Douglas Rademaker, P.E., Director
DEPARTMENT OF ENGINEERING
� J
By: jv ��j Si� �! � ti
�! Rick L. Trice, P.E., Manager, Consulting Services
ADVERTISING DATES
June 24, 1999
July 1, 1999
DNTB-2
�
�
�
�
�
�
�
L�!
�
�
SPECIAL INSTRUCTION TO BIDDERS
(WATER DEPARTMENT)
i
l. PREQUALIFICATION REQUIREMENT: All contractors submitting bids are
required to be prequalified by the Fort Worth Water Department prior to submitting
bids. This prequalification process will establish a bid limit based on a technical
evaluation and financial analysis of the contractor. It is the bidder's responsibility to
submit the following documentation: a current financial statement, an acceptable
experience record, an acceptable equipment schedule and any other documents the
Department may deem necessary, to the Director of the Water Department at least
seven (7) calendar days prior to the date of the opening of bids.
a) The financial statement required shall have been prepared by an independent
certified public accountant or an independent public accountant holding a valid
permit issued by an appropriate State licensing agency and shall have been so
prepared as to reflect the financial status of the submitting company. This
statement must be current and not more than one (1) year old. In the case that a
bidding date falls within the time a new statement is being prepared, the previous
statement shall be updated by proper verification. `
b) For an experience record to be considered to be acceptable for a given project, it
must reflect the experience of the firm seeking qualification in work of both the
same nature and technical level as that of the project for which bids are to be
received.
� c) The Director of the Water Department shall be the sole judge as to the
acceptability for financial qualification to' bid on any Fort Worth Water
Department project.
�
l�l
�
�!
I�l
�
�
�
d) Bids received in excess of the bid limit shall be considered non-responsive and
will be rejected as such.
e) The City, in it's sole discretion, may reject any bid for failure to demonstrate
experience and/or expertise.
fl Any proposals submitted by a non-prequalified bidder shall be returned unopened,
and if inadvertently opened, shall not be considered.
g) The City will attempt to notify prospective bidders whose qualifications (financial
or experience) are not deemed to be appropriate to the nature and/or magnitude of
the project on which bids are to be received. Failure to notify shall not be a
waiver of any necessary prequalification.
2. BID SECURITY: A cashier's check or acceptable bidder's bond payable to the City
of Fort Worth in an amount of not less than five percent (5%) of the largest possible
total of the bid submitted must accompany the bid, and is subject to forfeiture in the
1
�
L�J
�
�
�
�
�
�
lt;
�
�
event the successful bidder fails to execute the Contract Documents within (10} days
after the contract has been awarded. To be an acceptable surety on the bond, (1) the
name of the surety shall be included on the current U.S. Treasury, or (2) the surety
must have capital and surplus equal to ten times the limit of the bond. The surety
must be licensed to do business in the State of Texas. The amount of the bond shall
not exceed the amount shown on the Treasury list or one-tenth (1/10) the total capital
and surplus.
3. BONDS: A performance bond, a payment bond and a maintenance bond each for one
hundred (100%) percent of the contract price will be required, Reference C 3-3.7.
4. WAGE RATES: Not less than the prevailing wage rates established by the City of
Fort Worth, Texas and as set forth in the contract documents must be paid on this
project.
5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the
Proposal, the City reserves the right to adopt the most advantageous construction
thereof to the City or to reject the Proposal.
6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas.
7. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil
Statutes, the City of Fort Worth will not award this contract to a nonresident bidder
unless the nonresident's bid is lower than the lowest bid submitted by a responsible
Texas resident bidder by the same amount that a Texas resident bidder would be
required to underbid a nonresident bidder to obtain a comparable contract in the State
in which the nonresident's principal place of business is located.
"Nonresident bidder" means a bidder whose principal place of business is not in the
� State of Texas, but excludes a contractor whose ultimate parent company or majority
owner has its principal place of business in the State of Texas.
�
This provision does not apply if this contract involves Federal Funds.
The appropriate blanks of the Proposal must be filled out by all nonresident bidders in
� order for the bid to meet specifications. The failure of a nonresident contractor to do
so will automatically disqualify that bidder.
�
�
�
�
�
8. PAYMENT: If the contract amount is $25,000 or less, the contract amount shall be
paid within forty-five (45) calendar days after completion and acceptance by the City.
9. AGE: In accordance with the policy ("Policy") of the Executive Branch of the
Federal Government, Contractor covenants that neither it, not any of its officers,
members, agents, employees, program participants or subcontractors while engaged in
performing this contract, shall, in connection with the employment, advancement or
discharge of employees in connection with the terms, conditions or privileges of their
�
�
�
���
�
�•J
��
�
�
�
�'�:
LJ
O
�
�
�
IJ
�
�
�
employment, discriminate against persons because of their age except on the basis of
a bona fide occupational qualification, retirement plan, or statutory requirement. '
Contractor further covenants that neither it nor its officers, members, agents,
employees, subcontractors, program participants, or persons acting on their behalf,
shall specify, in solicitations or advertisements for employees to work on this
contract, a maximum age limit for such employment unless the specified maximum
age limit is based upon a bona fide occupational qualification, retirement plan or
statutory requirements.
Contractor warrants it will fully comply with the policy and will defend, indemnify
and hold City harmless against any claims or allegations asserted by third parties or
subcontractors and/or its subcontractors' alleged failure to comply with the above
referenced Policy concerning age discrimination in the performance of this
agreement.
10. DISABILITY: In accordance with the provisions of the Americans With
Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its
subcontractors will not unlawfully discriminate on; the basis of disability in the
provision of services to the general public, nor in the availability, terms and/or
conditions of employment for applicants for employment with or employees of
Contractor or any of its subcontractors. Contractor warrants it will fully comply with
the ADFA's provisions and any other applicable Federal, State and Local laws
concerning disability and will defend, indemnify and hold City harmless against any
claims or allegations asserted by third parties or subcontractors against City arising
out of contractor's and/or its subcontractors' alleged failure to comply with the above
referenced Policy concerning age discrimination in the performance of this
agreement.
11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the
City of Fort Worth Ordinance No. 11923 the City of Fort Worth has goals for the
participation of minority business enterprises and women business enterprises in City
contracts. A copy of the Ordinance can be obtained from the Office of the City
Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME
CONTRACTOR WAIVER FROM and/or the GOOD FAITH EFFORT FORM
("Documentation") as appropriate. The documentation must be received no later
than 5:00 PM, five (5) City business days after the bid opening date. The bidder
shall obtain a receipt from the appropriate employee of the managing department to
whom delivery was made. Such receipt shall be evidence that the documentation
was received by the City. Failure to comply shall render the bid nonresponsive.
Upon request, Contractor agrees to provide the Owner complete and accurate
information regarding actual work performed by a Minority Business Enterprise
(MBE) and/or a Women Business Enterprise (WBE) on the contract and payment
thereof. Contractor further agrees to permit any audit and/or examination of any
3
�
� books, records or files in its possession that will substantiate the actual work
performed by an MBE and/or WBE. The misrepresentation of facts (other than a
� negligent misrepresentation) and/or the commission of fraud by the Contractor will be
grounds for termination of the contract and/or initiating action under appropriate
federal state or local laws or ordinances relating to false statements. Further, any such
� misrepresentation (other than a negligent misrepresentation) and/or commission of
fraud will result in the Contractor being determined to be irresponsible and barred
from participating in City work for a period of time of not less than three (3) years.
f..[
LJ
�
�
�
!'�:
1�.
�
�
�
�
t!J
!J
�
4
D
�
� books, records or files in its possession that will substantiate the actual work
performed by an MBE and/or WBE. The misrepresentation of facts (other than a
� negligent misrepresentation) and/or the commission of fraud by the Contractor will be
grounds for termination of the contract and/or initiating action under appropriate
federal state or local laws or ordinances relating to false statements. Further, any such
� misrepresentation (other than a negligent misrepresentation) and/or commission of
fraud will result in the Contractor being determined to be irresponsible and barred
from participating in City work for a period of time of not less than three (3) years.
�
��
�
��
��
�
�
�
�
,
�
I
�
�
0
4
�!
�
ylain C1C4B Drainage Area Sanitary Sewer System Rehabilitatic��
and lmprovements (Group 6. Contract ?) Part � L�nit 2
city of Fort worth
Minority and Women Business Enterprise SpeciFications
r�
��
�
f�
t
��
f'
�PECiAL iNSTRUCTlONS FOR BIDDER�:►
APPLICATION OF POILICY
�If the total dollar value cfi the contract is $25,000 or more, the MJWBE goal is apFlicable. If the total doltar
va)ue of the contract is le ss than 525,000, the M/WBE goal is not applicable. �
POLICY STATEMENT
It is the policy of the City �f Fort Worth to ensure the full and equitable participation b� Minority/Wamen Business
Enterprises (M/WBE} in th�a procurement of all goods and services to the City on a contr� ctual basis. The objective
of the Policy is to increase the use of M/WBE firms to a level comparable to the availabi� ty af MIWBEs that provide
goods and services directi�� or indirectly to the City.
M1WBE PROJECT GC ALS
The City's MBElWBE goal �m this project is 14 °/, of the base bid value of the contr; :t.
COMPUANCE TO BIE� SPECIFfCATIONS
On City contracts of �25,0�.10 or more, bidders are required to cornply with the intent of tt ; City's M/WBE Ordinance
by either �f the fofiowing:
1. Meet or exceed the ab��ve stated MNVBE goal, or;
2. Good Faith Effort dociamentation, or;
3. Waiver dacumentatiori.
SUBMITTAL OF REQl,IIRED DOCUMENTATI�N
The applicable documents must be received by the Managing Department, within the f:; Ilowing times allocated, in
order for the entire bid to b:: considered responsive to the specifications.
1. M/WBE Utifization Forrr:
2. Prime Coniractor Waiver Form
3. Good Faith Effort Form:
received by 5:00 p.m., flve (5) City busi ; ess days after the
bid opening date, exctusive of the bid c �,ening date.
received by 5:00 p.m., five {5) City busi; i ess days afte� the
bid opening date, exclusive of the bid c � �ening date.
received by 5:00 p.m., five (5) City busiiiess days after the
bid opening date, exclusive of the bid e��eni�g date.
FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE, WILL RESULT IN TH : BID BEING
CONSIDERED NON-RESPONSIVE TO SPECIFICAttONS.
Any questions, piease contact the M/WBE Office at (817) 871-@� 04.
�
.,
-------------------------------------------------------------..
Main C1C46 Qrainage Area Sanitary Sewer System Rehabi; tation and ATTACHMENT 1A
Improvements (Group 6, Contract 2) Part 4 Unit 2 Page 1 of 2
i-: Ci of Fort Worth
Minority and Women �usiness Enterprise Specifi�;ations
� MBE/WBE UTfLI�ATION
I''I -(� v� �-t�`✓�S l.o� SiY1.�r.�� �%�„r . July ?2, 1999
p RIME COMPANY NAME �" BID DATE
i�ain C1C46 DA S/S System Rehab.� Imp Group 6,Contract 2} part 4 Unit 2 PS46-070460410230 - DC I: No. 2718
PROJECT NAME PROJECT NIiMBER
�:IT1''S V((��'BE PROJECT GOAL: S4%
1 �IlL�'BF. PERCE�TAGE .a;'li[EVED:
Faifure to compfete this form, in it, entirety with supporting documentation, and receive�l by the Managing Department
�n or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid ope� ing date, will result in the bid
�eing considered non-responsive ko bid specifications.
`he undersigned bidder agrees to enter into a formal agreement witb the MBE and/or Wfi E firms for work listed in this
chedule, conditioned upon exec ution of a contract with the City of Fort Worth. Tt 3 intentionat and/or knowing
misrepresentation of facts is groL nds for consideration of disquaiificatian and will res� I t in the bid being considered
^on-responsive to specifications.
I Company Name, Cantact Name, ��ertified
Address, and Telephone No.
Specify A11 Contracting
Scope of Work {"}
Specify Atl Items tc� be
Supplied{") P i
e a
� r
� �..�
y
`���'�S �
✓-u C �C �
I' s
�(�rv� i5� S`�� v�s�L
.����5 l
Dollar Amount
—'�T�.
I: TxDOT
(NWY
R QIv�
q
A _�..�>�,r��,�(C�!'►`1�...2d�rU���..��-�'..�_ �l-t,1/ i� 0 5 �`�
� �J i .�.1 a.s�, n
_
-w--.�__._._.__...� � _.._._._.__...�:._.,...
��- vJ � � F..i.:x._ �,.�!`� J,.,..
.._.:..,..:_.�:..�_.. ----. ..w..._._
�-.l��r-� ►2��.�.�_.._,.......,.._ �/ j-��� I
.r... �I�� 5S�-6s3� ..
�' ,�:�._���-�-�� c��-�-,-��
_ _..�. ���+���,��.��__..._.__.� /
-_ .- � ..._.....
......_�'-�_ w � r�._ �._i�.� � ��� . _.. ''
� _._..__ . .
�w��?e ��_.�"'n_'��.�
� - q a .__� _...
�� ~ � �'I sa�_.._......
�_..�_..�. I
�k.:.�.� (��5�, C�= hu�, %�-
�__....��:� _.�_ '� �:�_.��.`� _�, � uc ��--�
� ..,.:..
' �'�.,r �c�c � s e. �', �' �� 7 3 �/� � 1 �re.�-►�,��
• --- ....._.__._._, ..----�-- � i�-
�. ---� � ��, _. -- �..__ _.�._-
v.....
.�.. _,. . .
���r..rt..���..iT1:.."._.. .�3_::...''°o� .._.__..__._..._.__......_, _
�'f ,�a�
��
�� ��
�
� /S�D �6 a�
OU
�
_ M1WBEs must be located in the 9(nine; county marketplace or currently doing business ?n the marketplace . �t the time of bid_
('} Specify all areas in which MWBE's are t�o be utilized andlor items to be supplied:
('1 A compfete listing of items to be suppli�d is required in order to receive credit toward the MlWBE goal.
(, Identify each Tier level. Tier: Means the level of subcontracting below the prime contracf: r/consultant, i.e., a direct payment
frorn the prime contractor to a subcontractor is considered 1'� tif , a payment by a subcontra�tor to
_ its supplier is considered 2nO tier.
l..
THIS FORM MUST BE RECEIVED B �' THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5) CITY 3USiNESS DAYS AFTER BID
�� OPENiNG, EXCLUSIVE OF THE BID OPENING DATE
4 Rev. 6/2J98
Paqes 1 and 2�f Attachment 1A must hP rPrpiva� h„ tho nn�.,���.,.. n...�.....,..,..
Main C1C46 Drainage Area Sanitary Sewer System Rehabilitation and ATTACHMENT 1A
Improvements (Group 6, Contract 2) Part 4 Unit 2 Page 2 of 2
�
Q
,I
c��i of Fo�t wortn
Minority and Women usiness Enterprise Specifications
MBE/WBE UTILIZATION
Company Name, Contact Name, Certified Specify All Contracting Specify All Items to be S T Dollar Amount
Address, and Telephone No. Scope of Work (') Supplied(*) p i
N
C TzDOT c �
T (H�N i C')
R Div) f
C Y
A
�
_ . _ . .. . . .....
�
�
I�
2 __ .. __ ��,
��.........,. �....,,,,� �..� .�.x".�......_.
;
�...�,,�..,.,,.o . _. _.... __ _
�._.�.m ..... ».,._�.,
'he bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding
actual work performed by all subcontractors, including MBE(s) and/or WBE(s) arrangements submitted with this bid.
The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that
rill substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or
.;mployee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the
contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal,
�tate or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material
� �reach of contract may result in a determination of an irresponsible offeror and barred from participating in City work
for a period of time not less than one (1) year.
ALL MBEs and WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD
' �i:.�l �' �- i'��- r �� F L� t,- r r. S
, Authorized Signature
1-�� S\� � ✓: >��
t Title �
. �"� � ��..� ��5 C�,,.-�k-�,,��1� � � �� .
� ; ompany Name
����,� i1��1 �
� "�ddress
' 1�'� � ; �i � -k�— i �C l k� i � � ��� �
City/State/Zip Code I
l�
Printed Signature
Contact Name and Title (if different)
�i�����- �,�-���
Telephone Number (s)
� �� �{ � �- o �..0 '?
Fax Number
%- Z / - -r'! 9
Date
THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5) CITY BUSINESS DAYS AFTER BID
OPENING, EXCLUSIVE OF THE BID OPENING DATE
� ' Rev. 6/2/98
Pages 1 and 2 of Attachment 1A must be received by the Managing Department
'
L�
J
PART B1 - PROPOSAL
CONSTRUCTION
(This Proposal must not be removed from this book of Contract Documents)
� TO: Bob Terrell
City Manager Fort Worth, Texas
�
���
L�J
u
�
PROPOSAL FOR: The furnishing of all materials, except materials specified to be furnished by the
City, equipment and labor for:
Main C1C4B Drainage Area Sanitary Sewer System Rehabilitation and Improvements
(Group 6, Contract 2), Part 4
Sewer Project No. PS46-07046410230, DOE No. 2718
Miscellaneous Sanitary Sewer Replacements:
Unit 2: L-927, L-5489, L-183
The major work for this project shall consist of:
� Unit 2: L-927, L-5489, L-183 (DOE No. 2718) �
6 Manholes, 4 Shallow Cone Manholes, 13 LF 5' SS, 10 LF 6" DIP SS, 1,393 LF 8"
SS, 598 LF 8" DIP SS, 178 LF 8" DIP SS BY OTHER THAN OPEN CUT
��J
�
f�
�
L�J
�
and all necessary appurtenances and incidentat work to provide a complete and serviceable
project.
Pursuant to the foregoing "Notice to Bidders", the undersigned Bidder, having thoroughly
examined the Contract Documents, including Plans, Special Contract Documents, the General
Contract Documents and General Specifications for Water Department Projects, the site of the
project and understanding the amount of work to be done, and the prevailing conditions, hereby
proposes to do all the work, fumish all labor, equipment and material, except as specified to be
furnished by the City, which is necessary to fully complete the work as provided in the Plans and
Contract Documents, and subject to the inspection and approval nf the Director of the Department
of Engineering of the City of Fort Worth, Texas; and binds himself upon acceptance of this
Proposal to execuie a contract and fumish an approved Performance Bond, Payment Bond,
Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents
for the performing and completing of the said work. Contractor proposes to do the work within the
time stated and for the following sums:
(Fumish and install, including all appurtenant work, complete in place, the following items)
("D-No." refers to the related items in Part D- Special Conditions)
� _���...._..� w
�
� B2-1
Q
� Main C1C4B Drainage Area Sanitary Sewer System
Rehabilitation and Improvements (Group 6, Contract 2) Part 4
0 MISCELLANEOUS SANITARY SEWER REPLACEMENTS
_ Unit 2: L-927, L-5489, L-183
� Item Approx. Description of Item With Unit
No. Quantity unit Bid Price Written in Words Price
(Furnish and install, including all appurtenant work, complete in place, the following items)
� 1 ' 13 LF �S �S
�
� 2
l.a
� 3
�
Q 4
�
� 5
�
n s
I�
�
�. - .. __.. .
� _ . ,R __
�
'Contractor must co
� Product Form on Pa
Amount
Bid
10
' 1,393
598
178
18
LF
LF
LF
LF
LF
mplete City Approved
ge 62-7
6" Sanitary Sewer
(all depths); D-49
� h i r-�-�/ — S2uC vi Dollars &
-iw�h�� r_�1�2 Cents
per Linear Foot
6" Class 51 DIP Sanitary Sewer
(all depths); D-49
F�or'��l' 7 vL.tl'�' Dollars 8
�'ev�K-J-�� —� u c Cents
�
per Linear Foot
8" Sanitary Sewer
(all depths); D-49 � ti� s� �"'�
:f ',i, 1 ��-- ' C,:��-»' %/��rs &
5'e vp_ h�}- �� - -}-�'�(� Cents
per Linear Foot
8" Class 51 DIP Sanitary Sewer
(all depths); D-49
Fc�r�-�� — S� X Dollars 8�
S��en��--�ivL Cents
per Linear Foot
8" Class 51 DIP Sanitary Sewer by Other
Than Open Cut; DA-5
(�V1e hkhcSre�( -�l� �r-�--�i1�� D0118rs &
z �e�vu Cents
per Linear Foot
Concrete Encasement of Existing
Water Line per Figure 20
1 Wev��/— �iV� DollarsE�
�w Cents
per Linear Foot
BZ-2
$37- $�-�`%-
� �� �s $ � �'7 so
�c�„
7 � ��_
�/7 ��� ly � �/�'�s
$� 3�"r�JpJ � .
J
$ ��o7S $ a%�S(o So
$ /35� $ ��{-� o3t� �
$ a � �`' $ � so"=
� .
DMain C1C4B Drainage Area Sanitary Sewer System
Rehabilitation and Improvements (Group 6, Contract 2) Part 4
(-j MISCELLANEOUS SANITARY SEWER REPLACEMENTS ��"
�} Unit 2: L-927, L-5489, L-183
� Item APprox. Description of Item With Unit Amount
No. Quantity unit Bid Price Written in Words Price Bid
(Fumish and instali, including all appurtenant work, complete in place, the following items)
a20 178 LF Pre-Construction Television $`"7" SO �, ��
Inspection of Sanitary Sewer Pipe; D-62
� � �vuv' Doliars &
—�i --�'-iZ/ Cents
i
per Linear Foot
� J7 S '7S
21 2,133 LF Post-Construction Television . S/ g J� � 3�
inspection of Sanitary Sewer Pipe; D-65
� In e Dollars 8�
� Se �x.v, � j �ivC.. Cents
per Linear Foot
� 7�, �� o�
�• 22 470 LF Asphalt Pavement Replacement $�/� $ 1�j , 9 g(�
i
per Figure 4; D-50 (� .
n '-7—h � r-�� '� �"0�� Dollars &
1 1 �-�-u Cents
L� per Linear Foot
'I' 0 q
� 23 47 LF Asphalt Pavement Replacement $�'T b $ /, �/ 8—
per Figure 2; D-50 �
�7'' h ; r �i-�/ �u-r pollars �
� . . �e-✓t� Cents
per Linear Foot
� C�O o�
24 40 LF Concrete Pavement $ �� � — $ � , �(� —
Replacement per Figure 1; D-50 �
.S i �C+y/ Dollars 8
� � e�,,,� Cents
per Linear Foot
� C�o 4� Ol7
25 23 SY Asphalt Parking Lot RemovaUReplacement; $�(� '— $ �� � D �—
Per Fig 2; D-50
.� �ti �f --� �/ Dollars &
n�2 �„�> > Cents
'L� per Square Yard
�
a
�
B2-5
�
Q �
QMain C1C4B Drainage Area Sanitary Sewer System .
Rehabilitation and Improvements (Group 6, Corttract 2) Part 4
d MISCELLANEOUS SANITARY SEWER REPLACEMENTS �`
Unit 2: L-927, L-5489, L-183
Q Item approx. Description of Item With Unit Amount �
No. Quantity un�t Bid Price Written in Words Price Bid
(Fumish and install, including all appurtenant work, complete in place, the following items)
D26 12 SY Concrete Driveway Replacement; D-44 $�'��� $ 5�����
�o r � v - -�r'�/�2 Dollars &
� "/ . :
J �-�,,,� Cents
per Square Yard
b� � 00
27 � � SY Concrete Sidewalk Replacement; D-44 $ � � $ %, � �s —
� � %1 i Y--}'�/ -'F v� Dollars & �
� ��vr� Cents
n per Square Yard
U28 37 LF Concrete Curb 8� Gutter $� Q � $��� �
� Repair; D-44, DA-21 '
% �1��1 � y Dollars &
���� � Cents
� per Linear Foot — —
29 5 LF Concrete Valley Gutter $�5 �� $ oc ����
Replacement; DA-29 �
�� ���I —��! � Dollars &
U
�-e.,2� . Cents
Q per Linear Foot —
30 12 SY Topsoil; D-73 $ � vo $� b� u0
' V I Y�� Dollars &
I 1 �--�v Cents
� per linear Foot
� �O U� .
31 1,035 LF Seeding; D-73 $� $ a,(�`7c7 —
� V� � Dollars & ' l
� �-�-� Cents
per Square Yard
32 11 LF Sodding; D-73 • $/ lJ �� $" O O�
� 1 � Vl Dollars 8�
��� Cents 7'�
� per Square Yard
��U ��/ �
7 S �
TOTAL BID $ � ;� I
� FORWARD TOTAL TO BID SUMMARY SHEET B49 �� ��
� � B2-6 T _
�
�
�.1
�
�
�
�
U
�
�
�,
�
�
�
�
�
�
�
�
Main C1C4B Drainage Area Sanitary Sewer System
Rehabilitation and Improvements (Group 6, Contract 2) Part 4
MISCELLANEOUS SANITARY SEWER REPLACEMENTS
Unit 2: L-927, L-5489, L-183
City-Approved Product and Method Form for *
* CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED:
STANDARD SPECIFICATION NO.
�
E1-31
E 1-25
E1-27
E1-28
E100-2
PIPE SIZE
4" thru 30"
4" thru 15"
4" thru 15"
18" thru 27"
18" thru 48"
Consult the "City of Fort Worth, Texas standard Product LisY' to obtain the GeneriGTrade Name and the
Manufacture for the pipes listed above.
Failure to provide the information required above may result in rejection of bid as non-responsive.
Only products or methods listed above wili be allowed for use in this project. Any substitution shall
result in rejection of bid as non-responsive.
B2-7
m
!�J
�,�
J
PART B1 - PROPOSAL (Cont.)
� Within ten (10) days after notification by the City, the undersigned will execute the formal contract
and will deliver an approved Surety Bond and such other bonds as required by the Contract
Documents, for the faithful performance of this Contract. The attached bid security in the amount
Q of is to become the property of the City of Fort Worth, Texas, in the event the
contract and bond or bonds are not executed and delivered within the time above set forth as
liquidated damages for the delay and additional work caused thereby.
�
'I
�
�
L�l
The undersigned bidder certified that he has obtained at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978, and
that he has read and thoroughly understands all the requirements and conditions of those General
Documents, and the specific Contract Documents and appurtenant plans.
The undersigned assures that its employees and applicants for employment and those of any
labor organization, subcontractors, or employment agency in either furnishing or referring
employee applicants to the undersigned are not discriminated against as prohibited by the terms of
City Ordinance No. 7278 as amended by the City Ordinance No. 7400.
The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and
� to complete the contract within ninety (90) calendar days after beginning construction as set forth
in the written work order to be furnished by the Owner.
� A. The principal place of business of our company is in the State of
� Non-resident bidders in the State of , our principal place of business, are
required to be percent lower than resident bidders by state law. A copy of the statute
is attached. �
�
L�J
fj,
�J
^I
i' ��
�
�-',
LRJ
Non-resident bidders in the State of , our principal place of business, are
not required to underbid resident bidders.
�' The principal place of business of our company or our parent company or majority owner is in
the State of Texas.
Receipt is acknowledged of the following addenda:
Addendum No. 1 (Initials),�i,��,�'�
Addendum No. 2 (Initials)��.._.rG�—��
Addendum No. 3 (Initials)
— B2- 8
a
�
�
�
�
�
�
� (SEAL)
if Bidder is Corporation
(� Date: ' /.S— �J��
u
❑�
�
r�`
I
�
�
L�J
LsJ'
�
�
�
Respectfully submitted,
/�'/� �,�,�,,�s �,��� ��.��.
sy: � .. � .�' _� � ,
Title: �/�S> �-ac�-�!
Address: �d. /��7�
%2� f�a��`"�, �6�x,A-s %�/�� — 6 67�
Telephone: ��/ —`,y 7-' a Z-�t Z--- ,
B2- 9
�
il
��
Li� ,_ �.
�
PART C - GENERAL CONDITIONS
TABLE OF CONTENTS
N04*EM$ER, 1, 1987
TABLE OF CONTENTS
�
�
�
i�
�1-:`'
�
�
�
�
�
�
�� �� �
�
C1-1
C1-1.1
C1-1.2
C1-1.3
C1-1.4
C1-1.5
C1-1.6
C1-1.7
C1-1.8
C1-1.9
C1-1.10
C1-1.11
C1-1.12
C1-1.13
C1-1.14
C1-1.15
C1-1.16
C1-1.17
C1-1.18
C1-1.19
C1-1.20
C1-1.21
C1-1.22
C1-1.23
C1-1.24
C1-1.25
C1-1.26
C1-1.27
C1-1.28
C1-1.29
C1-1.30
C1-1.31
C1-1.32
C2-2
C2-2.1
C2-2.2
C2-2.3
C2-2.4
C2-2.5
C2-2.6
DEFINITIONS
Definition of Terms
Contract Documents
Notice to Bidders
Proposal
Bidder
General Conditions
Special Conditions
Specifications
Bond
Contract
Plans
City
City Council
Mayor
City Manager
City Attorney
Director of Public Works
Director, City Water Department
Engineer
Contractor
Sureties
The Work or Project
Working Day
Calendar Day
Legal Holiday
Abbreviations
Change Order
Paved Streets and Alleys
Unpaved Streets and Alleys
City Streets
Roadway
Gravel Street
C1-1
C1-1
C1-1
C1-1
Cl-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
ci-�
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
C1-1
(1)
(1)
(2)
(2)
(2)
(2)
(2)
(2)
(2>
(3)
(3)
(3)
(3)
(3)
(3)
(3)
t4)
t4)
(4)
(4)
t4)
(4)
(4)
(4)
(4)
(5)
t6)
(6)
(6)
(6)
(6)
(6)
INTERPRETATION AND PREPARATION
OF PROPOSA�
Proposal Form
Intezpretation of Quantities
Examination of Contract Documents
and Site
Submitting of Proposal
Rejection of Proposals
Bid Security
tl)
C2-2 (1)
C2-2 (1)
C2-� (2)
C2-2 t3)
C2-2 (3)
C2-2 (3)
1
�
C2-2.7 Delivery of Proposal
C2-2.8 Withdrawing Proposals
C2-2.9 Telegraphic Modification of Proposals
CZ-2.10 Public Opening of Proposal
C2-2.11 Irregular Proposals
C2-2.12 Disqualification of Bidders
C3-3
C3-3.1
C3-3.2
C3-3.3
C3-3.4
C3-3.5
C3-3.6
C3-3.7
C3-3.8
C3-3.9
C3-3.10
C3-3.11
C3-3.12
C3-3.13
C3-3.14
C3-3.15
AWARD AND EXECUTION OF DOCUMENTS
Consideration of Proposals
Minority Business Enterpise
Women-Owned Business�Enterprise
compliance
Equal Employment Provisions
Withdrawal of Proposals
Award of Contract
Return of Proposal Securities
Bonds
Execution of Contract
Failure to Execute Contract
Beginning Work
Insurance
Contractor's Obligations
Weekly Payroll
Contractor's Contract Administration
Venue •
C4-4 SCOPE OF WORK
C4-4.1 Intent of Contract Documents
C4-4.2 Special Provisions
C4-4.3 Increased or Decreased Quantities
C4-4.4 Alteration of Contract Documents
C4-4.5 Extra Work
C4-4.6 Scheciule of Operations
C4-4.7 Progress Schedules for Water and
Sewer Plant Facilities
CS-5 CONTROL OF WORR AND MATERIALS
CS-5.1 Authority of Engineer
CS-5.2 Conformi�y with Plans
C5-5.3 Coordination of Contract Documents
CS-5.4 Cooperation of Contractor
CS-5.5 Emergency and/or Rectification Work
CS-5.6 Field Office
CS-5.7 Construction Stakes
C5-5.8 Authority and Duties of Inspectors
CS-5.9 Inspection
CS-5.10 Removal of Defective and Unauthorized
CS-5.11 Substitute Materials or Equipment
CS-5.12 Samples and Tests of Materials
C5-5.13 Storage of Materials
CS-5.14 Existing Structures and Utilities
CS-5.15 Interruption of Service
CS-5.16 Mutual �es�onsibility of Contractors
CS-5.17 Cleanup
CS-5.18 Final Inspection
C2-2 (4)
C2-2 (4)
C2-2 (4)
C2-2 (4l
C2-2 (4)
C2-2 (5)
���
�
- �
C3-3 (1) `�
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
C3-3
(1)
(1)
�2�
(2)
(2)
(2)
(4)
(4)
(4)
(4)
(7)
(7)
(7)
(8)
��
C4-4 (1)
C4-4 (1)
C4-4 (1)
C4-4 (2)
C4-4 (2)
C4-4 (3)
C4-4 (4)
CS-5
CS-5
C5-5
CS-5
C5-5
C5-5
CS-5
CS-5
CS-5
Work CS-5
CS-5
CS-5
CS-5
C5-5
C5-5
CS-5
c�-s
C5-5
(1)
(1)
(2)
(2)
(3)
(3)
t3)
(4)
(5)
(5)
(5)
(6)
i6)
(7)
(7)
(8)
ca�
(9)
t�
�
i�
�
�;�
G�
�
��
r1
;� �
a
(2) i
u
�
�
C6-6
C6-6.1
C6-6.2
C6-6.3
C6-6.4
C6-6.5
C6-6.6
� C6-6.7
C6-6.8
C6-6.9
� Cb-6.10
C6-6.11
- C6-6.12
` C6-6.13
� C6-6.14
� C6-6.15
C6-6.16
� �.�
LJ
�
�J
C6-5.17
C6-6.18
C6-6.19
C6-6.20
C6-6.21
C7-7
C7-7.1
C7-7.2
C7-7.3
C7-7.4
C7-7.5
C7-7.6
C7-7.7
C7-7.8
C7-7.9
C7-7.10
C7-7.11
C7-7.12
C7-7.13
� C7-7.14
C7-7.15
�[ C7-7.16
[f C7-7.17
�--_
�'� i
C8-8
CS-8.1
C8-8.2
�
LEGAL RELATZONS AND PUBLIC RESPONSZBILITY
Laws to be Observed
Permits and Licenses
Patented Devices, Materials and Processes
Sanitary Provisions
Public Safety and Convenience
Privileges of Contractor in Streets,
Alleys, and Right-of-Way
Railway Crossings
Barricades, Warnings and Watchmen
Use of Explosives, Drop Weight, etc.
Work Within Easements
Independent Contractor
Contractor's Responsibility for
Damage Claims
Contractor's Claim for Damages
Adjustment of Relocation of Public
Utilities, etc.
Temporary Sewer Drain Connections
Arrangement and Charges of Water
Furnished by City
Use of a Section of Portion of the Work
Contractor's Responsibility for Work
No Waiver of Legal Rights
Personal Liability of Public Officials
State Sales Tax
PROSECUTION AND PROGRESS
Subletting
Assignment of Contract
Prosecution of the Work
Limitations of Operations
Character of Workman and Equipment
Work Schedule
Time of Commencement and Completion
Extension of time of Completion
Delays
Time of Completion
Suspension by Court Order
Temporary Suspension
Termination of Contract due to
National Emergency
Suspension of Abandonment of the
Work and Annulment of Contract
Fulfillment of Contract
Termination for Convenience of the Onwer
Safety Methods and Practices
MEASUREMENT AND PAYMENT
Measurement of Quantities
Unit Prices
(3)
C6-6
C6-6
C6-6
C6-6
C6-6
(1)
(1)
tl�
(2)
(2)
C6-6 (3)
C6-6 (4)
C6-6 (4)
C6-6 (5)
C6-6 (6)
C6-6 (8)
C6-6 (8)
C6-6 (10)
C6-6 (10)
C6-6 (10)
C6-6 (11)
C6-6 (11)
C6-6 (11)
C6-6 (12)
C6-6 (12)
C6-6 (12)
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
C7-7
(1)
(1)
(1)
t2)
t2)
(3l
(4)
(4)
(4)
(5)
(6)
(6)
C7-7 (7)
C7-7 (7)
C7-7 (9)
C7-7 (10)
C7-7 (13)
C8-8 (1)
C8-8 (1)
�
C8-8.3
C8-8.4
C8-8.5
C8-8.6
C6-8.7
C8-8.8
C8-8.9
C8-8.10
CS-8.11
C8-8.12
C8-8.13
Lump Sum
Scope of Payment
Partial Estimates and Retainage
Withholding Payment
Final Acceptance
Final Payment
Adquacy of Design
General Guaranty
Subsidiary Work
Miscellaneous Placement of Material
Record Documents
C8-8 (1)
CS-8 (1)
C8-8 (2)
C8-8 (3)
C8-8 (3)
C8-8 (3)
C8-8 (4)
C8-8 (4)
C8-8 (5)
C8-8 (5)
C8-8 (5)
'�
�
�
�
�
�
�
_���
,
�
�
�
'
(4)
�
�
.�
�
R
�^�'',
a
�
�
�
�
PART C - GENERAL CONDITIONS
C1-1 DEFINITIONS
SECTION C1-1 DEFINITIONS
C1-1.1 DEFINITIONS OF TERMS: Whenever in these Contract
Documents the following terms or pronouns in place of them are
used, the intent and meaning shall be understood and
interpreted as follows:
C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are all of
the written and drawn documents, such as specifications,
bonds, addenda, plans, etc., which govern the terms and
performance of the contract. These are contained in the
General Contract Documents and the Special Contract Documents.
a. GENERAL CONTRACT DOCUMENTS: The General Contract
Documents govern all Water Department Projects and
include the following items:
-�'
��!~
�
�
C
�
PART A- NOTICE TO BIDDERS (Sample)
PART B - PROPOSAL (Sample)
PART C - GENERAL CONDITIONS (CITY)
(Developer)
PART D - SPECIAL CONDITIONS
PART E - SPECIFICATIONS
PERMITS/EASEMENTS
PART F - BONDS
PART G - CONTRACT
(Sample)
tSample)
White
White
Canary Yellow
Brown
Green
E1-White
E2-Golden Rod
E2A-White
Blue
White
White
b. SPECIAL CONTRACT DOCUMENTS: The Special Contract
Documents are prepared for each specific project as
a supplement to the General Contract Documents and
include the following items:
PART A- NOTICE TO BIDDERS (Advertisement) Same as
above
PART B - PROPOSAL (Bid)
PART C - GENERAL CONDITIONS
PART D - SPECIAL CONDITIONS
PART E - SPECIFICATIONS
PERMITS/EASEMENTS
PART F - BONDS
PART G - CONTRACT
PART H - PLANS (Usually bound
separately)
� C1-1 (1)
C1-1.3 NOTICE TO BIDDERS: All of the legal publications
either actually published in public advertising mediums or
f urnished direct to interested parties pertaining to the work
contemplated under the Contract Documents constitutes the
notice to bidders.
C1-1.4 PROPOSAL: The completed written and signed offer or
tender of a bidder to perform the work which the Owner desires
to have done, together with the bid security, constitutes the
Proposal, which becomes binding upon the Bidder when it is
officially received by the Owner, has been publicly opened and
read and not rejected by the Owner.
C1-1.5 BIDDER: Any person, persons, firm, partnership,
company, association, corporation, acting directly or through
a duly authorized representative, submitting a proposal for
performing the work contemplated under the Contract Documents,
constitutes a bidder.
C1-1.6 GENERAL CONDITIONS: The General Conditions are the
usual construction and contract requirements which govern the
performance of the work so that it will be carried on in
accordance with the customary procedure, the local statutes,
and requirements of the City of Fort Worth's charter and
promulgated ordinances.
Wherever there may be a conflict between the General
Conditions and Special Conditions, the latter shall take
precedence and shall govern.
C1-1.7 SPECIAL CONDITIONS: Special conditions are the
specific requirements which are necessary f or the particular
project covered by the Contract Documents and not specifically
covered in the General Conditions. When considered with the
General Conditions and other elements of the Contract
Documents they provide the information which the Contractor
and Owner should have in order to gain a thorough knowledge of
the project.
C1-1.8 SPECIFICATIONS: The Specifications is that section or
part of the Contract Documents which sets f orth in detail the
requirements which must be met by all materials, construction,
workmanship, equipment and services in order to render a
completed and useful project. Whenever reference is made to
standard specifications, regulations, requirements, statutes,
etc., such referred to documents shall become a part of the
Contract Documents just as though they were embodied therein.
C1-1.9 BOND: The bond or bonds are the written guarantee or
security furnished by the Contractor for the prompt and
C1-1 (2)
�
�
�
L_'J
�
faithful performance of the contract and include the
following:
a. Performance Bond (see paragraph C3-3.7)
b. Payment Bond (see paragraph C3-3.7)
c. Maintenance Bond (see paragraph C3-3.7)
d. Proposal or Bid Security (see Special Instructions
to Bidders, Part A and C2-2.6)
� C1-1.10 CONTRACT: The Contract is the formal signed agreement
' between the Owner and the Contractor covering the mutual
� understanding of the two contracting�parties about the project
, to be completed under the Contract Documents.
��
!J
�".`
C1-1.11 PLANS: The plans are the drawings or reproductions
therefrom made by the Owner's representative showing in detail
the location, dimension and position of the various elements
of the project, including such profiles, typical
cross-sections, layout diagrams, working drawings, preliminary
drawings and such supplemental drawings as the Owner may issue
to clarify other drawings or for the purpose of showing
changes in the work hereinafter authorized by the Owner. The
plans are usually bound separately from other parts of the
Contract Documents, but they are a part of the Contract
Documents just as though they were bound therein.
a C1-1.12 CITY: The City of Fort Worth, Texas, a municipal
corporation, authorized and chartered under the Texas State
Statutes, acting by and through its governing body or its City
Manger, each of which is required by charter to perform
� specific duties. Responsibility for final enforcement of
' Contracts involving the City of Fort Worth is by Charter
vested in the City Manager. The terms City and Owner are
�
�'
�
�
I''1
syn�nymous.
C1-1.13 CITY COUNCIL: The duly elected and qualified
governing body of the City of Fort Worth, Texas.
C1-1.14 MAYOR: The officially elected Mayor, or in his
absence, the Mayor Pro tem of the City of Fort Worth, Texas.
C1-1.15 CITY MANAGER: The officially appointed and authorized
City Manager of the City of Fort Worth, Texas, or his duly
authorized representative.
C1-1.16 CITY ATTORNEY: The officially appointed City Attorney
of the City of Fort Worth, Texas, or his duly authorized
representative.
C1-1 ( 3 >
�
C1-1.17 DIRECTOR OF PUBLIC WORRS: The duly appointed official
of the City of Fort Worth, referred to in the Charter as the
City Engineer, or his duly authorized representative.
C1-1.18 DIRECTOR CITY WATER DEPARTMENT: The duly appointed
Director of the �ity Water Department of the City of Fort
Worth, Texas, or his duly authorized zepresentative,
assistant, or agents.
C1-1.19 ENGINEER: The Director of Public Works, the Director
of the Fort Worth City Water Department, or their duly
authorized assistants, agents,,enqineers,.inspectors, or
superintendents, acting within the scope of the particular
duties entrusted to them.
�-,
�
�
C1-1.20 CONTRACTOR: The person, persons, partnership, �
company, firm, association, or corporation, entering_'into a
contract with the Owner for the execution of the work, acting �
directly or through a duly authorized representative. A
sub-contractor is a person, firm, �orporation, or others under
contract with the principal contractor, supplying labor and �
materials or only labor, for work at the site of the project.
C1-1.21 SURETIES: The Corporate bodies which are bound by
such bonds are required with and for the Contractor. The
sureties engaged are to be fully responsible for the entire
and satisfactory fulfillment of the Contract and for any and
all requirements as set forth in the Contract Documents and
approved changes therein.
C1-1.22 TAE WORR OR PROJECT: The completed work contemplated
in and covered by the Contract Documents, including but not
limited to the furnishing of all labor, materials, tools,
equipment, and incidentals necessary to produce a completed
and serviceable project.
C1-1.23 WORRING DAY: A working day is defined as a calendar
day, not including Saturdays, Sundays, and legal holidays, in
which the weather or other conditions not under the control of
the Contractor permit the performance of the principal unit of
work for a period of not less than seven (7) hours between
7:00 a.m, and 6:00 p.m., with exceptions as permitted in
paragraph C7-7.6.
C1-1.24 CALENDAR DAYS: A calendar day is any day of the week
or month, no days being excepted.
C1-1.25 LEGAL HOLIDAYS: Legal holidays shall be
prescribed by the City Council of the City of Fort
observance by City employees as follows:
Cl-1 (4)
�
��
�
�
�
�
observed as �
Worth for
-- �
�
11
��
�
�
�
�
r
1W
L�J
L�
1.
2.
3.
4.
5.
6.
7.
8.
9.
New Year's Day January 1
M. L. Ring, Jr. Birthday Third Monday in January
Memorial Day Last Monday in May
Independence Day July 4
Labor Day First Monday in September
Thanksgiving Day Fourth Thursday in November
Thanksgiving Friday Fourth Friday in November
Christmas Day December 25
Such other days in lieu of
holidays as the City Council
may determine
When one of the above named holidays or a special holiday is
declared by the City Council, f alls on Saturday, the holiday
shall be observed on the preceding Friday or if it falls on
Sunday, it shall be observed on the following Monday, by those
employees working on working day operations. Employees
working calendar day operations will consider the calendar
holiday as the holiday. �
C1-1.26 ABBREVIATIONS: Wherever the abbreviations defined
herein appear in Contract Documents, the intent and meaning
shall be as follows:
AASHTO - American Association of MGD
State Aighway Transportation
Officials
ASCE - American Society of Civil
Engineers
LAW - In Accordance With
ASTM - American Society of
Testing Materials
AWWA - American Water Works
Association
ASA - American Standards Association
HI - Hydraulic Institute
Asph.
Ave.
Blvd.
CI
CL
GI
Lin.
lb.
MH
Max.
- Asphalt
- Avenue
- Boulevard
- Cast Iron
- Center Line
- Galvanized Iron
- Linear or Lineal
- Pound
- Manhole
- Maximum
- Million Gallons Per
Day
CFS - Cubic Foot per
Second
Min. - Minimum
Mono.- Monolithic
$ - Percentum
R - Radius
I.D. - Inside Diameter
O.D. - Outside
Diameter
Elev.- Elevation
F - Fahrenheit
C - Centigrade
In. - Inch
Ft. - Foot
St. - Street
CY - Cubic Yard
Yd. - Yard
SY - Square Yard
L.F. - Linear Foot
D.Z. - Ductile Iron
r* C1-1 (5)
L.:
C1-1.27 CHANGE ORDER: A"Change Order" is a written
supplernental agreement between the Owner and the Contractor
covering some added or deducted item or feature which,may be
found necessary and which was not specifically included in the
scope of the project on which bids were submitted. Zncrease
in unit quantities stated in the proposal are not the subject
matter of a Change Order unless the increase or decrease is
more than 25$ of the amount of the particular item or items in
the original proposal.
Al1 "Change Orders" shall be prepared by the City from
information as necessary furnished by the Contractor.
C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley
shall be defined as a street or alley having one of the
following types of wearing surfaces applied over the natural
unimproved surface:
1. Any type of asphaltic concrete with or without
separate base material.
2. Any type of asphalt surface treatment, not
including an oiled surface, with or without
separate base material.
3. Brick, with or without separate base material.
4. Concrete, with or without separate base material.
5. Any combination of the above.
C1-�.29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley,
roadway or other surface is any area except those defined
above for "Paved Streets and Alleys."
C2-1.30 CITY STREETS: A city street is defined as that area
between the right-of-way lines as the street is dedicated.
C1-1.31 ROADWAY:
parallel lines two
(4' ) feet back of
exists.
The roadway is defined as the area between
(2') feet back of the curb lines or four
the average edge of pavement where no curb
C1-1.32 GRAVEL STREET: A gravel street is any unpaved street
to which has been added one or more applications of gravel or
similar material other than the natural material found on the
street surface before any improvement was made.
C1-1 ( 6 )
�
�
�
SECTION C - GENERAL CONDITIONS
C2-2 INTERPRETATION AriD
PREPARATION OF PROPOSAL
�
SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL
� C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with
proposal form, which will contain an itemized list of the
items of work to be done or materials to be furnished and upon
� which bid prices are requested. The Proposal form will state
the Bidder's general understanding of the project to be
completed, provide a space f or furnishinq the amount of bid
security, and state the basis for entering into a formal
� contract. The Owner will furnish forms for the Bidder's
"Experience Record," "Equipment Schedule," and "Financial
Statement," all of which must be properly executed and filed
� with the Director of the City Water Department one week prior
to the hour for openinq of bids.
T"' The financial statement required shall have been prepared by
, an independent certified public accountant or an independent
public accountant holding a valid permit issued by an
��'; appropriate state licensing agency, and shall have been so
�-�t prepared as to reflect the current financial status. This
statement must be current and not more than one (1) year old.
In the case that a bidding date falls within the time a new
� statement is being prepared, the previous statement shall be
updated by proper verification. Liquid asset� �r. the amount
of ten (10$) percent of the estimated project cost will be
� required.
For an experience record to be considered to be acceptable for
� a given project, it must reflect the experience of the firm
� seeking qualification in work of both the same nature and
magnitude as that of the project for which bids are to be
received, and such experience must have been on projects
� completed not more than five (5) years prior to the date on
which are to be received. The Director of the Water
department shall be sole judge as to the acceptability of
Q experience for qualification to bid on any Fort Worth Water
Department project.
� The prospective bidder shall schedule the equipment he has
available for the project and state that he will rent such
additional equipment as may be required to complete the
,,, project on which he submits a bid.
C2-2.2 INTERPRETATION OF QUANTITIES: The quantities of work
and materials to be furnished as may be listed in the proposal
C2-2(1>
�.
�
forms or other parts of the Contract Documents will be
considered as approximate only and will be used for the
purpose of comparing bids on a uniform basis. Payment will be
made to the Contractor for only the actual quantities of work
performed or materials furnished in strict accordance with the
Contract Documents and Plans. The quantities of work`to be
performed and materials to be furnished may be increased or
decreased as hereinafter provided, without in any way
invalidating the unit prices bid or any other requirements of
the Contract Documents.
C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT:
Bidders are advised that the Contract Documents on file with
the Owner shall constitute all of the information which the
Owner will furnish. All additional inf ormation and data which
the owner will supply after promulgation of the,formal
contract documents shall be issued in the form of written
addenda and shall become part of the Contract Documents just
as though such addenda were actually written into the original
Contract Documents.
Bidders are required, prior to the filing of proposal, to read
and become familiar with the Contract Documents, to vis�t the
site of the project and examine carefully all local
conditions, to inform themselves by their own independent
research and investigations, tests, boring, and by such other
means as may be necessary to gain a complete knowledge of thz
conditions which will be encountered during the construction
of the project. They must judge for themselves the
difficulties of the work and all attending circumstances
affecting the cost of doing the work or the time required for
its completion, and obtain all information required to make an
intelligent proposal. No information given by the Owner or
any representative of the Owner other than that contained in
the Contract Documents and officially promulgated addenda
thereto, shall be binding upon the Owner. Bidders shall rely
exclusively and solely upon their own estimates,
investigation, research, tests, explorations, and other data
which are necessary for full and complete information upon
which the pr oposal is to be based. It is mutually agreed that
the submission of a proposal is prima-f acie evidence that the
bidder'has made the investigations, examinations and tests
herein required. Claims for additional compensation due to
variations between conditions actually encountered in
construction and as indicated in the Contract Documents will
not be allowed.
The logs of Soil Borings, if any, showing on the plans are for
general information only and may not be correct. Neither the
CZ_2�2�
--�
, ;�
�
�
f�
�J
�
1
�
�
:_r
If
�
�
Owner nor the Engineer guarantee that the data shown is
representative of conditions which actually exist.
� C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shall submit his.
Proposal on the form furnished by the Owner. All blank spaces
applicable to the project contained in the�form shall be
correctly filled in and the Bidder shall state the prices,
�} written in ink in both words and numerals, for which he
�� proposes to do the work contemplated or furnishe the materials
required. All such prices shall be written legibly. In case
� of discrepancy between the price written in words and th e
, price written in numerals-, the-price most advantageous to the
City shall govern. .
� If a proposal is submitted by an individual, his or her name
must be signed by him (her> or his (her) duly authorized agent.
Zf a proposal is submitted by a firm, association, or
p partnership, the name and address of each member must be
given, and the proposal must be signed by a member of the
firm, association, or partnership, or by a person duly
� authorized. If a proposal is submitted by a company or
, corporation, the company or corporate name and business
address must be given, and the proposal signed by an official
�'��� or duly authorized agent. The corporate seal must be affixed.
, �,._,
�` �� Power of Attorney authorizing agents or others to sign
proposal must be properly certified and must be in writing and
� submitted with the proposal.
� C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if
they show any alteration of words or figures, additions not
�: called for, conditional or uncalled for alternate bids,
incomplete bids, erasures, or irregularities of any kind, or
contain unbalance value of any items. Proposal tendered or
. delivered after the official time designated for receipt of
proposal shall be returned to the Bidder unopened.
�
C2-2.6 BZD SECURITY: No proposal will be considered unless it
� is accompanied by a"Proposal Security" of the character an3
in the amount indicated in the "Notice to Bidders" and the
"Proposal." The Bid Security is required by the Owner as
� evidence of good faith on the part of the Bidder, and by way
of a guaranty that if awarded the contract, the Bidder will
within the required time execute a formal contract and furnish
� the required performance and other bonds. The bid security of
the three lowest bidders will be retained until the contract
is awarded or other disposition is made thereof. The bid
security of all other bidders may be returned promptly after
� the canvass of bids.
a[{_
1��'t
'" i
r
C2-2(3)
�
C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered
unless it is delivered, accompanied by its proper Bid
Security, to the City Manager or his representative in the
official place of business as set forth in the "Notice to
Bidders." It is the Bidder's sole responsibility to deliver
the proposal at the proper time to the proper place. The mere
fact that a proposal was dispatched will not be considered.
The Bidd�r must have the proposal actually delivered. Each
proposal shall be in a sealed envelope plainly marked with the
word "PROPOSAL," and the name or description of the project as
designated in the "Notice to Bidders." The envelope shall be
addressed to the City Manager, City Hall, Fort Worth, Texas.
C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with
the City Manager cannot be withdrawn prior to the time set for
opening proposals. A request for non-consideration of a
proposal must•be made in writing, addressed to the City
Manager, and filed with him prior to the time set for the
opening of proposals. After all proposals not requested for
non-consideration are opened and publicly read aloud, the
proposals for which non-consideration requests have been
properly filed �, at the option of the Owner, be returned
unopened.
C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may
modify his proposal by telegraphic communication at any time
prior to the time set for opening proposals, provided such
telegraphic communication is received by the City Manager
prior to the said proposal opening time, and provided further,
that the City Manager is satisfied that a written and:duly
authenticated confirmation of such telegraphic communication
over the signature of the bidder was mailed prior to the
proposal opening time. If such confirmation is not received
within forty-eight (48) hours after the proposal openinq time,
no further consideration will be given to the proposal.
C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been
properly filed and for which no "Non-consideration Request"
has been received will be publicly opened and read aloud by
the City Manager or his authorized representative at the time
and place indicated in the "Notice to Bidders." All proposals
which have been opened and read will remain on file with the
Owner until the contract has been awarded. Bidders or their
authorized representatives are invited to be present for the
opening- of bids.
C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as
being "Irregular" if they show any omissions, alterations of
form, additions, or conditions not called for, unauthorized
alternate bids, or irregularities of any kind. flowever, the
C2-2(4)
�
��.
Owner reserves the right to waive any and all irregularities
and to make the award of the contract to the best interest of
the City. Tendering a proposal after the closing hour is an
irregularity which cannot be waived.
C2-2.12 DISQUALIFICATION OF BIDDERS: Bidders may be
� disqualified and their proposals not considered for any of,
but not limited to, the following reason:
a. Reasons for believing that collusion exists among
�� bidders.
b. Reasonable grounds for believing that any bidder is
interested in more than one proposal for work
� contemplated.
� c. The bidder being interested in any litigation
against the Owner or where the Owner may have a
claim against or be engaged in litigation against
� the bidder.
d. The bidder being in arrears on any existing contract
or having defaulted on a previous contract.
� e. The bidder having performed a prior contract in an
unsatisfactory manner.
f. Lack of competency as revealed by the financial
statement, experience record, equipment schedule,
' and such inquiries as the Owner may see fit to make.
��� Uncom leted work which, in the
9• p judgment of the
� Owner, will prevent or hinder the prompt completion
of additional work if awarded.
h. The bidder not filing with the Owner, one week in
advance of the hour of the opening of proposals the
�? following:
1. Financial Statement showing the financial
� condition of the bidder as specified in Part
� "A" - Special Instructions.
2. A current experience record showinq especially
the projects of a nature similar to the one
� under consideration, which have been
successfully completed by the Bidder.
3. An equipment schedule showing the equipment
� the bidder has available for use on the
project.
� The Bid Proposal of a bidder who, in the judgment of the
Engineer, is disqualified under the requirements stated
herein, shall be set aside and not opened.
C2-2(5)
�
�
�~.
.� ,
�
�
LJ
�
�
�°�
�
�
�
�
�
PART C - GENERAL CONDITIONS
C3-3 AWARD AND EXECUTION OF
DOCUMENTS
SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS:
C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been
opened and read aloud, the proposals will be tabulated on the
basis of the quoted prices, the quantities shown in the
proposal, and the application- of such� formulas or other
methods of bringing items to a common basis as may be
established in the Contract Documents.
The total obtained by taking the sum of the products of unit
prices quoted and the estimated quantities plus any lump sum
items and such other quoted amounts as may enter into the cost
of the completed project will be considered as the amount of
the bid.
Until the award of the contract is made by the Owner, the
right will be reserved to reject any or all proposals and
waive technicalities, to re-advertise for new proposals, or to
proceed with the work in any manner as maybe considered for
the best interest of the Owner.
C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSZNESS
ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner,
up.on request, complete and accurate information regarding
actual work performed by a Minority Business Enterprise (MBE)
and or a a Woman-owned Business Enterprise (WBE) on the
contract and the payment therefor. Contractor further agrees,
upon request by Owner, to allow and audit and/or an
examination of any books, records, or files in the possession
of Contractor that will substantiate the actual work performed
by the MBE or WBE. Any material misrepresentation of any
nature will be grounds for termination of the contract and for
initiating any action under appropriate federal, state or
local laws and ordinances relating to false statements;
further, any such misrepresentation may be grounds for
disqualification of Contractor at Owner's discretion for
bidding on future Contracts with the Owner for a period of
time of not less than six (6) months.
C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall
{1 comply with Current City Ordinance prohibiting discrimination
l� in employment practices.
;>:.
�
C3-3 (1)
�
The Contractor shall post the required notice to that effect
on the project site, and, at his request, will be provided
assistance by the City of Fort Worth's Equal Employment
Officer who will refer any qualified applicant he may have on
file in his office to the Contractor. Appropriate notices may
be acquired from the Equal Employment Officer. �
C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been
read by the Owner it cannot be withdrawn by the Bidder within
f orty-five (45) days after the date on which the proposals
were opened. .
C3-3.5 AWARD OF CONTRACT: The Owner�reserves the right to
withholdfinal action on the proposals for a reasonable time,
not to exceed forty-five (45) days after the date of opening
proposals, and in no event will an award be made until after
investigations have been made as to the responsibility:of the
proposed awardee.
The award of the contract, if an award is made, will be to the
lowest and best res�onsible bidder_
The award of the contract shall not become effective until the
Owner has notified the Contractor in writing of such award.
C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as proposed
price totals have been determined for comparison of bids, the
Owner may, at its discretion, return the proposal security
which accompanied the proposals which, in its judgment, would
not be considered for the award. All other proposal
securities, usually those of the three lowest bidders, will be
retained by the Owner until the required contract has been
executed and bond furnished or the Owner has otherwise
disposed of the bids, after which they will be returned by the
City Secretary.
C3-3.7 BONDS: With the execution and delivery of the Contract
Documents, the Contractor shall furnish to, and file with the
Owner in the amounts herein required, the following bonds:
a. PERFORMANCE BOND: A good and sufficient
performance bond in an amount not less than 100
percent of the amount of the contract, as- evidenced
by the proposal tabulation or otherwise,
�� guaranteeing the full and faithful execution of the
� work and performance of the contract, and for the
protection of the Owner and all other persons
against damage by reason of negligence of the
Contractor, or improper execution of the work or
the use of inferior materials. This performance
C3-3 t2)
��
�
a 3
�
1�
ri
�V
�
L' ■
�
�
'��
�
Y
�''
� bond shall guarantee the payment for all labor,
materials, equipment, supplies, and services used
in the construction of the work, and shall remain
� in full force and effect until provisions as above
stipulated are accomplished and final payment is
made on the project by the City.
�
�
�
lJ
�
b. MAINTENANCE BOND: A good and sufficient
maintenance bond, in the amount of not less than
100 percent of the amount of the contract, as
evidenced by the proposal tabulation or otherwise,
guaranteeing the prompt, full and faithful
performance of the general guaranty which is set
forth in paragraph C8-8.10.
c. PAYMENT BOND: A good and sufficient payment bond,
in an amount not less than 100 percent of the
amount of the contract, as evidenced by the
proposal tabulation or otherwise, guaranteeing the
prompt, full and faithf ul payment of all claimants
as defined in Article 5160, Revised Civil Statutes
of Texas, 1925, as amended by House Bill 344 Acts
56th Legislature, Regular Session, 1959, effective
April 27, 1959, and/or the latest version thereof,
supplying labor and materials in the prosecution of
the work provided for in the contract being
constructed under these specifications. Payment
Bond shall remain in force until all payments as
above stipulated are made.
d. OTHER BONDS: Such other bonds as may be required
by these Contract Documents shall be furnished by
the Contractor.
No sureties will be accepted by the Owner which are at the
� time in default or delinquent on any bonds or which are
interested in any litigation against the owner. All bonds
� shall be made on the forms furnished by the Owner and shall be
executed by an approved surety company doing business in the
City of Fort Worth, Texas, and which is accep table to the
� owner. In order to be acceptable, the name of the surety
shall be included on the current U.S. Treasury list of
acceptable sureties, and the amount of bond written by any one
acceptable company shall not exceed the amount shown on the
� Treasury list for that company. Each bond shall be properly
executed by both the Contractor and Surety Company.
Should any surety on th
at any time by the Owner,
to that effect and the
�
e contract be determined unsatisfactory
notice will be given the Contractor
Contractor shall iinmediately provide a
C3-3 (3)
�
new surety satisfactory to the Owner. No payment will be made
under the contract until the new suzety or sureties, as
required, have qualified and have been a�cepted by the Owner.
The contract shall not be operative nor will any payments be
due or paid until approval of the bonds by the Owner.
C3-3.8 EXECUTION OF CONTRACT; Within ten (10) days after the
Owner has by appropriate zesolution, or otherwise, awarded the
contract, the Contractor shall execute and file with the Owner
the Contract and such bonds as may be required in the Contract
Documents.
No contract shall be bindinq upon the owner until it has been
attested by the City Secretary, approved as to form and
legality by the City Attorney, and executed for the Owner by
either the Mayor or City Manager.
C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the
Awardee to execute the required bond or bonds or to sign the
required contract within ten (10) days after the contract is
awarded shall be considered by the Owner as an abandonment of
his proposal, and the Owner may annul the Award. By reason of
the uncertainty of the market prices of material and labor,
and it being impracticable and difficult to accurately
determine the amount of damages occurinq to the Owner by
reason of said awardee's failure to execute said bonds and
contract within ten (10) days, the proposal security
accompanying the proposal shall be the agreed amount of
damages which Owner will suffer by reason of such f ailure on
the part of the Awardee and shall thereupon immediately be
forfeited to the Owner.
The filing of a proposal will be considered as an acceptance
of this provision by the Bidder.
C3-3.10 BEGINNING WORR: The Contractor shall not commence
work until authorized in writing to do so by the Owner.
Should the Contractor fail to commence work at the site of the
project within the time stipulated in the wri.tten
authorization usually termed the "Work Order" or "Proceed
Order", it is agreed that the Surety Company will, within ten
(10) days after the commencement date set forth in such
written authorization, commence the physical execution of the
contract.
C3-3.11 INSURANCE: The Contractor shall not commence work
under this contract until he has obtained all the insurance
required under the Contract Documents, and such insurance has
been approved by the Owner. The prime Contractor shall be
responsible for delivering to the Owner the sub-contractors'
C3-3 (4)
: _._�
�
�
�s
�
L' 1
�
�
�
_:::�
�
Y
�'
L
� certificate of insurance for approval. The prime contractor
shall indicate on the certificate of insurance included in the
documents for execution whether or not his insurance covers
� sub-contractors. It is the intention of the Owner that the
insurance coverage required herein shall include the coverage
of all sub-contractors.
I *J
�
�
;
..t=•;:
�;_
�
�
a. COMPENSATION INSURANCE: The Contractor shall
maintain, during the life of this contract,
Workers' Compensation Insurance on all of his
employees to be engaged in work on the project
under this contract, and-for all sub-contractors.
In case any class of employees engaged in hazardous
work on the project under this contract is not
protected under the Workers' Compensation Statute,
the Contractor shall provide adequate employer's
general liability insurance for the protection of
such of his employees not so protected.
b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The
Contractor shall procure and shall maintain �during
the life of this contract Contractor's
Comprehensive General Liability Insurance (Public
Liability and Property Damage Insurance) in an
amount not less than $500,OOQ covering each
occurrence on account of bodily injury, including
death, and in an amount not less than $500,000
covering each occurrence on account of property
damage with $2,000,000 umbrella policy coverage.
c. ADDITIONAL LIABILITY: The Contractor shall
furnish insurance as separate policies or by
additional endorsement to one of the
above-mentioned policies, and in the amount as set
forth for public liability and property damage, the
following insurance:
�
!�J
1.
2.
Contingent Liability (covers General
Contractor's Liability for acts of
sub-contractors).
Blasting, prior to any blasting being done.
�
3.
4.
Collapse of buildings or structures adjacent
to excavation (if excavations are to be
performed adjacent to same).
Damage to underground utilities for $500,000.
� C3-3 (5)
�
5. Builder's risk (where above-ground structures
are involved).
6. Contractual Liability (covers all
indemnification requirements of Contract).
d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY
DAMAGE: The Contractor shall procure and maintain,
during the life of this Contract, Comprehensive
Automobile Liability insurance in an amount not
less than $250,000 for injuries including
accidental death to any one person and subject to
the same limit for each person an amount not less
than $500,000 on account of one accident, and
automobile property damage insurance in an amount
not less than $100,000.
e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The
insurance required under the above paragraphs shall
provide adequate protection for the Contractor and
his sub-contractors, respectively, against damage
claims which may arise from operations under this
contract, whether such operations be by the insured
or by anyone directly or indirectly employed by
him, an3 also against any of the following special
hazards which may be encountered in the performance
of the Contract.
�
�
�
�
�
�
,' �
� '_J
f. PROOF OF CARRIAGE OF INSURANCE: The Contractor
shall furnish the Owner with satisfactory proof of
coverage by insurance requi�red in these Contract
Documents in amounts and by carriers satisfactory
to the Owner. (Sample attached.) All insurance
requirements made upon the Contractor shall apply
to the sub-contractor, should the Prime
Contractor's insurance not cover the
sub-contractor's work operations.
g. LOCAL AGENT FOR INSURANCE AND BONDING: The
insurance and bonding compa�ies with whom the
Contractor's insurance and performance, payment,
maintenance and all such other bonds are written
shall be represented by an agent or agents having
an office located within the city limits of the
C3-3 (6)
�
�
�
�
�
_. �
�
�
matter associated such as maintaining adequate and appropriate
insurance or security coverage for the project. Such local
authority for administration of the work under the Contract
shall be maintained until all business transactions executed
as part of the Contract are complete.
_�
Should the Contractor's principal base of operations be other
than in the Fort Worth-Dallas metropolitan area, notification ,�
of the Contractor's assignment of local authority shall be
made in writing to the Engineer in advance of any work on the
project, all appropriately signed and sealed, as applicable, ��
by the Contractor's responsible officers with the
understanding that this written assignment of authority to a
Iocal representative shall become part of the project Contract
as though bound directly into the project documents. The �
intent of these requirements is.that all matters associated
with the Contractor's administration, whether it be oriented
in furthering the work, or other, be governed direct by local ��
authority. This same requirement is imposed on insurance and
surety coverage. Should the Contractor's local representative
fail to perform to the satisfaction of Engineer, the Engineer, z
at his sole discretion, may demand that such local
representative be replaced and the Engineer may, at his sole
discretion, stop all work until a new local authority
satisfactory to the Engineer is assigned. No credit of �
working time will be for periods in which work stoppages are ��"-'�
in effect for this reason.
C3-3.15 VENUE: Venue of any action hereinunder shall be
exclusively in Tarrant County, Texas.
�
L1
�
�
�
C3-3 (8)
�
�
�•
t:
�City of Fort Worth, Tarrant County, Texas. Each.
` such agent shall be a duly qualified, one upon whom
service of process may be had, and must have
� authority and power to act on behalf of the
insurance and/or bonding company to negotiate and
settle with the City of Fort Worth, or any other
claimant, any claims that the City of Fort Worth or
� other claimant or any property owner who has been
damaged, may have against the Contractor,
insurance, and/or bonding company. If the local
� insurance representative is not so empowered by the
�� insurance or bonding companies, then such authority
must be vested in a local agent or claims officer
� residing in the Metroplex, the Fort Worth-Dallas
area. The name of the agent or agents shall be set
forth on all of such bonds and certificates of
insurance.
�
�
�
u
�
I'�
.�
�
�
�
�
CI ^ j
�
�
C3-3.12 CONTRACTOR'S OBLIGATIONS: Under the Contract, the
Contractor shall pay for all materials, labor and services
when due.
C3-3.13 WEERLY PAYROLL: A certified copy of each payroll
covering payment of wages to all person engaged in work on the
project at the site of the project shall be furnished to the
Owner's representative within seven (7) days after the close
of each payroll period. A copy or copies of the applicable
minimum wage rates as set forth in the Contract Documents
shall be kep t posted in a conspicuous place at the site of the
project at all times during the course of the Contract.
Copies of the wage rates will be furnished the Contractor, by
the Owner; however, posting and protection of the wage rates
shall be the responsibility of the Contractor.
C3-3.14 CONTRACTOR'S CONTRACT ADMTNZSTRATION: Any Contractor,
whether a person, persons, partnership, company, firm,
association, corporation or other who is approved to do
business with and enters into a contract with the City for
construction of water and/or sanitary sewer facilities, will
have or shall establish a fully operational business office
within the Fort Worth-Dallas metropolitan area. The
Contractor shall charge, delegate, or assign this office (or
he may delegate his Project Superintendent) with full
authority to transact all business ac'tions required in the
performance of the Contract. This local authority shall be
made responsible to act for the Contractor in all matters
pertaining to the work governed by the Contract whether it be
administrative or otherwise and as such shall be empowered,
thus delegated and directed, to settle all material, labor or
other expenditures, all claims against the work or any other
C3-3 (7)
�
�
PART C - GENERAL CONDITIONS
C4-4 SCOPE OF WORR
SECTZON C4-4 SCOPE OF WORK
� C4-4.1 INTENT OF CONTRACT DOCUMENTS: It is the definite
intention of these Contzact Documents to provide for a
complete, useful project which the Contractor undertakes to
�construct or furnish, all in full compliance with the
4 requirements and intent of the Contract Documents. It is
definitely understood that the Contractor shall do all work as
provided for in the Contract Documents, shall do all extra or
� special work as may be considered by the Owner as necessary to
complete the project in a satisfactory and acceptable manner.
The Contractor shall, unless otherwise specifically stated in
� these Contract Documents, furnish all labor, tools, materials,
machinery, equipment, special services, and incidentals
necessary to the prosecution and completion of the project.
�'
C4-4.2 SPECIAL PROVISIONS: Should any work or conditions
which are not thoroughly and satisfactorily stipulated or
-;--;_ covered by General or Special Conditions of these Contract
� Documents be anticipated, or should there be any additional
�y"u� proposed work which is not covered by these Contract
Documents, then "Special Provisions" covering all such work
will be prepared by the Owner previous to the time of
� receiving bids or proposals for such work and furnished to the
Bidder in the form of Addenda. All such "Special Provisions"
�� shall be considered to be a part of the Contract Documents
just as though they were originally written therein.
, C4-4.3 INCREASED OR DECREASED QUANTITIES: The Owner reserves
the right to alter the quantities of the work to be performed
�- or to extend or shorten the improvements at any time when and
as found to be necessary, and the Contractor shall perform the
�` work as altered, increased or decreased at the unit prices.
: Such increased or decreased quantity shall not be more than 25
percent of the contemplated quantity of such item or items.
�-� When such changes increase or decrease the original quantity
of any item or items of work to be done or materials to be
` furnished by the 25 percent or more, then either party to the
. contract shall upon�written request to the other party be
� entitled to a revised consideration upon that portion of the
work above or below the 25 percent of the original quantity
stated in the proposal; such revised consideration to be
/`' determined by special agreement or as hereinafter provided for
,_ "Extra Work." No allowance will be made for any changes in
(��=: anticipated profits nor shall such changes be considered as
i C4-4 (1)
�.
�
waiving or invalidating any conditions or provisions of the
Contract Documents.
Variations in quantities of sanitary sewer pipes in depth
categories, shall be interpreted herein as applying _to the
overall quantities or sanitary sewer pipe in each pipe size,
but not to the various depth categories.
.r
�
C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the
Owner reserves the right to make such changes in the Contract
Documents and in the character or quantities of the work as
may be necessary or desirable to insure completion in the most
satisfactory manner, provided such-changes do not materially
alter the original Contract Documents or change the general
nature of the project as a whole. Such changes shall not be
considered as waiving or invalidating any condition or
provision of the Contract Documents.
C4-4.5 EXTRA WORK: Additional work made necessary by changes
and alterations of the Contract Documents or of quantities or
for other reasons for which no prices are provided in the
Contract Documents, shall be defined as "Extra Work" and shall
be performed by the Contractor in accordance with these
Contract Documents or approved additions thereto; provided,
however, that before any extra work is begun a"Change Order"
shall be executed or written order issued by the Owner to do
the work f or payments or credits as shall be determined by one
or more combination of the following methods:
a.
Unit bid price previously approved.
b.
c.
An agreed lump sum.
The actual reasonable cost of (1) labor, (2) rental
of equipment used on the extra work for the time so
used at Associated Ge-neral Contractors of America
current equipment rental rates; (3) materials
entering permanently into the project, and (4)
actual cost of insurance, bonds, and social
security as determined by the Owner, plus a fixed
fee to be agreed upon but not to exceed 10$ of the
actual cost of such extra work. The fixed fee is
not to include any additional profit to the
Contractor for rental of equipment owned by him and
used for the extra work. The fee shall be f ull and
complete compensation to cover the cost of
superintendence, overhead, other profit, general
and aIl other expense not included in- (1), t2),
(3), and (4) above. The Contractor shall keep
accurate cost records on the form and in the method
�
�
�
--�_�
-�
�
�
�
�
r-,
�
�
�
�
��
C4-4 (2) �
�
�
t
� suggested by the Owner and shall give the Owner
access to all accounts, bills, vouchers, an�d
records relating to the Extra Work.
allo "Change Order" shall become effective until it has been
approved and signed by each of the Contracting parties.
� No claim for Extra Work of any kind will be allowed unless
ordered in writing by the Owner. In case any orders or
instructions, either oral or written, appear to the Contractor
�t to involve Extra Work for which he should receive
compensation, he shall make written request to the Engineer
for written orders authorizing such Extra Work, prior to
, beginning such work.
'� Should a difference arise as to what does or does not
constitute Extra Work, or as to the payment thereof, and the
� Engineer insists upon its performance, the Contractor shall
proceed with the work after making written request for written
orders and shall keep an accurate account of the actual
� reasonable cost thereof as provided under method (Item C).
Claims for extra work will not be paid unless the Contractor
shall file his claim with the Owner within five (5) days
- before the time for making the first estimate after such work
_ is done and unless the claim is supported by satisfactory
� vouchers and certified payrolls covering all labor and
materials expended upon the said Extra Work.
{�% The Contractor shall furnish the Owner such installation
records of all deviations from the original Contract Documents
� as may be necessary to enable the Owner to prepare for
permanent record a corrected set of plans showing the actual
� installation.
The compensation agreed upon for 'extra work' whether or not
� iniitiated by a'change order' shall be a full, complete and
final payment for all costs Contractor incurs as a result or
Q relating to the change or extra work, whether said costs are
known, unknown, foreseen or unforeseen at that time, including
without limitation, any costs for delay, extended overhead,
� ripple or impact cost, or any ather effect on changed or
unchanged work as a result or the change or extra work.
� C4-4.6 SCHEDULE OF OPERATIONS: Before commencing any work
under this contract, the Contractor shall submit to the Owner
and receive the Owner's approval thereof, a"Schedule of
Operations," showing by a straight line method the date of�
� commencing and finishing each of the major elements of the
L� contract. There shall be also shown the estimated monthly
�' cost of work for which estimates are to be expected. There
� C4-4 (3)
�
�
shall be presented al
anticipated progress of
plotted horizontally and
vertically. The progress
11" sheets and at least
be furnished to the Owner.
so a composite graph showing the
construction with the time being
the percentage of completion plotted
charts shall be prepared on 8=1/2" x
five black or blue line prints shall
C4-4.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT
FACILITIES: Within ten (�0) days prior to submission of
first monthly progress payment, the Contractor shall
prepare and submit to the Owner for approval six copies of
the schedule in which the Contractor proposes to carry on
the work, the date of which he will start the several major
activities (including procurement of materials, plans, and
equipment) and the contemplated dates for completing the
same. The schedule shall be in the form of a time schedule
Critical Path Method tCPM) network diagram. As the work
progresses, the Contractor shall enter on the diagram the
actual progress at the end of each partial payment period
or at such intervals as directed by the Engineer. The
Contractor shall also revise the schedule to reflect any
adjustments in contract time approved by the Engineer.
Three copies of the updated schedule shall be delivered at
such intervals as directed by the Owner.
As a minimum, the construction schedule shall incorporate
all work elements and activities indicated in the proposal
and in the technical specifications.
Prior to the final drafting of the detailed construction
schedule, the Contractor shall review the draft schedule
with the Engineer to ensure the Contractor's understanding
of the contract requirements.
The following guidelines shall be adhered to in preparing
the construction schedule:
a. Milestone dates and final project completion
dates shall be developed to conform to time
constraints, sequencing requirements and
completion time.
b. The construction process shall be divided into
activities with time durations of approximately
fourteen (14) days and construction values not to
exceed $50,000. Fabrication, delivery and
submittal activities are exceptions to this
guideline. '
C4-4 (4)
��
��
!� �
�J
t
��E
��
��
i�
l�
►�
��
�
,_ �
r
a
�
�
L�
��
�J
c. Durations shall be in calendar days and normal
holidays and weather conditions over the duration
of the contract shall be accounted for within the
duration of each activity.
d. One critical path shall be shown on the
construction schedule.
e. Float time is defined as the amount of time
between the earliest start date and the latest
start date of a chain of activities of the CPM
construction schedule._ Float. time is not for the
exclusive use or benefit of either the Contractor
or the Owner.
f. Thirty days shall be used for submittal review
unless otherwise specified.
The construction schedule shall as a minimum be divided
into general categories as indicated in the Proposal and
Technical Specifications and each general category shall be
broken down into activities in enough detail to achieve
activities of approximately fourteen (14) days durati�n.
For each general �ategory, the construction schedule shall
identify all trades or subcontracts whose work is
represented by activities that follow the guidelines of
this Section.
For each of the trades or subcontracts, the construction
f'! schedule shall indicate the following procurements,
construction and preacceptance activities and events in
their logical sequence for equipment and materials. -
� 1.
� 2.
3.
�'j 4 .
��
5.
�
b.
� 7.
i ��
_�
�,`:�
8.
�
Preparation and transmittal of submittals.
Submittal review periods.
Shop fabrication and delivery.
Erection or installation.
Transmittal of manufacturer's operation and
maintenance instructions.
Installed equipmer.t and materials testing.
Owner's operator instruction (if applicable).
Final insp�ction.
C4-4 (5)
9. Operational testing.
10. Final inspection.
If, in the opinion of the Owner,. work accomplished falls
` behind that scheduled, the Contractor shall take such
action as necessary to improve his progress. Zn addition,
the Owner may require the Contractor to submit a revised
schedule demonstrating his program and proposed plan to
make up lag in scheduled progress and to insure completion
of the work within the contract time. If the Owner finds
the proposed plan not acceptable, he may require the
� Contractor to increase the work force, the construction
plant and equipment, the number of work shifts or the
overtime operations without additional cost to the Owner.
Failure of the Contractor to comply with these requirements
shall be considered grounds for determination by the Owner
that the Contractor is failing to prosecute the work with
such diligence as will insure its completion within the
time specified.
�
-r
�
�
�
-= �
�
=: �
� =�=.,
�
�
�
�
�
u
�
��
C4-4 (6)
\.- �
�
�
�
PART C - GENERAL CONDITIONS
C5-5 CONTROL OF WORR AND
MATERIALS
Q
�
�
�
�
�
� %.
�
�
SECTION C5-5 CONTROL OF WORR AND MATERIALS
C5-5.1 AUTHORITY OF ENGINEER: The work shall be performed to
the satisfaction of the Engineer and in strict compliance with
the Contract Documents. Ae shall decide all questions which
arise as to the quality and acceptability of materials
furnished, work performed, rate of progress of the work,
overall sequence of the construction, interpretation of the
Contract Documents, acceptable fulfillment of the contract,
compensation, mutual rights between Contractor and Owner under
these Contract Documents, supervision of the work, resumption
of operations, and all other questions or disputes which may
arise. Engineer will not be responsible for Contractor's
means, methods, techniques, sequences or procedures of
construction, or the safety precaution and programs incident
thereto, and he will not be responsible for Contractor's
failure to perform the work in accordance with the contract
documents.
He shall determine the amount and quality of the work
completed and materials furnished, and his decisions and
estimates shall be final. Ais estimates in such event shall
be a condition to the right of the Contractor to receive money
due him under the Contract. The Owner shall have executive
authority to enforce and make effective such necessary
decisions and orders as the Contractor fails to carry out
promptly.
In the event of any dispute between the Enqineer and
� Contractor over the decision of the Engineer on�any such
matters, the Engineer must, within a reasonable time, upon
� written request of the Contractor, render and deliver to both
the Owner and Contractor, a written decision on the matter in
controversy.
CS-5.2 CONFORMITY WITH PLANS: The finished project in all
cases shall conform with lines, grades, cross-sections,
finish, and dimensions shown on the plans or any other
requirements otherwise described in the Contract Documents.
Any deviation from the approved Contract Documents required by
the Engineer during construction will in all cases be
determined by the Enqineer and authorized by the Owner by
Change Order.
-�
CS-5 (1>
� _
�
CS-5.3 COORDZNATZON OF CONTRACT DOCUMENTS: The Contract
Documents are made up of several sections, which, taken
together, are intended to describe and provide for a complete
and useful project, and any requirements appearing in one of
the sections is as binding as though it occurred in all
sections. In case of discrepancies, figured dimension shall
govern over scaled dimensions, plans shall govern over
specifications, special conditions shall govern over general
conditions and standard specifications, and quantities shown
on the plans shall govern over those shown in the proposal.
The Contractor shall not take advantage of any apparent error
or omission in the Contract Documents, and the Owner shall be
permitted to make such corrections or interpretations as may
be deemed necessary for the fulfillment of the intent of the
Contract Documents. In the event the Contractor discovers an
apparent error or discrepancy, he shall immediately call this
condition to the attention of the Engineer. In the event of a
conflict in the drawings, specifications, or other portions of
the Contract Documents which were not reported prior to the
award of Contract, the Contractor shall be deemed to have
quoted the most expensive resolution of the conflict.
C5-5.4 COOPERATION OF CONTRACTOR: The Contractor will be
furnished with three sets of the Contract Documents and shall
have available on the site of the project at all times one set
of such Contract Documents.
The Contract shall give to the work the constant attention
necessary to facilitate the progress thereof and shall
cooperate with the Engineer, his inspector, and,•other
Contractors in every possible way.
The Contractor shall at all times have competent personnel
available to the project site for proper performance of the
work. The Contractor shall provide and maintain at all times
at the site of the project a competent, English-speaking
superintendent and an assistant who are fully authorized to
act as the Contractor's agent on the work. Such
superintendent and his assistant shall be capable of reading
and understanding the Contract Documents and shall receive and
fulfill instructions from the Owner, the Engineer, or his
authorized representatives. Pursuant to this responsibility
of the Contractor, the Contractor shall designate in writing
to the project superintendent, to act as the Contractor`s
agent on the work. Such assistant project superintendent
shall be a resident of Tarrant County, Texas and shall be
subject to call, as is the project Superintendent, at any time
of the day or night on any day of the week on which the
Engineer determines that circumstances require the presence on
the project site of a representative of the Contractor to
CS-5 (2)
_.a
�
f41
�
�
�
--`�
._= ° �
�
i�
��
�
��
, .,
C�
��
-.
j�,�
t
�.:
�
�
�
�
�'`
��;�
�
��
f'
CJ
adequately provide for the safety or convenience of the
traveling public or the owners of property across which the
project extends or the safety of property contiguous to the
project routing.
The Contractor shall provide all facilities to enable the
Engineer and his inspector to examine and inspect the
workmanship and materials entering into the work.
CS-5.5 EMERGENCY AND/OR RECTIFICATION WORR: When, in the
opinion of the Owner or Engineer, a condition of emergency
exists related to any part of the work, the Contractor, or the
Contractor through his designated representative, shall
respond with dispatch to a verbal request made by the Owner or
Engineer to alleviate the emergency condition. Such a
response shall occur day or night, whether �he project is
scheduled on a calendar-day or on a working-day basis.
Should the Contractor fail to respond to a request from the
Engineer to rectify any discrepancies, omissions, or
corrections necessary to conform with the requirements of the
project specifications or plans, the Engineer shall give the
Contractor written notice that such work or changes are to be
performed. The written notice shall direct attention to the
discrepant condition and request the Contractor to take
remedial action to correct the condition. In the event the
Contractor does not take positive steps to fulfill this
written request, or does not show just cause for not taking
the proper action, within 24 hours, the City may take such
remedial action with City forces or by contract. The City
shall then deduct an amount equal to the entire costs for such
remedial action, plus 25$, from any funds due the Contractor
on the project.
CS-5.6 FIELD OFFICE: The Contractor shall provide, at no
extra compensation, an adequate field office for use of the
Engineer, if specifically called for. The field office shall
be not less than 10 by 14 feet in floor area, substantially
constructed, well heated, air conditioned, lighted, and
weather-proof, so that documents will not be damaged by the
elements.
C5-5.7 CONSTRUCTION STARES: The City, through its Engineer,
will furnish the Contractor with all lines, grades, and
measurements necessary to the proper prosecution and control
of the work contracted for under these Contract Documents, and
lines, grades and measurements will be established by means of�
stakes or other customary method of marking as may be found
consistent with good practice.
C5-5 (3)
J
_1
These stakes or markings shall be set sufficiently in advance
of construction operations to avoid delay. Such stakes or
markings as may be established for the Contractor's use or
guidance shall be preserved by the Contractor until-:he is
authorized by the Engineer to remove them. Whenever, in the
opinion of the Engineer, any stakes or markings have been
carelessly or willfully destroyed, disturbed, or removed by
the Contractor or any of his employees, the full cost of
replacing such stakes or marks plus 258 will be charged
against the Contractor, and the full amount will be deducted
from payment due the Contractor.
CS-5.8 AUTHORITY AND DUTIES OF CITY INSPECTORS: City
Inspectors will be authorized to inspect all work done and to
be done and all materials furnished. Such inspection may
extend to all or any part of the work, and the preparation or
manufacturing of the materials to be used or equipment to be
installed. A Cit� Inspector may be stationed on the�work to
report to the Engineer as to the progress of the work and the
manner in which it is being performed, to report any evidence
that the materials being furnished or the work being performed
by the Contractor fails to fulfill the requirements of the
Contract Documents, and to call the attention of the
Contractor to any such failure or other infringements. Such
inspection �or lack of inspection will not relieve the
Contractor from any obligation to perform the work in
accordance with the requirements of the Contract Documents.
Zn case of any dispute arising between the Contractor and the
City Inspector as to the materials or equipment furnished or
the manner of performing the work, the City Inspect_or will
have authority to reject materials or equipment to suspend
work until the question at issue can be referred to and be
decided by the Engineer. The City Inspector will not,
however, be authorized to revoke, alter, enlarge, or release
any requirement of these Contract Documents, nor to approve or
accept any portion or section of the work, nor to issue any
instructions contrary to the requirements of the Contract
Documer�ts. He will in no case act as superintendent or
foreman or perform any other duties for the Contractor, or
interfere with the management or operation of the work. He
will not accept from the Contractor any compensation in any
form for performing any duties. The Contractor shall regard
and obey the directions and instructions of the City Znspector
or Engineer when the same are consistent with the obligations
of th�e� Contract Documents, provided, however, should the
Contractor object to any orders or instructions of the City
Inspector, the Contractor may within six days make written
appeal to the Engineer for his decision on the matter in
controversy.
C5-5 (4)
�
�
: �
z
"����.
-, �
�
�
�
'
�
�
�
�
�
�
�
� CS-5.9 INSPECTION: The Contractor shall furnish the Engineer
with every reasonable facility for ascertaining whether or not
the work as performed is in accordance with the requirements
' of the Contract Documents. If the Engineer so requests, the
� Contractor shall, at any time before acceptance of the work,
remove or uncover such portion of the finished work as may be
� directed. After examination, the Contractor shall restore
said portions of the work to the standard required by the
Contract Documents.
�' Should the work exposed or examined prove acceptable, the
uncovering or removing and.replacing of the covering or making
good of the parts removed shall be paid for as extra work, but
` should be work so exposed or examined prove to be
� unacceptable, the uncovering or removing and the replacing of
all adjacent defective or damaged parts shall be at the
� Contractor's expense. No work shall be done or materials used
without suitable supervision or inspection.
CS-5.10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORR: All work,
� materials, or equipmen� which has been rejected shall be
remedied or removed and replaced in an acceptable manner by
the Contractor at his own expense. Work done beyond the lines
' and grades given or as shown on the plans, except as herein
�-�� specifically provided, or any Extra Work done without written
authority, will be considered as unauthorized and done at the
expense of the Contractor and will not be paid for by the
� Owner. Work so done may be ordered removed at the
Contractor's expense. Upon the failure on the part of the
Contractor to comply with any order of the Engineer made under
�' the provisions of this paragraph, the Engineer will have the
authority to cause defective work to be remedied or removed
and replaced and unauthorized work to be removed, and the cost
� thereof may be deducted from any money due or to become due.to
� the Contractor. Failure to require the removal of any
defective or unauthorized work shall not constitute acceptance
r, of such works.
�" CS-5.11 SUBST�TUTE MATERIALS OR EQUIPMENT: If the
Specifications, law, ordinance, codes or regulations permit
Contractor to furnish or use a substitute that is equal to any
material or equipment specified, and if Contractor wishes to
furnish or use a proposed substitute, he shall, prior to the
� preconstruction conference, make written application to
ENGINEER f or approval of such substitute certifying in writing
that the proposed substitute will perform adequately the.
f unctions called for by the general desiqn, be similar and of
� equal substance to that specified and be suited to the same
'--_ use and capable of performing the same function as that
(-�-:_` specified; and identifying all variations of the proposed
- C5-5 (5)
D
��
�
substitute from that specified and indicating available
maintenance service. No substitute shall be ordered or
installed without the written approval of Engineer who will be
the judge of the equality and may require Contractor to
furnish such other data about the proposed substitute as he
considers pertinent. No substitute shall be orde'r'ed or
installed without such performance guarantee and bonds as
Owner may require which shall be furnished at Contractor's
expense. Contractor shall indemnify and hold harmless Owner
and Engineer and anyone directly or indirectly employed by
either of them from and against the claims, damages, losses
and expenses (including attorneys fees) arising out of the use
of substituted materials or equipment.
CS-5.12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion
of the Engineer, or as called for in the Contract Documents,
tests of materials or equipment are necessary, such tests will
be made at the expense of and paid for direct to the testing
agency by the Owner unless otherwise specifically provided.
The failure of the Owner to make any tests of materials shall
be in no way relieve the Contractor of his responsibility of
furnishing materials and equipment fully conforming to the
requirements of the Contract Documents. Tests and sampling of
materials, unless otherwise specified, will be made in
accordance with the latest methods prescribed by the American
Society for Testing Materials or specific requirements of the
Owner. The Contractor shall provide such facilities as the
Engineer may require far colle�ting and forwarding samples and
shall not, without specific written permission of the
Engineer, use the materials represent.ed by the samples until
tests have been made and the materials approved for use. The
Contractor will furnish adequate samples without charge to the
Owner.
In case of concrete, the aggregates, design minimum, and the
mixing and transporting equipment shall be approved by the
Engineer before any concrete is placed, and the Contactor
shall be responsible for replacing any concrete which does not
meet the requirements of the Contract Documents. Tests shall
be made at least 9 days prior to the placinq of concrete,
using.samples from the same aggregate, cement, and mortar
which are to be used later in the concrete. Should the source
of supply change, new tests shall be ma3e prior to the use of
the new materials.
CS-5.13 STORAGE OF MATERIALS: All materials which
used in the construction operation shall be store
insure the preservation of the quality and fitness of
When directed by the Engineer, they shall b� placed
platf orms or other hard, clean durable surfaces and
CS-5 (6)
are to be
d so as to
the work.
on wooden
not on the
�
.:
.�
�1
�
�
'
�
a.
, ;; �
: : •;�
�
\ �
�
l�.
���
� ground,� and shall be placed under cover when directed. Stored
materials shall be placed and located so as to facilitate
prompt inspection.
��
��
I �J
�
�
�
�
�
�_ =
-z
4:
_"
�
L'�]
C5-5.14 EXZSTING STRUCTURES AND UTILITIES: The location and
dimensions shown on the Plans-relative to existing utilities
are based on the best information available. Omission from, or
the inclusion of utility locations on the Plans is not to be
considered as the nonexistence of, or a definite location of,
existing underground utilities. The location of many gas
mains, water mains, conduits, sewer lines and service lines
for all utilities, etc., is unknown to the Owner, and the
Owner assumes no responsibility for failure to show any or all
such structures and utilities on the plans or to show them in
their exact location. It is mutually agreed that such failure
will not be considered sufficient basis for claims for
additional compensation for Extra Work or for increasing the
pay quantities in any manner whatsoever, unless an obstruction
encountered is such as to necessitate changes in the lines and
grades of considerable magnitude or requires the building of
special works, provision for which is not made in the Contract
Documents, in which case the provision in these Contract
Documents for Extra Work shall apply.
It shall be the Contractors responsibility to verify locations
of adjacent and/or conflicting utilities sufficiently in
advance of construction in order that he may negotiate such
local adjustments as necessary in the construction process to
providz adequate clearances. The Contractor shall take all
necessary precautions in order to protect all existing
utilities, structures and service lines. Verification of
existing utilities, structures and service lines shall include
notification of all utility companies at least forty eight
(48) hours in advance of construction including exploratory
excavation if necessary. All verification of existing
utilities and their adjustment shall be considered as
subsidiary work.
C5-5.15 INTERRUPTION OF SERVICE:
a. Normal Prosecution: In the normal prosectuion of
work where the interruption of service is necessary,
the Contractor, at least 24 hours in advance, shall
be required to:
1. Notify the Water Department's Distribution
Division as to location, time, and schedule of
service interruption.
CS-5 (7)
�
�
2. Notify each customer personally through
responsible personnel as to time and schedule
of the interruption of their service, or
3. In the event that
customer cannot be
shall be attached
door knob. The
composition, and in
personal notification of a
made, a prepared tag= f orm
to the customer's entrance
tag shall be durable in
large bold type shall say:
"NOTICE"
Due to Uti�lity��Improvement in
your neighborhood, your (water)
(sewer) service will be inter-
rupted on between
the hours of and
This inconvenience will be as
short as possible.
Thank you,
Contractor
Address Phone
. --
b. Emergency: In the event that an unforeseen service
interruption occurs, notice shall be as above,but
immediate. ��
CS-5.16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If, through
acts or neglect on the part of the Contractor, any other
Contractor or any sub-contractor shall suffer loss or damage
on the work, the Contractor agrees to settle with such other
Contractor or sub-contractor by agreement or arbitration. If
such o�her Contractor or sub-contractor shall assert any claim
against the Owner on account of any damage alleged to have
been sustained, the Owner will notify the Contractor, who
shall indemnify and save harmless the Owner against any such
claim.
C5-5.17 CLEAN-UP: Clean-up of surplus and/or waste materials
accumulated on the job site during the prosecution of the work
under these Contract Documents shall be accomplished in
keeping with a daily routine established to the the
satisfaction of the Engineer. Twenty-fours fours after
written notice is given to the Contractor that the clean-up on
the job site is proceeding in a manner unsatisfactory to the
Engineer, if the Contractor fails to correct the
CS-5 (8)
'
�
� ■
�
�
�
�
�
D
�
�
�
_ ,
iL��
�l
���,
� unsatisfactory procedure, the City may take such direct action
as the Engineer deems appropriate to correct the clean-up
deficiencies cited to the Contractor in the written notice,
� and the costs of such direct action, plus 25$ of such costs,
shall be deducted from monies due or to become due to the
Contractor.
� Upon the completion of the project as a whole as covered by
these Contract Documents, and before final acceptance and
final payment will be made, the Contractor shall clean and
� remove from the site of the project all surplus and discarded
materials, temporary structures, and debris of every kind. He
shall leave the site of all work in a neat and orderly
� condition equal to that which originally existed. Surplus and
waste materials removed from the site of the work shall be
disposed of at locations satisfactory to the Engineer. The
� Contractor shall thoroughly clean all equipment and materials
installed by him and shall deliver over such materials and
equipment in a bright, clean, polished and new appearing
condition. No extra compensation will be made to the
� Contractor for any clean-up required on the project.
CS-5.18 FINAL INSPECTION: Whenever the work provided for in
and contemplated under the Contract Documents has been
� satisfactorily completed and final cleanup performed, the
� .,
Engineer will notify the proper officials of the Owner and
request that the Final inspection be ma3e. Such inspection
� will be made within 10 days after such notification. After
such final inspection, if the work and materials and equipment
are found satisfactory, the Contractor will be notified in
� writing of the acceptance of the same after the proper
; resolution has been passed by the City Council. No time
charge will be made against the Contractor between said date
. of notification of the Engineer and the date of final
� inspection of the work.
�
,
�
� C5-5 (9)
�
�
�
L
PART C - GENERAL CONDITIONS
C6-6 LEGAL RELATIONS AND PUBLIC
RESPONSIBILITY
� SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY
C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times
observe and comply with all Federal and State Laws and City
ordinances and regulations which in any way affect the conduct
1'� of the work or his operations, and shall observe and comply
with all orders, laws, ordinances and regulations which exist
or which may be enacted later by bodies having jurisdiction or
� authority for such enactment. No plea of misunderstanding or
� ignorance thereof will be considered. The Contractor and his
Sureties shall indemnify and save harmless the City and all of
its officers, agents, and employees against any and all claims
p or liability arisinq from or based on the violation of any
such law, ordinance, regulation, or order, whether it be by
himself or his employees.
�
_ r4 •--_...
�
LJ
�
�
�
�
�
�_
�
C6-6.2 PERMITS AND LICENSES: The Contractor shall procure all
permits and licenses, pay all charges, costs and fees, and
give all notices necessary and incident to the due and lawful
prosecution of the work.
C6-6.3 PATENTED DEVICES MATERIALS AND PROCESSES: If the
Contractor is required or �esires to use any design, device,
material, or process covered by letter, patent, or copyright,
he shall provide for such use by suitable legal agreement with
the patentee or owner of such patent, letter, or copyrighted
desiqn. It is mutually agreed and understood that without
exception the contract prices shall include all royalties or
cost arising from patents, trade-marks, and copy riqhts in any
way involved in the work. The Contractor and his sureties
shall indemnify and save harmless the Owner from any and all
claims for •infringement by reason of the use of any such
patented design, device, matezial or process, or any
trade-mark or copy right in connection with the work agreed to
be performed under these Contract Documents, and shall
indemnif y the Owner for any cost, expense, or damage which it
may be obliged to pay by reason of such infringement at any
time durinq the prosecution of the work or after completion of
the work, provided, however, that the Owner will assume the
responsibility to defend any and all suits brought for the
infringement of any patent claimed to be infringed upon by the
design, type of construction or material or equipment
specified in the Contract Documents furnished the Contractor
by the Owner, and to hold the Contractor harmless on account
of such suits.
C6-6 (Z)
�
.�
C6-6.4 SANITARY PROVISIONS: The Contractor shall establish
and enforce among his employees such regulations in regard to
cleanliness and disposal of garbage and waste as will.tend to
prevent the inception and spread of infectious or contagious
diseases and to effectively prevent the creation of a nuisance
about the work on any property either public or private, and
such regulations as are required by Law shall be put into
immediate force and effect by the Contractor. The necessary
sanitary conveniences for use of laborers on the work,
properly secluded from public observation, shall be
constructed and maintained by the Contractor and their use
shall be strictly enforced- by�- the� Contractor. All such
facilities shall be kept in a clean and sanitary condition,
free from objectionable odors so as not to cause a nuisance.
All sanitary laws and regulations of the State of Texas and
the City shall be strictly complied with.
C6-6.5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment
stored about the work shall be so placed and used, and the
work shall at all times be so conducted, as to cause no
greater obstruction or inconvenience to the public than is
considered to be absolutely necessary by the Engineer. The
Contractor is required to maintain at all times all phases of
his work in such a manner as not to impair the safety or
convenience of the public, including, but not limited to, safe
and convenient ingress and egress to property contiguous to
the work area. The Contractor shall make adequate provisions
to render reasonable ingress and egress for normal vehicular
traffic, except during actual trenching or pipe installation
operations, at all driveway crossings. Such provisions may
include.bridging, placement of crushed stone or qravel or such
other means of providing proper ingress and egress for the
property served by the driveway as the Engineer may appr ove as
appropriate. Such other means may include the diversion of
driveway traffic, with specific approval by the Engineer. If
diversion of traffic is approved by the Engineer at any
location, the Contractor shall make arrangements satisf actory
to the Engineer at any location, the Contractor shall make
arrangements satisfactory to the Engineer for the diversion of
traffic, and shall, at his own expense, provide all materials
and perform all work necessary for the construction and
maintenance of roadways and bridges for such diversion of
traffic. Sidewalks must not be obstructed except by special
permission of the Engineer.
The materials excavated and the construction materials such as
pipe used in the construction of the work shall be placed so
as not to endanger the work or prevent free access to all fire
hydrants, fire alarm boxes, police call boxes, water valves,
C6-6 (2)
�
�
'
�
i
-� �
�
�
��
�
�
�
�
,
�
t_1
( ',
u
C!'
�
�
�--°_'�
gas valves, or manholes in the vicinity. The Owner reserves
the right to remedy any neglect on the part of the Contractor
as regards to public convenience and safety which may come to
its attention, after twenty-f our hours notice in writing to
the Contractor, save in cases of emergency when it shall have
the right to remedy any neglect without notice, and in either
case, the cost of such work done or materials furnished by the
Owner or by the City shall be deducted from monies due or to
become due to the Contractor.
The Contractor, after approval of the Engineer, shall notify
the Fire Department Headquarters, Traffic Engineer, and Police
Department, when any street or alley is requested to be closed
or obstructed or any fire hydrant is to be made inaccessible,
and, when so directed by the Engineer, shall keep any street,
streets, or highways in condition for unobstructed use by fire
apparatus. The Contractor shall promptly notify the Fire
Department Headquarters when all such obstructed streets,
alleys, or hydrants are again placed back in service.
Where the Contractor is required to construct temporary
bridges or make other arrangements for crossing over ditches
or streams, his responsibility for accidents in connection
with such crossings shall include the roadway approaches as
well as the structures of such crossings.
The Contractor shall at all times conduct his operation and
� the use of construction machinery so as not to damage or
destroy trees and shrubs located in close proximity to or on
the site of the work. Wherever any such damage may be done,
� the Contractor shall immediately satisfy all claims of
property owners, and no payment will be made by the Owner in
settlement of such claims. The Contractor shall file with the
Engineer a written statement showing all such claims adjusted.
�
LJ
�
L�'
C6-6.6 PRIVILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND
RIGHT-OF-WAY: For the performance of the contract, the
Contractor will be permitted to use and occupy such portions
of the public streets and alleys, or other public places or
other rights-of-way as provided for in the ordinances of the
City, as shown in the Contract Documents, or as may be
specifically authorized in writing by the Engineer. A
reasonable amount of tools, materials, and equipment for
construction purposes may be stored in such space, but no more
than is necessary to avoid delay in the construction
operations. Excavated and waste materials shall be piled or
stacked in such a way as not to interfere with the use of
spaces that may be designated to be left free and unobstructed
and so as not to inconvenience occupants of adjacent property.
If the street is occupied by railway tracks, the work shall be
C6-6 (3)
�
carried on in such manner as not to interfere with the
operation of trains, loading or unloading of cars, e tc. Other
contractors of the Owner may, for all purposes required by the
contract, enter upon the work and premises used by the
Contractor and shall be provided all reasonable facilities and
assistance for the completion of adjoining work. Any
additional grounds desired by the Contractor for his use shall
be provided by him at his own cost and expense.
C6-6.7 RAILWAY CROSSINGS: When the work encroaches upon any
right-of-way of any railway, the City will secure the
necessary easement for the work. Where the railway tracks are
to be crossed, the Contractor shall observe all the
regulations and instructions of the railway company as to the
methods of performing the work and take all precautions for
safety of property and the public. Negotiations with the
railway companies for permits shall be done by and through the
City. The Contractor siiall give the City notice not less than
five days prior to the time of his intentions to begin�work on
that portion of the project which is related to the railway
properties. The Contractor will not be given extra or
additional compensation for such railway crossings unless
specifically set forth in the Contract Documents.
C6-6.8 �ARRICADES, WARNINGS AND WATCHMEN: Where the work is
carried on in or adjacent to any street, alley, or public
place, the �ontractor shall at his own expense furnish, erect,
and maintain such barricades, fences, lights and danger
signals, shall provide such watchmen, and shall take all such
other precautionary measures for the protection of persons or
property and of the work as are necessary. Barricades and
fences shall be painted in a color that will be visible at
night. From sunset to sunr.ise the Contractor shall furnish
and maintain at Ieast one easily visible burning lig ht at each
barricade. A sufficient number of barricades shall be erected
and maintained to keep pedestrians away from, and vehicles
from being driven on or into, any work under construction or
being maintained. The Contractor shall furnish watchmen and
keep them at their respective assignments in sufficient
numbers to protect the work and prevent accident or damage.
All installations and procedures shall be consistent with the
provisions set forth in the "1980 Texas Manual on Uniform
Traffic Control Devices for Streets and Highways" issued under
the authority of the "State of Texas Uniform Act Regulating
Traffic on Highways", codified as Article 67Q1d Veron's Civil
Statutes, pertinent sections being Section Nos. 27, 29, 30 and
31.
C6-6 (4)
� ��
�
'
�
D
�
0
a
�
'
0
'
i. �
�.
..�
� The Contractor will not remove any regulatory sign,
instructional sign, street name sign, or other sign which has
been erected by the City. If it is determined that a sign
Q must be removed to permit required construction, the
Contractor shall contact the Transportation and Public Works
department, Signs and Markings Division tphone number
� 8780-8075), to remove the sign. In the case of regulatory
signs, the Contractor must replace the permanent sign with a
temporary sign meeting the requirements of the above
referenced manual and such temporary sign must be installed
� prior to the removal of the permanent sign. If the temporary
sign is not installed correctly or. if it does not meet the
required specifications, the permanent sign shall be left in
' place until the temporary sign requirements are met. When
�j construction work is completed to the extent that the
permanent sign can be re-installed, the Contractor shall again
a contact the Signs and Markings Division to re-install the
permanent sign and shall leave his temporary sign in place
until such re-installation is completed.
��1
�
C,
i�
The Contractor will be held responsible for all damage to the
work or the public due to failure of barricades, signs,
fences, lights, or watchmen to protect them. Whenever
evidence is found of such damage to the work the Engineer may
order the damaged portion immediately removed and replaced by
the Contractor at the Contractor's own expense. The
Contractor's responsibility for the maintenance of barricades,
signs, fences and lights, and for providing watchmen shall not
cease until the project shall have been completed and accepted
by the Owner.
No compensation, except as specifically provided in these
Contract Documents, will be paid to the Contractor f or the
work and materials involved in the constructing, providing,
and maintaining of barricades, signs, fences, and lights or
for salaries of watchmen, for the subsequent removal and
disposal of such barricades, signs, or for any other
incidentals necessary for the proper protection, safety, and
convenience of the public during the contract period, as this
work is considered to be subsidiary to the several items for
which unit or lump sum prices are requested in the Proposal.
C6-6.9 USE OF EXPLOSIVES, DROP WEIGHT� ETC.: ShOuld the
� Contractor elect to use explosives, drop weight, etc., in the
prosecution of the work, the utmost care shall be exercised at
all times so as not to endanger life or property. The
a Contractor shall notify the proper representative of any
public service corporation, any company, individual, or
�,_ utility, and the Owner, not less than twenty-four hours in
�
C6-6 (5)
�
advance of the use of any activity which might damage or
endanger their or his property along or adjacent to the work.
Where the use of explosives is to be permitted on the project,
as specified in the Special Contract Documents, or the�use of
explosives is requested, the Contractor shall submit.notice to
the Engineer in writing twenty-four hours prior to commencing
and shall furnish evidence that he has insurance coverage to
protect against any damages and/or injuries arising out of
such use of explosives.
All claims arising out of the use of explosives shall be
investigated and a writtem report made by the Contractor's
insurers to the Engineer within ten (10) days after receipt of
written notice of the claim to the Contractor from either the
City or the claimant. The City shall proceed to give notice
to the Contractor of any such claim. The use of explosives
may be suspended by the Engineer if any complaint is received
and such use shall not be resumed until the cause of the
complaint has been addressed.
Whenever explosives are stored or kept, they shall be stored
in a safe and secure manner and all storage pZaces shall be
plainly marked "DANGEROUS EXPLOSIVES° and shall be under the
care of a competent watchman at all times. All vehicles in
which explosives are being transported shall be plainly marked
as mentioned above and shall, insofar as possible, not use
heavy traffic routes.
C6-6.10 WORR WITHIN EASEMENTS: Where the work passes over,
through, or into private property, the Owner will provide such
right-of-way or easement privileges as the City may deem
necessary for the prosecution of the work. Any additional
rights-of-way or work area considered necessary by the
Contractor shall be provided by him at his own expense. Such
additional rights-of-way or work area shall be acquired for
the benefit of the City. The City shall be notified in
writing as to the rights so acquired before work begins in the
affected area. The Contractor shall not enter upon private
property for any purpose without having previously obtained
permission from the owner of such property. The Contractor
will not be allowed to store equipment or material on private
property unless and until the specified approval of the
property owner has been secured in writing by the Contractor
and a copy furnished to the Engineer. Unless specifically
provided otherwise, the Contractor shall clear all
rights-of-way or easements of obstructions which must be
removed to make possible proper prosecution of the work as a
part of the project construction operations. The Contractor
shall be responsible for the preservation of and shall use
C6-6 t6)
�
,�
�
�
'
, --:� �
_, �
a
'
�
�
'
,
_ �
� ,
�
��'�
�
L'�J
�
lJ
lJ
, ,, =.,,
�'°'' �
�
every precaution to prevent damage to all trees, shrubbery,
plants, lawns, fences, culverts, curbing, and all other types
of structures or improvements, to all water, sewer, and gas
lines, to all conduits, overhead pole lines, or appurtenances
thereof, including the construction of temporary fences, and
to all other public or private property along adjacent to the
work.
The Contractor shall notify the proper representatives of
owners or occupants of public or private lands or interest in
lands which might be affected by the work. Such notice shall
be made at least 48 hours -in. advance_ of. the beginning of the
work. Notices shall be applicable to both public and private
utility companies or any corporation, company, individual, or
other, either as owners or occupants, whose land or interest
in land might affected by the work. The Contractor shall be
zesponsible for all damage or injury to property of any
character resulting from any act, omission, neglect, or
misconduct in the manner or method or execution of the work,
or at any time due to defective work, material, or equipment.
When and where any direct or indirect or injury is done to
public or private property on account of any act, omission,
neglect, or misconduct in the execution of the work, or in
consequence of the non-execution thereof on the part of the
Contractor, he shall restore or have restored at his own cost
and expense such property to a condition at least equal to
that existing before such damage or injury was done, by
repairing, rebuilding, or otherwise replacing and restozing as
may be directed by the Owner, or he shall make good such
damages or injury in a manner acceptable ta the owner of the
property and the.Enqineer.
° All fences encountered and removed during construction of
�y this project shall be restored to the original or a better
than original condition upon completion of this project.
� When wire fencing, either wire mesh or barbed wire is to be
crossed, the Contractor shall set cross braced posts on
either side of permanent easement before the fence is cut.
Should additional fence cuts be necessary, the Contractor
� shall provide cross braced posts at point of the proposed
cut in addition to the cross braced posts provided at the
permanent easements limits, before the fence is cut.
Temporary fencing shall be erected in place of th
removed whenever the work is not in progress and
site is vacated overnight, and/or at all times t
livestock from entering the construction area. The
fence removal, temporary closures and replacement
subsidiary to the various items bid in the
� fencing
when the
� prevent
cost for
shall be
project
QC6-6 (7)
�
_'
proposal. Therefore, no separate payment shall be allowed
for any service associated with this work.
In case of failure on the part of the Contractor to restore
such property to make good such damage or injury, the Owner
may, upon 48 hour written notice under-ordinary circumstances,
and without notice when a nuisance or hazardous condition
results, proceed to repair, rebuild, or otherwise restore such
property as may be determined by the Owner to be necessary,
and the cost thereby will be deducted from any monies due or
to become due to the Contractor under this Contract.
C6-6.11 INDEPENDENT CONTRACTOR: It is understood and agreed
by the parties hereto that Contractor shall perform all work
and services hereunder as an independent contractor, and not
as an officer, agent, servant or employee of the Owner.
Contractor shall have exclusive control of and the exclusive
right to control the details of all the work and services
performed hereunder, and all persons performing same, and
shall be solely responsible for the acts and omissions of its
officers, agents, servants, employees, contractors,
subcontractors, licensees and invitees. The doctrine of
respondeat superior shall not apply as between Owner and
Contractor, its officers, agents, employees, contractors and
subcontractors, and nothing herein shall be construed as
creating a partnership or joint enterprise between Owner and
Contractor.
C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS:
Contractor covenants and agrees to, and does hereby indemnif y,
hold harmless and defend Owner, its officers, agents,
servants, and employees from and against any an all claims or
suits for property damage or loss and/or personal injury,
including death, to any and all persons, of whatsoevez kind or
character, whether real or asserted, arising out of or in
connection with, directly or indirectly, the work and services
to be performed hereunder by Contractor, its officers, agents,
employees, contractors, subcontractors, licensees or invitees,
whether or not caused, in whole or in part, by alleged
negligence on the part of officers, agents, servants,
employees, contractors, subcontractors, licensees and invitees
of the'Owner; and said Contractor does hereby covenant and
agree to assume all liability and responsibility of Owner, its
officers agents, servants and employees for property damage or
loss, and/or personal injuries, including death, to any and
all persons of whatsoever kind or character, whether real or
asserted, arising out of or in connection with, directly or
indirectly, the work and services to be performed hereunder by
Contractor, its officers, agents employees, contractors,
subcontractors, licensees and invitees, whether or not caused,
C6-6 (8)
�
.:
�
�
_ �
-... �
t�
- - �!
�=4�
�
�
8
D
�
'
�
_�. �
�
�
�`,
/� in whole or in part, by alleged negligence of officers,
agents, servants, employees, contractors, subcontractors,
licensees or invitees of the Owner. Contractor likewise
covenants and agrees to, and does hereby, indemnify and hold
� harmless Owner from and against any and all injuries,loss or
damages to property of the Owner during the performance of any
of the terms and conditions of this Contract, whether arising
[� out of or in connection with or resulting from, in whole or in
�� part, any and all alleged acts or omissions of officers,
agents, servants, employees, contractors, subcontractors,
� licenses, or invitees of the Owner.
U
�
In the event a written claim for damages against the
contractor or its subcontractors remains unsettled at the time
all work on the project has been completed to the satisfaction
of the Director of the Water Department, as evidenced by a
final inspection, final payment to the Contractor shall not be
recommended by the Director of the Water Department for a
period of 30 days after the date of such final inspection,
unless the Contractor shall submit written evidence
satisfactory to the Director that the claim has been settled
and a release has been obtained from the claimant involved.
If the claim concerned remains unsettled as of the expiration
+^� of the above 30-day period, the Contractor may be deemed to be
�'�� entitled to a semi-final payment for work completed, such
semi-final payment to be in an amount equal to the total
� dollar amount then due less the dollar value of any written
claims pending against the Contractor arisinq out of the
perf ormance of such work, and such semi-final payment may then
� be recommended by the Director.
The Director shall not recommend final payment to a Contractor
against whom such a claim for damages is outstanding for a
� period of six months following the date of the acceptance of
the work performed unless the Contractor submits evidence in
writing satisfactory to the Director that:
� 1. The claim has been settled and a release has been
obtained from the cl.aimant involved, or
�
�
�
2. Good faith efforts have been made to settle such
outstanding claims, and such good faith efforts
have failed.
If condition (1) above is met at any time within the six month
period, the Director shall recommend that the final payment to
the Contractor be made. If condition (2) above is met at any
time within the six month period, the Director may recommend
that the final payment to the Contractor be made. At the
C6-6 (9)
expiration of the six month period the Director may recommend
that final payment be made if all other work has been
performed and all other obligations of the Contractor have
been met to the satisfaction of the Director. -.
The Director may, if he deems it appropriate, refuse to accept
bids on other water Department Contract work from a Contractor
against whom a claim for damages is outstanding as a result of
work performed under a City contract.
C6-6.13 CONTRACTOR'S CLAZM FOR DAMAGES: Should the Contractor
claim compensation for any alleged damage by reason of the
acts or omissions of the Owner, he shall within three days
after the actual sustaining of such alleged damage, make a
written statement to the Engineer, settinq out in detail the
nature of the alleged damage, and on or before the 25th day of
the month succeeding that in which any such.damage is claimed
to have been sustained, the Contractor shall file with the
Engineer an itemized statement of the details and amount of
such alleged damaqe and, upon request, shall give the Engineer
access to all books of account, receipts, vouchers, bills of
lading, and other books or papers containing any evidence as
to the amount of such alleged damage. Unless such statements
shall be filed as hereinabove required, the Contractor's claim
f or compensation shall be waived, and he shall not be entitled
to payment on account of such damages.
C6-6.14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES� ETC.:
In case it is necessary to change, move, or alter.in any
manner the property of a public utility or others, the said
property shall not be moved or interfered with until orders
thereugon have been issued by the Engineer. The right is
reserved to the owners of public utilities to enter the
geographical limits of the Contract for the purpose of makinq
such changes or repairs to their property that may be
necessary by the performance of this contract.
C6-6.15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existinq
sewer lines have to be taken up or removed, the Contractor
shall, at his own expense and cost, provide and maintain
temporary outlets and connections for all private or public
drains and sewers. The Contractor shall also take care of all
sewage and drainage which will be received from these drains
and sewers, and for this purpose he shall provide and
maintain, at his own cost and expense, adequate pumping
facilities and temporary outlets or diversions.
The Contractor, at his own cost and expense, shall construct
such troughs, pipes, or other structures necessary, and be
prepared at all times to dispose of drainage and sewage
C6-6 (10)
�
�
�
a
,
i�
�
- '
�
�a
,-`
�
a
�
�
�
'
,
'
_, �
'
�
�
M
�
�
received from these temporary connections until such times as
the permanent connections are built and are in service. The
existing sewers and connections shall be kept in service and.
maintained under the Contract, except when specified or
ordered to be abandoned by the Engineer. All water, sewage,
and other waste shall be disposed of in a satisf actory manner
so that no nuisance is created and so that the work under
construction will be adequately protected.
� C6-6.16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE
CITY: When the Contractor desires to use City water in
connection with any construction.work,.he shall make complete
and satisfactory arrangements with the Fort Worth City Water
Department for so doinq.
�
City water furnished to the Contractor shall be delivered to
the Contractor from a connection on an existing City main.
� All piping required beyond the point of delivery shall be
installed by the Contractor at his own expense.
�
�
1�
�
a
�
LJ
The Contractor's responsibility in the use of all existing
fire hydrant and/or valves is detailed in Section E2-1.2 USE
OF FIRE HYDRANTS AND VALVES in these General Contract
Documents.
When meters are used to measure the water, the charges, if
any, for water will be at the regular established rates, When
meters are not used, the charges, if any, will be as
prescribed by the City Ordinance, or where no ordinance
applies, payment shall be made on estimates and rates
established by the Director of the Fort Worth Water
Department.
C6-6.17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, in
the opinion of the Engineer, any section or portion of the
work or any structure is in suitable condition, it may be put
into use upon the written order of the Engineer, and such
usage shall not be held to be in any way an acceptance of said
work or structure or any part thereof or as a waiver of any of
the provisions of these Contract Documents. All necessary
repairs and removals of any section of the work so put into
use, due to defective materials or workmanship, equipment, or
to deficient operations on the part of the Contractor, shall
be performed by the Contractor at his own expense.
C6-6.18 CONTRACTOR'S RESPONSIBILITY FOR THE WORR: Until
written acceptance by the Owner as provided for in these
Contract Documents, the work shall be under the charge and
care of the Contractor, and he shall take every necessary
precaution to prevent injury or damage to the work or any part
CE-6 (11)
thereof by action of the elements or from any cause
whatsoever, whether arising from the execution or nonexecution
of the work. The Contractor shall rebuild, repair, restore,
and rnake good at his own expense all injuries or damage to any
portion of the work occasioned by any of the hereinabove
causes. �
C6-6.19 NO WAIVER OF LEGAL RIGHTS: Inspection by the Engineer
or any order by the Owner by payment of money or any payment
for or acceptance of any work, or any extension of time, or
any possession taken by the City shall not operate as a waiver
of any provision of the Contract Documents. Any waiver of any
breach or Contract shall not.be held.to.be a waiver of any
other or subsequent breach.
The Owner reserves the right to correct any error that may be
discovered in any estimate that may have been paid and to
adjust the same to meet the requirements of the Contract
Documents.
C6-6.20 PERSONAL LZABILZTY OF PUBLIC OFFICIALS: In carrying
out the provisions of these Contract Documents or in
exercising any power of authority granted thereunder, there
shall be no liability upon the authorized representatives of
the Owner, either personally or otherwise as they are agents
and representatives of the City.
C6-6.21 STATE SALES TAX: On a contract awarded by the City of
Fort Worth, an organization which qualifies for exemption
pursuant the provisions of Article 20.04 tH) of the Texas
Limited Sales, excise, and Use Tax Act, the Contractor may
purchase, rent or lease all materials, supplies and equipment
used or consumed in the performance of this contract by
issuing to his supplier an exemption certificate in lieu of
the tax, said exemption certificate to comply with State
Comptroller's Ruling .007. Any such exemption certificate
issued by the Contractor in lieu of the tax shall be subject
t o an3 shall comply with the provisions of State Comptroller's
Ruling .011, and any other applicable State Comptroller
rulings pertaining to the Texas Limited Sales, Excise, and Use
Tax Act.
On a contract awarded by a developer for the construction of a
publicly-owned improvement in a street right-of-way or other
easement which has been dedicated to the public and the City
of Fort Worth, an organization which qualifies for exemption
pursuant to the provisions of Article 20.04 (H) of the Texas
limited Sales, Excise, and Use Tax Act, the Contractor can
probably be exempted in the same manner stated above.
C6-6 t12)
�
�.
�
_{
� Limited Sale, Excise and Use Tax permits and information can
be obtained from:
t Comptroller of Public Accounts
� Sale Tax Division
Capitol Station
Austin, TX
�
,
a
�
�
�,�
�
�
�
�t
�
�
�
� -��=:
�_:
� C5-6 (13)
U
�,
t.
i�
�
a
�
,
�
�
�
1
�
D
�
�Y
�
PART C - GENERAL CONDITIONS
C7-7 PROSECUTION AND PROGRESS
SECTION C7-7 PROSECUTION AND PROGRESS:
C7-7.1 SUBLETTING: The Contractor shall perform with his own
organization, and with the assistance of workman under his
irnmediate superintendance, work of a value of not less than
fifty (50$) percent of the value embraced in the contract. If
the Contractor sublets any part of the work to be done under
these Contract Documents, he will not under any circumstances
be relieved of the responsibility and obligation assumed under
these Contract Documents. All transactions of the Engineer
will be with the Contractor. Subcontractors will be
considered only in the capacity of employees or workmen of the
Contractor and shall be subject to the same requirements as to
character and competency. The Owner will not recognize any
subcontractor on the work. The Contractor shall at all times,
when the work is in operation, be represented either in person
or by a superintendent or other designated representatives.
C7-7.2 ASSIGNMENT OF CONTRACT: The Contractor shall not
assign, transfer, sublet, convey, or otherwise dispose of the
contract or his rights, title, or interest in or to the same
or any part thereof without the previous consent of the Owner
expressed by resolution of the City Council and concurred in
by the Sureties.
If the Contractor does, without such previous consent, assign,
transfer, sublet, convey, or otherwise dispose of the contract
or his right, title, or interest therein or any part thereof,
to any person or persons, partnership, company, firm, or
corporation, or does by bankruptcy, voluntary or involuntary,
or by assignment under the insolvency laws of any state,
attempt to dispose of the contract may, at the option of the
Owner be.revoked and annulled, unless the Sureties shall
successfully complete said contract, and in the event of any
such revocation or annulment, any monies due or to become due
under or by virtue of said contract shall be retained by the
Owner as liquidated damages f or the reason that it would be
impracticable and extremely difficult to fix the actual
damages.
C7-7.3 PROSECUTION OF TAE WORR: Prior to beqinning any
construction operation, the Contractor shall submit to the
Engineer in five or more copies, if requested by the Engineer,
a progress schedule preferably in chart or diagram f orm, or a
brief outlining in detail and step by step the manner of
C7-7 (1)
�
�
prosecuting the work and ordering materials and equipment
which he expects to follow in order to complete the project in
the scheduled time. There shall also be submitted a table of
estimated amounts to be earned by the Contractor during each
monthly estimate period.
The Contractor shall commence the work to be performed under
this contract within the time limit stated in these Contract
Documents and shall conduct the work in a continuous manner
and with sufficient equipment, materials, and labor as is
necessary to insure its completion within the time limit.
The sequence requested of all constructi"on operations shall be
at all times as specified in the Special Contract Documents.
Any deviation from scuh sequencing shall be submitted to the
Engineer for his approval. Contractor shall not proceed with
any deviation until he has received written approval from the
Engineer. Such specification or approval by the Engineer
shall not relieve the Contractor from the full responsibility
of the complete performance of the Contract.
The contract time may be
C7-7.8 "Extension of Tim
and a progress
contract time.
schedule
changed only as set forth in Section
e of Completion" of this Agreement,
shall not constitute a change in the
C7-7.4 LZMITATIONS OF OPERATIONS: The working operations
shall at all times be conducted by the Contractor so as to
create a minimum amount of inconvenience to the public. At
any time when, in the judgment of the Engineer, the Contractor
has obstructed or closed or is carrying on operations in a
portion of a street or public way greater than is necessary
for the proper execution of the work, the Engineer may require
the Contractor to finish the section on which operations are
in progress before the work is commenced on any additional
section or street.
C7-7.5 CHARACTER OF WORRMEN AND EQUIPMENT: Local labor shall
be used by the Contractor is available.. The Contractor may
bring in from outside the City of Fort Worth his key men and
his superintendent. All other workmen, including equipment
operators, may be imported only after the local supply is
exhausted. The Contractor shall employ only such
superin_tendents, foremen, and workmen who are careful,
competent, and fully qualified to perform the duties or tasks
assigned to them, and the Engineer may demand and secure the
summary dismissal of any person or persons employed by the
Contractor in or about or on the work who, in the opinion of
the Owner, shall misconduct himself or be found to be
incompetent, disrespectful, intemperate, dishonest, or
C7-7 (2)
�
�
, '
�
' ' ��
�
�
,
t
'
__:1
'
�
�'
�
�
otherwise objectionable or neglectful in the proper
performance of his or their duties, or who neglects or refuses
to comply with or carry out the directions of the Owner, and
such person or persons shall not be employed again thereon
without written consent of the Engineer.
Al1 workmen shall have sufficient skill, ability, and
� experience to properly perform the work assigned to them and
operate any equipment necessary to properly carry out the
performance of the assigned duties.
L
�
The Contractor shall furnish and maintain on the work all such
equipment as is considered to be necessary for prosecution of
the work in an acceptable manner and at a satisfactory rate of
progress. All equipment, tools, and machinery used for
handling materials and executing any part of the work shall be
subject to the approval �f the Engineer and shall be
maintained in a satisfactory, safe and efficient working
condition. Equipment on any portion of the work shall be such
that no injury to the work, workmen or adjacent property will
result from its use.
C7-7.6 WORK SCHEDULE: Elapse3 working days shall
- starting with the first day of work completed as
C1-1.23 "WORRING DAY" or the date stipulated in
�^. ORDER" for be innin work, whichever comes first.
g 9
�
I "J
I_'�
lJ
�
�
. ,-
�.�` .,
�
L�
be computed
defined in
the "WORK
Nothing in these Contract Documents shall be construed as
prohibiting the Contractor from working on Saturday, Sunday or
Legal Holidays, providing that the following requirements are
met:
a. A request to work on a specific
Legal Holiday must be made to the
than the proceeding Thursday.
Saturday, Sunday or
Engineer no later
b. Any work to be done on the project on such a
specific Saturday, Sunday or Legal Holiday must be,
in the opinion of the Engineer, essential to the
time2y completion of the project.
The Engineer's decision shall be final in response to such a
request for approval to work on a specific Saturday, Sunday or
Legal Holiday, and no extra compensation shall be allowed to
the Contractor for any work performed on such a specific
Saturday, Sunday or Legal Aoliday.
Calendar Days shall be defined in C1-1.24 and the Contractor
may work as he so desires.
C7-7 (3)
�
",+
C7-7.7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor
shall commence the working operations within the time
specified in the Contract Documents and set forth in the Work
Order. Failure to do so shall be considered by the Owner as
abandonment of the Contract by the Contractor and the Owner
may proceed as he sees fit.
The Contractor shall maintain a rate of progress such as will
insure that the whole work will be performed and the premises
cleaned up in accordance with the Contract Documents and
within the time established in such documents and such
extension of time as may be properly authorized by the Owner.
C7-7.8 EXTENSION OF TIME COMPLETION: The Contractor's request
for an extension of time of completion shall be considered
only when the request for such extension is submitted in
writing to the Engineer within seven days from and af ter the
time alleged cause of delay shall have occurred. Should an
extension of the time of completion be requested su�h request
will be.forwarded to the City Council for approval .
In adjusting the contract time for completion of work,
consideration will be given to unforseeable causes beyond the
control of and without the fault or negligence of the
Contractor, including but limited to acts of the public enemy,
acts of the Owner, fire, flood, tornadoes, epidemics,
quarantine restrictions, strikes, freight embargoes, or delays
of sub-contractors due to such causes.
When the d�te of completion is based on a calendar day bid, a
request for extension of time because of inclement weather
will not be considered. A request for extension of time due
to inability to obtain supplies and materials will be
considered only when a review of the Contractor's purchase
order dates and other pertinent data as requested by the
Engineer indicates that the Contractor has made a bonafide
attempt to secure delivery on schedule. This shall include
efforts to obtain the supplies and materials from alternate
sources in case the first source cannot make delivery.
If satisfactory execution and completion of the contract
should require work and materials in greater amounts or
quantities than those set forth in the approved Contract
Documents, then the contract time may be increased by Change
Order.
C7-7.9 DELAYS: The Contractor shall receive no compensation
for delays or hindrances to the work, except when direct and
unavoidable extra cost to the Contractor is caused by the
failure of the City to provide information or material, if
C7-7 (4)
�
�
�
_ �
. �
� `�
�
�
�
�
_'
�
L'J
f
�'
�
�
�
�
�
W-=T
�
�
�
�
�
�
�
any, which is to be furnished by the City. When such extra
compensation is claimed a written statement thereof shall be
presented by the Contractor to the Engineer and if by him
found correct shall be approved and referred by him to the
Council for final approval or disapproval; and the action
thereon by the Council shall be final and binding. If delay
is caused by specific orders qiven by the Engineers to stop
work, or by the performance of extra work, or by the failure
of the City to provide material or necessary instructions for
carrying on the work, then such delay will entitle the
Contractor to an equivalent extension of time, his application
for which shall, however, be subject to the approval of the
City Council; and no such extension of time shall release the
Contractor or the surety on his performance bond f rom all his
obligations hereunder which shall remain in full force until
the discharge of the contract.
C7-7.10 TIME OF COMPLETION: The time of completion is an
essential element of the contract. Each bidder shall indicate
in the appropriate place on the last page of the Proposal the
number of working days or calendar days that he will require
to fully complete this contract or the time of completion will
be specified by the City in the Proposal section of the
contract documents.
The number of da�•s indicated shall be a realistic estimate of
the time required to complete the work covered by the specific
contract being bid upon. The amount of time so stated by the
successful bidder or the City will become the time of
completion specified in the Contract Documents.
For each calendar day that any work shall remain uncompleted
after the time specified in the Contract Documents, or the
increased time granted by the Owner, or as automatically
increased by additional work or materials ordered after the
contract is signed, the sum per day given in the following
schedule, unless otherwise specified in other parts of the
Contract Documents, will be deducted from monies due the
Contractor, not as a penalty, but as liquidated damages
suffered by the Owner.
AMOUNT OF CONTRACT
Less than $ 5,000
$ 5,001 to $ 15,000
$ 15,001 to $ 25,000
$ 25,001 to $ 50,000
$ 50,001 to $ 100,000
$ 100,001 to $ 500,000
C7-7 (5)
inclusive $
inclusive $
inclusive $
inclusive $
inclusive $
inclusive $
35.00
45.00
63.00
105.00
154.00
210.00
��
$ 500,001 to
$1,000,001 to
$2,000,001 and over
�
$1,000,000 inclusive $ 315.00 �
$2,000,000 inclusive $ 420.00
$ 630.00 �+
The parties hereto understand and agree that any harm;to the
City caused by the Contractor's delay in completing the work
hereunder in the time specified by the Contract Documents
would be incapable or very difficult of accurate estimation,
and that the "Amount of Liquidated Damages Per Day", as set
out above, is a reasonable f orecast of just compensation due
the City for harm caused by any delay.
C7-7.11 SOSPENSION BY COORT`
suspend operations on such part
by any court, and will not
compensation by virtue of such c
be liable to the City in the e�
Court Order. Neither will t
ORDERs The Contractor shall
or parts of the work ordered
be entitled to additional
ourt order. Neither will he
�ent the work is suspended by a
he Owner be liable to the
Contractor by virtue of any Court Order or action for which
the Owner is not solely responsible.
C7-7.12 TEMPORARY SUSPENS14N: The Owner shall have the right
to suspend the work operation wholly or in part for such
period or periods of time as he may deem necessary due to
unsuitable weather conditions or any other unfavorable
conditions which in the opinion of the Owner or Engineer cause
further prosecution of the work to be unsatisfactory or
detrimental to the interest of the project. During temporary
suspension of work covered by this contract, for any reason,
the Owner will make no extra payment for stand-by,.time of
construction equipment and/or construction crews.
If it should become necessary to suspend work for an
indefinite period, the Contractor shall store all materials in
such mann�r that they will not obstruct or impede the public
unnecessarily nor become damaged in any way, and he shall take
every precaution to prevent damage or deterioration of the
work performed; he shall provide suitable drainage about the
work, and erect temporary structures where necessary.
Should the Contractor not be able to complete a portion of the
project due to causes beyond the control of and without the
fault or negligence of the Contractor as set forth in
Paragraph C7-7.8 EXTENSION OF THE TIME OF COMPLETZON, and
should it be determined by mutual consent of the Contractor
and the Engineer that a solution to allow construction to
proceed is not available within a reasonable period.of time,
then the Contractor may be reimbursed f or the cost of moving
his equipment off the job and returning the necessary
equipment to the job when it is determined by the Engineer
C7-7 (6)
�
. '
_. �
,-_ _�
�
�
�
�
�
�
��I
Y
�'.
� that construction may be resumed. Such reimbursement shall be
based on actual cost to the Contractor of moving the equipment
"� and no profit will be allowed.
�
� No reimbursement shall be allowed if the equipment is moved to
another construction project for-the City of Fort Worth.
� The Contractor shall not suspend work without written notice
from the Engineer and shall proceed with the work operations
promptly when notified by the Engineer to so resume
�[ operations.
�
�
�
�
�
�
�
�^
� yY ;
�
�
�
C7-7.13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY:
Whenever, because of National Emergency, so declared by the
President of the United States or other lawful authority, it
becomes impossible for the Contractor to obtain all of the
necessary labor, materials, and equipment for the prosecution
of the work with reasonable continuity for a period of two
months, the Contractor shall within seven days notify the City
in writin�, giving a detailed statement of the efforts which
have been made and listing all necessary items of labor,
materials, and equipment not obtainable. If, after
investigations, the Owner finds that such conditions existing
and that the inability of the Contractor to proceed is not
attributable in whole or in part to the fauZt or neglect of
the Contract, then if the Owner cannot after reasonable effort
assist the Contractor in procuring and making available the
necessary labor, materials and equipment within thirty days,
the Contractor may request the Owner to terminate the contract
and the Owner may comply with the request, and �he termination
shall be conditioned and based upon a final settlement
mutually acceptable to both the Owner and the Contractor and
final payment shall be made in accordance with the terms of
the agreed settlement, which shall include, but not be limited
to, the payment for all work executed but no anticipated
profits on work which has not been performed.
C7-7.14 SUSPENSION OR ABANDONMENT OF THE WORR AND ANNULMENT OF
CONTRACT: The work operations on all or any portion or
section of the work under Contract shall be suspended
immediately on written order of the Engineer or the Contract
may be declared cancelled by the City Council for any good and
sufficient cause. The following, by way of example, but not
of limitation, may be considered grounds for suspension or
cancellation:
a. Failure of the Contractor to commence work
operations within the time specified in the Work
Order issued by the Owner.
C7-7 t7)
�
b. Substantial evidence that progress of the work
operations by Contractor is insufficient to
complete the work within the specified time.
c. Failure of the Contractor to provide and maintain
sufficient labor and equipment to properly execute
the working operations.
d.
e.
Substantial evidence that the Contractor has
abandoned the work.
Substantial evidence that the Contractor has become
insolvent or bankrupt, or otherwise financially
unable to carry on the work satisfactorily.
f. Failure on the part of the Contractor to observe
any requirements of the Contract Documents or to
comply with any orders given by the Engineer or
Owner provided for in these Contract Documents.
g. Failure of the Contractor promptly to make good any _
defect in materials or workmanship, or any defects
of any nature the correction of which has been
directed in writing by the Engineer or the Owner.
h. Substantial evidence of collusion for the purpose
of illegally procurinq a contract or perpetrating
fraud on the City in the construction of work under
contract.
i. A substantial indication that the Contractor has
, made an unauthorized assignment of the contract or
any iunds due therefrom for the benefit of any
creditc�r or for any other purpose.
7•
k.
If the Contractor shall for any cause whatsoever
not carr}• on the working operation in an acceptable
manner.
If the Contractor commences legal action against
the Owner.
A copy of the suspension order or action of the City Council
shall be served on the Contractor's Sureties. When work is
suspended for any cause or causes, or when the contract is
cancelled, the Contractor shall discontinue the work or such
part thereof as the Owner shall designate, whereupon the
Sureties may, at their option, assume the contract or that
portion thereof which the Owner has ordered the Contractor to
discontinue, and may perform the same or may, with the written
C7-7 (8)
-�
...�
�
�
�
�
��
't
�
�
�
�
�`.
�
�
�
�
�
�-°'`
�
r�
consent of the Owner, sublet the work or that_portion of the
work as taken over, provided however, that the Sureties shall
exercise their option, if at all, within two weeks after the
written notice to discontinue the work has been.served upon
the Contractor and upon the Sureties or their authorized
agents. The Sureties, in such event shall assume the
Contractor's place in all respects, and shall be paid by the
Owner for all work performed by them in accordance with the
terms of the Contract Documents. All monies remaining due the
Contractor at the time of this default shall thereupon become
due and payable to the Sureties as the work progresses,
subject to all of the terms of the Contract Documents.
Zn case the Sureties do not, within the hereinabove specified
time, exercise their right and option to assume the contract
responsibilities, or that portion thereof which the Owner has
ordered by the Contractor to discontinue, then the Owner shall
have the power to complete, by contract or otherwise, as it
may determine, the work herein described or such part thereof
as it may deem necessary, and the Contractor hereto agrees
that the Owner shall have the right to take possession of and
use any materials, plants, tools, equipment, supplies, and
property of any kind provided by the Contractor for the
purpose of carrying on the work and to procure other tools,
equipment, materials, labor and property for the completion of
the work, and to charge to the account of the Contractor of
said contract expense for labor, materials, tools, equipment,
and all expenses incidental thereto. The expense so charged
shall be deducted by the Owner from such monies as may be due
or may become due at any time thereafter to the Contractor
under and by virtue of the Contract or any part thereof. The
Owner shall not be required to obtain the lowest bid for the
work completing the contract, but the expense to be deducted
shall be the actual cost of the owner of such work.
�'` In case such expenses shall exceed the amount which would have
been payable under the Contract if the same had been completed
� by the Contractor, then the Contractor and his Sureties shall
pay the amount of such excess to the City on notice from the
Owner of the excess due. When any particular part of the work
Q is being carried on by the Owner by contract or otherwise
under the provisions of this section, the Contractor shall
continue the remainder of the work in conformity with the
terms of the Contract Documents and in such a manner as to not
�, hinder or interfere with performance of the work by the Owner.
�
L
`���-`
�.
C7-7.15 FULFILLMENT OF CONTRACT:
considered as having been fulfilled,
bond or bonds or by law, when all the
parts of the project covered by the
The Contract will be
save as provided in any
work and all sections or
Contract Documents have
C7-7 (9)
�
�
�
been finished and completed, the final inspection made by the
Engineer, and the final acceptance and final payment made by �
the Owner.
C7-7.I6 TERMZNATION FOR CONVENIENCE OF THE OWNER: -�
A. NOTICE OF TERMINATION: The performance of the work
under this contract may be terminated by the Owner
in whole, or from time to time in part, in
accordance with this section, whenever the Owner
shall determine that such termination is in the
best interest of the Owner. Any such termination
shall be effected by mailing a notice of
termination to the Contractor specifying the extent
to which performance of work under the contract is
terminated, and the date upon which such
termination becomes effective. Receipt of the
notice shall be deemed conclusively presumed and
established when the letter is placed in the United
States Mail by the Owner. Further, it shall be
deemed conclusively presumed and established that
such termination is made with just cause as therein
stated; and no proof in any claim, demand or suit
shall be required of the Owner regarding such
discretionary action.
B. CONTRACTOR ACTION: After receipt of a notice of
termination, and except as otherwise directed by
the Engineer, the Contractor shall: -..
1. Stop work under the contract on the date and
to the extent specified in the notice of
termination;
2. place no further orders or subcontracts for
materials, services or facilities except as
may be necessary for completion of such
portion of the work under the contract as is
not terminated;
��
� 1�
.�
i�
►�
3. terminate all orders and subcontracts to the
extent that they relate to the performance of
work terminated by the notice of termination;
4. transfer title to the Owner and deliver in �'
the manner, at the times, and to the extent,
if any, directed by the Engineer: �
��
C7-7 (10) �
��
�
f
i1
�
�
�
5.
a. the fabricated or unfabricated parts,
work in process, completed work,
supplies and other material produced as
a part of, or acquired in connection
with the performance of, the work
terminated by the notice of
termination; and
b, the completed, or partially completed
plans, drawings, information and other
property which, if the contract had
been completed, would have been
required to be furnished to the Owner.
complete performance of such part of the work
as shall not have been terminated by the
notice of termination; and
6. take such action as may be necessary, or as
the Engineer may direct, for the protection
and preservation of the property related to
its contract which is in the possession of
the Contractor and in which the Owner has or
may acquire the rest.
�
! ��
�
LJ
At a time not later than 30 days after the
termination date specified in the notice of
termination, the Contractor may submit to the
Engineer a list, certified as to quantity and
guality, of any or all items of termination
inventory not previously disposed of, exclusive of
items the disposition of which has been directed or
authorized by the Engineer. Not later than 15 days
thereafter, the Owner shall accept title to such
items provided, that the list submitted shall be
subject to verification by the Engineer upon
removal of the items or, if the items are stored,
within 45 days from the date of submission of the
list, and any necessary adjustments to correct the
list as submitted, shall be made prior to final
settlement.
C. TERMINATION CLAIM: Within 60 days after notice of
termination, the Contractor shall submit his
termination claim to the Engineer in the form and
with the certification prescribed by the Engineer.
Unless one or more extensions in writing are
granted by the Owner upon request of the
Contractor, made in writing within such 50-3ay
period or authorized extension thereof, any and all
such claims shall be conc?usively deemed waived.
C7-7 (11)
1
�
D. AMOUNTS: Subject to the provisions of Item
C7-7.16(C), the Contractor and Owner may agree upon
the whole or any part of the amount or amounts to
be paid to the Contractor by reason of the total or
partial termination of work pursuant hereto;
provided, that such agreed amount or amounts shall
never exceed the total contract price as reduced by
the amount of payments otherwise made and as
further reduced by the contract price of work not
terminated. The contract shall be amended
accordingly, and the Contractor shall be paid the
agreed amount. No a�nount._ shall be due for lost or
anticipated profits. Nothing in C7-7.16(�E)
hereafter, prescribing the amount to be paid to the
Contractor in the event of failure of the
Contractor by reason of the termination of work
pursuant to this section, shall be deemed to limit,
restrict or otherwise determine or affect the
amount or amounts which may be agreed upon to be
paid to the Contractor pursuant to this paragraph.
E. FAILURE TO AGREE: Zn the event of the failure of
the Contractor and the Owner to agree as provided
in.C7-7.16 (D) upon the whole amount to be paid to
the Contractor by reason of the termination of work
pursuant to this section the Owner shall determine,
on the basis of information available to it, the
amount, if any, due to the Contractor by reason of
the termination and shall pay to the Contractor the
amounts determined. No amount shall be due for
lost or anticipated profits.
F. DEDUCTIONS: In arriving at the amount due the
contractor under this section, there shall be
deducted (a) all unliquidated advance or other
payments on account theretof_ore made to the
Contractor, applicable to the terminated portion of
this contract; (b) any claim which the Owner may
have against the Contractor in connection with this
contract; and (c) the agreed price for, or the
proceeds of sale of, any materials, supplies or
other things kept by the Contractor or sold,
pursuant to the provisions of this clause, and not
otherwise recovered by or credited to the Owner.
G. ADJUSTMENT: If the termination hereunder be
partial, prior to the settlement of the terminated
portion of this contract, the Contractor may file
with the Engineer a request in writing for an
C7-7 (12)
�
_ �
�
it
�
-._ �
��
t,�
��l
� �
L�
�
!
�
C
�
1'J
�
�
�
1 �l
�
l�
equitable adjustment of the price or prices
specified in the contract relating to the continued
portion of the eontract (the portion not terminated
by the notice of termination), such equitable
adjustment as may be agreed upon shall be made in
such price or prices; nothing contained herein,
however, shall limit the right of the Owner and the
Contractor to agree upon the amount or amounts to
be paid to the Contractor for the completion of the
continued portion of the contract when said
contract does not contain an established contract
price for such continued portion.
H. NO LIMITATION OF RIGHTS: Nothing contained in this
section shall limit or alter the rights which the
Owner may have for termination of this contract
under C7-7.14 hereof entitled "Suspension of
Abandonment of the work and Amendment of Contract"
or any other right which Owner may have f or def ault
or breach of contract by Contractor.
C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be
responsible for initiating, maintaining, and supervising all
safety precautions and programs in connection with the work at
all times and shall assume all responsibilities for their
enforcement.
The Contractor shall comply with federal, state, and local
laws, ordinances, and regulations so as to protect person and
property from injury, including death, or damage in connection
with the work.
C7-7 (13)
�
��,
�
�
�
PART C - GENERAL CONDITIONS
C8-8 MEASUREMENT AND PAYMENT
SECTION C8-8 MEASUREMENT AND PAYMENT
i� C8-8.1 MEASUREMENT OF QUANTITIES: The determination of
�l quantities of work performed by the Contractor arid authorized
by the Contract Documents acceptably completed under the terms
rt of the Contract Documents shall be made by the Engineer, based
on measurements made by the Engineer. These measurements will
� be made according to the United States Standard Measurements
used in common practice, and will be the actual length, area,
� solid contents, numbers, and weights of the materials and
items installed.
�
�
�:�
�
�
�
�
�
�
��'::
��
�
C8-8.2 UNIT PRICES: When in the Proposal a"Unit Price" is
set forth, the said "Unit Price" shall include the furnishing
by the Contractor of all labor, tools, materials, machinery,
equipment, appliances and appurtenances necessary for the
construction of and the completion in a manner acceptable to
the Engineer of all work to be done under these Contract
Documents.
The "Unit Price" shall include all permanent and temporary
protection of overhead, surface, and underground structures,
cleanup, finished, overhead expense, bond, insurance, patent
fees, royalties, risk due to the elements and other causes,
delays, profits, injuries, damages claims, taxes, and all
other items not specifically mentioned that may be required to
f ully construct each item of the work complete in place and in
a satisfactory condition for operation.
C8-8.3 LUMP SUM: When in the Proposal a"Lump Sum" is set
forth, the said "Lump Sum" shall represent the total cost f or
the Contractor to furnish all Iabor, tools, materials,
machinery, equipment, appurtenances, and all subsidary work
necessary for the construction and completion of all the work
to provide a complete and f unctional item as detailed in the
Special Contract Documents and/or Plans.
C8-8.4 SCOPE OF PAYMENT: The Contractor shall receive and
accept the compensation, as herein provided, in full payment
for furnishing all labor, tools, materials, and incidentals
for performing all work contemplated and embraced under these
Contract Documents, for all loss and damage arising out of the�
nature of the work or from the action of the elements, for any
unforeseen defects or obstructions which may arise or be
encountered during the prosecution of the work at any time
C8-8 (1)
�
before its final acceptance by the Owner, texcept as provided
in paragraph CS-5.14) for all risks of whatever description
connected with the prosecution of the work, for all expense
incurred by or in consequence of suspension or discontinuance
of such prosecution of the working operations as herein
specified, or any and all infringements of patents,
trademarks, copyrights, or other legal reservations, and for
completeing the work in an acceptable manner according to the
terms of the Contract Documents.
The payment of any current or partial estimate prior to final
acceptance of the work by the Owner shall in no way constitute
an acknowledgment of the acceptance of"the work, materials, or
equipment, nor in any way prejudice or aff ect the obligations
of the Contractor to repair, correct, renew, or replace at his
own and proper expense any defects or imperfections in the
construction or in the strength or quality of the material
used or equipment or machinery furnished in or about the
construction of the work under contract and its appurtenances,
or any damage due or attributed to such defects, which
def ects, imperfection, or damage shall have been discovered on
or before the final inspection and acceptance of work or
during the one year guaranty period after final acceptance.
The Owner shall be the sole judge af such defects,
imperfections, or damage, and the Contractor shall be liable
to the Owner for failure to correct the same as provided
herein.
C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Between the lst and
Sth day of each month the Contractor shall submit to the
Engineer a statement showing an estimate of the value of the
work done during the previous month, or estimate period under
the Contract Documents. Not later than the lOth day of the
month the Engineer shall verify such estimate, and if it is
found to be acceptable and the value of work performed since
the last partial payment was made exceeds one hundred dollars
($100.00) in amount, 90$ of such estimated sum will be paid to
the Contractor if the total contract amount is less than
$400,000, or 95$ of such estimated sum will be paid to the
Contractor if the total contract amount is $400,000 or greater
within twenty-five (25) days after the regular estimate period.
The City will have the option of preparing estimates on forms
furnished by the City. The partial estimate may include
acceptable nonperishable materials delivered to the work whrch
are to be incorporated into the work as a permanent part
thereof, but which at the the time of the estimate have not
been installed. (such payment will be allowed on a basis of
858 of the net invoice value thereof.) The Contractor shall
f urnish the Engineer such information as he may request to aid
C8-8 (2)
�
�
. :' �
' -�
�
I�,
�
�
r-w
�
�
�
'��_ .'
�
�
���.
him as a guide in the verification or the preparation�of
partial estimates.
It is understood that the partial estimate from month to month
� will be approximate only, and all partial monthly estimates
and payment will be subject to.correction in the estimate
rendered following the discovery of an error in any previous
� estimate,and such estimate shall not, in any respect, be taken
as an admission of the Owner of the amount of work done or of
its quality of sufficiency, or as an acceptance of the work
� done or the release of the Contractor of any of his
responsibilities under the Contract Documents.
The City reserves the right to withhold the payment of any
� monthly estimate if the contractor fails to perf orm the work
1� strictly in accordance with the specifications or provisions
of this contract.
��
�
�
�
�
L�J
�
,,_~�
� : _.�,`-
C8-8.6 WITHHOLDING PAYMENT: Payment on any estimate or
estimates may be held in abeyance if the performance of the
construction operations is not in accordance with the
requirements of the Contract Documents.
C8-8.7 FINAL ACCEPTANCE: Whenever the improvements provided
for by the Contract Documents shall have been completed and
all requirements of the Contract Documents shall•have been
fulfilled on the part of the Contractor, the Contractor shall
notify the Engineer in writing that the improvements are ready
for the final inspection. The Engineer shall notify the
appropriate officials of the Owner, will within a reasonable
time make such final inspection, and if the work is
satisfactory, in an acceptable condition, and has been
comp�eted in accordance with the terms of the Contract
Documents and all approved modifications thereof, the Engineer
will initiate the processinq of the final estimate and
recommend final acceptance of the project and final payment
therefor as outlined in C8-8.8 below.
C8-8.8 FINAL PAYMENT: Whenever all the improvements provided
for by the Contract Documents and all approved modifications
thereof shall have been completed and all requirements of the
Contract Documents have been fulfilled on the part of the
Contractor, a final estimate showing the value of the work
will be prepared by the Engineer as soon as the necessary
measurements, computations, and checks can be made.
All prior estimates upon which payment has been made are
subject to necessary corrections or revisions in the final
payment.
C8-8 (3)
!�
�
The amount of the final estimate, less previous payments and
any sum that have been deducted or retained under the
provisions of the Contract Documents, will be paid to the
Contractor within 60 days after final acceptance by the Owner
on a proper resolution of the City Council, provided the
Contractor has furnished to the Owner satisfactory evidence of
payment as follows: Prior to submission of the final estimate
for payment, the Contractor shall execute an affidavit, as
furnished by the City, certifying that all persons, firms,
associations, corporations, or other organizations furnishing
labor and/or materials have been paid in full, that the wage
scale established by the City Council in the City of Fort
Worth has been paid, and that there are no claims pending for
personal injury and/or property damages. �
The acceptance by the Contractor of the last or final payment
as aforesai.d shall operate as and shall release the Owner from
all claims or liabilities under the Contract for anything done
or furnished or relatinq to the work under Contract Documents
or any act or neglect of said City relating to or connected
with the Contract.
The making of the final payment by the Owner shall not relieve
the Contractor of any guarantees or other requirements of the
Contract Documents which specifically continue thereafter.
C8-8.9 ADEQUACY OF DESZGN: It is understood that the Owner
believes it has employed competent Engineers and designers to
prepare the Contract Documents and all modifications of the
approved Contract Documents. Zt is, therefore, agreed that
the Owner shall be responsible for�the adequacy of its own
desiqn features, sufficiency of the Contract Documents, the
safety of the structure, and the practicability of the
operations of the completed praject, provided the Contractor
has complied with the requirements of the said Contract
Documents, all approved modifications thereof, and additions
and alterations thereto approved in writing by the Owner. The
burden of proof of such compliance shall be upon the
Contractor to show that he has complied with the said
requirements of the Contract Documents, approved modifications
thereof, and all approved additions and alterations thereto.
C8-8.10 GENERAL GUARANTY: Neither the final certificate of
payment nor any provision in the Contract Documents nor
partial or entire occupancy or use of the premises by the
Owner shall constitute an acceptance of work not done in
accordance with the Contract Documents or relieve the
Contractor of liability in respect to any express warranties
or responsibility for faulty materials or workmanship. The
Contractor shall remedy any defects or damages in the work and
C8-8 (4)
-�
.�
�
�
<.-'�
�
�
�
�... �
�
G�
�.
. � :--,
��- .
pay for any damage to other work resulting therefrom wh�ich
shall appear within a period of one year from the date of
� tance of the work unless a longer period is
� final a�cep
specified andshall furnish a good and sufficient mainte�ance
bond in the amount of 100 percent of the amount of the
contract which shall assure the performance of the general
� guaraniy as above outline. The Owner will give notice of
observe3 defects with reasonable promptness.
�
!�
�
Lr
�
�
�
�
!1
a`
�~.' :
L'�J
�g-8.11 SUBSIDIARY WORR: Any and all WOro ectclsuchlas
go��erned by documentary requirements for the p j
conditions imposed by the Plans, the General Contract ,
Documents or these Special Contract Documents, in k�l�ich n�o�
specif ic item for bid has been provided for in the Proposal,
shall be considered as a subsidiary item of work, the cost of
which shall be included in the price bid in the Proposal, for�
each bid item. Surface restoration, rock excavation and
cleanup are general items of work whicr�fall in the category
of subsidiary work.
�g-g,12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be
allocated under various bid items in the Proposal to establish
unit prices for miscellaneous placement of material:` These
mat�rials shall be used only when directed by the Engineer,
dependi t fnmataraal�willlbesmadeafornonlyrthatcamount�of
placemen
material used, measured to the nearest one-tenth unit.
Payment for Wi�h ethe nGeneral aContract 117 cumentslregardless of
accordance
the actual amount used for the project.
C8-8.13 RECORD DOCU�IENTS: Contractor shall keep on record a
copy of all specifications, plans, ad3enda, modific_ations,
shop drawings and �amples at the site, in good order and
annotated to show all changes made during the construction
proc ess. These shall be delivered to Engineer upon comple�ion
of the work.
C8-8 (5)
G
�
�
�
�
�
�
�
�
�
L!�J
��
��
�
�J
��
��
I�
��
�
PART C1
Supplementary Conditions
to Part C
�
�
�
SECTION C1:
SUPPLEMENTARY CONDITIONS TO PART C- GENERAL CONDITIONS
� A. General
These Supplementary Conditions amend or supplement the General Conditions of the
� Contract and other provisions of the Contract Documents as indicated below. Provisions
which are not so amended or supplemented remain in full force and affect.
B. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS
ENTERPRISE COMPLIANCE: Page C3-3 (1), should be deleted in its entirety and
replaced with the following:
�
�
iJ
C
�
� D.
Upon request, Contractor agrees to provide to Owner complete and accurate information
regarding actual work performed by a Minority Business Enterprise (MBE) and/or a
Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor
further agrees to permit an audit and/or examination of any books, records or files in its
possession that will substantiate the actual work performed by an MBE and/or WBE.
The misrepresentation of facts (other than a negligent misrepresentation) and/or the
commission of fraud by the Contractor will be grounds for termination of the contract
and/or initiating action under appropriate federal, state or local laws or ordinances
relating to false statements; further, any such misrepresentation (other than a negligent
misrepresentation) and/or commission of fraud will result in the Contractor being
determined to be irresponsible and barred from participating in City work for a period of
time of not less than three (3) years.
C3-3.7 BONDS: Page C3-3 (3), the paragraph after subparagraph d. Change the
paragraph to read as follows:
"No sureties will be accepted by the owner which are at the time in default or delinquent
on any bonds or which are interested in any litigation against the Owner. All bonds shall
be made on the forms furnished by the Owner and the surety shall be acceptable to the
owner. In order for a surety to be acceptable to the City, (1) the name of the surety shall
be included on the current U.S. Treasury List of Acceptable Sureties {Circular 870}, or
(2) the surety must have capital and surplus equal to ten times the amount of the bond.
The surety must be licensed to business in the state of Texas. The amount of the bond
shall not exceed the amount shown on the Treasury list or one-tenth (1/10) of the total
capital and surplus. If reinsurance is required, the company writing the reinsurance must
be authorized, accredited or trusteed to do business in Texas."
C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Page C8-8 (2), should be deleted in
its entirety and replaced with the following:
� Partial pay estimates shall be submitted by the Contractor or prepared by the City on the
Sth day and 20th day of each month that the work is in progress. The estimate shall be
proceeded by the City on the lOth day and 25th day respectively. Estimates will be paid
� within 25 days following the end of the estimate period, less the appropriate retainage as
� set out below. Partial pay estimates may include acceptable nonperishable materials
delivered to the work place which are to be incorporated into the work as a permanent
�
Revised
� 6/04/99
�.
Pg. 1
�
�
�
part thereof, but which at the time of the pay estimate have not been so installed. If such
materials are included within a pay estimate, payment shall be based upon 85% of the net
voice value thereof. The Contractor will furnish the Engineer such information as may be
reasonably requested to aid in the verification or the preparation of the pay estimate.
� For contracts of less than $400,000 at the time of execution, retainage shall be ten per
cent (10%). For contracts of $400,000 or more at the time of execution, retainage shall
be five percent (5%).
�j Contractor shall pay subcontractors in accord with the subcontract agreement within five
�� (5) business days after receipt by Contractor of the payment by City. Contractor's failure
� to make the required payments to subcontractors will authorize the City to withhold
future payments from the Contractor until compliance with this paragraph is
accomplished.
�
�
�'1
� E
� F.
� G
!J
L
�
�
�
Revised
6/04/99
It is understood that the partial pay estimates will be approximate only, and all partial pay
estimates and payment of same will be subject to correction in the estimate rendered
following the discovery of the mistake in any previous estimate. Partial payment by
Owner for the amount of work done or of its quality or sufficiency or acceptance of the
work done; shall not release the Contractor of any of its responsibilities under the
Contract Documents.
The City reserves the right to withhold the payment of any partial estimate if the
Contractor fails to perform the work in strict accordance with the specifications or other
provisions of this contract.
C3-3.11 INSURANCE: Page C3-3 (5): Delete subparagraph "a. COMPENSATION
INSURANCE"
C3-3.11 INSURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGENT FOR
INSURANCE AND BONDING"
C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6
(8), should be deleted in its entirety and replaced with the following:
Contractor covenants and agrees to indemnify City's engineer and architect, and their
personnel at the project site for Contractor's sole negligence. In addition, Contractor
covenants and agrees to indemnify, hold harmless and defend, at its own expense, the
Owner, its officers, servants and employees, from and against any and all claims or suits
for property loss, property damage, personal injury, including death, arising out of, or
alleged to arise out of, the work and services to be performed hereunder by Contractor, its
officers, agents, employees, subcontractors, licensees or invitees, whet/ter or not any
sucli injury, damage or death is caused, in whole or in part, by the ne�li�ence or
alle�ed ne,�li�ence of Owner, its offtcers, servants, or employees. Contractor likewise
covenants and agrees to indemnify and hold harmless the Owner from and against any
and all injuries to Owner's officers, servants and employees and any damage, loss or
destruction to property of the Owner arising from the performance of any of the terms and
conditions of this Contract, wltether or not any sucli injury or damage is caused in
whole or in part by tlre ne�ligence or alle;�ed ne,�li�ence of Owner, its officers, servants
Pg. 2
r
�
�
�
�
L�
#i
�
�
�
�
'
�
�
'
,
�
�
Q
Revised
6/04/99
or employees..
In the event Owner receives a written claim for damages a�ainst the Contractor or its
subcontractors prior to final payment, final payment shall not be made until Contractor
either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a
release from the claimant involved, or (b) provides Owner with a letter from Contractor's
liability insurance carrier that the claim has been referred to the insurance carrier.
The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort
Worth public work from a Contractor against whom a claim for damages is outstanding
as a result of work performed under a City Contract.
Pg. 3
�
'
�
�
�
l�
,
O
PART D
Special Conditions
�
�
�
'
'
'
�
'
�
'
lJ
�
�
U
0
�
l�
�
�J
�
U
�
�
L1
�
�
0
�
�
D-1
D-2
D-3
D-4
D-5
D-6
D-7
D-8
D-9
D-10
D-11
D-12
D-13
D-14
D-15
D-16
D-17
D-18
D-19
D-20
D-21
D-22
D-23
D-24
D-25
D-26
D-27
D-28
D-29
D-30
D-31
D-32
D-33
D-34
D-35
D-36
D-37
D-38
D-39
D-40
D-41
D-42
D-43
D-44
D-45
D-46
D-47
D-48
D-49
D-50
D-51
D-52
D-53
D-54
D-55
D-56
D-57
D-58
oarz��ss
PART D - SPECIAL CONDITIONS
AWARD OF CONTRACT ........................................................................................SG-3
SUBMISSION OF CONTRACT DOCUMENTS ........................................................SC-3
GENERAL...............................................................................................................SC-4
TAX EXEMPTIONS ................................................................................................SC-5
PROJECT DESIGNATION ......................................................................................S�-5
EQUAL EMPLOYMENT PROVISIONS ....................................................................SC-5
PRE-CONSTRUCTION CONFERENCE ................................................................: .SC-6
COORDINATION MEETINGS ........................................................:........................SC-6
PROJECT ABANDONMENT ...................................................................................SC-6
BREAKDOWf� OF BID PROPOSAL .......................................................................SC-6
INDEMNIFICATION ............................... .. . . . ......:..........................................�C-6
.
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW...........SC-6
MINORITY AND WOMENS BUSINESS ENTERPRISE (M/WBE)COMPLIANCE....SC-8
CALENDARDAY ..................................................................................................SC-10
SUBSIDIARY WORK .............................................................................................SC-10
WAGERATES ......................................................................................................S.C-10
EASEMENTS AND PERMITS ...............................................................................SC-11
COORDINATION WITH FORT WORTH WATER DEPARTMENT .........................SC-12
DAMAGE TO PRIVATE PROPERTY ..................................................................W.SC-12
SHOPDRAWINGS ...............................................................................................SC-12
CROSSING OF EXISTING UTILITIES ...................................................................SC-12
EXISTING UTILITIES AND IMPROVEMENTS ......................................................SC-13
CONSTRUCTION TRAFFIC OVER PIPELINES ...................................................SC-13
TRAFFICCONTROL .............................................................................................SC-13
PAYMENT .............................................................................................................S�-14
DELAYS..........................................................:.....................................................SC-14
DETOURS.............................................................................................................S�-14
BARRICADES AND WARNING SIGNS .................................................................SC-14
EXAMINATION OF SITE .......................................................................................SC-14
ZONING COMPLIANCE ........................................................................................SC-15
WATER FOR CONSTRUCTION ...........................................................................S.C-15
WASTE MATERIAL .............................................................:................................ SC-15
CLEANUP FOR FINAL ACCEPTANCE .......................:.........................................SC-15
PROPERTY ACCESS ...........................................................................................SC-15
CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK ..........................SC=15
SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES .:...................�SC-17
CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS .............................SC-16
SANITARY FACILITIES FOR WORKERS .............................................................SC-17
LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC ........................SC-17
RIGHT TO AUDIT .................................................................................................�C-17
INCREASE OR DECREASE IN QUANTITIES .......................................................SC-17
CUTTING �F CONCRETE ....................................................................................S�-18
PROJECT DESIGNATION SIGN ..........................................................................SC-18
CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT ...............................SC-18
MISCELLANEOUS PLACEMENT OF MATERIAL .................................,...............SC-18
TYPE"C" BACKFILL .............:............................................................................... SC-19
CRUSHED LIMESTONE BACKFILL .....................................................................SC-19
2:27 CONCRETE ..................................................................................................�C-19
TRENCH EXCAVATION, BACKFILL AND COMPACTION ...................................:SC-19
PAV�MENT REPAIR (E2-19) ................................................................................S�-20
TRENCH SAFETY SYSTEM FOR WATER DEPARTMENT PROJECTS ONLY...SC-21
SANITARY SEWER MANHOLES .........................................................................SC-22
SANITARY SEWER SERVICES ...........................................................................SC-24
NOTUSED ............................................................................................................S�-25
REMOVAL, SALVAGE AND ABANDONMENT OF EXISTING FACILITIES...........SC-25
DETECTABLE WARNING TAPES ........................................................................SC-26
PIPECLEANING ...................................................................................................SC-27
BARRICADES, WARNINGS AND FLAGMEN .......................................................SC-27
SC-1
PART D - SPECIAL CONDITIONS
D-59 DISPOSAL OF SPOIUFILL MATERIAL ................................................................ �C-27
D-60 MECHANICS AND MATERIALMEN'S LIEN ..........................................................SC-27
D-61 SUBSTITUTIONS ................................................................................................. SC-27
D-62 PRECONSTRUCTION TELEVISION INSPECTION/SANITARY SEWER LINES..SC-28
D-63 VACUUM TESTING OF SANITARY SEWER MANHOLES ...................................SC-30
D-64 BYPASS PUMPING ..............................................................................................SC-31
D-65 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS..SC-31
D-66 SAMPLES AND QUALITY CONTROL TESTING ..................................................SC-33
D-67 TEMPORARY EROSION SEDIMENTS AND WATER POLLUTION CONTROL...SC-33
�D-6�8 INGRESS AND EGRESS/ ACCESS TO DRIVES .........................�.......................:•SC-34
��-��D-69 PROTECTION OF TREES, PLANTS AND SOIL .....................................:.............SC-34
i' {* -
`D-70 SITE RESTORATION ............................................................................................SC-35
D-71 STANDARD PRODUCT LIST ..........................................................:.....................SC-35
D-72 STATE REVOLVING FUND (SRF) REQUIREMENTS .........................:.................SC-35
D-73 TOPSOIL, SODDING AND SEEDING ...................................................................SC-35
D-74 CONFINED SPACE ENTRY PROGRAM ...............................................................SC-40
D-75 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION .................... SC-40
D-76 EXCAVATION NEAR TREES .. .............................................................................S.C-40
D-77 CONCRETE ENCASEMENT OF SEWER PIPE ...................................................SC-40
D-78 CLAY DAM ............................................................................................................S�-41-
D-79 EXPLORATORY EXCAVATION (D-HOLE) ...........................................................SC-41
D-80 INSTALLATION OF WATER FACILITIES ..............................................................SC-41
80.1 POLYVINYAL (CHLORIDE PVC) WATER PIPE ......:............................................SC-41
80.2 BLOCKING ............................................................................................................SC-41
80.3 TYPE OF CASING PIPE ........................................................................................SC-41
80.4 TIE-INS ..................................................................................................................SC-42
80.5 CONNECTION OF EXISTING MAINS ...................................................................SC-42
80.6 VALVE CUT-INS ...................................................................................................S.C-42�
80.7 WATER SERVICES ...............................................................................................SC-43
80.8 2-INCH TEMPORARY SERVICE LINE ..........................................�........:..............SC-44
80.9 ADJUST MANHOLES AND VAULTS (UTILITY CUT) ............................................SC-45
80.10 ADJUST WATER VALVE BOXES .........................................................................SC-45
80.11 PURGING AND STERILIZATION OF WATER LINES ...........................................SC-45
80.12 WORK NEAR PRESSURE PLANE BOUNDARIES ...............................................SC-46
80.13 WATER SAMPLE STATION ..................................................................................SC-46
80.14 Dl'7CTILE IRON AND GRAY IRON FITTINGS .......................................................SC-46
D-81 SPRINKLING FOR DUST CONTROL ....................................................................SC-47
D-82 DEWATEF2ING ......................................................................................................S.C-47
D-83 TRENCH EXCAVATION FOR DEEP�TRENCHES ................................................SC-47
D-84 TREE PRUNING ...................................................................................................�C-47
D-85 TREE REMOVAL ..................................................................................................�C-48
D-86 TEST HOLES .......................................................................................................S.C-48
oar���s SC-2
i�
�J
�J
LJ
PART D - SPEC�AL CONDITIONS
FOR: Main C1C4B Draina�e Area Sanitary Sewer System Rehabilitation and Improvements
(Group 6, Contract 2) Part 4 .
SEWER PROJECT NO. PS46-070460410230
UNIT 1: DOE PROJECT NO. 1829
UNIT 2: DOE PROJECT NO. 2718
UNIT 3: DOE PROJECT NO. 2719
FORT WORTH, TEXAS
a D-1 AWARD OF CONTRACT: The City reserves the right to abandon without obligation to the
contractor, any part of the project, or the entire project, at any time before the contractor begins
any construction work authorized by the City. Award, if made, shall be to the responsive low
bidder.
�
�
�
U
�
�
�
�
�
�
�
a
D
�
The folfowing shall apply for contract documents with• multiple units of work. Each unit represents
a separate project, each with an individual M/WBE specification and proposal section. The
proposal sections are arranged to allow prospective bidders to submit bids on one unit, some of
the units, or all of the units. Award of contract(s), if made, shall be to the responsive low bidder for
each individual unit. If a contractor is the responsive low bidder on two units or more, a single set
of contract documents consisting of all applicable units will be created and one single award of
contract shall be made. The Contractor shall comply with the City's M/WBE Ordinance on each
unit. Bidders shall'submit individual and separate monthly M/WBE reports for each Unit included
in the Contract.
Construction time on all units will run concurrently. For situations involving approved contracts .;�
with multiple units, the total allowable construction completion time period for all the units shall be
the same as the unit with the longest construction time period. .
D-2 SUBMISSION OF CONTRACT DOCUMENTS, CONSTRUCTION START TIME AND
PRE-CONSTRUCTION SUBMITTALS: The contractor(s) shall execute and return the contract
documents to the Department of Engineering within ten (10) working days after notification by the
City. �
A Pre:.-Construction meeting date will be established and noted in the Letter to Contractor. The
effective work order date will be set at the pre-construction conference.
The contractor(s) shall be required to start consfruction on the project no later than ten (10)
calendar working days after the pre-construction meeting date. The City shall begin to charge
time on the project to the contractor eleven days after the pre-construction meeting date.
Per City ordinance 11923, the contractor(s) shall submit the letters of intent or a copy of the
agreements with the approved M/WBE subcontractor(s) at or before the pre-construction
conference. To expedite M/WBE compliance contractors are strongly encouraged to submit the
executed letters of intent (with M/WBE subcoritractors) at the time of submittal of the
UTILIZATION FORM or GOOD FAITH EFFORT FORM. The letter(s) must be signed by both
parties. If the contractor(s) fails to submit the letter(s) or agreement(s), the contractor(s) will not
be allowed to begin work. Time on the project will start to accumulate at the end of the ten (10)
days as stipulated above.
Additional submittals at time of pre-construction meeting shall include (but not limited to):
Contractors Work Plan and Schedule
Disposal Site for Waste Material Information
Sub-Contractor ldentification
Trench Safety Design (if required)
Confined Space Entry Program -
Name and number of a responsible person for off hour emergencies
04/21/99
SC-3
PART D - SPECIAL CONDITIONS
Project scheuule which must reflect a project completion date to be determined by the
completion time period stipulated in the proposal section.
The pre-construction conference is intended as a forum between the contractor and the
appropriate City staff to go over the project in detail and to afford the contractor the opportunity to
submit all the required documents listed above.
,�� If the contractor fails to submit any of the required documents, the contractor will not be allowed to
begin work and time on the project will start to accumulate.
D-3 GENERAL:
The order or precedence in case of conflicts or di'screpancies between various parts of the
Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily,
follow the guidelines listed below:
1. Plans
2. Contract Documents
3. Special Conditions
The following Special Conditions shall be applicable to this project and shall govern over any
conflicts with the General Contract Documents under the provisions stated above. The Contractor
shall be responsible for defects in this project due to faulty materials and workmanship, or both,
for a period of one (1) year from date of final acceptance of this project by the City Council of the
City of Fort Worth and will be required to replace at his expense any part or all of this project
which becomes defective due to these causes.
The City reserves the right to abandon, without obligation to the Contractor, any part of the
project, or the entire pro�ect, at any time before the Contractor begins any construction work
authorized by the City. Contract, if awarded, shall be as described in "Award of Contract" above.
Subject to modifications as herein contained, the Fort Worth Water Department's General
Contract Documents and General Specifications, with latest revisions, are made a part of the
General Contract Documents for this project. The Plans, these Special Contracf Documents and
the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers
name, or identification include therein as specifying, referring or implying product control,
performance, quality, or other shall be binding upon the contractor. The specifications and
drawings shall be considered cooperative; therefore, work or material called for by one and not
shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though
required by all.
Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre-
qualified with the Water Department to perform such work in accordance with procedures
described in the current Fort Worth Water Department General Specifications, which general
specifications shall govern perFormance of all such work.
This contract and project, where applicable, may also be governed by the finro following published
specifications, except as modified by these Special Provisions:
1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION -
CITY OF FORT WORTH
2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH
CENTRALTEXAS
A copy of either of these specifications may be purchased at. the office of the Transportation and
Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth,
Texas 76102. The specifications applicable to each pay item are indicated by the call-out for the
pay item by the designer. If not shown, then applicable published specifications in either of these
o4rr»s SC-4
��
��
�
L�1
�
��
�
�
���
�*J
�'
�
�
! �J
'�
I-,1
J
��
�i�
PART D - SPECIAL CONDITIONS
documents may be followed at the discretion of the Contracto� . General Provisions shall be those
of the Fort Worth document rather than Division 1 of the North Central Texas document.
Bidders shall not separate, detach or remove any portinn, segment or sheets from the
contract document at any time. Failure to bid or fully execute contract without retaining
contract documents intact may be grounds for designating bids as "non-responsive" and
rejecting bids or voiding contract as appropriate as determined by the City Engineer.
INTERPRETATION AND PREPARATION OF PROPOSAL:
A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered,
accompanied by its proper Bid Security, to the Purchasing Manager or his representative at
the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole
responsibility to deliver the proposal at the proper time to the proper place. The mere fact that
a proposal was dispatched will not be considered. The Bidders must have the proposal
actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word
"PROPOSAL", and the name or description of the project as designated in the "Notice to
Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth
Purchasing Division, PO Box 17027, Fort Worth, Texas 76102.
B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Managercannot
be withdrawn prior to the time set for opening proposals. A request for non-consideration o a
proposal must be made in writing, addressed to the City Manager, and filed with him prior to
the time set for the opening of proposals. After all proposals not requested for non-
consideration are opened and publicly read aloud, the proposals for which non-consideration :}
requests have been properly filed �, at the option of the Owner be returned unopened. •
C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by ��.
telegraphic communication at any time prior to the time set for opening proposals, provided �`=
such telegraphic communication is received by the Purchasing Manager prior to the said
proposal opening time, and provided further, that the City Manager is satisfied that a written
and duly authenticated confirmation of such telegraphic communication over the signature of
the bidder was mailed prior to the proposal opening time. If such confirmation is not received
within forty-eight (48) hours after the proposal opening time, no further consideration will be
given to the proposal. -- �
D-4 TAX EXEMPTIONS: This contract is i�sue� by an organization which qualifies for
exemption pursuant of the provisions of Article 20.04(F) of the Texas Limited Sales, Excise and
Use Tax Act. All equipment and materials not consumed by or incorporated into the project
construction, are subject to State sales tax under House Bill 11, enacted August 15, 1991. All
such taxes shall be included in the various amounts on the Proposal Form. The successful Bidder
shall be required to submit a breakdown between labor and material costs prior to execution of the
contract.
D-5 PROJECT DESIGNATION: Construction under these Special Documents shall be
performed under the Project Designation: Project No. PS46-07046410260
D-6 EQUAL EMPLOYMENT PROVISIONS: Contractor shall comply with City Ordinance
Number 7278 as amended by City Ordinance Number 7400 (Fort Worth City Code Sections 13-A-
21 through 12-A-29) prohibiting discrimination in employment practices.
The Contractor shall post the required notice to that effect on the project site, and at his request,
will be provided assistance by the City of Fort Worth's Equal Employment Offcer who will refer
any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may
be acquired from the Equal Employment Officer.
04/21/99 S C-�J
�
,�
PART D - SPECIAL CONDITIONS
J-7 PRE-CONSTRUCTION CONFERENCE: 6afore the project work order is issued, a pre-
construction conference shall be held with representatives of the following agencies present: City
Engineering Department, City Water Department, City Public Works Department, other interested
City Departments (such as Traffic), interested utility companies (such as gas, telephone, and
electric), Design Engineer and the successful Contractor. Contractor shall submit a schedule of
operations at the pre-construction conference.
D-8 COORDINATION MEETINGS: For coordination purposes, weekly meetings at the job site
may be required to maintain the project on the desired schedule. The Contractor shall be present
at all meetings.
D-9 PROJECT ABANDONMENT: The City reserves the right to abandon, without obligation to
the Contractor, any part of the project, or the entire project, at any time before the Contractor
begins any construction work authorized by the City.
D-10 BREAKDOWN OF BID PROPOSAL: When requested by the Engineer, the Contractor
shall furnish a cost breakdown of those bid items shown in the Proposal as lump sum items. This
information is for use in the preparation of a recommendation to the City for award of contract.
D-11 INDEMNIFICATION: The Contractor agrees to fully indemnify and save whole and
harmless the City, Owner and Engineer from all costs or damages arising out of any real or
asserted claim or cause of action against it of any kind or character and in addition from any and
all costs or damages arising out of any wrongs, injuries, demands or suits for damages, either real
or asserted, claimed agamst it that may be occasioned by any act, omission, neglect or
misconduct of the said Contractor, his agents, servants and employees. The Contractor further
agrees to co.mply with all applicable laws, regulations, ordinances, building and construction codes
of the City of Fort Worth and State of Texas and with any regulations for the protection of workers
which may be promulgated by the Government and shall protect such work with all necessary
lights, barriers, safeguards and warnings as are provided for in said specifications and in the
ordinances of said City.
D-12 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW:
A. Definitions:
1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of
authority to self-insure issued by the commission, or a coverage agreement (TWCC-81,
TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance
coverage for the person's or entity's employees providing services on a project, for the
duration of the �roject.
2. Duration of the project - includes the time from the beginning of the work on the project
until the contractor's/person's work on the project has been completed and accepted by
the governmental entity.
3. Persons providing services on the project ("subcontractor" in §406.096)- includes all
persons or entities performing all or part of the services the contractor has undertaken to
perform on the project, regardless of whether that person contracted directly with the
contractor and regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, leasing companies, motor carriers,
owner operators, employees of any such entity, or employees of any entity which furnishes
persons to provide services on the project. "Services" include, without limitation; providing,
hauling, or delivering e�quipment or materials, or providing labor, transportation, or other
services related to a project. "Services" does not include activities unrelated to the project,
such as food�beverage vendors, office supply deliveries, and delivery of portable toilets.
B. The Contractor shall provide coverage,�based on proper reporting of classification codes and
payroll amounts and filing of any coverage agreements, which meets the statutory
04/71/99 SC-6
L�J
0
�
PART D - SPECIAL CONDITIONS
requirements of Texas Labor Code, 3ection 401.011(44) or all employees of the Cont� actor
providing services on the project, for t�ie duration of the project.
C. The Contractor must provide a certificate of coverage to the governmental entity prior to being
awarded the contract.
D D. If the coverage period shown on the contractor's current certificate of coverage ends during
the duration of fhe project, the contractor must, prior to the end of the coverage period, file a
new certificate of coverage with the governmental entity showing that coverage has been
extended.
'�
�
�
�
E. The Contractor shall obtain from each person pr.oviding services on a project, and provide the
governmental entity:
1. A certificate of coverage, prior to that person beginning work on the project, so the
governmental entity wilt have on file certificates of coverage showing coverage for all
persons providing services on the project; and
2. No later than seven days after receipt by the contractor, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project.
F. The contractor shall retain all required certificates of coverage for the duration of the project
and for one year thereafter.
G. The contractor shall notify the governmental entity in writing by certified mail or personal
� delivery, within ten (10) days after the contractor knew or should have known„ of any change
that materially affects the provision of covera�ge of any person providing services oi� the
project. .
LJ
�
L�
�
�
�
L1
�
H. The contractor shall post on each project site a notice, in the text, form and manner prescribed
by the Texas Worker's Compensation Commission, informing all persons providing services
on the project that they are required to be covered, and stating how a person may verify
coverage and report lack of coverage.
i. The contractor. shall contractually require each person with whom it contracts to provide
services on a project, to: �
1. Provide coverage, based on proper reporting on classification codes and payroll amounts
and filing of any coverage agreements, which meets the statutory requirements of Texas
Labor Code, Section 401.01�1(44) for all of its employees providing services on the project,
for the duration of the project;
2. Provide to the Cor�tractor, prior to that person beginning work on the project, a cettificate of
coverage showing that coverage is being provided for all employees of the person
providing services on the project, for the duration of the project;
3. Provide the Contractor, prior to the end of the coverage period, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the current
certificate of cover'age ends during the duration of the project;
4. Obtain from each other person with whom it contracts, and provide to the Contractor:
Q04/21/99
a.) A certificate of coverage, prior to the other person beginning work on the project; and�
b:) A new certificate of coverage showing extension of coverage, prior to the end of the
coverage period, if the coverage period shown on the current certificate of coverage
ends during the duration of the project.
S�_,
�
PART D - SPEClAL CONDITIONS
5. Retain all required certif�cates of coverage on file for the duration of the pr�ject and for one
year thereafter.
6. Notify the governmental entity in writing by certified mail or personal delivery, within ten
� (10) days after the person knew or should have known, of any change that materially
affects the provision of coverage of any person providing services on the project; and
7. Contractually require each person with whom it contracts, to perform as required by
paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom
they are providing services.
8. By signing this contract or providing or causing to be provided a certificate of coverage, the
contractor is representing to the governmental entity that all employees of the contractor
who will provide services on the project will be covered by worker's compensation
coverage for the duration of the project, that the coverage will be based on proper
reporting of classification codes and payroll amounts, and that all coverage agreements
will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the
commission's Division of Self-Insurance Regulation. Providing false or misleading
information may subject the contractor to administrative, criminal, civil penalties or other
civil actions. �
9. The contractor's failure to comply with any of these provisions is a breach of contract by
the contractor which entitles the governmental entity to declare the contract void if the.
contractor does not remedy the breach within ten days after receipt of notice of breach
from the governmental entity.
The contractor shall post a notice on each project site informing all persons providing services
on the project that they are required to be covered, and• stating how a person may verify
current coverage and report failure to provide coverage. This notice does not satisfy other
posting requirements imposed by the Texas Worker's Compensation Act or other Texas
Worker's Compensation Commission rules. This notice must be printed with a title in at least
30 point bold type and text in at least 19 point normal type, and shall be in both English and
Spanish and any other language common to the worker population. The text for the notices
shall be the following text, without any additional words or changes:
"REQUIRED WORKER'S COMPENSATION COVERAGE
The law requires that each person working on this site- or providing services related to this
construction project must be covered by workers' compensation insurance. This includes
persons providing, hauling, or delivering equipment or materials, or providing labor or
transportation or other service related to the project, regardless of the identity of their
employer or status as an employee."
Call the Texas Worker's Compensation Commission at (512)440-3789 to receive information
on the legal �equirement for coverage, to verify whether your employer has provided the
required coverage, or to report an employer's failure to provide coverage".
�
D-13 MINORITY AND WOM�NS BUSINESS ENTERPRISE (M/WBE) COMPLIANCE: In
accordance with City of Fort Worth Ordinance No. 11923, the City of Fort Worth has goals for the
participation of minority business enterprises and women business enterprises in City contracts.
The Ordinance is incorporated in these specifications by reference. A copy of the Ordinance may
be obtained from the Office of the City Secretary. Failure to comply with the ordinance shall be a
material breach of contract.
The M/WBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM AND GOOD FAITH EFFORT
FORM, as applicable, must be submitted within five (5) city business days after bid opening.
Failure to comply shall render the bid non-responsive.
04/21/J9
SC-8
�
�
�
l�
[�J
�
l�
�'
�J
LJ
L�J
�
L�!J
�
L1
�
PART D - SPECIAL CONDITIONS �
Upon request, contrdctor agrees to provide the City complete and accurate information regarding
actual work perFormed by a Minority or Women Business Enterprise (M�JVBE) on the contract and
payment thereof. Contractor further agrees to permit an audit and/or examination of any books,
records or files in its possession that will substantiate the actual work performed by an MBE
and/or WBE. The misrepresentation of acts (other than a negligent misrepresentation) and/or the
commission of fraud by the Contractor will be grounds for termination of the contracf and/or
initiating action under appropriate federal, state, or local laws or ordinances relating to false
statement. Further, any such misrepresentation (other than a negligent misrepresentation) and/or
commission of fraud will result in the Contractor being determined to be irresponsible and barred
from participating in City work for a period of time of not less than three years.
The City will consider the contractor's performance regarding its M/WBE program.in the evaluation
of bids. Failure to comply with the City's M/WBE Ordinance, or to demonstrate"good faith effort",
shall result in a bid being rendered non-responsive to specifications.
Contractor shall provide copies of subcontracts or co-signed letters of intent with approved
M/WBE subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide
monthty reports on utilization of the subcontractors to the City's M/WBE office.
The Contractor may count first and second tier subcontractors and/or suppliers toward meeting
the goals. The Contractor may count towarti its goal a portion of the total dollar amount of the
contract with a joint venture equal to the percentage of the M/WBE participation in the joi'nt venture
for a clearly defined portion of the work to be performed. All M/WBE contractors used in meeting
the goals must be certified prior to the award of the Contract. The M/WBE contractor(s) must be
certified by either the North Central Texas Regional Certification Agency (NCTRCA) or Texas
Department of Transportation (TxDOT), Highway Division and must be located in the nineA.,(9)
county marketplace at time of bid. The Contractor sfiall contact all such M/WBE subcontractors or
suppliers prior to listing them on the M/WBE utilization or good faith effort forms as applicable.
Failure to contact the listed M/WBE subcontractor or supplier prior to bid opening may result iri the
rejection of bid as non-re'sponsive. .
Whenever a change order affects the work of an M/WBE subcontractor or supplier, the M/WBE
shall be given an opportunity to perForm the work. Whenever a change order exceeds 10% of the
original contract, the M/WBE coordinator shall determine the goals applicable to the work to be
performed under the change order.
During the term of the contract the contract shall:
1. Make no unjustified changes or deletions in it's M/WBE participation commitments
submitted with or subsequent to the bid, and,
2. If substantial subcontracting and/or substantial supplier opportunities arise during the term
of the contract which the contractor had represented he would perform with his forces, the
contractor shall notify the City before subcontracts or purchase orders are let, and shall be
required to comply with modifications to goals as determined by the City, and ,
3. Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the conti-actor .desires to
change or delete any of the M/VVBE �subcontractors or suppliers. Justification for change
may be granted for the following:
� 04/21/99
a. Failure of Subcontractor to provide e�idence of coverage by Worker's Compensation
Insurance.
b. Failure of Subcontractor to provide required general liability of other insurance.
c. Failure of Subcontractor to execute a standard subcontract form in the amount of the
proposal used by the Contractor in preparing his M/WBE Participation plan.
SC-9
L�J
LwJ
PART D - SPECIAL CONDITIONS
d. Jefault by the M/WBE subcontractor or sup�lier in the performance of the �
subcontractor. �
Within ten (10) days affer final payment from the City, the contractor shall provide the
M/WBE Office with documentation to reflect final participation of each subcontractor and
supplier used on the project, inclusive of M/WBEs.
D-14 CALENDAR DAY: Delete paragraph C1-1.24, in Part C-General Conditions, in its entirety
and substitute the following new paragraph:
C1-1.24 Calendar Day: A Calendar day is any day of the week or month. The Contractor
wi�� not be allowed to work on Sundays or any holidays observed by the City of Fort Worth.
D-15 SUBSIDIARY� WORK: Any and all work specifically governed by documentary
requirements for the project, such as conditions imposed by the Plans, the General Contract
Documents or these Special Contract Documents, in which no specific item for bid has been
provided fo`r in the Proposaf, shall be considered as a subsidiary item of work, the cost of which
shall be included in the price bid in the Proposal for each bid item. Surface restoration, removal
and replacement of fencing, and cleanup are general items of work which fa�l in the category of
subsidiary work.
D-16 WAGE RATES: The labor classifications and minimum wage rates set forth herein have
been predetermined by the City Council of the City of Fort Worth, Texas, in accordance with
statutory requirements, as being the prevailing classifications and rates that shall govern on all
work performed by the Contractor or any Subcontractor on the site of the project covered by these
Contract Documents. In no event shall less than the following rates of wages be paid. (Attached)
CITY OF FORT WORTH
HIGHWAY CONSTRUCTION
PREVAILING WAGE RATE FOR 1995
CLASSIFICATION
Air Tool Operator
Asphalt Raker
Asphalt Shoveler
Batching Flant Weigher
Batterboard Setter
Carpenter
Concrete Finisher (PA�
Concrete Finisher (STRS)
Concrete Rubber
Electrician
Flagger
Form Builder (STRS)
RATE
CLASSIFICATION
RATE
$7.554
$8.565
$8..255
$9.371
$8.920
$9.447
$9.345
$9.058
$7.733
$12.761
$5:598
$8.717
Form Liner
Form Setter (Pav & Curb)
Form Setter (Structures)
Laborer, Common
Laborer, Utility
Mechanic
Oiler
Servicer
Piledriver
Pipelayer
Blaster
$8.913
$8.686
$8.427
$6.402
$7.461
$10.658
$8.698
$8.104
$7.500
$8.509
$11.333
o4rl��ss SC-10
�
PART D - SPECIAL CONDITIONS
� CLASSIFICATION RATE
L�l
�
�J
�
L�J
,� �
�
,
��
�I
L�J
L�J
�
L�
��
� �J
�
CLASSIFICATION
POWER EQUIPMENT�OPERATORS
Asphalt Distributor $8.404
Asphalt Paving Machine $9.053
Broom or Sweeper Operator $7.908
Bulldozer, 150 HP or Less $8.703
Bulldozer, Over 150 HP $9.160
Concrete Paving Curing Mach.$8.213
Concrete Pav Finishing Mach. $9.453
Concrete Paving Form Grader$8.500
Concrete Paving Joint Mach. $9.042
Concrete Paving Joint Sealer $7.350
Concrete pauing Float $7.875
Concrete Paving Saw $9.290
Concrete Paving Spreader $9.750
Slipform Machine $9.000
Crane, Clamshell, Backhoe,
Derrick, Dragline, Shovel
(Less than 1 '/z cy) $9.513
Crane, Clamshell, Backhoe,
Derrick, Dragline, Shovel
(1 '/2 cy & Over) $10.517
Crushing or Scrng Plt Opr. $9.500
Elevating Grader Foundation
Drill Oper. (Crawler Mounted) $10.000
Foundation Drill Operator
(Truck Mounted) $11.138
Foundation Drill Opr Helper
Front Ent Loader
(2'/z CY or Less) $8.823
Front Ent Loader
(Over 2 '/ CY) $9.311
Hoist (Double Drum & Less) $8.917
Milling Machine Operator $6.650
Mixer (Over 16 CF) $9.000
Mixer (16 CF & Less) $7.913
Mixer - Concrete Paving $9.500
Motor Grader Operator
(Fine Grade) $10.346
Motor Grader Operator $9.891
Pavement Marking Machine $6.402
Posthole Driller Operator
Rolier, Steel Wheel
(Plant-Mix Pavements)
Rolier, Steel Wheel
(Flatwheel or Tamping)
Roller, Pneumatic Self-Pro
Scraper - 17 CY & Less
Scraper - Over 17 CY
Side Boom
Tractor - Crawler Type
(150 HP & Less)
Tractor - Crawler Type
(Over 150 HP)
Tractor - Pneumatic
Traveling Mixer
Trenching Machine - Light
Trenching Machine - Heavy
Wagon-Drill, Boring Machine
Reinforcing Steel Setter
(Paving)
Reinforcing Steel Setter
(Structural)
Steel Worker - Structural
Sign Erector
Spreader Box Operator
Barricade Seivicer Zone Wk.
Mounted Sign Installer
(Permanent Ground)
Truck Driver - Single Axle
(Light)
Truck Driver - Single Axle
(Heavy)
Truck Driver- Tandem Axle
(Semi-Trailer)
Truck Driver - Lowboy/Float
Truck Driver - Transit Mix
Truck Driver - Winch
Vibrator Operator
Welder
RATE
$9.000
$8.339
$7.963
$7.403
$8.138
$8.205
$7.793
$8.448
$8.873
$7.735
$7.615
$8.188
$12.498
$9.000
$9.218
� .�..
$11.548 '�'•�
$16.300
$11.436
$6.988
$6.402
$6.402
$7.465
$8.067 .�
$7.816
$9.653
$7.507
$8.200
$7.000
$10.459
D-17 EASEMENTS AND PERMITS: The performance of this contract requires certain
temporary construction and/or right-of-entry agreements to perform work on private property. The
City has attempted to obtain the temporary construction and/or right-of-entry agreements for
properties where construction activity is necessary on City owned facilities, such as sewer lines or
manholes. For locations where the City was unable to obtain the easement or right-of-entry, it
shall be the Contractor's responsibility to obtain the agreement prior to beginning work on� subject
property. This shall be subsidiary to the contract. The agreements which the City has obtained
are available to the Contractor for review by contacting the plans desk at the Department of
Erigineering, City of Fort Worth. Also, it shall be the responsibility of ttie Contractor to obtain
written permission from property owners to perform such work as cleanout repair and sewer
service replacement on private property. Contractor shall adhere to all requirements of Paragraph
C6-6.10 of the General Contract Documents. The Contractor's attention is directed to the
agreement terms along with any special conditions that may have been imposed on these
agreements, by the property owners.
oa2��ss SC-11
u
PART D - SPECIAL CONDITIONS
The easements and/or private property s�iall be cleaned up after use and restored to its original
condition or better. In event additional work room is required by the Contractor, it shall be the
Contractor's responsibility to obtain written permission from the property owners involved for the
�s
use of additional property required. No additional payment will be allowed for this item.
D-18 COORDINATION WITH FORT WORTH WATER DEPARTMENT: During the construction
of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor
shall be required to coordinate with the Water Department to determine the best times for
deactivating and activating those lines.
D-19 DAMAGE TO PRIVATE PROPERTY: The Contractor shall immediately repair or replace
any damage to �private property, including but not limited .to fences, walls, pavement and water
and sewer services, at no cost to the Owner. This shall be subsidiary to the contract and not a
separate pay item.
D-20 SHOP DRAWINGS: Shop drawings shall be submitted by the Contractor to the
Construction Engineer, for all equipment and materials for this project. Contractor shall submit
seven (7) copies of shop drawings, layouts, manufacturer's data and material schedules as may
be required by the Engineer for his review. Such review by the Engineer shall include checking
for general conformance with the design concept of the project and general compliance with
information given in the General Contract Documents. Indicated action by the Engineer, which
may result from his review, shall not constitute concurrence with any deviation from the plans and
specifications unless such deviations are specifically identified by the method described below,
and further shall not relieve the Contractor of responsibility for errors or omissions in the submitted
data. Processed shop drawing submittal are not change orders. The purpose� of submittals, by
the Contractor, is to demonstrate that the Contractor understands the design concept, and that he
demonstrates his understanding by indicating which equipment and materials he intends to furnish
and install, and by detailing the fabrication and installation methods he intends to use. If
deviations, discrepancies or conflicts betvueen submittals and the design drawings and/or
specifications are discovered, either prior to or after submittals are processed, the design
drawings and specifications shall govern. The Contractor shall be responsible for all dimensions
which are to be confirmed and correlated at the job site, fabrication processes and techniques of
construction, coordination of his work with that of other trades and satisfactory perFormance of his
work. The Contractor shall check and verify all measurements and review submittals prior to
being submitted, and sign or initial a statement included with the submittal, which signifies
compliance with the plans and specifications and dimensions suitable for the applic�tion. Any
deviation from the specified criteria shall be expressly stated in writing in the submittal.
Shop drawings shall be submitted for the following items prior to installation:
1. All pipe `
2. Reinforced steel fabrication for structures
3. Cast Iron structural appurtenances
Shop drawings must be approved by the Engineer prior to the start of work.
D-21 CROSSING OF EXISTING UTILITIES: Where a proposed water line crosses over a
sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line
and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or �anitary
sewer service line shall be made water tight or be constructed of ductile iron �pipe. The required
length of replacement shall be determined by the Engineer. The material for sanitary sewer mains
and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping. �The
material for sanitary sewer service lines shall be extra strength cast iron soil pipe with
polyethylene wrapping. Adapter fittings shall be a urethane or neop�ene coupling ASTM C-425
with series 300 stainless steel compression straps.
Payment for work such as backfill, fittings, tie-ins and all other associated appurtenances required,
shall be included in the�linear foot price of the appropriate bid item.
o4r���ss SC-12
�
�
�
!�I
�J
u
��,
�
�
�
LJ
�
�)
I�l
l�l
L�J
PART D - SPECIAL CONDITIONS
D-22 EXISTING UTILITIES AND IMPROVEMENTS: The plans show the locati�ns of all known
surface and subsurface structures. However, the Owner assumes no responsibility for failure to
show any or all of these structures on the Plans, or to show them in their exact location. It is
mutually agreed that such failure shall not be considered sufficient basis for. claims for additional
compensation for extra work or for increasing the pay quantities in any manner whatsoever.
The Contractor shall be responsible for verifying the locations of and protecting all existing utilities,
service lines, or other property exposed by his construction operations. Contractor shall make all
necessary provisions for the support, protection, relocation, and/or temporary relocation of all
utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines,
electrical cables, drainage pipes, and all other utilities and structures both above and below
�ground during construction. The Contractor is liable for all damages done to such existing
facilities as a result of his operations and any and all cost incurred for the protection and/or
temporary relocation of such facilities shall be included .in the cost bid per linear foot of pipe
installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or
repair the utilities or service lines with the same type of original material and corrstruction, or
better, unless otherwise shown or noted on the plans, at his own cost and expense. The
Contractor shall immediately notify the Owner of the damaged utility or service line. He shall
cooperate with the Owners of all utilities to locate existing underground facilities and notify the
Engineer of any conflicts in grades and alignment.
Any and all permanent structures such as parking lot sur,face, fencing, and like structures shall be. ,
replaced at no cost to the City by material of equal value and quality as that damaged. :.�;
In case it is necessary to change or move the property of any Owner of a public utility, such�
property shall not be moved or interfered with until ordered to do so by the Engineer. The right is:
reserved to the owner of public utilitiss to enter upon the limits of the project for the purpose of
making such changes or repairs of their property that may be made necessary by performance of
this contract.
The utility lines and conduits shown on the plans are for information only and are not guaranteed
by the City of the Engineer to be accura�e as to extent, location, and depth; they are shown on the
plans as the best information available at the time of design, from the owners of the utilities
involved and from evidences found on the ground.
D-23 CONSTRUCTION TRAFFIC OVER PIPELINES: It is apparent that certain construction
vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will
be the responsibility of the Contractor to protect both the new line and the existing lines from these
possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe
with a truck delivering new pipe to the site. Any damage to the existing or new pipe will be
repaired or replaced by the Contractor, at the �ont��ctor's expense, to the satisfaction of the City.
In locations where it is not permissible to cross the existing or proposed pipes without�additional
protection the Contractor may elect to provide additional protection of the pipes so that more
frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor
to repair any damage to the existing or proposed lines, if the damage results from any phase of
his construction operation.
a D-24 TRAFFIC CONTROL: The Contractor shall be responsible for providing traffic control
during the construction of this project consistent with the provision set forth in the"1980 Texas
Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority
of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701d
� Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. In addition, the
Contractor shall comply with City of Fort Worth, 7exas, February 1979, Traffic Control Handbook
for Construction and Maintenance Work Areas.
a _
04/21/99 SC-13
L!J
PART' �D - SPECIAL CONDITIONS
Tlie Contractor will n�t remove any regulatory sign, instructional sign, street name sign or other
sign which has been zrected by the City. If it is determined that� a sign riust be removed to permit
required construction, the Contractor shall contact the Transportation/Public Works Department,
Signs and Markings Division, (Phone Number 871-8100) to remove the sign. In the case of
regulatory sigrrs, the Contractor must replace the permanent sign with a temporary sign meeting
the requirements of the above-referenced manual and such temporary sign must be installed prior
to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does
not meet the required specifications, the permanent sign shall be left in place until the temporary
sign requi�'ements are met. When construction work is completed to the extent that the permanent
sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to
reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is
completed.
1. The Contractor shall furnish barricades, flares, etc., for the protection of the public and the
work.
2. The cost of the traffic control shall be included in the price bid for pipe complete in place as
bid in the Propo�sal, and no other compensation will be allowed.
3. The Contractor shall furnish a traffic control plan to the City at the pre-construction
meeting. The cost for traffic control Shall be subsidiary to the unit prices for this project.
D-25 PAYMENT: Payment for all work and material involved in salvaging, abandoning, and/or
removing of existing facilities shall be included� in the linear foot bid price of the pipe except as
follows:
1. Separate payment will be made for removal of all fire hydrants, gate valves 16-inch and
larger, and sanitary sew�r manholes regardless of location.
2. Payment will be made for salvaging, abandoning, and/or removing of all other existing
facilities when said facility is nof being replaced in the same trench, i.e., when removal
requires a separate trenching operation.
D-26 DELAYS: The Contractor shall receive no compensation for delays or hindrances to the
work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of
the City to provide information or material, if any, which is to be furnished by the City. When such
extra compensation is claimed, a written stateme.nt thereof shall be presented by the Contractor to
the Engineer, and if by him found correct, shall be approved and referred by him to the Council for
final approval or disapproval; and the action thereon by the Council shall be final and binding. If
delay is caused by specific orders given by the Engineers to stop work, or by the performance of
extra work, or by the failure of the City to provide material or necessary instructions for carrying on
the work, then such delay will entitle the Contractor to an equivalent extension of time, his
application for which shalt, however, be subject to the approval of the City Council; and no such
extension of time shall release the Contractor or the surety on his performance bond from all his
obligations hereunder which shall remain in full force until the discharge of the contr,act.
D-27 DETOURS: The Contractor shall prosecute his work in such a manner as to create a
minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and
pedestrian traffic within the project area.
D-28 BARRICADES AND WARNING SIGNS: Barricades, warning and detour signs shall
conform to the Standard Specifications "Barriers and Warning and/or Detour Signs," Item 524,
and/or as shown on the plans. Construction signing and barricades shall conform with "1980
Texas Manual on Uniform Traffic Control Devices, Vol. No. 1" or latest edition there of.
D-29 EXAMINATION OF SITE: It shall be the responsibility of the prospective,bidder to.visit the
project site and make such examinations and explorations as may be necessary to determine all
conditions which may affect construction of this project. Particular attention should be given to
oar���ss SC-14
PART D - SPECIAL CONDITIONS
methods o�•providing ingress�and egress to adjacent private a�d public properties, procedures for
protecting existing improvements and disposition of all n��aterials to be removed. Proper
consideration should be given to these details during the preparation of the Proposal and all
unusual conditions which may give rise to later contingencies should be brought to the attention of
the Owner prior to the submission of the Pr,oposal.
D-30 ZONING COMPLIANCE: During the construction of this project, the Contractor shall
comply with present zoning requirements of the City of Fort Worth in the use of vacant property�for
storage purposes.
D-31 WATER FOR CONSTRUCTION: Water for construction will be furnished by the
Contractor at his own expense.
D-32 WASTE MATERIAL: All waste material shalt become the property of the Contractor and
shall be disposed of by the Contractor at locations approved by the Engineer. All material shall be
disposed of in such a manner as to present a neat appearance and to not obstruct proper
drainage or to cause injury to street improvements or to abutting property.
D-33 CLEANUP FOR FINAL ACCEPTANCE: Final cleanup work shall be done for this project
as soon as all construction has been completed. No more than seven days shall elapse after
completion of construction before the roadway, right-of-way, or easement is cleaned up to the
satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work
before acceptance by the City of Fort Worth or its representative. This cleanup shall include
removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials,<-
and in general preparing the site of the work in an orderly manner and appearance. Final
acceptance of the completed project work shall be given by the City of Fort Worth Department of
Engineering. �
D-34 PROPERTY ACCESS: Access to adjacent property shall be maintained at all times
unless otherwise directed by the Engineer. �
D-35 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK: Prior to executing the
Contract, it shall be the responsibility of the Contractor to, furnish a schedule outlining the
anticipated time for each phase of construction with starting and completion dates, including
sufficient time being allowed for cleanup. �
D-36 SAFETY RESTRICTIONS - WORK NEAR H1GH VOLTAGE LINES: The following
procedures will be followed regarding the subject item on this contract:
1. A waming sign not less than five inches by seven inches, painted yellow with black letters
that are legible at twelve feet shall be placed inside and outside vehicles such as cranes,
derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus.
The warning sign shall read as fotlows: "WARNING - UNLAWFUL TO OPERATE THIS
EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES.°
2. Equipment that may be operated within ten feet of high voltage lines shall have insulating
cage-type of guard about the boom or arm, except back hoes or dippers, and insulator
links on the lift hook connections.
3. When necessary to work within six feet of high voltage electric lines, notification shall be
given the� power company (Texas Utility Electric) who will erect temporary mechanical
barriers, de-energize the lines, or raise or lower the lines. The work done by the power
company shall not be at the expense of the City of Fort Worth. The notifying department
shall maintain an accurate log of all such calls to Texas Utility Electric, and shall record
action taken in each case.
04/21/99 SC-15
PART D - SPECIAL CONDITIONS
4. The Contractor is required to make arrangen�ents with the Texas Electric Service company
for the temporary relocation or raising of hiyh voltage lines at the Contractor's sole c�st
and expense. '
5. No person shall work within six feet of a liigh voltage line without protection having been
taken as outlined in Paragraph (3).
D-37 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: The Contractor covenants
and agrees to indemnify, hold harmless and defend the City, and their officers, agents servants or
employees, and/or owners of the units and lot abutting the units in this contract from and against
any and all claims for damages or injuries, including death, to any and all persons or property, of
whatsoever kind of character, whether real or asserted, arising out of or incident to the services
relating to the project to be performed by said Contractor, its officers, agents, servants or
employees, under the terms and conditions of this Contract, whether or not caused by negligence
on the part of the City, or their officers, agents, servants or employees; and said Contractor does
hereby covenant and agree to assume all liability and responsibility of City for injuries, claims or
suits for damages to any and all persons or property, of whatsoever kind or character, occurring
during the term of this agreement and arising out of or by reason of service, covenants or
agreements performed by said Contractor, its officers, agents, servants or employees. Contractor
likewise covenants and agrees to, and does hereby, indemnify and hold harmless the City from
and against any and all injuries or damages to property of City during the performance of any of
the terms and conditions of this Contract, whether arising out of or in connection with or resulting
from any and all acts or omissions of the City, their o�cers, agents, servants, or employees, or
caused by negligence on the part of City, or their officers, agents, servants employees and/or
owners of the units and lots abutting the units in this contract.
In the event a written claim for damages against the Contractor remains unsettled at the time all
work on the project has been completed to the satisfaction of the Director for the Department of
Engineering, as evidenced by a final inspection, final payment to the Contractor shall not be
recommended by the Director of Department of Engineering for a period of 30 days after the date
of such final inspection, unless the Contractor shall submit written evidence satisfactory to the
Director that the claim has been settled and a release has been obtained from the claimant
involved.
Although the claim concerned remains unsettled as of the expiration of the above 30-day period,
the Contractor may be deemed to be entitled to a semi-final payment for work completed, such
semi-final payment to be in an amount equal to the total dollar amount then due less the dollar
value of any written claims pending against the Contractor arising out of the perFormance of such
work, and such semi-final payment may then. be recommended by the Director. `
The Director shall not recommend final payment to a Contractor against whom such a claim for
damages is outstanding for a period of six months following the date of the acceptance for the
work performed unless the Contractor submits evidence in writing satisfactory to the Director that:
1. The claim has been settled and a release has been obtained from the claimant involved, or
2. Good faith efforts have been made to settle such outstanding class, and' such good faith
efforts have failed.
If condition (1). above is met at any time within the six-month period, the Director shall recommend
that the final payment to the Contractor be made. If condition (2) above is met at any time within
the six-month period, the Director may recommend that the final payment to the Contractor be
made. At the expiration of the six-month period, the Director may recommend that final payment
be made if all other work has been performed and all other obligation of the Contractor have been
met to the satisfaction of the Director.
The Director may, if he deems it appropriate, refuse to accept bids on other Department of
Engineering contract work from a Contractor against whom a claim for damages is outstanding as
oar���ss SC-16
�
0
�
�
�
u
��
'
�
�
�
I�J
C�
I
I #;
�
�J
l�J
L�J
L�'
PART D - SPECIAL CONDITIONS
a result of work pe�formed under a City c�ntract or under a developer-let contract for City �` Fort
Worth street and/or storm drainage facilitics.
D-38 SANITARY FACILITIES FOR V1iORKERS: The Contractor shall provide all necessary
sanitary conveniences for the use of workers at the project site. Specific attention is directed to
this requirement. �
D-39 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's
particular attention is directed to the requirements of Item C-6-6, "Legal Relations and
Responsibilities to the Public" of the Fort Worth General Conditions.
D-40 RIGHT TO AUDIT:
A. Contractor agrees that the City shall, until the expiration of three (3) years after final payment
under this contract have access to and the right to examine and photocopy any directly
pertinent books, documents, papers and records of the Contractor involving transactions
relating to this contract. Contractor agrees that the City shall have access during normal
working hours to all necessary Contractor facilities and shall be provided adequate and
appropriate work space in order to conduct audits in compliance with the provisions of this
section. ihe City shall.give Contractor reasonable advance notice of intended audits.
B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect
that the subcontractor agrees that the City shall, under the expiration of three (3) years after
final payment under the subcontract, have access to and the right to examine and photocopy
any directly pertinent books, documents, papers and records of such subcontractor, involving
transactions to the subcontract, and>further, that City shall have access during normal working
hours to all subcontractor facilities, and shall be provided adequate and appropriate-� work �
space, in order to conduct audits in compliance with the provisions of this article together with
subsection (c) hereof. City shatl �give subcontractor reasonable advance notice of intended
audits.
C. Contractor and subcontractor agree to photocopy such documents as may be requested-by
the :City. The City agrees to reimburse Contractor for the cost of copies as follows:
1. copies and und�r - 10 cents per page
2. more than 50 copies - 85 cents for the first page plus fifteen cents for each page thereafter
D-41 INCREASE OR DECREASE IN QUANTITIES: The quantities shown in the proposal are
approximate. It is the Contractor's sole responsibility to verify all pay item quantities prior to
submitting a bid.
When the quantity of the work to be done or materials to be furnished under any pay item of the
contract is more than 125% of the quantity stated in the contract, whether stated by Owner or by
Contractor, then either party to the contract, upon demarid, shall be entitled to negotiate for
revised consideration on the portion of work above 125% of the quantity in the contract.
When the quantity of the work to be done or materials to be furnished under any pay item of the
contract is less than 75% of the quantity stated in the contract, whether stated by Owner or by�
Contractor, then either party to the contract, upon demand, shall be entitled to .negotiate for
revised consideration on the portion of work below 75% of the quantity stated in the contract. This
paragraph shall not apply in the event Owner deletes a pay item in its entirety from this contract.
In the event Owner and Contractor are unable to agree on a negotiated price, Owner and
Contractor agree that the consideration will be the actual field cost of the work plus 15% as
described herein below, agreed upon in writing by the Contractor and Director of Department of
Engineering and Contractor and Director of Department bf Engineering and approved by the City
Council after said work is completed, subject to all other conditions of,the contract. As used
herein, field cost of the work will include the cost of all- workmen, foremen, time keepers,
04/21/99 SC-� 7
r
1 �J
PART D - SPECIAL CONDITIONS
."
mechanics and laborers; all ma;erials, supplies, trucks, equipment rental for such ;ime as actually
used on such work only, plus al� power, fuel, lubricants, water and similar operatir�g expenses; and
a ratable portion of premiums on performance and payment bonds, public liability, Workers
Compensation and all other insurance required by law or by ordinance. Tr�e Director of
Department of Engineering will direct the form in which the accounts of actual field cost will be
kept and will recommend in writing the method of doing the work and the type and kind of
equipment to be used, but such work will be performed by the Contractor as an independent
Contractor and not as an agent or employee of the City. The 15% of the actual field cost to be
paid to the Contractor shall cover and compensate him for profit, overhead, general supervision
and field office expense, and all other elements of cost and expense not embraced within the
actual field cost as herein specified. Upon request, the Contractor shall provide the Director of
Department of Engineering access to all accounts, bills and vouchers relating thereto.
D-42 CUTTING OF CONCRETE: When existing concrete is cut, such cuts shall be made with a
concrete saw. All sawing shall be subsidiary to the unit cost of the respective item.
D-43 PROJECT DESIGNATION SIGN: Project signs are required at all locations. It shall be in
accordance with the attached Figure 30 (dated 9-18-96). The signs may be mounted on skids or
posts. The exact locations and methods of mounting shall be approved by the Engineer. In
addition to the 4' x 8' project signs, project signs shall be attached to barricades used where
manhole rehabilitation or replacement is being conducted. Signs suspended from barricading
shall be placed in such a way that signs do not interFere with reflective paint or coloring on the
barricades. Barricade signs shall be in accordance with Figure 30, except that they shall be �I'-0"
by 2'-0" in size. The information box shall have the following information:
For Questions on this Project Call:
(817)871-8306 M-F 7:30 am to 4:30 p.m.
or
(817)871-8300 Nights and Weekends
Any and all cost for the required materialg, labor, and equipment necessary for the furnishing of
Project Signs shall be considered as a subsidiary cost of the project and no additional
compensation will be allowed.
D-44 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT: At locations in the project
where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks
and/or driveways shall be completely replaced for the full existing width, between existing
construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in
accordance with City of Fort Worth Transportation/Public Works Department Standard
Specifications for Construction, Item 504.
At locations where mains are required to be placed under existing curb and gutter, such curb and
gutter shall be replaced to match type and geometry of the removed curb and gutter shall be
installed in accordance with City of Fort Worth Public Works Department Standard Specification
for Construction, Item 502.
Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances
required, shall be included in the square yard price of the bid item for concrete sidewalk or
driveway repair.
D-45 MISCELLANEOUS PLACEMENT OF MATERIAL: Material has been allocated under
various bid items in the Proposal to establish unit prices for miscellaneous placement of material.
These materials shall be used only when directed by the Engineer, depending on field conditions.
Payment for miscellaneous placement of material will be made for only that amount of material
used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material
shall be in accordance with the General Contract Documents regardless of the actual amount
used for the project.
oarz��s SC-18
LJ
�,J
�
�
L�J
PART D - SPECIAL, CONDITIONS
D-46 TYPE "C" EACKFILL: Excavated material used for Type "C" b`ackfill must be
mechanically compa�ted unless the Contractor can furnish the Er�gineer with satisfactory
evidence the P.I. of the excavated material is less then 8.* Such evidence shall be a test report
from an independent testing laboratory and must include representative samples of soils in all
involved areas, with a map showing the location and depth of the various test holes.
If excavated material is obviously granular in nature, containing little or no plastic material, the
Engineer may waive the test report requirement.
See E-1.24, Type "C" Backfill, and E2.11 Trench Backfill.**
" Revised 3/20/81
'"' Revised 4/20/81
D D-47 CRUSHED LIMESTONE BACKFILL: Where specified on the plans or directed by the
Engineer, Crushed Limestone shall be used for trencfi backfill on this project. The material shall
conform to Public Works Standard Specifications for Street and Storm Drain Construction Division
� 2 Item 208.2 - Materials and Division 2 Item 208.3 - Materials Sources. Trench backfill and
compaction shall meet the requirements of E2-2 Excavation and Backfill, Construction
Specifications, General Contract Documents.
�
�
�
Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal
multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of
Backfill Materials, Construction Specifications, General Contract Documents.
D-48 2:27 CONCRETE: Transportation and Public Works Department typical sections for
Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as
base repair. Since this call-out includes the word "concrete", the consistent interpretation of the
Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement
per cubic yard of concrete.
D-49 TRENCH EXCAVATION, BACKFILL, AND COMPACTION: Trench excavation and
� backfill under parking lots, driveways, gravel surfaced roads, within easements, anci within existing
or future R.O.W. shall be in accordance with Section E1-2 Backfill and E2-2 Excavation and
Backfill of the General Contract Be6�aaeats-apd-�pecifications except as specified herein.
�
�
�
�
a
a
D
�
A. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the
stated maximum trench widths are exceeded, either through accident or otherwise, and,�if the
Engineer determines that the design loading of the pipe will be exceeded, the Contractor will
be required to support fhe pipe with an improved trench bottom. The expense of` such
remedial measures shall be entirely the Contractor's own. All trenching operations shall be
confined to the width of permanent rights-of-way, permanent easements, and any temporary
construction easements. All excavation shall be in strict compliance with the Trench Safety
Systems Special Condition of this document. "
B. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be
backfilled above the top of the embedment material with Type "C" backfill material. Excavated
material used for Type "C" backfill must be mechanically compacted unless the Contractor can
furnish the Engineer with satisfactory evidence that the P.I. of the excavated material is less
than 8. Such evidence shall be a test report from an independent testing laboratory and must
include representative samples of soils in all involved areas, with a map showing the location
and depth of the various test holes. If excavated material is obviously granular in nature,
containing little or no plastic material, the Engineer may waive the test report requirement.
See E1-2.3, Type "C" or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements.
When Type "C" backfill material is not suitable, at the direction of the Engineer, Type "B"
backfill material shall be used. In general, all backfill material for trenches in existing paved
streets shall be in accordance with Figure(s) A, B, C, or D. Sand material specified in
Figure(s) A-D shall be obtained from an �approved source and shall consist of durable particles
oan��ss
SC-19
PART D - SPECIAL CONDITIONS
.�� 3
free of ►�in or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet
the foll��ving gradation:
kh
♦
Size Sieve
#�4
#16
#50
#100
#200
% Retained
0-5
0-20
0-50
60-95
90-�00
(P.I. = 8 or less)
C. TRENCH COMPACTIbN: Atl trench backfill shall be placed in lifts per E2-2.9 Backfill:
Trenches which lie outside existing or future pavements shall be compacted to a minimum of
90% Standard Proctor Density (A.S.T.M. D698) by means of tamping only.
Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95%
Standard Proctor Density by jetting, mechanical tamping, or a combination of inethods.
Backfill material to be mechanically tamped must be within +-4%, of its optimum moisture
content. The top two (2) feet of sewer line trenches and the top eighteen (18) inches of water
line may be rolled in with heavy. equipment tices, provided it is placed in lifts appropriate to the
material being used and the operation can be performed without.damage to the installed pipe.
The City, at its own expense, will perform trench compaction tests per A.S.T.M. standards on
all trench backfill. Any retesting required as'a result of failure to compact the backfill material
to meet the standards will be at° the expense of the Contractor and will be billed at the
commercial rates as determined by the City. These soil density tests shall be performed at
two (2) foot vertical intervals beginning at a level two (2) feet above the top of the installed pipe
and continuing to the top of the compl�ted backfill at intervals along the trench not to exceed
300 linear feet. The Contractor will be responsible for providing access and trench safety
system to the level of trench backfill to be tested. No extra compensation will be allowed for
exposing the backfill layer to be tested or providing trench safety system for tests conducted
by the Cit�. � .
D. MEASUREMENT AND PAYMENT: All material, including any and all Type "B" backfill, and
labor costs of excavation and backfill will be included in the price bid per linear foot of water
and sewer pipe.
D-50 PAVEMENT REPAIR (E2-19�: The unit price bid under the appropriate bid item of the
proposal shall cover all cost for providirig pavement repair equal to or superior in composition,
thickness, etc., to existing pavement as detailed in the Public Works Department typical sections
for Pavement and Trench Repair for Utility Cuts, Figures 1 through 5.
All required paving cuts sh�ll be made with a concrete saw in a true �nd straight line on both sides
of the trench,. a minimum of twelve (12) inches outside the trench walls. The trench shall be
backfilled and the top nine (9) inches shall be filled with required materials as shown on paving
details, compacted and level with the finished street surface. This finished grade shall be
maintained in a serviceable condition until the paving has been replaced. All residential driveways
shall be accessible at night and over weekends.
04l21/99
SC-20
�
0
�
u
L�J
�
�
�
'
�
�
�
�
�
,�
�
;�
��
PART D - SPECIAL CONDITIONS
It has been determined by the Transportation anu Public Works Department that the strip of
Existing HMAC pavement between the existing gutter and the edge of the trench pavement repair
will not hold up if such strip of existing pavement is two (2) feet or less in width.
Therefore, at the locations in the project where the trench wall is three (3) feet or less from the lip
of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter.
The pavement repair shall then be made from a minimum distance of twelve (12) inches outside
the trench wall nearest the center of the street to the gutter line.
The pavement shall be replaced within a maximum of five (5) working days, providing job
placement conditions will permit repaving. If paving conditions are not suitable for repaving, in the
opinion of the Owner, the repaving shall be done at the earliest possible date.
A permit must be obtained from the Department of Engineering Construction Services S�ction by
the Contractor in confor�nance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility
cuts in �the street. The Department of Engineering will inspect the paving repair after construction.
This permit requirement may be waived if work is being done under a Performance Bond and
inspected by'the Department of Engineering.
D-51 TRENCH SAFETY SYSTEM FOR WATER DEPARTMENT PROJECTS ONLY:
�
�
GENERAL: This specification covers the trench safety requirements for all trench excavations
exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of
this item govern all trenches for mains, manholes, vaults, service lines, and all oth,er •
appurtenances. The design for the trench safety shall be signed and sealed by a Registere�i
Professional Engineer licensed in Texas. ,�
, °� '
STANDARDS: The latest version of the U.S. Department of Labor, Occupational Safety a�d'
Health Administration Standards, 29 CFR Part 1926, Sub-Part P- Excavations, are hereby
made a part of this specification and shall be the minimum governing requirements for trench
safety.
C. DEFINITIONS:
1�. TRENCHES - A trench is referred to as a narrow excavation made below the surface of
the ground ir� �vhictrthe depth is-greater than the width, where the width measured .at t�ie
bottom is not greater than fifteen (15) feet.
.
,
2. BENCHING SYSTEM - Benching means excavating the sides of a trench to form one or:a;'
series of horizontal level or steps, usually with vertical or near-vertical surfaces between
levels.
3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined
away from the excavation.
4. SHIELD SYSTEM - Shields used in trenches are generally referred to as"trench boxes" or
"trench shields". Shield means a structure that is able to withstand the forces imposed�� on
it by a cave-in and protect workers within the structure. Shields can be permanent
structures or can be designed to be portable and move along as the work progresses.
Shields can be either pre-manufactured or job-built in accordance with OSHA standards.
5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical or
timer system that supports the sides of a trench and which is designed to prevent cave-ins.
Shoring systems are generally comprised of cross-braces, vertical rails, (uprights),
horizontal rails (wales) and/or sheeting.
04/21/'99
SC-21
PART D - SPECIAL CONDITIONS
D. MEASUREMENT - Trench depth is the vertical measurement from the top of the ex�sting
ground to the bottom of the pipe or st� uctures. The quantity of trench safety systems shali be
based on the linear foot amount of trench depth greater than five (5) feet.
' E. PAYMENT - Paymerit shall be full compensation for safety system design, labor, tools,
materials, equipment and incidentals necessa�y for the installation and removal of trench
� safety systems.
µ
� D-52 SANITARY SEWER MANHOLES:
A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes will
be required as shown on the plans, and/or as described in these Special Contract Documents
in addition to those located in the field and-identified by the Engineer. All manholes shall be in
accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc.,
and E2-14 Vault and Manhole Construction of the General Contract Documents and
Specifications, unless amended or superseded by requirements of this Special Condition.
1. CONCRETE COLLARS: Concrete collars will be required on all manholes specified as per
Figure 121.
2. WATERTIGHT MANHOLE INSERTS: Watertight gasketed manhole inserts shall be
installed in all sanitary sewer manholes. Inserts �hall be constructed in accordance with
Fort Worth Water Department Standard E100-4 and shall be fitted and installed according
to the manufacturer's recommendations. Stainless Steel m,anhole inserts shall be required
for all pipe diameters 18" and greater.
3. LIFT HOLES: All lift holes shall be plugged with a pre-cast concrete plug. The lift hole
shall be sealed on the outside of�the manhole with Ram-Nek or an approved equal sealant.
The lift hole shall be sealed on the inside of the manhole with quick setting cement grout.
4. FINAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands
shall be at an elevation not more than one (1) nor less than one-half (1/2) inch above the
surrounding ground. Backfill shall provide � uniform slope from the top of manhole casting-
for not less than three (3) feet each direction to existing finish grade of the ground. The
grade of all surfaces shall be checked for proper slope and grade by string lining the entire
area regarded near the manhole.
Manholes in open fields, unimproved land, or drainage courses shall be at an elevation
shown on the drawings or minimum of 6 inches above grade.
5. MANHOLE COVERS: All lids shall have pick slots in lieu of pick holes. Manhole frames
and covers shall be McKinley, Type N, with indented top design, or equal, with pick slots.
Covers shall set flush with the rim of the frame and shall have no larger than 1/8 inch gap
between the frame and cover. Bearing surFaces shall be machine finished. Locking
manhole lids and frames will be restricted to locations within the 100-year floodplain and
areas specifically designated on the plans. Certainteed Ductile Iron Manhole Lids and
Frames are acceptable for use where locking lids are specified.
6. SHALLOW CONE MANHOLES: Shallow manhole construction will be used when
manhole depth is four (4) feet or less. All shallow cone manholes shall be �built in
accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and
frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED.
7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer manhole
8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with
two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec "46-
450 Heavy Tnemecol," or equal to, a minimum or 14 mils dry film thickness.
oar���ss SG22
J
J
�
PART D - SPECIAL CONDITIONS
9. MANHOLE JOINT SE�,LING: All interior and/or exterior joints on cor�crete manhole
sections constructed for the City of Fort Worth Water Department, excluding only the joints
using a trapped type performed O-ring rubber gasket shall require Bitumastic joint sealants
as per Figure M.
� This sealant shall be pre-formed and trowelable Bitumastic as manufactured by Kent-Seal,
Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either extrude,d pipe
form or suitable cross-sectional area or flat-tape and shall be sized as recommended by
the manufacturer and approved by the Engineer. The joint sealer shall be protected by a
� suitable removable wrapper and shall not in any way depend on oxidation, evaporation, or
any other chemical action for either its adhesive properties or cohesive strength. The Joint
sealer shall remain totally flexible without shrinking, hardening, or oxidizing regardless of
� the length of time it is exposed to the elements. The manufacturer shall furnish an affidavit
attesting to the successfui use of the product as a pre-formed flexible joint sealant on
concrete pipe and manhole sections for a period of at least five years.
�I
�
�
�
�
I
�1
�
D
!J
�
B. EXECUTION:
1. INSTALLATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame
shall be sealed with the above specifi�d materials. All surfaces to be in contact with the
joint sealant shall be thoroughly cleaned of dirt, sand, mud, or other foreign matter, A
prime�' shall be applied to all surfaces prior to installing the joint sealant in accordance with
the recommendations by the manufacturer. The protective wrapper shall remain o�_ the
joint sealant until immediately prior to the placement of the pipe in the trench. After-
removal of the protective wrapper, the joint sealant shall be kept clean. Install frames and
cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer.
Frames and grade rings shall rest on two (2) rows (inside and outside) of Bitumastic�.joint
sealer.
2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth
saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and�a
minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical.
D �
04/21/99
Remove manhole frame from the manhole structure and observe the condition of the
frame and grade rings. Any frame or grade ring that is not suitable for use as determiried
by the Engineer� shall be replaced. Grade rings that are constructed of brick, block
materials other than pre-Gast concrete rings, or where necessary and approved by the
Engineer, shall be replaced with a pre-cast flattop section. Pre-cast concrete rings, or a
pre-cast concrete flattop sectiora will be the only adjustments allowed.
In brick or block manholes, replace the upper portion of the manhole to a point 24 inches
below the frame. If the walls or cone section below this level are structurally unsound,
notify the Engineer prior to replacement of the grade rings and manhole frame. Existing
brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense.
Wire brush manhole frame and exposed manhole surfaces to remove dirt and I�ose
debris. Coat exposed manhole surfaces with an approved bonding agent followed by an
application of a quick setting hydraulic cement to provide a smooth working surface. �
If the inside diameter of the manhole is too large to safely support new adjustment rings or
frames, a flat top section shall be installed. .
Joint surfaces between the frames, adjustment rings, and cone section shall be free of dirt,
stones, debris and voids to ensure a watertight seal. Place flexible gasket joint material
along the inside and outside edge of each joint, or use trowelable material in lieu of pre-
formed gasket material. Position the butt joint of each .length of joint material on opposite
sides of the manhole. No steel shims, wood, stones, ot any material not specifically
SC-23
�
PART D - SPECIy4L CONDITIONS
accepted by t��e Engineer may be �sed to obtain final surface alevation of the manhole
frame. �
In paved areas or future paved areas, castings shall be installed by using a straight edge
,;�� not less than ten (10) feet long so that the top of the casting will conform to the slope and
finish elevation of the paved surface. The top of the casting shall be 1/8.inch below the
finished elevatibn. Allowances for the compression of the joint material shall be made to
assure a proper final grade elevation.
3. E�CPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with
two mop coats of coal tar epoxy. Kopper "Bitumastic Super Service Black"; Tnemec "46-
450 Heavy Tnemecol", or equal, to a minimum of 14 mils dry film thickness.
4. The exterior surface of all pre-cast section joints shall be thoroughly cleaned with a wire
brush and then waterproofed with a 1/2-inch thick coat of trowelable bitumastic joint
sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be
wrapped with 6 mil plastic to protect the sealant from damage during backfilling.
C. MEASUREMENT AND PAYMENT: The price bid for new manhoCe installations shall include
all labor, equipment, and materials necessary for construction of the manhole including, but
not limited to, joint sealing, lift hole sealing and exterior surface coating and pavement repair.
The price bid for reconstruction of existing manholes shall include all labor equipment and
materials necessary for construction of new manhole, including, but not limited to, excavation,
backfill, disposal of materials, joint sealing, lift hole sealing, exterior surface coating and
pavement repair. �
The price bid for adjusting and/or sealing of existing manholes shall include all labor,
equipment and materials necessary for adjusting and/or sealing the manhole, including but not
limited to, joint sealing, lifthole sealing, and exterior surface coating.
Payment for concrete collars will be made per each. Payment for manhole inserts will be
made per each.
D-53 SANITARY SEYVER SERVICES: Any reconnection, relocation, re-routes, replacement, or
new sanitary sewer service shall be required as shown on the plans, and/or as described in these
Special Contact Documents in addition to those located in the field and identified by the Engineer
as active sewer taps. The service connections shall be constructed by the Contractor utilizing
standard factory manufactured tees. City approved factory manufactured saddle taps may be
used, but only as directed �y the Engineer. The decision to us� saddle taps as opposed to tees
shall be made on a case by case basis. The Contractor shall be responsible for coordinating the
scheduling of tapping crews with building owners and the Engineer in order that the work be
performed ir� an expeditious manner. A minimum of 24 hours advance notice shall be given when
taps will be required. Severed service connections shall be maintained as specified in section C6-
6.15.
A. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the
Contractor shall vertically adjust the existing sewer service line as required for reconnection
and furnish a new tap. The fittings used for vertical adjustment shall consist of a maximum
bend of 45 degrees. The tap shall be located so as to line up with the service line and avoid
any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be
replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer
services on sewers being rehabilitated using pipe enlargement methods shall be replaced to
the property or easement line or as directed by the Engineer. Frocedures listed below for
Sewer Senrice Replacement shall be adhered to for the installation of any sewer service line
including the incidental four (4) feet of service line which is included in the price bid for
Sanitary Sewer Taps. Payment for work such as backfill, saddles, tees, fittings incidenfal four
(4) feet of service line and all other associated appurtenances required shall be included in the
price bid for Sanitary Sewer Taps.
oar���s SG24
iJ
�
C�
PART D - SPECIAL CONDITIONS
Type of Utility
Water
Co/or Code
Safety Blue
Legends
Caution! Buried Water Line Below
Sewer
Safety Green
Caution! Buried Sewer Line Below
� Installation of detectabie tapes shall be per manufacturer's recommendations and shall be as
close to the grade as i's practical for optimum protection and detectabi�ity. Aflow a;ninimum of 18
inches between the tape and the pipe. Payment for work such as backfill, bedding, blocking,
� detectable tapes, and all other associated appurtenances required shall be included in the unit
price bid for the appropriate bid item(s).
�
�
I�l
�
�
�
�
��
I�l
�
�
�
D-57 P(PE CLEANING: Joints shall be wiped and then inspected for proper installation by the
inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night
plug shall be installed on all exposed pipe ends during any period of work stoppage.
D-58 BARRICADES, WARNINGS, AND FLAGMEN: Reference Part C- General Conditions,
Section C6-6.8 Barricades, Warnings, and Watchmen: '
A. Wherever the word Watchmen appears �in this paragraph, it shall be changed to the word
Flagmen.
B. In the first paragraph, lines five (5) and six (6), change the phrase "take all such other
precautionary measures" to "take all reasonable necessary measures".
D-59 DISPOSAL OF SPOIL/FILL MATERIAL': Prior to the disposing of any spoil/fill material,
the Contractor shall advise the Director of Engineering Department, acting as the City of Fort
Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the Contractor
intends to dispose of such material. Contractor shall not dispose of such material until the
proposed sites have been determined by the Administrator to meet the requirements of the Flood
Plain Ordinances of the City of Fort Worth (Ordinance No. 1 G056). All disposal sites must be
approved by the Administrator to ensure that filling is nof occurring within a floodplain without a
permit. A floodplain permit can be issued upon approval of necessary Engineering studies. No fill
permit is required if disposal sites are not in a floodplain. Approval of the Contractor's disposal
sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a
known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any
expenses associated with obtaining the fill permit, including any necessary Engineering studies,
shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/�II material
at a site withbut a fill permit or a letter from the administrator approving the disposal site, upon
notification by the Director of Engineering Department, Contractor shall remove the spoil/fill
material at its expense and dispose of such materials in accordance with the Ordinances of the
City and this section.
D-60 MECHANICS AND MATERIALMEN'S LIEN: The Contractor shall be required to execute
a release of inechanics and materialmen's liens upon receipt of payment. .
D-61 SUBSTITUTIONS: The specifications for materials set out the minimum standard of
quality which the City believes necessary to procure a satisfactory project. No substitutions will be
permitted until the Contractor has received written permission of the Engineer to make a
substitution for the material which has been specified. Where the term"or equal", or "or approved
equal" is used, it is understood that if a material, product, or piece of equipment bearing the name
so used is furnished, it will be approvable, as the particular trade name was used for the_ p.�rpose
of establishing a standard of quality acceptable to the City. If a product of any other name is
proposed for use, the Engineer's approval thereof must be obtained before the proposed
substitute is procured by, the Contractor. Where the term "or equal", or "or approved equal" is not
used in the specifications, this does not necessarily exclude alternative items or material or
equipment which may accomplish the intended purpose. However, the Contractor shall have the
full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer•, as
04/21/99 S�:-27
�
PART D - SPECIAL CONDITIONS
the representative of the City, �hall be the sole judge of the acceptability of sub�titutions. The
provisions of this sub-section as related to "substitutions" shall be applicable to all sections of
these specifications.
D-62 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER
A. GENERAL: Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be
abandoned, removed (except where being replaced in the same location); or rehabilitated
(pipe enlargement, cured-in-place pipe, fold and form pipe, slip-line, etc.), shall be cleaned,
and a television inspection performed to identify any active sewer service taps, other sewer
laterals and their location. Work shall consist of furnishing all labor, material, and equipment
necessary for the cleaning and inspection of the sewer lines by means of closed circuit
television. Satisfactory precautions shall be taken to protect the sewer lines from damage that
might be inflicted by the improper use of cleaning equipment.
1. HIGH VELOCITY JET (HYDROCLEANING) EQUIPMENT. The high-velocity sewer line
cleaning equipment shall be constructed for�easy and safe operation. The equipment shall
also have a selection of two or more high-velocity nozzles. The nozzles shall be capable
of producing a scouring action from 15 to 45 degrees in all size lines designated to be
cleaned. Equipment shall also include a high-velocity gun for washing and scouring
manhole walls and floor. The ,gun shall be capable of producing flows from a fine spray to
a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps,
and hydraulically driven hose reel.
Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in
such a way that a portion of the dam may be collapsed at any time during the cleaning
operation to protect against flooding of the sewer. The movable dam shall be equal in
diameter around the outer periphery to ensure removal of grease.. If sewer cleaning balls
or other equipment which cannot be collapsed is used, special precautions to prevent
flooding of the sewers and public or private property shall be taken. The flow of sewage
present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning
devices whenever po'ssible.
2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using
` high-velocity jet equipment. The equiprr�ent shall be capable of removing dirt, grease,
rocks, sand, and other materials and "obstructions from the sewer lines and manholes. If
cleaning of an entire section cannot be successfully performed from one manhole, the
equipment shall be set up on the other manhole and cleaning again attempted. !f, again,
successful cleaning cannot be perFormed or equipment fails to traverse the entire manhole
section, it will be assumed that a�major blockage exists, and the cleaning effort shall be
abandoned. When ��dditional quantities of water from fire hydrants is r�ecessary to avoid
delay in normal working procedures, the water shall be conserved and not: used
unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by
the hydrant. Before using any water from the City Water� Distribution System, the
Contractor shall apply for and receive permission from the Water Department. The
Contractor shall be responsible for the water meter and related charges for the setup,
including the water usage bill. All expenses shall be considered incidental to cleaning.
3. DEBRIS REMOVAL AND DISPOSAL: All sludge, dirt, sand, rock, grease, and other solid
or semisolid material resulting from the cleaning operation shall be removed at the
downstream manhole of the section being cleaned. Passing material from manhole
section to manhole section, which could cause line stoppages, accumulations of sand in
wet wells, or damage pumping equipment, shall not "be permitted.
4. All solids or semisolid resulting from the cleaning operations shall be removed from the site
and disposed of at a site designated by the Engineer. All materials shall be removed from
the site no less often than at the end"of each workday and disposed of at no additior�al cost
to the City.
oar���s SG28
LJ
�
f!'1
�
�
��
��
LJ
�
�
LJ
PART D - SPECIAL CONDITIONS
5. UNDER NO C�RCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM
BE DUMPED 'JNTO STREETS OR INTO DITCHES, CATCH B,=,SINS, STORM DRAINS
OR SANITARY SEWER MANHOLES�.
6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection
shall be one specifically designed and constructed for such inspection. Lighting for the
camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The
camera shall be operative in 100% humidity conditions. The camera, television monitor,
and other components of the video system shall be capable of producing picture quality to
the. satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no
payment will be made for an unsatisfactory inspeetion.
B. EXECUTION:
1. TELEVISION INSPECTION: The camera shall be moved through the line in either
direction at a moderate rate, stopping when necessary to permit proper documentation of
any sewer service taps. In no case will the television camera be pulled at a speed greater
than 30 feet per minute. Manual winches, power winches, N cable, and powered rewinds
or other devices that do not obstruct the camera view or interfere with proper
documentation shall be used to move �he camera through the sewer line.
When manually operated winches are used to pull the television camera through the line,
telephones or other suitable means of communications shall be set up between the two
manholes of the section being inspected to ensure good communications between
members of the crew. � �- .f
�:
The importance of accurate distance measurements is emphasized. .�- All television,
fnspectfon video tapes shall have a tootage counter. Measurement for location of �ewer
service taps shall be above ground by means of ineter device. Marking on the cable, or
the like, which would require interpolation for depth of manhole, will not be allowed.
Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or
other suitable device, and the accuracy shall be satisfactory to the Engineer.
:,� .t .
�,, .
k•,�
',�-,,•r
, �: -..
;> :
.
The City makes no guarantee that all of the sanitary sewers to be entered are clear for the `� �� `
passage of a camera. The methods used for securing passage of the camera are to be at ���_�' �
the option of the Contractor. The cost of retrieving the Television camera, under all ��` �
circumstances, when it becomes lodged during inspection,- shall be incidental to`Television �"'' =
inspection. •
� •2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by
the Contractor and will clearly show the location in relation to an adjacent manhole of each
sewer service taps observed during inspection. In addition, other points of significance
such as locations of unusual conditions, roots, storm sewer connections, broken pipe,
� presence of scale and corrosion, and other discernible features will be recorded, and a
copy of such records will be supplied to the City.
� 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the
television picture of problems shall be taken by the Contractor upon request of the
Engineer, as long as such photographing does not interfere with the Contractor's
operations.
D
�
a
�
4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual
and audio record of problem areas of the lines that may be replayed. Video tape recording
playback shall be at the same speed that it was recorded. The television tapes shall be
furnished to the City for review immediately upon completion of the television inspection
and may be retained a maximum of 30 calendar days.
04/21/99
SC-29
PART D - SPECIAL CONDITIONS
Equ��ment shali be provided to the City by the Contrac;tor for review of the tapes. Tapes
will ue returned to the Contractor upon completion of review by the Engineer. Tapes shall
; not be erased without the permission of the Engineer.
If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of
the sewer line or to locate service connections, the Contractor shall be required to re-
televise and provide a good tape of the line at no additional cost to the City. If a good tape
cannot be provided of such quality that can be reviewed by the Engineer, no payment for
televising this portion shall be made. Also, no payment shall be made for portions of lines
not televised or portions where manholes cannot be negotiated with the television camera.
THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION
FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the tapes
by the Engineer, the Contractor will be notified as to which sections of the sanitary sewer
are to be corrected. Tapes will be returned to the Contractor upon completion of review by
the Engineer. �
All costs assqciated with this work -shall be incidental to unit prices bid for items under
Television Inspection of the Proposal.
C. PAYMENT OF CLEANING AND PRE-CONSTRUCTION TELEVISION INSPECTION OF
SANITARY SEWERS: The cost for Pre-Construction Cleaning and-Television Inspection of
sanitary sewers shall be per linear foot of �ewer actually televised. The Contractor shall
provide the Engineer with tapes of a quality that the particular piece of sewer can be readily
evaluated as to existing sewer conditions and for providing appropriate means for review of
the tapes_ by the Engineer including collection and removal, transportation and disposal of
sand and debris from the sewers to a legal dump site.
Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to
provide video image required for line analysis.
The primary purpose of cleaning is for television inspection and rehabilitation; when a portion
of a line is not or cannot be televised or rehabilitated, the cleaning of that portion �of line shall
be incidental and no payment shall be made.
The City makes no guarantee that all of the sanitary sewers to be entered are clear for the
passage of a camera. The methods used for securing passage of the camera are to. be at the
option of the Contractor, and the costs must be included in the bid price for N Inspections.
The cost of retrieving the N Camera, under all circumstances, when it becomes lodged
during inspection, shall be incidental to N Inspection.
The item shall also include all costs of installing and maintaining any bypass pumping required
to provide reliable, regular sewer service to the area residents. All bypass pumping. shall be
incidental to the project.
D-63 VACUUM TESTING� OF SANITARY SEWER MANHOLES
A. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer
manholes.
6. EXECUTION:
1. TEST PROCEDURE: Manholes shall be tested with all connections in place. Lift holes
shall be plugged, and all drop-connections and gas sealing connections shall be installed
prior to testing.
The sewer lines entering the manhole shall be plugged and braced to prevent the plugs
from being drawn into the manhole. The plugs shall be installed in the lines beyond the
oar���ss SC-30
�
L!
�
PART D - SPECIAL CONDITIONS
drop-connections, gas sealing connections, �tc. The test head shall be placed inside the
frame at the top of the manhole and infloted in accordance with the manufacturer's
recommendations. A vacuum of ten inches of inercury (10"Hg) shall be drawn and the
vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read
after the required test time. The required test time shall be determined from the Table I
below in accordance with ASTM C1244-93:
Table I
MINIMUM TIME REQUIRED FOR VACUUM DROP
OF 1" H 10"H - 9"Hg) (SEC�
Depth of MH. 48-Inch Dia. 0-Inch Dia.
(FT.� Manhole Manhole
0 to 1' _ 40 sec. 52 sec.
18'
I�
1�1
�
�
�
�
�
�J
I�I
�
20'
22'
24'
�26'
28'
30'
45 sec.
50 sec.
55 sec.
59 sec.
64 sec.
69 sec.
74 sec.
59 sec.
65 sec.
72 sec.
78 sec.
85 sec.
91 sec.
98 sec.
For Each 5 sec. 6 sec.
Additional 2' '�
,5
2. ACCEPTANCE: The manhofe shall be considered acceptable, if the drop in the level of
vacuum is less than one-inch of inercury (1" Hg) after the required test time. Any manhole
which fails to pass the initial test must be repaired with a suitable material which conforms
to the construction material of the manhole. The manhole shall be retested�as described
above until it has successfully passed the test.
Following comptetion of a successful test, the manhole shall be restored to its normal
condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be
removed and disposed of in a manner satis ac o�Ortpl� CIII�III�Ci. --
C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid a't the
contract price per each vacuum test. This price shall include all material, labor, equipment,
and all incidentals, including all bypass pumping, required to complete the test as specified
herein.
D-64 BYPASS PUMPING: The Contractor shall bypass the sewage �around the section or
sections of sewer to be rehabilitated and/or replaced. The bypass shall be made by plugging
existing upstream manhole and pumping the sewage into a downstream manhole or adjacent
system or other method as may be approved by the Engineer. The pump and bypass lines shall
be of adequate�capacity and size to handle the flow without sewage backup occurring to facilities
connected to the sewer. Provisions shall be made at driveways and street crossings to permit
safe vehicular travel without interrupting flow in the bypass system. Under no circumstances will
the Contractor be permitted to discharge sewage into the trenches. Payment shall be incidental to
rehabilitation or replacement of the sewer line.
D-65 POST-CONSTRUCTION TELEVISlON INSPECTION OF SANITARY SEWER:
� A. GENERAL: After construction, ALL �ections of sanitary sewer lines shall have a television
inspection performed. Work shall consist of furnishing all labor, material, and equipment
necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory
� oa2��ss
SC-31
�
PART D - SPECIAL CONDITIONS
precautions shall be taken to protect �he sewer lines from damage that might be inflict�d by
the improper use of cleaning equipmer��.
B. TELEVISION INSPECTION EQUIPM�NT: The television camera used for the inspection shall
be one specifically designed and constructed for such inspection. Lighting for the camera
shall be operative in 100% humidity conditions. The camera, television monitor, and other
components of the video system shall be capable of producing picture quality to the
satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no
payment will be made for an unsatisfactory inspection.
C. EXECUTION:
1. TELEVISION INSPECTION: The camera shall be moved through the line in either
direction at a moderate rate, stopping when necessary to permit proper documentation of
any sewer service taps. In no case will the television camera be pulled at a speed greater
than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds
or other devices that do not obstruct the camera view or interfere with proper
documentation shall be used to move the camera through the sewer line.
When manually operated winches are used to pull the television camera through the line,
telephones or other suitable means of communications shall be set up between the two
manholes of the section �eing inspected to ensure good communications between
members of the crew.
The importance of accurate distance measurements is emphasized. All television
inspection video tapes shall have a footage counter. Measurement for iocation of sewer
service taps shall be above ground by means of ineter device. Marking on the cable, or
the like, which would require interpolation for depth of manhole, will not be allowed.
Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or
other suitable device, and the accuracy shall be satisfactory to the Engineer.
The City makes no guaranfee that all of the sanitary sewers to be entered are clear for the
passage of a camera. The methods used for securing passage of the camera are to be at
the option of the Contractor. The cost or retrieving the Television camera, under all
circumstances, when it becomes lodged during inspection, shall be incidental to Television
inspection.
Sanitary sewer mains must be laced with enough w�ter to fill all low pints. The television
inspection must be done immediately following the lacing of the main with no water flow. If
sewer is active, flow must be restricted to provide a clear image of sewer being inspected.
2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by
the Contractor and will clearly show the location in relation to an adjacent manhole of each
sewer service tap observed during inspection. All television logs shall be referenced to
stationing as shown on the plans. A copy of these television logs will be supplied to the
City.
3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the
television picture of problems shall be taken by the Contractor upon request of the
Engineer, �as long as such photographing does not interfere with the Contractor's
operations.
4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual
and audio record of problem areas of the lines that may be replayed. Video tape recording
playback shall be at the same speed that it was recorded. The television tapes shall be
furnished to the City for review immediately upon completion of the television inspection
and may be retained a maximum of 30 calendar days. Equipment shall be provided to the
City �by the Contractor for review of the tapes. Tapes will be returned to the Contractor
04/21/99 SC-32
Ll
L!
�1
L�
�
`�i
PART D - SPECIAL CONDITIONS
upon completion of rev�aw by the Engineer. Tapes shall not be erasad without the
permission of the Enginear.
ff the tapes are of such poor quality that the Engineer is unable to evaluate the condition of
the sewer line or to locate servfce connections, the Contractor shall be required to re-
televise and provfde a good tape of the line at no additional cost to the City. If a good tape
cannot be provided of such quality that can be reviewed by the Engineer, no payment for
televising this portion shall be made.• Also, no payment shall be made for portions of lines
not televised or portions where manholes cannot be negotiated with the television camera.
D. PAYMENT OF POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY
SEWERS: The cost for post-construction Television Inspection of sanitary sewers shall be per
linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a
quality that the particular piece of�sewer can be readily evaluated as to sewer conditions and
for providing appropriate means for review of the tapes by the Engineer.
Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to
provide video image required for line analysis. The quantity of TV inspection shall be
�' measured as the total length of new pipe installed. All costs associated with this work shall be
included in the appropriate bid item - Post-Construction Television Inspection.
u
L7
I�
[�:
�
The item shall also include all costs of installing and maintaining any bypass pumping required
to provide reliable, regular sewer service to the area residents. All bypass pumping shall be
incidental to the project.
D-66 SAMPLES AND QUALITY CONTROL TESTING:
�
A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all
materials proposed to be used on the project, including a mix design for any asphaltic and/or
Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be
used along with the name of the pit from which the material was taken. The contractor shall
provide manufacturer's certifications for all manufactured items to be used in the project and
will bear any expense related thereto.
B. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine
days prior to the placing of concrete using the same aggregate, cement, and mortar which are
to be used later in the concrete. The Contractor shall provide a certified copy of the tesfi
results to the City.
� C. Quality control testing of in-place material on this project will be performed by the city at its
own expense. Any retesting required as a result of failure of the material to meet project
specifications will be at the expense of the contractor and will be billed at commercial rates as
determined by the City. The failure of the City to make any tests of materials shall in no way
j"� relieve the contractor of its responsibility to furnish materials and equipment conforming to the
l,} requirements of the contract.
� D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations
requiring testing. The Contractor shall provide access and trench safety system (if required)
for the site to be tested, and any work effort involved is deemed to be included in the unit price
for the item being tested.
�
�
�
�
E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to
the job site. The ticket shall specify the name of the pit supplying the fill material.
D-67 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL:
A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution
control measures deemed necessary by the Engineer for the duration of the contract. These
04/71/'99
SC`-3�3
PART D - SPEGIAL CONDITIONS
control measures �hall at no time be used as a�substitute for the per�7anent control measures
unless otherwise uirected by the Engineer and they shail not includ� measures taken �by the
CONTRACTOR to control conditions created by his construction operations. The temporary
measures shall include. dikes, dams, berms, sediment basins, fiber mats, jute netting,
temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled-hay retards,
dikes, slope drains and other devices.
B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth
and the authority to limit the surface area of erodible-earth material exposed by preparing
right-of-way, clearing and grubbing, the surface area of erodible-earth material exposed by
excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control
measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or
other areas of water impoundment. Such work may involve the construction of temporary
berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats,
seeding, or other control devices or methods directed by the Engineer as necessary to control
soil erosion. Temporary pollution-control measures shall be used to prevent or correct erosion
that may develop during construction prior to installation of permanent pollution control
features, but are not associated with permanent control features on the project. The Engineer
will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to be
proportional to the CONTRACTOR'S capability and progress in keeping the finish grading,
mulching, seeding, and other such permanent pollution-control measures current in
accordance with the accept�d schedule. Should seasonal conditions make such limitations
unrealistic, temporary soil-erosion-control measures shall be perFormed as directed by the
Engineer.
1. Waste or disposal areas and construction roads shall be located and constructed in a
manner that will minimize the amount of sediment entering streams.
2. When work areas or material sources are located in or adjacent to live streams, such
areas shall be separated from the stream by a dike or other barrier to.keep sediment from
entering a flowing stream. Care shall be taken during the construction and removal of
such barriers to minimize the muddying of a stream.
3. All watenivays shall be cleared as soon as practicable of false work, piling, debris or other
obstructions placed during construction operations that are not a part of the finished work.
4. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and
reservoirs with fuels, oils, bitumens, calcium chloride or other harmful materials. He shall
conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes
and reservoirs and to avoid interference with movement of migratory fish.
C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide
temporary erosion control shall be considered subsidiary to the contract and no extra pay will
be given for this work.
D-68 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES: ' The Contractor
shall provide ingress and egress to the property being crossed by this construction and adjacent
property when construction is not in progress and at night. Drives shall be left accessible at night,
on weekends, and during holidays. The Contractor shall conduct his activities to minimize
obstruction of access to drives and property during the progress of construction. Notification shall
be made to an owner prior to his driveway being removed and/or rebuilt.
D-69 PROTECTION OF TREES, PLANTS AND SOIL: All property along and adjacent to the
Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored
after completion of the work, to a condition equal to or better than existed prior to start of work.
Any trees or other landscape features scarred or damaged by the Contractor's operations shall be
restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be
permitted only by experienced workmen in an approved manner (No trimming or pruning without
04/21/99 SC-34
�
0
�
�
�
PART D - SPECIAL CONDITIONS
the property owners' consent). Pruned limbs of 1" diameter a� larger shail be thoroughly treated
as soon as aossible with a tree wound dressing.
D-70 SITE RESTORATION: The contractor shall be responsible for restoring the site to original
grade and condition after completion of his operations subject to approval of the Engineer. The
basis for approval by the Engineer will be grade restoration to plus minus one-tenth (0.1) of a foot.
D-71 CITY OF FORT WORTH STANDARD PRODUCT LIST: Proposed products submitted in
the bid documents must appear in tl�e latest"City of Fort Worth Standard Product List, for the bid
to be considered responsive. Products and processes listed in the "City of Fort Worth Standard
Product List, shall be considered to meet City of Fort Worth minimum technical requirements.
D-72 STATE REVOLVING FUND (SRF) REQUIREMENTS This project, in addition to standard
� City of Fort Worth requirements, may involve certain State requirements. These requirements, if
applicable, are provided in the following documents and should thoroughly be reviewed and
completed by the contractor•. They include:
1. At the Time of Contract Document Execution
• �D-1 U3-C;ontractors Act ot Assurance
• ED-104-Resolution
�
�
Work required to conform to these requirements shall be considered subsidiary and no extra
payment �vill be made.
The SRF requirements are included in Appendix A.
D-73 TOPSOIL, SODDING AND SEEDING: This item shall be performed in accordance witk� the
City of Fort Worth Parks and Community Services Department Specifications for Topsoil, Sodding
and Seeding.
1. TOPSOIL
� DESCRIPTION: This item will consist of furnishing and placing a minimum of six (6) inches of
topsoil, fre�#ror�- rock and foreign material, in all parkways and medians to the lines and
grades as established by the Engineer.
� CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to
supplement material secured from street excavation. All excavated materials from streets
which is suitable for topsoil will be used ir� the parkways and medians before any topsoil is
� obtained from a borrow source. Topsoil material secured from street excavation shall be
stockpiled at locations approved by the Engineer, and at completion of grading and paving
operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6)
inches of compacted depth of topsoil parkways. �
�
�
U
�
��
�
2. SODDING
DESCRIPTION: Sodding will consist of furnishing and planting Bermuda, Buffalo or St.
Augu�tine grass in the areas between the curbs and walks, on terraces, in median strips, on
embankments or cut slopes, or in such areas as designated on the Drawings and in
accordance with the requirements of this Specification. Recommended Buffalo grass var'ieties
for sodding are Prairie and 609.
MATERIALS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass
secured from sources where the soil is fertile. Sod to be placed during the dormant state of
these grasses shall be alive and acceptable. Bermuda and Buffalo grass sod shall have a
healthy, virile root system of dense, thickly matted roots throughout a two (2) inch minimum
thickness of.native soil attached to the roots. St. Augustin�. grass sod shall have a healthy,
04/21/99
SC-35
PART D - SPECIAL CONDITIONS
virile root system of dense, thickly matted roots ihroughout a one (1) inch minimum thickness
of native soil attached to the roots.
The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter
deleterious to its growth or which might affect its subsistence or hardiness when transplanted.
Sod to be placed between curb and walk and on terraces shall be the same type grass as
adjacent grass or existing lawn.
Care shall be taken at all times to retain native soil on the roots of the sod during the process
of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug
until planted. When so directed by the Engineer, the sod existing at the source shall be
watered to the extent required prior to excavating. Sod material shall be planted within three
days after it is excavated.
CONSTRUCTION METHODS: After the designated areas have been completed to the lines,
grades, and cross-sections shown on the Drawings and as provided for in other items of the
contract, sodding of the type specified shall be performed in accordance with the requirements
hereinafter described. Sodding shall be either "spot" or "block"; either Bermuda, Buffalo or St.
Augustine grass.
a. Spot Sodding
Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the
dimensions shown on the Drawings, shall be opened on areas to be sodded. In all
furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch
centers at proper depth so that the top of the sod shall not be more than one-half (1/2) inch
below the finished grade. Holes of equivalent depth and spacing may be used instead of
furrows. The soil shall 6e firm around each block and then the entire sodded are� shall be
carefully rolled with a heavy, hand roller developing fifteen (15) to twenty-five (25) pounds
per square inch compression. Hand tamping may be required on terraces.
b. Block Sodding.
At locations on the Drawin,gs or where directed, sod blocks shall be carefully placed on the
prepared areas. The socl shall be so placed that the entire designated area shall be
covered, and. any voids left in the block sodding shall be filled with additional sod and
tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact
solid mass. Surfaces of block sod, which, in the opinibn of the Engineer, may slide due to
the height or slope cf the surface or nature of the soil, shall,. upon direction of the
Engineer, be pegged with wooden pegs driven through the sod block to the firm earth,
sufficiently close to hold the block sod firmly in place.
When necessary, the sodded areas shall be smoothed after planting has been completed
and shaped to conform to the cross-section previously provided and existing at the time
sodding operations were begun. Any excess dirt from plant�ig operations shall be spread
uniformly over the adjacent areas or disposed of as directed by the Engineer so that the
completed surface will present a sightly appearance.
The sodded areas shall be thoroughly watered immediately after they are planted and shall
be subsequently watered at such times and in a manner and quantity directed by the
Engineer until completion and final acceptance of the project by the City of Fort Worth.
3. SEEDING
DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a
mixture of seed of the kind specified along and across such areas as may be designated on
the Drawings and in accordance with these Specifications.
04/21/'99 SC-36
�
� MATERIALS:
!J
�
l� 1
!��
�
�
�
�
�
�
�
�
PART D - SPECIAL CONDITIONS
a. General. All seed used must carry a Texas Testing Seed label showing purit; and
germination, name, type of seed, and that the seed meets all requirements of the Texas
Seed Law. Seed furnished shall be of the previous season's crop and the date of analysis
shown on each tag shall be within nine (9) months of time of de.livery to the project. Each
variety of seed shall be furnished and delivered in separate bags or containers. A sample
of each variety of seed shall be furnished for analysis and testing when directed by the
Engineer. ,
The specified seed shall equal or exceed the following percentages of Purity and
germination:
Common Name
Common Bermuda Grass
Annual Rye Grass
Tall Fescue
Western Wheatgrass
Buffalo Grass Varieties
Top Gun
Cody
�
Purity
95%
95%
95%
95%
95%
95%
Germination
90%
95%
90%
90%
90%
90%
Table 120.2.(2)a. �
URBAN AREA WARM-SEASON SEEDING RATE (Ibs.); Pure Live Seed (PLS)
Mixture for Clay or Tight SoilsMixture for
Sandy Soils
Dates (Eastern Sections) (Western Sections) (All 5ections)
Fe f t3ermudagrass 4U t3utta�ograss �� Eiermudagrass 60
to Buffalograss 60 Bermudagrass 20 Buffalograss 40
May 1 �
Total: 100 Total: 100 Total: 100
Table, 120.2.(2)b
TEMPORARY COOL-SEASON SEEDING RATE; (Ib.) Pure Live Seed (PLS)
Dates (All Sections)
�5 I all Fescue
to Western Wheatgrass
May 1 Annual Rye
Total:
50
50
50
100
��
,�„ .
r.
,f
��;s
CONSTRUCTION METHODS: After the designated areas have been completed to the lines,
grades, and cross-sections shown on the Drawings and as provided for in other items of this
Contract, seeding of the type specified shall be perforrried in accordance with the
requirements hereinafter described.
a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent
washing of the slopes or dislodgment of the seed.
b. Finishing. Where applicable, the shoulders, slopes, and ditches shall be smoothed after
seed bed preparation has been completed and shaped to conform to the cross-section
previously provided and existing at the time planting operations were begun.
BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be uniformly
distributed over the areas shown on the Drawings and where directed. If the sowing of seed is
04/21/99
SC-37
PART D - SPECIAL CONDITIONS
by hand, rather than by mec��anical methods, the seed shail be sown in two diractions at right
angles to each other. Seed and fertilizer shall be distributed at the same tima provided the
specified uniform rate of apn!ication for both is obtained. "Finishing" as specified in Section D-
46, Construction Methods, is not<applicable since no seed bed preparation is required.
DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall
be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be
reduced to less than one (1) inch in diameter or they shall be removed. The area-shall then be
finished to line and grade as specified �under "Finishing" in Section D-46, Construction
Methods.
The seed, or seed mixture, specified shall then be planted at the rate required and the
application shall be made uniformly. If the sowing of seed is by hand rather than by
mechanical methods, seed shall be raked or harrowed into the soil to a depth of approximately
one-eight (1/8) inch. The planted area shall be rolled with a corrugated roller of the
"Cultipacker" type. All rolling of the slope areas shall be on the contour.
ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to
be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in the
seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed.
The area shall then be finished to line and grade as specified under "Finishing" in Section D-
46, Construction Methods.
Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six
(6) inches is thoroughly moistened:
Afte�r the watering, when the ground has� become sufficiently dry to be loose and pliable, the
seed, or seed mixture specified, shall then be planted at the rate required and the application
shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods,
the seed shall be sown in two directions at right angles to each other. Se�d and fertilizer may
be distributed at the same time, provided the specified uniform rate of application for both is
obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of
approximately one-quarter (1/4) inch. The planted surface area and giving a smooth surface
without ruts or tracks. In between the time compacting is completed and the asphalt is
applied, the planted area shall be watered sufficiently to assure uniform moisture from the
surface to a minimum of six (6) inches in depth.
The application of asphalt shall follow the last watering as rapidly as possible. Asphaf� shall be
of the type and grade as shown on the Drawings and shall conform to the requirements of the
item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the
Drawings, or if Drawings are not included, then MS-2 shall be used. Applications of the
asphalt shall be at a rate of three-tenths (0.3) gallons per square yard. It shall be applied to
the area in such a manner so that a complete film is obtained and the finished surface shall be
comparatively smooth.
RE-SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where
temporary cool season species have been planted may be replanted beginning February 1
with warm season species as listed in Table 120.2(2)a. The re-seeding will be achieved in the
following manner. The cool season species shall be mowed down to a height of one (1) inch
to insure that slit-seeding equipment will be able to cut through the turf and achieve adequate
soil penetration.
'` Slit-seeding, is achieved through the use of an implement which cuts a furrow (slit) in the soil
and places the seed in the slit which is then pressed close with a cultipacker wh°eel.
CONSTRUCTION WITHIN PARK AREAS
TURF RESTORATION OF PARK AREAS: FERTILIZER
04/21/99 SC-3$
r��
i�
`��
��
LJ
i�
L�
�
'.�J
O
PART D - SPECIAL CONDITIONS
DESCRIPTION: "F ertilizer" will consist of providing and distributing iertilizer over such areas
as are designated on the Drawings and in accordance with these Specifications.
MATERIALS: All fertilizer used shall be delivered in bags or containers` clearly labeled showing
the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the
Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis of 16-
20-0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the analysis
represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as
determined by the methods of the Association of Official Agricultural Chemists.
In the event it is necessary to substitute a fertilizer of a different analysis, it s�iall be a pelleted
or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and
applied per acre shall equal or exceed that specified for each nutrient.
CONSTRUCTION METHODS: When an item for fertilizer is included in fhe• Drawings and
proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to
be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry
and in good physical condition. Fertilizer that is powdered to caked will be rejected.
Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer.
Unless otherwise� indicated on the Drawings, fertilizer shall be applied uniformly at the average
rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400)
pounds per acre for all types of "Seeding".
a:,,.,�,
MEASUREMENT: Topsoil secur�d from borrow sources will be measured by the square yard
in place on the project site. Measurement will be made only on topsoils secured from bor.�-ow
sources.
�� �
Acceptable material-for "Seeding" will be measured by the linear foot, complete in place.
Acceptable material for "Sodding" will be measured by the linear foot, complete in place.
Acceptable material for "Fertilizer" shall be subsidiary to the price of sodding or seeding.
� PAYMENT: All work performed a� ordered and measured as provided under "Measurerrient"
shall be paid for at the unit price bid for each item of work. Its price shall be full compensation
for excavating (except as noted below), loading, hauling, placing and furnishing all labor,
equipment, tools, supplies, and incidentals necessary to complete work.
�
�
U
U
�
�
a
All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place
topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items
and will not be paid for directly.
"Spot sodding" or "block sodding" as the case may be, will be paid for at the cQntract unit price
per square yard, complete in place, as provided in the proposal and contract. The contract
unit price shall be the total compensation for furnishing and placing all sod; for all rolling and
tamping; for all watering; for disposal of all surplus materials; and for all materials, labor,
equipment, tools and incidentals necessary to complete the work, all in accordance with the
Drawings and these Specifications.
The work perFormed and materials furnished and measured as provided under "Measurement"
shall be paid for at the unit price for "Seeding", or "Sodding", of the type specified, as the case
may be, which price shall each be full compensation for furnishing all materials and for
performing all operations necessary to complete the work accepted as follows:
Fertilizer material and application will not be measured or paid for directly, but is considered
subsidiary to Sodding and Seeding.
04/21/99
SC-39
PART D - SPECIAL CONDITIONS
D-74 CONF�NED SPACE ENTRY PROGRAM: It shali be th� responsibility of the contractor to
implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet
OSHA requirements for all its employees and subcontrac#ors at all fimes during construction. All
active sewer manholes, regardless of depth, are defined by OSHA as "permit required confined
spaces". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for
all applicable manholes and maintain an active file for these manholes. The cost of complying
with this program shall be subsidiary to the pay items involving work in confined spaces.
D-75 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION:
1. Prior to the final inspection being conducted for the project, the contractor shall contact the
city inspector in writing when the entire project or a designated portion of the project is
substantially complete.
2. The inspector along with appropriate City staff and the City's consultant shall make an
inspection of the substantially completed work and prepare and submit to the contractor a
list of items needing to be completed or corrected.
3. The contractor shall take immediate steps to. rectify the listed deficiencies and notify the
owner in writing when all the items have been completed or corrected.
4. Payment for substantial completion inspection as well as final inspection shall be
subsidiary to the project price. Contractor shall still be required to address all other
deficienaes which are discovered at the time of final inspection.
5.
D-76
Final inspection shall be in conformance with general condition item "C5-5.18 Final
Inspection" of PART C- GENERAL CONDITIONS.
EXCAVATION NEAR TREES:
1. The Contractor shall be'responsible for taking measures to minimize damage to tree limbs,
tree trunks, and tree roots at each work site. All such measures shall be considered as
incidental work included in the Contract Unit Price bid for applicable pip� or structure
installation except for short tunneling/tree augering.
2., Any and all trees located within the equipment operating area at each work site shall, at
the d�rection of the Engineer, be protected by erecting a"snow fence" along the drip line or
edge of the tree root system between tree and the construction area.
3. Contractor shall inspect each work site in- advance and arrange to have any tree limbs
pruned that might be damaged by equipment operations. The Engineer shall be notified at
least 24 hours prior to any tree tri"mming work. No trimming work will be permitted within
private property without written permission of the Owner.
4. Nothing shall be stored over the tree root system within the drip line area of any tree.
5. Before excavation (off the roadway) within the drip line area of any tree, the earth shall be
sawcut for a minimum depth of 2 feet.
6. At designated locations shown on the drawings, the "short tunnel" method using Class 51
D.I. pipe shall be utilized.
7. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during
construction shall be removed and replaced with the ,same type and diameter tree at the
contractor's expense.
8. Contractor shall employ a qualified landscaper for all the work required for tree care to
ensure utilization of the best agricultural practices and procedures.
oar���s SC-40
i�
�
��
PART D - SPECIAL CONDITIONS
9. Short tunneling shall consist of power augeri� �g or hand excavation. The tunnel diameter
shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe
installation shall be pressure grouted.
D-77 CONCRETE ENCASEMENT OF SEWER PIPE: Concrete encasement of sewers shall be
� paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place
along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall
include all costs associated with installation and reinforcement of the concrete encasement.
��
I�
��
�
[�li
�
�
�J
�t
��
80.1 Polyvinyl Chloride (PVC) Water Pipe: POLYVINYL Chloride Plastic Water Pipe
and fittings on this Project shall be in accordance with the material standard contained in the
General Contract Documents. Payment for work such as backfill, bedding, blocking,
detectable tapes and all other associated appurtenant required, shall be included in the linear
foot price bid of the appropriate BID ITEM(S). '
(�j 80.2 Blocking: Concrete blocking on this Project will necessarily be required as shown
!„t on the Plans and shall be installed in accordance with the General Contract Documents. All
valves shall have concrete blocking provided for supporting. No separate payment will be
� made for any of the work involved for the item and all costs incurred will be considered to be
included in the linear foot bid price of the pipe or the bid price of the valve.
�
�
04/21/99
1�.�
D-78 CLAY DAM: Clay dam construction shall be performed in accordance with the
Wastewater Clay Dam Construction, figure in the Drawings in these Specifications, at locations
indicated on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed
soil to rt�ake an impervious barrier to reduce groundwater percolation through the pipeline trench.
Construction material shall consist of compacted bentonite clay or 2:27 concrete. Payment for
work such as forming, placing and finishing shall be subsidiafy to the price bid. for pipe installation.
D-79 EXPLORATORY EXCAVATION (D-HOLE}: The Contractor shall be responsible for
verifying the locations of all existing utilities prior to construction, in accordance with item D-22.
At locations identified on the drawings, contractor shall conduct an exploratory excavation (D-
Hole), to locate and verify the location and elevation of the existing underground utility where it
may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be
conducteci prior to construction of the entire project only at locations denoted on the plans or
as directed by the engineer. Contractor shall submit a report of findings (including surveyed
elevations of existing conflicting utilities) to the City prior to the start of construction of the��ntire
project. If the contractor determines an existing utility is_ in conflict with the proposed facility, the
contractor shall contact the engineer immediately for appropriate design modifications. ,.
The contractor shall make the necessary repairs at the exploratory excavation (D-Hole) to obtain a
safe and proper driving surface to ensure the safety of the general public and to meet the approval
of the City inspector. The contractor shall be liable for any and all damages incurr�d due to the
exploratory excavation (D-Hole).
Payment shall not be made for verification of existing utilities per item D-22. Payment for
exploratory excavation (D-Hole), at locations identified on the plans or as directed by the
Engineer, shall include full compensation for all materials, excavation, surface restoration; field
surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No
payment shall be made for+exploratory excavation(s) conducted after construction has begun:
D-80 INSTALLATION OF WATER FAClLITIES
80.3 T�ype,of Casing Pipe:
1. WATER:
The casing pipe for open cut and bored .or tunneled section shall be AVWVA C-200
Fabricated Electrically Welded 5teel Water Pipe, and shall conform to the provisions of E1-
SC=41
�
PART D - SPECIAL COf�DITIONS
15, E1-5 and E1-9 in Material 3pecifications of General Contract Documents and
Specifications for Water Departmer�t Projects. The steel casing pipe shall be supplie:i as
follows:
For the inside and outside of casing pipe, coal-tar protective coating in accordance with the
requirements of Sec. 2.2 and related sections in A1NWA C-203.
Touch-up after field welds shall provide coating equal to those specified above.
C. Minimum thickness for casing pipe used shall be 0.375 inch.
Stainless Steel Casing Spacers (centerang style) such as manufactured by �ascade
Waterworks Manufacturing Company or an approved equal shall be used on all non-
concrete pipes when installed in casing. Installation shall be as �ecommended by the
manufacturer.
2. SEWER:
Boring used on this project shall b� in accordance with the material standard E1-15 and
Construction standard E2-15 as per Fig. 110 of the General Contract Documents.
3. PAYMENT:
Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and
incidental work shall be included in the unit price bid per foot.
80.4 Tie-Ins: The Contractor shall be responsible for making tie-ins to the existing
water mains. It shall be the responsibility of the Contractor to verify the exact location and
elevation of the existing line tie-ins.: And any differences in locations and elevation of
existing line tie-ins between the contract drawings and what may be encountered in the
field shall be considered as incidental to construction. The cost of making tie-ins to
existing water or sanitary sewer mains shall be included in the linear foot bid price of the
pipe.
80.5 Connection of Existing Mains: The Contractor shall determine the exact
location, elevation, configuration and angulation of existing water or sanitary sewer lines
prior to manufacturing of the connecting piece. Any differences in locations, elevation,
configuration, and or angulation of existing lines between fhe contract drawings and what
may be encounfered in the said work shall be considered as incidental to construction.
Where it is required to shut down existing mains in order to make proposed connections,
such down time shall be coordinated with the Engineer, and all efforts shall be made to
keep this down time to a minimum. In case of shutting down �n existing main, the
Contractor shall notify the Manager, Construction Services, Phone $71-7813, at least 48-
hours prior to the required shut down time. The Contractor's attention is directed to
Paragraph C5-5.15 INTERRUPTION OF SERVICE, Page' C5-5(5), PART C- GENERAL
CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS
AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both
personally and in writing as to the location, time, and schedule of the service interruption.
The cost of removing any existing concrete blocking shall be included in the cost of
connection. Unless bid separately all cost incurred shall be included in the linear foot price
bid for the appropriate pipe size.
80.6 Valve Cut-Ins: It may be necessary to cut-in gate valves to isolate the water main
from which the extension and/or replacement is to be connected. This may require clo�ing
valves in other lines and putting consumers out of service for that period of time necessary
to cut in the new valve; the work must be expedited to the' utmost and all such cut-ins must
be coordinated with the engineer in charge of inspection. All consumers shall be
individually advised prior to the shut out and advised of the approximate length of time they
may be without service.
Payment for work such as backfill, bedding, fittings, blocking and all other associated
appurtenants required, shall be included in the price of the appropriate bid items.
04/21/99
SC-42
��
PART D - SPECIAL CONDITIONS
0
��
�
�
L�
��
�
L��
'�
!J
�
�
�'
�
�
�
�
�
80.7 Water Services: The relocation, replacement, or reconnection of vvater services
wi�l be required as shown on the plans, and/or as described in these Snecial Contract
Documents in addition to tiiose located in the field and identified by the Engineer.
All service's shall be constructed by the contractor utilizing approved factory manufactured
tap saddles (when required) and corporation stops, type K copper water tubing, curb stops
with lock wings, meter boxes, and if required approved manufactured
service branches. All materials used shall be as specified in the Material Standards (E1-
17 & E1-18) contained in the General Contract Documents.
All water services to be replaced shall be installed at a minimum depth of 36 inches below
final grade.
All existing 3/4-inch water service lines which are to be replaced shall be replaced with 1-
inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation
from the main line to the meter box.
All services which are to be replaced or relocated shall be installed with the service main
tap and service line being in line with the service meter unless otherwise directed by the
Engineer.
A minimum of 24 hours advance notice shall be given when service interruption will be,
required as specified in Section C5-5.15 INTERRUPTION OF SERVICE. �;;;
All water service meters-shall be removed, tagged, and collected by the contractor for
pickup by the Water Department for reconditioning or replacement. After installation of the
water service in the proposed location and receipt of a meter from the project inspector the
contractor shall install the meter. The meter box shall be reset as necessary to be flush
with existing ground or as otherwise directed by the Engineer. All such work
on the outlet side of the service meter shall be performed by a licensed plumber.
1. WATER SERVICE REPLACEMENTS: Water service replacement or relocation is
required when the existing service is lead or is too shallow to avoid breakage during street
reconstruction. The contractor shall replace the existing service line with Type K copper
from the main to the meter, curb stop with lock wings, and corparation stop.
Payment for all work and materials such as backfill, fittings, type K copper tubing, curb
stop with lock wings, service line adjustment, and any relocation of up to 12-inches from
center line existing meter location to center line proposed meter location shall be included
in the Linear Foot price bid for Copper �ervice Line from Main to five (5) feet behind Meter.
Any vertical adjustment of customer service line within the 5 foot area shall be subsidiary
to the service installation.
Payment for all work and materials such as tap saddle (if required), corporation stops, and
fittings shall be included in the price bid for Service Taps to Main.
2. WATER SERVICE RECONNECTION: Water service reconnection is required when the
existing service is copper and at adequate depth to avoid breakage during street
reconstruction. The contractor shall adjust the existing water service line as required for
reconnection and furnish a new tap with corporation stop. The contFactor will be paid for
one (1) Service Tap to Main for each service reconnected plus for any copper service line
used in excess of five (5) feet�from Main to five (5) feet behind the Meter.
3. WATER SERVICE METER AND METER BOX RELOCATIONS: When the replacement
and relocation of a water service and meter box is required and the location of the meter
and meter box is moved more than twelve (12) inches, as measured from the center line of
the existing meter to location to the center line of the proposed meter location, separate
04/21/99
SC-43
PART D - SPECIAL CONDITIONS
payment wiil ba allowed for the relocation of service meter and meter box. Centerline is
defined by a lir�a extended from the service tap through the meter. Only relocations made
perpendicular to this centerline will be paid for separately. Re!ocations made along the
centerline will be paid of in feet of copper service line. �
When relocation of service meter and meter box is required, payment for all work and
materials such as backfill, fittings, five (5) feet of type K copper service and all materials,
labor, and equipment used by ard for the licensed plumber shall be included in the price
bid for the service meter relocation. All other costs will be included in other appropriate bid
item(s).
This item will also be used to pay for all service meter and meter box relocations as
required by the Engineer when the service line is not being replaced. Adjustment of only
the meter box and customer service line within 5 feet distance behind the meter will not
justify separate�payment at any time. Locations with multiple service branches will be paid
for as one service meter and meter box relocation.
4. NEW SERVICE: When new services are required the contractor shall install tap saddle
(when required), corporation stop, type K copper service line, curb stop with lock wings,
and meter box.
Payment for all work and materials such as backfill, fittings, type K copper tubing, and curb
stop, with lock wings shall be included in the Linear Foot price bid for Service Line from
Main to Meter five (5) feet behind the meter.
Payment for all work and materials such as tap saddle, corporation stops, and fittings shall
be included in the price bid for Service Taps to Mains.
Payment for all work and materials such as furnishing �and setting new meter box shall be
included in the price bid for furnish and set meter box.
5. MULTIPLE SERVICE BRANCHES: When multiple service branches are required the
contractor shall furnisli approved factory manufactured branches.
Payment for multiple service bPanches will include furnishing and installing the multiple
service branch only and all other cost will be included in other appropriate bid item�s).
6. MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple
service lines with taps servicing a single service meter encountered during construction
shall be replaced with one service lihe that is applicable for the size of the existing service
meter and approved by the Engineer.
Payment shall be made at the unit bid price in the appropriate bid item(s).
80.8 2-Inch Temporary Service Line: The 2-inch temporary service main and 3/4-inch
service lines shall be installed to provide temporary water service to all tiuildings that will
necessarily be required to have severed water service during said work. The contractor
shall be responsible for coordinating the schedule of the temporary service connections
and permanent service reconnections with the building owners and the Engineer in order
that the work be performed in an expeditious manner. Severed water service must be
reconnected within 2 hours of discontinuance of ser'vice.
A 2-inch tapping saddle and 2-inch corporation stop or �2-inch gate valve with an
appropriate fire hydrant adapter fitting shall be required at the temporary service point of
connection to the City water supply. The 2-inch temporary service main and 3/4-irich
service lines shall be installed in acco�dance to the attached figures 1, 2 and 3. 2"
temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated
lime (HTH) prior to installation.
04/21/99 SC-44
�
��
�
�
PART D - SPECIAL CONDITIONS
A tw�-inch meter will be furnished by the Water Depart�nent Meter Shop and installed by
the Contractor at its poinf of connection to the City water supply for record keeping
purposes only. The out-of-service meters shall be removed, tagged and collected by the
Contractor for delivery to the Water Department Meter Shop for reconditioning or
replacement. Upon restoring permanent service, the Contractor shali re-install the meters
at ther correct location. The meter box shall be reset as necessary to be flush with the
existing ground or as otherwise directed by the Engineer.
The temporary service layout shall have a minimum available flow rate of 5 GPM at a
� dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor to
determine the length of temporary service allowed, number of service taps and number of
feed points.
I�
�
�
�
l*J
When the t�mporary service is required for more than one location the 2-inch temporary
service pipes, 3/4-inch service lines and the 2=inch meter shall be moved to the next
successive project location.
Payment for work such as fittings, 3/4-inch service lines, asphalt, barricades, all service
connections, removal of temporary services and all other associated appurtenants
'required, shall be included in the appropriate bid item.
80.9 Adjust Manholes, and Vaults (Utility Cut): Contractor will be responsible for
adjusting water valve boxes, manholes and vaults to match new pavement grade. The unit
price bid will be full payment for materials including all labor, equipment, tools and
incidentals necessary to complete the work.
- R
80.10 Adjust Water Valve Boxes: Contractor will be responsible for adjusting water
valve boxes to match new pavement grade. The water valves�themselves will be adjusted,
if necessary, by-City of Fort Worth Water Department forces.
Prior to the beginning of work, the Contractor shall make an inventory of the condition of
� existing water valve boxes. The Construction Engineer will field verify this inventory and
provide the Contractor replacements for broken valve boxes. The contractor shall replace
the valve boxes which are damaged during construction at no cost to the City.
�
�
�
L�J
�
�
� 04/21/59
'�f
The unit price bid per each will be full compensation for all labor, materials, equipment,
tools, and incidentals necessary to complete the work.
80.11 Purging and Sterilization of Water Lines: Before being placed into service'�II
newly constructed water lines shall be purged and sterilized in accordance with E2-24 of
the General Contract Documents and Specifications except as modified herein. The
Contractor will furnish all water for INITIAL cleaning and sterilization of water lines. All
materials for construction of the project, including appropriately sized "pipe cleaning pigs",
chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated
lime (HTH) shall be used in sufficient quantities to provide a chlorine resldual of fifty (50)
PPM. The residual of free chlorine shall be measured after 24 hours and shall not be less
than 10 parts per million of free chlorine. Chlorinated water shall be disposed of in the
sanitary sewer system. Should a sanitary sewer not be available, chlorinated water shall
be "de-chlorinated" prior to disposal. The line may not be placed in service until two
successive sets of samples, taken 24 hours apart, have met the established standards of
purity.
Purging and sterilization of the water lines shall be considered as incidental to the project
and al1 costs incurred will be considered to be included in the linear foot bid price of the
pipe.
SC-45
�
PART D - SPECIAL CONDITIONS
80.12 Work Near Pressure Plane Boundpries: Contractor shali take note that the
water line to be replaced under this contract r��ay cross or may be in close proximity to an
existing pressure plane boundary. Care shall be taken to ensure all "pressure plane"
valves installed are installed closed and n'o cross connections are made between pressure
planes
80.13 Water Sample Station:
GENERAL:
All water sampling station installations will be per attached Figure 34 or as required in
large water meter vaults as per Figure 33 unless otherwise directed by the Engineer.
The appropriate water sampling station will be furnished to the Contractor free of charge;
however, the Contractor will be required to pick up this item at the Field Operations
Warehouse.
PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials
necessary for the installation of the 3/4-inch type K copper service line will be shall be
included in the price bid for copper'Service Line from Main to Meter.
Payment for all work and materials necessary for the installation t�p saddle (if required),
corporation stops, and fittings shall be included in the price bid for Service Taps to Main.
Payment for all work and materials necessary for the installation of the sampling station,
concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper service
line which are required to provide a complete and functional water sampling station shall
be included in the price bid for Water Sample Stations.
PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials
necessary for the installation tap saddle, gate valve, and fittings shall be included in the
price bid for Service Taps to Main.
Payment for all work and materials necessary for the installation of the sampling station,
modification to the vault, fittings, ar�d all type �K copper service line which are required to
provide a complete and functional water sampling station shall be included in the price bid
for Water Sample Stations.
80.14 Ductile Iron and Gray Iron Fittings:
Reference Part E2 Construction Specifications, Section E2-7 Installing Cast Iron Pipe,
fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: the first Paragraph shall be
revised to read as follows:
E2-7.11 DUCTILE-IRON AND GRAY-IRON FITTINGS: All ductile-iron and gray-iron
fittings shall be furnished with cement mortar lining as stated iri Section� E1-7. The price
bid per ton of fittings shall be payment in full for all fittings, joint accessories, polyethylene
wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete
cradle necessary for construction as designed.
All ductile-iron and gray-iron fittings, valves and specials shall be wrapped with
polyethylene wrapping conforming to Material Specification E1-13 and Construction
Specification E2-13. Wrapping shall precede horizontal concrete blocking, vertical tie-
down concrete blocking, and concrete cradle. Payment for the polyethylene wrapping,
horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle shall
be included in bid items for vales and fittings and no other payments will be allowed.
oarz��ss SC-46
�
�
�
�
�
�
U
�
�
�
�
�
�
�
�
�
�
�
�
PART D - SPECIAL CONDITIONS
D-81 SPRINKLING FOR DUST CONTRCL:
All applicable provisions of Standard Specifications Item 200, "Sprinkiing for Dust Control" shall
apply. However, no direct payment will be made for this item and it shall be considered to �his
contract.
D-82 DEWAT�RING:
The Contractor shali be responsible for determining the method of dewatering operation for the
water or sewage flows from the existing mains and ground water. The Contractor shall be
responsible for damage of any nature resulting from the dewatering operations.
The DISCHARGE from any dewatering operation shall be conducted as approved by the
Engineer. Ground water shall not be discharged into sanitary sewers. �
Dewatering shall be considered as incidental to a construction and all costs incurred will be
considered to be included in the project price.
D-83 TRENCH EXCAVATION ON DEEP TRENCHES:
Contractor to prevent any water flowing into open trench during construction. Contractor shall not
leave excavated trench open overnight. Contractor shall fill any trench the same day of
excavation. No extra payment shall be allowed for this special condition.
D-84 TREE PRUNING: �
A. REFERENCES: National Arborist Association's "Pruning Standards for Shade Trees".
�
C
L�
ROOT PRUNING EQUIPMENT
1. Vibratory I�nife
2. Vermeer V-1550RC Root Pruner
NATURAL RESOURCES PROTECTION FENCE
1. Steel "T" = Bar stakes, 6 feet long.
2. Smooth Horse-Wire: 14-1/2 gauge (medium gauge) or 12 gauge (heavy gauge).
T- 3. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red
color.
4. Combination Fence: Commercially manufactured combination soil separator fabric on
wire mesh backing as shown on the Drawings.
ROOT PRUNING
1. Survey and stake location of root pruning trenches as shown on drawings.
2. Using the approved specified equipment, make a cut a minimum of 36 inches deep in
order to minimize damage to the undisturbed root zone.
3. Backfill and compact the trench immediately after trenching.
4. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the
Engineer.
04/21/59
SC-47
�
��
��
�'
PART D - SPECIAL CONDITIONS
E
5. Within 24 hours, pru�e flush with ground and backfili any exposed roots due to
construction activity. Cover with wood chips of mulch in order to equalize soil
temperature and minimize water loss due to evanoration.
6. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no
roots over 1-inch diameter being cut unless cut by hand or cut by specified methods,
equipment and protection.
MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing operation
on areas designated by the Engineer.
F. Tree Pruning shall be considered subsidiary to the project contract price.
D-85 TREE REMOVAL:
Trees to be removed shall be removed using applicable methods, including stump a'nd root ball
removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities
both everhead and buried. The Contractor shall immediately repair or replace any damage to
utilities and private property including, but not limited to, wate� and sewer services, pavement,
fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal,
including temporary service costs, shall be considered subsidiary to the project contract price and
no additional payment will be allowed.
D-86 TEST HOLES:
The matter of subsurface exploration to ascertain the nature of the soils, including the amount of
rock, if any, through which this pipeline installation is to be made is the responsibility of any and all
prospective bidders, and any bidder on this project shall submit his bid under this condition.
Whether prospective bidders perform this subsurface exploration jointly or' independently, and
whether they make such determination by the use of test holes or other means, shall be left to the
discretion of such prospective bidders.
If test borings have been made anci are provided for bidder's information, at the locations shown
on the logs of borings in the appendix of this specification, it is expressly declared that neither the
City nor the Engineer guarantees the accuracy for- the information or that the material encountered
in excavations is the same, either in character, location, or elevation, as shown on the boring logs.
It shall be the responsibility of the bidder to make such subsurface investigations as he deems
necessary to determine the nature of the material to be excavated. The Contractor .assumes all
responsibility for interpretation of these records and for making and maintaining the required
excavation and of doing other work affected by the geology of the site.
� _
The cost of all rock removal and other associated appurtenances, if required, shall be included in
the linear foot bid price of the pipe.
oar�»s SC-48
�J
�
�
�
�
�
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
DA-1 PiPELINE REFiABILITATION CURED—IN—PLACE PIPE .....................................................OMIT
DA-2 PIPELINE REHABILITATION PIPE ENLAR�EMENT SYSTEM .......................................ASC-3 �
DA-3 PIPELINE REHABILITATION FOLD AND FORM PIPE ......................................................OMIT
DA-4 SLIPLININ� ........................................................................................................................O.MIT
DA-5 PIPE INSTALLED BY OTHER THAN OPEN CUT ...........................................................ASC-10
DA-6 SERVICE LINE POINT REPAIR / CLEANOUT REPAIR .....................................................OMIT
DA-7 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION ...................... ASC-14
DA-8 MANHOLE REHABILITATION ITEMS ...............................................................................OMIT
DA-9 SURFACE PREPARATION FOR MANHOLE REHABILITATION ........................................OMIT
DA-10 INTERIOR MANHOLE COATING — MICROSILICATE MORTAR SYSTEM ........................ OMIT
DA-11 INTERIOR MANHOLE COATING — QUAD'EX SYSTEM ......................................................OMIT
� ,�
DA-12 INTERIOR MANHOLE COATING — SPRAYWALL SYSTEM ................................:�.........ASC-16 �
DA-13 INTERIOR MANHOLE COATING — RAVEN LINING SYSTEM .......................................ASC-19
�
�
�
�
�
�
L!1
DA-14 INTERIOR MANHOLE COATING — PERMACAST SYSTEM WITH EPDXY LINER........... OMIT
DA-15 INTERIOR MANHOLE COATING—STRONG—SEAL SYSTEM ..............................................OMIT
DA-16 RIGID FIBERGLASS MANHOLE LINERS ................................................. .........................OMIT
DA-17 PVC LINED CONCRETE WALL RECONSTRUCTION .......................................................OMIT
DA-18 PRESSURE GROUTING .....................................................................................................OMIT
DA-19 VACUUM TESTING OF REHABILITATED MANHOLES ..............................................:....:.OMIT
DA-20 FIBERGLASS MANHOLES .................................................................................................OMIT
DA-21 LOCATION AND EXPOSURE OF MANHOLE� AND WATER VALVES .............................OMIT
DA-22 REPLACEMENT OF CONCRETE CURB AND GUTTER ................................................ASC-22
DA-23 REPLACEMENT OF 6" CONCRETE DRIVEWAYS ........................................................ASC-23
DA-24 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE .....................................................OMIT
oa��r�ss ASC-1
� �4
. ;� .
a� �
-�,
a,
..r� ,
,
�.,
Ja�f
�
PART DA - ADDITIONAL SPECIAL CONDITIONS �
DA-25 GRA�ED CRUSHED STONES ...........................................................................................OMIT
DA-26 WE�:?GE MILLING 2" TO 0" DEPTH 5.0' WIDE ...................................................................OMIT
DA-27 BUTT JOINTS - MILLED .....................................................................................................OMIT
DA-2& 2" H.NI.A.C. SURFACE COURSE (TYPE "D" MIX) .............................................................fJMIT
DA-29 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER .................................................ASC-23
DA-30 NEW 7" CONCRETE VALLEY GUTTER ..:..........................................................................OMIT
DA-31 NEW 4" STANDARD WHEELCHAIR RAMP ........................................................................OMIT
DA-32 8" PAVEMENT�PULVERIZATION .......................................................................................UMIT
DA-33 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) ............................. ASC-24
DA-34 RAISED PAVEMENT MARKERS ..............................................................,.........................OMIT
DA-35 POTENTIALL`Y PETROLEUM CONTAMINATED MATERIAL HANDLING .........................OMIT
DA-36 LOADING, TRANSPORTATION, AND DISPO�AL OF CONTAMINATED SOIL ................ OMIT
DA-37 ROCK RIPRAP - GROUT - FILTER FABRIC .......................................................................OMIT
DA-38 CONCRETE PIPE FITINGS �ND SPECIALS .....................................................................OMIT
r
oai�siss ASG2
�
IL�J
�
O
L;
Ll
�
L!�
O
���I
�
�
�
1. Description: This
s�nitary sewers by
Pipe Crushing (Pipe
the existing pipe to
service connections.
�
specification includes requirements to rehabilitate existing
the pipe enlargement system, herein called Pipe Bursting or
Bursting/Crushing). This system includes splitting or bursting
install a new polyethylene pipe and reconnect existing sewer
2. Methods: This section specifies the approved system method or process to include
all labor, materials, tools, equipment and incidentals necessary to provide for the
complete rehabilitation of deteriorated gravity sewer lines by the Pipe
Bursting/Crushing systems. Approved methods include: the PIM Corporation (PIM
System), Piscata Way, New Jersey; McLat Construction (McConnell System for
Pipe Crushing), Houston, Texas; and Trenchless Replacement Systems, (TRS
System), Calgary, Canada. Refer to Part D- SPECIAL CONDITIONS D-61
SIBSTITUTIONS for information regarding pre-approval procedures for alternative
processes. �-
3. Definition: The Pipe Bursting/Crushing system is defined as the reconstruction of
gravity sewer pipe by installing an approved pipe material, by means of one of the
pre-approved methods set forth in Section A.2 of this specification. The ,process
involves the use of a static, hydraulic. or pneumatic hammer "moling" device,
suitably sized to break out the old pipe or using modified boring "knife" with a
flared plug that implodes and crushes the existing sewer pipe. Forward progress of
the "mole" or the "knife" may be aided by the use of hydraulic equipment or other
apparatus, as specified in the approved methods. The replacement pipe is either
pulled or pushed into the bore. The method allows for replacement of pipe sizes
from 8" through 21" and/or upsizing in varying increments up to 21". This
specification is based on the precedent that the Pipe Bursting/Crushing system
used has been pre-approved by the City of Fort Worth Department of Engineering,
and Fort Worth Water Department.
j'� 4. Quality Assurance:
i��
The Contractor shall be certified by the particular Pipe Bursting/Crushing system
(`� manufacturer that such firm is a licensed installer of their system. No other Pipe
�.i Bursting/Crushing system other than those listed in Section A.2. of these
specifications is acceptable.
t�
�
�' o4i�c�ss
PART DA - ADDITIONAL SPECIAL CONDITIONS
DA-1 PIPELINE REHABILITATION CURED-IN-PLACE PIPE: OMIT
DA-2 PIPE ENLARGEMENT SYSTEM:
A. GENERAL:
a. Personnel directly involved with `nstalling the new pipe shall receive training
in the proper methods for joint fusing, handling, and installing the
polyethylene pipe. Training shall be performed by a qualified representative
as determined by the pipe manufacturer.
ASC-3
[�i
�PART DA - ADDITIONAL SPECIAL CONDITIONS
�
�
b. Personnel directly involved with installing the new pipe shall receive training
in the proper methods for joint fusing, handling, and installing the
polyethylene pipe. Training shall be performed by a qualified representative
as determined by the pipe manufacturer.
Submittals: Submit for review and acceptance, the following Contractor's Work
Plan and Drawings to the Department of Engineering (DOE):
a. Shop drawings, catalog data, and manufacturer's technical data showing
complete information on material composition, physical properties, and
dimensions of new pipe and fittings. Include manufacturer's
recommendation for handling, storage, and repair of pipe and fittings if
damaged.
i�
[«
Location and number of insertion or access pits shall be planned by
Confractor and submitted in writing prior to excavation for approval by DOE.
Method of construction and restoration of existing sewer service
connections. This shall include:
1) Detail drawings and written description of the entire construction
procedure to install pipe, bypass sewage flow and reconnection of �
sewer service connections. „
2) Working drawings for information only showing sewage flow bypass, �
and maintenance of traffic. Contractor shall provide for continuous
sewerage flow. Dewatering shall be the Contractor's responsibility.
3)
Certification of workmen training for installing pipe.
,�
4)
Television inspection reports and video tapes made after new pipe
installation.
Delivery, Storage, and Handling:
a. Transport, handle, and store pipe and fittings as recommended by
manufacturer.
b. If new pipe and fittings become damaged before or during installation, it
shall be repaired as recommended by the manufacturer or replaced as
required by the Project Manager at the Contractor's expense, before
proceeding further.
c.
B. MATERIALS:
04/16/99
Deliver, store and handle other materials as required to prevent damage.
ASC-4
��
�
�
�
�
. �
�
�
�•,
�
l�
�
�
�
L�J
�
� 2.
�
�
�
U
�
C
�
�
�
04/1f/99
PART DA - ADDITIONAL SPECIAL CONDITIONS
Polyethylene Piping Material: The pipe and fitting material shall be high density,
extra molecular weight (EHMV1� polyethylene pipe material conforming to ASTM
..D1248, Type III, Class C, Category 5, Grade P34, and have a PPI (Plastic Pipe
Institute) recommended designation of PE3408 and cell classification 345434C per
ASTM D3350. The molecular weight category shall be extra high (250,000 to
1,500,000) as per the Gel Permeation Chromatography determination procedure
with a typical value of 330,000.
a. The interior of the pipe shall be a light reflective color to facilitate closed
circuit television inspection.
b. The pipe material shall be listed by the Plastic Pipe Institute (PPI) in PPI
TR-4. The pipe material shall have as hydrostatic design basis of 1600 psi
at 73 F and 800 psi at 140 F.
c. The manufacturer's certification shall state that the pipe was manufactured
from one specific resin and shall state the resin used and its source. All
pipe shall be made of virgin material. No rework, except that obtained from
the manufacturer's own production of the same formulation, shall be used.
d. Pipe supplied under this specification shall have a nominal IPS (Iron Pipe
Size) outside diameter. The Standard Dimension Ratio (SDF��� and
minimum pressure rating of the pipe shall be SDR 17 - 100 psi. Pipe with a
lower SDR ratio and higher pressure rating may be used in lieu ��of the
minimum specified.
Tests: The Contractor shall be required to send submittals to the City of Fort Worth
on the production material.
- a. The pipe manufacturer shall .provide certification that samples of the
prortaction product meets these specifications. The certification will state
that production product has been tested in accordance with ASTM D2837,
and validated in accordance with the latest revision of PPI TR-3.
b. The pipe manufacturer shall provide certification that
testing has been performed on the specific product.
include a stress life curve per ASTM D2837 and testing
perFormed in accordance with ASTM D2837. .
stress regression
Certification shall
shall have been
c. Rejection: Polyethylene plastic pipe and fittings may be rejected for failure
to meet any of the requirements of this specification.
SEWER SERVICE CONNECTIONS:
1. Sewer Service Connections: Sewer service connections shall be connected to the
new pipe by mechanical or fusion methods. Once the saddle is secured, a hole
shall be drilled in the pipe the full inside diameter �f saddle outlet.
ASC-5
0
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
�
L�:
2. Pipe Saddles: Mechanical saddles shail be made of polyethylene pipe compound
that meets the requirements of ASTM D1248, Class C, have stainless steel straps
and fasteners, neoprene gasket and backup plate.. Mechanical saddles shall be
Strap-on-Saddle Type as manufactured by Driscopipe or Tapping Saddle
manufactured by DuPont; or approved equal. Fusion saddles shall be
electrofusion branch saddles as manufactured by Central Plastics Company, or
approved equal. �
3. Connection to Existing Service: Connections to the existing sewer service
connections pipe shall be made using flexible couplings. All flexible couplings shall
conform to ASTM C425 and shall be as manufactured by Fernco Joint Sealer Co.,
DFVV Plastics, Inc. ,or approved equal. Backfill at service connections shall be
cement stabilized sand��(2 sacks per cubic yard) to a point 12 inches above the
service lateral to trench intersection and shall be in accordance with these
specifications.
The Contractor shall, upon request, permit the Engineer to take elevations on both
the existing and new portions of the service connection pole to determine final
grade and invert elevations. Elevation changes greater than 0.10 feet from the
house lateral piping and shall be reconnected as directed by the Engineer.
4. Service Interruptions: Service interruptions to homes shall not exceed 18 hours.
PREPARATION:
Bypassing Sewage:
a. The Contractor shall bypass the sewage around the section or sections of
sewer to be rehabilitated. The bypass shall be made by plugging existing
upstream manhole and pumping the sewage into a downstream manhole or
� adjacent system or other method as may be approved by the Engineer.
The pump and bypass lines shall be of adequate capacity and size to
handle the flow without sewage backup occurring to facilities connected to
. the sewer.
�
�
.�
�
�
,�
�
�
��
�
�
�
b. The Contractor shall be responsible for continuity of sanitary sewer service
to each facility connected to the section of sewer during the execution of the �
work.
If sewage backup occurs and enters buildings, the Contractor shall be
responsible for clean-up, repair, property damage costs and claims.
2. Line Obstructions: If pre-installation (TV) inspection reveals an obstruction in the
existing sewer (heavy solids, dropped joints, protruding service taps or collapsed
pipe) which will prevent completion of the pipe bursting/crushing process, and
cannot be removed by conventional sewer cleaning equipment, then an obstruction
removal shall be made by the Contractor, with the approval of the Engineer.
oai�siss ASC-6
�
�
�
�
11
��
0
�
'�
�
I
�
l�J
!_!1
�
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
3. Sags in Sewer Line: ALL SAGS AND GRADE PROBLEMS IN EXISTING SEWER
LINES SHALL BE CORRECTED AS PART OF THIS CONTRACT. If the pre-
construction television inspection reveals a sag in the sewer line, the Contractor
shall be responsible for bringing the proposed sewer pipe to an acceptable grade
without a sag. A sag is defined as any sewer line segment more than 3 feet in
length which ponds water in the absence of sewage flow. The contractor shall take
the necessary measures to eliminate the sag by the method of: pipe replacement,
digging a sag elimination pit and bringing the bottom of the pipe trench to a uniform
grade in line with the existing pipe invert or by other measures that shall be
acceptable to the Engineer and the City.
a. Identification of Sags: Sags shall be identified by television inspection in
the absence of sewage flow. If available, the Contractor shall be furnished
television tapes from the �City identifying the sag location. Flow shall be
blocked at an upstream manhole and diverted to another sewer line or
downstream manhole below the segment of pipe to be inspected. N
inspection shall be performed in accordance with tel_evision inspection of
sanitary sewer lines. Video tapes shall be submitted to the Department of
Engineering for review.
b. Correction of Sags: Sags shall be corrected by open cut and by �adding
additional bedding material to bring the sag back to grade where access is
available.J For pipe enlargement methods, all sags identified on the pre-
construction video tapes shall be corrected prior to commencing with pipe
enlargement.
In instances where sags are loca�ed unde� existing structures, the existing
sewer line may be relocated using open cut or boring methods. The
Department of Engineering shall specifically review potential relocation's
and evaluate the constructabilitjr, economics and engineering feasibility
prior to construction work.
c. Measurement and Payment: Measurement and payment to correct sags
(� shall be per linear foot of pipe construction to correct the sag. For pipe
(,,,� bursting methods, open-cut or bore construction, the applicable bid prices in
the proposal section shall apply.
�
l3
� E.
�
��
04/16/99
4. Television Inspection: Inspection of the pipelines shall be performed by
experienced personnel trained in locating breaks; obstacles and service
connections by closed circuit color television. Television inspection shall be in
accordance with the specifications contained herewith for "Pre- and Post-
Construction Television Inspection of Sanitary Sewer Lines".
PIPE ENLARGEMENT SYSTEM ANR PIPE INSTALLATION:
Site Organization:
ASC-7
.�
PART DA - ADDITIONAL SPECIAL CONDITIONS
a. Insertion or access pits shall be located such that their total number shall be
minimized and the length of replacement pipe installed in a single pull shall
be maximized. _....
�
r�
L'�!
b. Existing manholes shall be utilized wherever practical. Manhole inverts and
bottoms may be removed to permit access for installation equipment. �
c. Equipment used to perform the work shall be located away from buildings
so as not to create a noise impact. Provide silencers or other devises to
reduce machine noise as ne�ded to meet requirements.
2. Finished Pipe: The installed replacement pipe shall be continuous over the entire,
length of each pipe segment from manhole to manhole and shall be free from
visual defects such as foreign inclusions, concentrated ridges, discoloration, pitting,
varying wall thickness, pipe separation, other deformities. Replacement pipe with
gashes, nicks, abrasions, or any such physical damage which may have occurred
during storage and/or handling, which are larger/deeper than 10% of the wall
thickness shall not be used and shall be removed from the construction site. The
replacement pipe passing through or terminating in a manhole shall be carefully cut
out in a shape and manner approved by the Eng�neer. The invert and benches
shall be streamlined and improved for smooth flow. The installed pipe shall meet
the leakage requiremerits of the pressure test specified later.
3.
n
�
Pipe Jointing:
a. Sections of polyethylene replacement pipe shall be assembled arid joined
on the job site above the ground. Jointing shall be accomplished by the
heating and butt-fusion system in strict conformance with the
manufacturer's printed instructions.
b. The butt-fusion system for pipe jointing shall be carried out in the field by
operators with prior experience in fusing polyethylene pipe with similar
equipment using proper jigs and tools per standard procedures outlined by
the pipe manufacturer. These joints shall have a smooth, uniform, double
rolled back bead made while applying the proper melt, pressure, and
alignment. It shall be the sole responsibility of the Contractor to provide an
acceptable butt-fusion joint. All joints shall be made available for inspection
by the Engineer before insertion. The replacement pipe shall be joined on
the site in appropriate working lengths near the insertion pit. The maximum
length of continuous replacement pipe wtiich shall be assembled above
ground and pulled on the job site at any one time shall be 600 linear feet.
c. For situations where the replacement pipe is not pulled all the way to the
manhole or if �it is impossible to pull the missle all the way through, the
following shall apply: At the direction of the Engineer, a 12"-18" full circle
steel clamp shall be utilized to connect segments of the HDPE pipe.
New Pipe Installation:
oai�r�s ASC-8
�
�
�
[�J
�
L��
�
�
�
C�
��
�
LJ
�
�
l�
L�J
� 04/1 fa/99
5.
,:
PART DA - ADDITIONAL SPECIAL CONDITIONS
a. Thread winch cable or chain and associated lines through sewer section to
be rehabilitated. Keep lines away from pedestrian and vehicular traffic.
b. Existing manholes may be used for launch and receiving access. Remove
manhole invert and bottom as required. Pull winch chain through sewer
section and attach to cutter and machine head. Lower into launching
manhole, apply winch tension pulling the cutter and head into the sewer
until the rear of the machine is flush with the manhole wall. Attach steel
starter pipe and advance assembly until the rear of the steel starter pipe is
flush with the manhole wall. Lower hydraulic jack into the manhole and
align. Insert new pipe by simultaneous operation of the jack and winching
the cutter and head forward.
Anchoring New Pipe and Sealing Manholes:
a. After the new pipe has been installed in the entire length of the sewer
section, anchor the pipe at manholes.� The new pipe shall protrude in the
manholes for enough distance to allow sealing and trimming.
b. Sealing the new pipe at manholes shall not begin for a minimum of ten (10)
hours after installation. Provide a flexible gasket connector in the manhole
wall at the end of the new pipe, centered in the existing manhole wall.
Grout flexible connector in the manhole, filling all voids the full thickness of
the manhole wall.
c. Restore manhole bottom and invert.
Field Testing:
a. Low Pressure Air Test of Replacement Pipe: After a manhole-to-manhole
section of sanitary sewer main has been pipe burst/crushed and prior to any
—�ervise-aiaes-being connected to the replacement pipe, the pipe shall be
plugged at each manhole with pneumatic pfugs. The design of the plugs
shall be such that they will hold againsf the test pressure wittiout requiring
external blocking or bracing. One of the plugs shall have three air hose
connections; one for the inflation of the plug, one for reading the air
pressure in the sealed line, and one for introducing air into the sealed line.
Low pressure air shall then be introduced into the sealed line until the
internal air pressure reaches 4.0 psig greater than the average back
pressure resulting from any ground water that may be over the pipe. At
least two minutes shall elapse to allow the pressure to stabilize. The time
required for the internal pressure to decrease from 3.5 to 2.5 psig greater
than the average back pressure resulting from any ground water that may
be over the pipe, shall not be less than the time shown for a given pipe
diameter in the following table:
Carrier Pipe Minimum Elapsed
Diameter (inches) Time (minutes)
8 4
ASC-9
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
10
12
15
0
5
6
7
�
�
�
Post-Construction Television Inspection of New Pipe: Refer to Special
Condition for Post-Construction Television Inspection of Sanitary Sewer. �
F. MEASUREMENT AND PAYMENT:
1. Pipe Installation: Pipe installation will be measured for payment by the linear foot
of pipe actually installed in the various diameters of sewers measured along the
centerline of the sewer from centerline to centerline of manholes. Payment will be
made for the quantities measured at the unit price per linear foot for the various
sewer diameters listed.
2. Service Reconnections: Installation of sewer service connections will be measured
for payment by each actually reconnected to the installed pipe. Payment will be
made for the quantities measured at the unit price per each listed. Payment shall
include required excavation and backfill, saddles, flexible connections, and all other
incidentals necessary to successfully reconnect sewer service lines to the
rehabilitated sewer. Payment shall not include pavement replacement, which if
required, shall be paid separately.
3. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic
jet cleaning shall be performed by bucket machines. The payment for such
cleaning shall be included in the bid item for Pre-Construction Television Inspection
of Sanitary Sewer Lines.
4. By-pass Pumping: The Contractor shall provide diversion for the flow of sewage
around the section or sections of pipe designated for rehabilitation. The pumps
and by-pass lines shall be of adequate capacity and size to handle all flows. All
costs for by-pass pumping required during installation of the pipe shall be
subsidiary to pipe enlargement.
5. Subsidiary Work: Any damage to utilities and property, resulting repairs, temporary �
service costs, etc. shall be borne by Contractor. Repair and/or replacement of
fences, sprinkler system piping and other such restoration work resulting from
Contractor activities shall be considered subsidiary to the cost of the project and no
addit'ional payment will be allowed.
6. Testing: All cost for testing the replacement pipe by a pressure method will be
incidental to pipe installation. Q
DA-3 FOLD AND FORM PIPE: OMIT
DA-4 SLIPLINING: OMIT
DA-5 PIPE INSTALLED BY OTHER THAN OPEN CUT:.
A. GENERAL:
04/16/99
ASC-10
I�
�
�
�
O
�
�
�
a
� B.
a
�
�
�
�
�
� C
�
�
�
�J
� 04/16/99
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
Furnish materials and necessary accessories, with strengths, thickness, coatings,
and fittings indicated, specified and/or necessary to complete the work.
All excavation shall provide an open area conforming to the outside diameter of the
casing and/or carrier conduit. The excavation shall be to an alignment and grade
which will allow the carrier conduit to be installed to proper line and grade as
shown on the Plans and as established in the Specifications.
1
2
3. Work shall be performed in accordance with the requirements of the City of Fort
Worth Water Department, the Texas Department of Transportation, or railroad
company, as applicable.
MATERIALS:
1. Casing Pipe: Casing pipe shall be steel conforming to ANSI B36.10 and the
following:
a.
b.
d.
Field Strength: 35,000 psi minimum.
Walhthickness: 0.312 in. minimum (0.5 for railroad ossings).
Diameter: As shown on the drawings (minimum size requirements).
Joints: Continuous circumferential weld in accordance with AWS D1.�1.
Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings� and as
specified in the General Contract Documents.
2
Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or
as designated on the plans.
3
4. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive
strength at 28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of fine
sand with sufficient water added to provide a free flowing thick slurry. �
EXECUTION
1. Where sewer pipe is required to be installed under railroad embankments or under
highways, streets or other facilities in other than open cut, construction shall be
performed in such a manner so as to not interfere with the operation of the railroad,
street, highway, or other facility, and so as not to weaken or damage any
embankment or structure. During construction operations, :barricades and lights to
safeguard traffic and pedestrians shall be furnished and maintained, until such time
as the backfill has been completed and then shall be removed from the site.
2. Pits and Trenches:
a. If the grade of the pipe at the end is below the ground surface, suitable pits
or trenches shall be excavated for the purpose of conducting the jacking or
ASC-11 �
PA��RT DA - ADDITIONAL SPECIAL CONDITIONS
tunneling operations and for placing end joints of the pipe. Wherever erid
� trenches are cut in the sides of the embankment or beyond it, such work
shall be sheeted securely and' braced in a manner to prevent earth from
caving in.
3
4
b. The location of the pit shall meet the approval of the Engineer.
c. The pits of trenches excavated to facilitate these operations shall be
backfilled immediately after the casing and carrier pipe installation has been
completed.
Boring and Jacking Steel Casing Pipe: Steel casing pipe shall be installed by
boring hole with the earth auger and simultaneously jacking pipe into place.
a. The boring shall proceed from a pit provided for the boring equipment and
workmen. The holes are to be bored mechanically. The boring shall be
done using a pilot hole. By this method an approximate 2-inch hole shall be
bored the entire length of the crossing and shall be checked for line and
grade on the opposite end of the bore frorn the work pit. This pilot hole
. shall serve as the centerline of the larger diameter hole to be bored. Other
methods of maintaining line and grade on the casing may be approved if
acceptable to the Engineer. Excavated material shall be placed near the
top of the working pit and disposed of as required. The use of water or
other fluids in connection with the boring operation will be permitted only to
the extent. required to lubricate cuttings. Jetting or sluicing will not be
permitted.
b. In unconsolidated soil formations, a gel-forming colloidal drilling fluid
consisting of at least 10 percent of high grade carefully processed bentonite
may be used to consolidat� cuttings of the bit, seal the walls of the hole,
and furnish lubrication for subsequent removal of cuttings and installation of
the pipe immediately thereafter.
c. Allowable variation from the line and grade shall be as specified under
paragra�h A.2. All voids between bore and outside of casing shall be
press�re grouted.
Installation of Carrier Pipe in Casing:
a. Sanitary sewer pipe located within the encasement pipe shall be supported
by "skids" or "bands" to prevent the pipe and bells from snagging on the
inside of the casing, and to keep the installed line from resting on the bells.
b. All skids shall be treated with a wood preservative. Skids should extend for
the full length of the pipe with the exception of the bell area and spigot area
necessary for assembly unless otherwise specified.
o4i�s�s ASC-12
t�'
0
�
�
�
C��
� 5.
�
�
�
1� {'
�
L�J
�
�
�
� 04/1 fa/99
PART DA - ADDITIONAL SPECIAL �CONDITIONS
c. The Contractor shall prevent over-belling the pipe while installing it through
the casing. A method of restricting the movement befinreen the assembled
bell and spigot where applicable shall be provided. ._
d. At all bored, jacked, or tunneletl installations, the anriular space befinreen
the carrier pipe and casing shall be filled with grout. Care must be taken
that not too �much water is forced into the casing so as not to float the pipe.
The backfill material will not be required unless specified on the plans and
specified by the Engineer.
e. Closure of the casing after the pipe has been installed shall be plugged at
the ends of the casing as shown on the drawings or as required by the
Engineer.
Boring and Jacking Ductile Iron Pipe without Casing Pipe:
a. As indicated on drawings and as required and directed by the Engineer
sewer shall be constructed of bore and jacked ductile iron pipe-. �
b. When a casing pipe is not designated on the drawings, the contractor shall
provide a casing pipe if necessary to achieve line and grade. Casing pipe
shall be provided at no additional cost and shall be subsidiary to the cost
bid for installation By Other than Open Cut. o�
�
c. Bore and jack in accordance with paragraph C.3. above.
ii. Short length of �sewer consisting of a single pipe section may be installed by
jacking without a bore hole if permitted by �the Engineer and in soft soil
layer. All voids outside of installed pipe shall be pressure grouted.
,
6. Tunneling: Where the characteristics of the soil, the size of the proposed pipe, or
the use of monolithic sewer would make the use of tunneling more satisfactory than
jacking or boring, or when shown on the p('ans, a tunneling method may be used,
with the approval of the Engineer or railroad/highway officials.
a. When tunneling is permitted, the lining of the tunnel shall be of sufficient
strength of support the overburden. The Contractor shall submit the
proposed liner method to the Engineer for approval. The tunnel liner design
shall bear the seal of a licensed professional engineer in the State of Texas.
Approval by the Engineer shall not relieve the Contractor of the
responsibility for the adequacy of the liner method.
i�
C«
The space befinreen the tunnel liner and the limits of excavation shall be
pressure grouted or mud jacked.
Access holes for placing concrete shall be space at maximum intervals of
10 feet.
ASC-13
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
D. MEASUREMENT AND PAYMENT: Installation of pipe by other than open cut will be
measured by the linear foot of pipe, complete in place. Such measurement will be made
between the ends of the pipe along the central axis as installed. The work performed and
materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid
per linear foot for Pipe Installed by Other Than Open Cut of the type, size, and class of
pipe specified as shown on plans. The furnishirig of all materials, pipe, liner materials
required for installation, for all preparation, hauling and installing of same, and for all labor,
tools, equipment and incidentals necessary to complete the work, including excavation,
backfilling and disposal of surplus material shall.be included in the Contract Unit Price as
shown in the Bid Proposal.
DA-6 SERVICE LINE POINT REPAIR / CLEANOUT �REPAIR: OMIT
DA-7 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION:
A. GENERAL:
Scope: This section governs all work, materials and testing required for the
application of interior protective coating. Structures designated to received interior
coating are listed on the construction drawings. The structures are to be coated,
including interior wall, top and bench surfaces. Protective coating for corrosion
protection shall meet the requirements of this Specification (and items DA-12 and
DA-13) and the Manufacturers recommendations and specifications.
2. Description: The Contractor shall be responsible for the furnishing of all labor,
supervision, materials, equipment, and testing required for the completion of
protecfive coating of structures in accordance with manufacturer's
recommendations.
3
4
Manufacturer's Recommendati�ns: Materials and procedures utilized for the lining
process shall be in strict accordance with manufacturer's recommendations.
Corrosion Protection: Corrosion protection may be required on all structures where
high turbulence or high H2S content is expected.
B. MATERIALS:
1. Scope: This section governs the materials required for completion of protective �
coating of designated structures.
2. Protective Coating: The protective coating shall be a proprietary two component,
100 percent solids, rigid polyurethane system designated as Spray Wall as
manufactured by Sprayroq, Inc. ora two-part epoxy resin system using 100% solids
based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining
systems and designated as Raven 405.
L��
�
�
oai�s�ss AS�-14 �
�
0
�
� �
�
�
�
U
L3
�
� C
�
�
�
PART� DA - ADDITIONAL SPECIAL CON.DITIONS
3. Specialty Cement (If required for leveling or filling): The specialty cement-based
coating material shall be either Quadex QM-1s as manufactured by Quadex,� Inc. or
Reliner MSP as manufactured by Standard Cement Materials.
4. Material Identification: The protective coating material sprayed onto the surface of
the structure shall be a urethane or epoxy resin system formulated for the
application to a sanitary sewer environment. The spray system shal� exhibit the
minimum physical properties as follows:
Property Standard
Tensile Strength ASTM D-638
Flexural Stress ASTM D-790
Flexural Modulus ASTM D-790
Long Term Value
5,000 psi
10,000 psi
550,000 psi
5. Mixing and Handling: Mixing and Handling of specialty cement material and
protective coating material, which may be toxic under certain conditions shall be in
accordance with the recommendations of the manufacturer and in such a manner
as to minimize hazard to personnel. It is the responsibility of the Contractor to
provide appropriate protective measures to• ensure that materials are under control
at all times and are not available to unauthorized personnel or animals. All
• equipment shall be subject to the approval of the Engineer. Only personnel
thoroughly familiar with the handling of the coating material shall perForm the3spray
coating operations and coating installations. �
EXECUTION:
1
2.
� 3
�
a
�
04/16/99
�
General: Protective coating shall not be installed until the structure is complete and
in'place. .
Preliminary Repairs:
a. All foreign materials shall be removed from the interior of the structure using
high pressure water spray �3500 psi to 4000 psi at spray tip).
b. All unsealed lifting holes, unsealed step holes, and voids larger than
approximately one-half (1/2) inch in thickness shall be filled with patching
compound as recommended by the material supplier for this application.
c. After all repairs have been completed, remove all loose material.
Protective Coating:
a. The protective coating shall be applied to the structure from the bottom of
the� frame to the bench, down to the top of the trough. The top of the
structure shall also be coated.
b. The protective coating shall be installed in accordance with the
manufacturer's recommendations and the following procedure.
ASG15
PART DA - ADDITIONAL SPECIAL CONDITIONS
�
�
x,�
1)
The surFace shall be thoroughly cleaned of all for.eign materials and
matter. , e
�
2)
3)
Place covers over the invert to prevent extraneous material from
entering the sewers.
If required for filling or leveling, apply specialty cement product to
provide a smooth surface for the coasting material.
4) Spray the urethane or epoxy onto the structure wall and
bench/trough to a minimum uniform thickness of 125 mils (0.125
inches). Thickness to be verifiable through the use of inethods
acceptable to the Engineer. After the walls are coated, the wooden
bench covers shall be removed.
5) The final application shall have a minimum of three (3) hours cure
time or be set hard to the touch, before being sutijected to active
flow.
6) No applications shall be made to frozen surfaces or if freezing is
expected to occur inside the structure within 24 hours � after
application.
4. Testing of Rehabilitated Manholes: Testing of rehabilitated manholes for
watertightness shall be performed by the Contractor after operations are
comptete in accordance with the Section D-63 - VACUUM TESTING OF
SANITARY SEWER MANHOLES.
D. MEASUREMENT AND PAYMENT: Payment shall be based on the Contract Unit Price
Bid per vertical foot, measured from the bottom of the frame to the top -of the bench. The
Contract Unit Price shall be payment in full for performing the work and for furnishing all
labor, supervision, materials, equipment and material testing �equired to complete the
work. Pressure grouting, if necessary to stop active infiltration prior to application of the
protective coating, shall be included in the above unit price. Grouting of the pipe seals,
bench and trough, and lower portion of a particular structure, if required by the Engineer,
shall be paid for�separately, as specified in Section DA-8, MANHOLE REHABILITATION.
DA-8 MANHOLE REHABILITATION: OMIT
DA-9 SURFACE PREPARATION FOR MANHOLE REHABILITATION: OMIT
I
DA-10 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM: OMIT
DA-11 INTERIOR MANHOLE COATING - QUADEX SYSTEM: OMIT
DA-12 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM:
A. GENERAL
oai�s�ss
ASC-16
�
II.
,�.
��
�
,�
LJ
l�
�
�
�
�
��
,�
�
,�
�*'
�
L�
�
L�J
�
�
�
C'
�'
PART DA - ADDITIONAL SPECIA�L CONDITIONS
Scope
1.
This section governs all work, materials and testing required for the application of
interior manhole coating. Manholes designated for interior coating are listed on the
Manhole Rehabilitation Schedule. Interior manhole coating shall meet the
requirements of this Section or of Section DA-10, DA-11, DA-13, or DA-14.
Description �
The Contractor shafl be responsible for the furnishing of all labor, supervision,
materials, equipment, and testing required for the completion of interior coating of
manholes in accordance with the Contract Documents.
2.
3. Manufacturer's Recommendations
Materials, mixture ratios, and procedures utilized for the coating process shall be in
accordance with manufacturer's recommendations.
4. Manholes
Manholes to be coated are of brick, block, or concrete construction. All manholesr:
shall have a minimum of one-half (1/2) inch specialty cement-based coating material
(Quadex QM-1s or Reliner MSP) sprayed or trowelled on coating over the original
interior surFace.
B. MATERIALS
� 1. Scope
�•J
�
�
�
l�'
�
� 04/16✓99
This section governs the materials required for completion of interior coating of �,
manholes.
Interior Coating
2.
The interior coating shall be a proprietary finro component, 100 percent solids, rigid
polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc.
Specialty Cement
The specialty cement-based coating material shatl be either Quadex QM-1 s as
manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement
Materials.
3.
4. Materialldentification
ASC-17
C�
PART DA - ADDITIONAL SPECIAL CONDITIONS
5.
The interior manhole coating material sprayed onto the surFace of the manhole shall
be a urethane resin system formulated for the; application to a sanitary sewer
environment. The spray system shall exhibit the physical properties as follows:
Pr.operty
Tensile Strength
Flexural Stress
Flexural Modulus
Mixing and Handling
Standard
ASTM D-638
ASTM D-790
ASTM D-790
Long Term Value
5,000 psi
10,000 psi
550,000 psi
Mixing and handling of specialty cement material and interior coating material, which
may be toxic under certain conditions shall be in accordance with the
recommendations of the manufacturer and-in such a manner as to minimize hazard
to personnel. It is the responsibility of the Contractor to provide appropriate
protective measures to ensure that materials are under control at all times and are
not available to unauthorized personnel or animals. All equipment shall be subject to
the approval of the Engineer. Only personnel thoroughly familiar with the handling of
the coating material shall perform the spray coating operations and coating
installations.
C. EXECUTION
1. Genera�
2.
3.
Manhole coating shall not be installed until sealing of manhole frame and grade
adjustments, or partial manhole replacement when required for the manhole per the
Manhole Rehabilitation Schedule, is complete.
Temperature
Normal interior coating operation shall be performed at temperatures of 4Q'F� or
greater. No application shall be made when freezing is expected within 24 hours.
Interior Manhole Coating
a. The interior coating shall be applied to the manhole from the bottom of the
frame to the bench, down to the top of the trough.
b. The interior coating shall be installed in accordance with the manufacturer's �
recommendations and the following procedure.
1) The surface shall be thoroughly cleaned of all foreign materials and
matter. Cleaning shall be accomplished by using high pressure water
spray (minimum 3500 psi at spray tip), cleaning with muriatic acid,
degreaser, or other solvents as needed in order to remove any film or
residue on the surface.
04/1 fi/99
ASC-18
I,
�
�
�
LJ
L�J
�
�
�
L�J
� 1.
Q D.
�
�
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
2>
3)
Place covers over the invert to prevent extraneous material from
entering the sewers.
Apply a minimum of one-half (1/2) inch specialty cement product
(Quadex QM-1s or Reliner MSP) smooth surface for the urethane
coating material.
4) Spray the urethane onto the manhole wall and bench/trough with a
minimum thickness of 125 mils (0.125 inches). Thickness to be
verifiable through the use of inethods acceptable to the Engineer.
5) Coat trough area with specialty cement product (Quadex QM-1s or
Reliner MSP).
Testing of Rehabilitated Manholes
a. Testing of rehabilitated manholes for watertightness shall be performed by the
Contractor after operations are complete in accordance with Section DA-18.
MEASUREMENT AND PAYMENT
Payment shall be based on the Contract Unit Price per vertical foot, measured from the
bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full
for performing the work and for furnishing all labor, supervision, materials, equipment and
material testing required to complete the work. Grouting, if necessary, shall be included in
the above unit price. Grouting of the pipe seals, bench and trough, and lower portion of a
particular manhole, if required by Manhole Rehabilitation Work Schedule or required to be
done by the Engineer, shall be paid for separately at the Contract Unit Price.
DA-13 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM:
QA. GENERAL
1. Scope
This section governs all work, materials and testing required for the application of
� interior manhole coating. Manholes designated for interior coating are listed of the
Manhole Rehabilitation Schedule, listed in Section I. Interior manhole coating shall
meet the requirements of this Section, or of Section DA-10, DA-11, DA-12, or DA-14.
� 2. Description
Q The Contractor shall be responsible for the furnishing of all labor, supervision,
materials, equipment, and testing required for the completion of interior coating of
manholes in accordance with the Contract Documents.
� 3. Manufacturer's Recommendations
p o4„�9
ASC-19
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
4
Materials, mixture ratios, and procedures utilized for the coating process shall be in
accordance with manufacturer's recommendations.
Manholes
Manholes to be coated are of brick, block, or concrete construction. All manholes
shall have a minimum of one-half (1/2) specialty cement-based coating material
(Quadex QM-1 s or Reliner MSP) sprayed or trowelled on coating over the original
interior surface.
B. MATERIALS
1. Scope
This section governs the materials required for completion of interior coating of
manholes.
2. Interior Coating
Raven Ultra High-Build epoxy Coating, a two-part epoxy resin sysfem using 100%
solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven
Lining systems and designated as Raven 405.
3. Specialty Cement
4.
5.
The specialty cement-based coating material shall be either Quadex QM-1 s as
manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement
Materials.
Material Identification
Contractors will completely identify the types of grout, mortar, sealant, and/or root
control chemicals proposed and provide case histories of successful use or defend
the choice of grouting materials based on chemical and physical properties, ease of
application, and expected performance. These grouting materials shall be
compatible with Raven 405 interior coating. The contractor shall be responsible for
getting approval from Raven Lining systems and/or the grout manufacturers for the
use of these grouting materials.
Mixing and Handling
Mixing and handling of interior coating, which may be toxic under certain conditions
shall be in accordance with the recommendations of the manufacturer and in such a
manner as to minimize hazard to personnel. It is the responsibility of the Contractor
to provide appropriate protective measures to ensure that materials are under control
at all times and are not available to unauthorized personnel or animals. All
equipment shall be subject to the approval of the Engineer. Coating shall be
performed only by certified applicators approved by the manufacturers.
C. EXECUTION
o4i�r�ss ASG20
�
C
1.
�
�
�
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
General
Manhole coating shali not be performed until sealing of manhole .from frame and
grade adjustments, partial manhole replacement, manhole grouting or sewer
replacement/repairs are complete.
2. Temperatures
3.
��
L�l
�
�
�
L�J
l�J
�
�
4
u
� 04/16/59
�
Normal interior coating operation shall be performed at temperatures of 4�F or
greater. No application shall be made when freezing is expected within 24 hours.
Interior Manhole Coating
a. Manholes scheduled for interior coating are shown on the Manhole
Rehabilitation Schedule. The interior coating shall be applied to the manhole
from the bottom of the manhole frame to the bench/trough, including the
bench/trough.
b. The interior coating shall be installed in accordance with the manufacturer's
recommendations and the following procedure.
1) The surface preparation shall comply with the requirements of Section
DA-9, SURFACE PREPARATION FOR MANHOLE RESTORATION.
2) Apply a minimum of one-half (1/2) inch specialty cement-based
product (Quadex QM-1s or Reliner MSP) smooth surFace for the
urethane coating material.
3) The surface prior to application may be damp but shall not have
noticeable free water droplets seeping or runr�ir�g—wa#e� Material
shall be spray applied per manufacturer's recommendations with a
minimum thickness of 125 mils (0.125 inch).
4) After the walls are coated, the wooden bench covers shall be
removed °and the bench sprayed to the same average and minimum
thickness as required for the walls.
5) The final application shall have a minimum of three (3) hours cure
time or be set hard to the touch, before being subjected to active flow.
6) No applications shall be made to frozen surfaces or if freezing is
expected to occur in side the manhole within 24 hours after
application.
Testing of Rehabilitated Manholes
a. After the epoxy liner has set (hard to touch), all visible pinholes shall be
repaired. Repairs shall be made by lightly abrading the surface and brushing
ASC-21
ts�
�
PART DA - ADDITIONAL SPE�CIAL CONDITIONS
the lining material over the area. All blisters and evidence of uneven cover
shall be repaired according to the manufacturer's recommendations. Spot
check of coating thickness may be made by Owner's Representative, and the
contractor shall repair these areas as required, at no additional cost to the
Owner.
b. Testing of rehabilitated manholes for watertightness shall be performed by the
Contractor after operations are complete in accordance with Section DA-18 —
VACUUM TESTING OF REHABILITATED MANHOLES.
�
MEASUREMENT AND PAYMENT
Payment shall be based on the Contract Unit Price per vertical foot, measured from the
bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full
for performing the work and for furnishing all labor, supervision, �materials, equipment all
testing necessary to complete the work. Payment for grouting of pipe seals, bench and
trough and manhole walls shall be based on the Contract Unit Price for each manhole
actually grouted.
DA-14 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXY LINER: OMIT
DA-15 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM: OMIT
DA-16 RiGID FIBERGLASS MANHOLE LINERS : OMIT
DA-17 PVC LINED CONCRETE WALL RECONSTRUCTION: OMIT
DA-18 PRESSURE GROUTING: OMIT
DA-19 VACUUM TESTING OF REHABILITATED MANHOLES: OMIT
DA-20 FIBERGLASS MANHOLES: OMIT
DA-21 LOCATION A�ND EXPOSURE OF MANHOLES�AND WATER VALVES: OMIT
DA-22 REPLACEMENT OF CONCRETE CURB AND GUTTER:
Contractor shall replace all damaged existing curb and gutter, as designated by the Construction
Engineer, and replace with standard concrete curb and gutter, laydown curb and gutter, or in like
kind, as governed by the standard City Specifications. Pay limits for laydown curb and gutter•are
as shown in Drawing No. S-S5 of the Standard Specifications. Included, and figured subsidiary to
this unit price, will be the required excavation into the street to aid in the construction of the curb
and gutter. The pay limit will be 9" out from the gutter lip, with same day haul-off of the removed
material to a suitable dump site. The street void shall be filled with H.M.A.C. "Type D" mix and
compacted to standard City densities and top soil, if needed, shall be added and leveled to grade
behind the curb. Existing improvements within the parkway such as water meters, sprinkler
system, etc. damaged during construction shall be replaced with same or better at no cost to the
City.
oai�siss ASG22
�
0 .
Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of
� demolition to date of completion. if the contractor fails to complete the work within fourteen (14)
calendar days, a$100 dollar liquidated damage will be assessed per block per day.
lJ
�
This item shall include the removal and replacement of existing concrete driveways, due to
O deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate
ponding water with same day haul-off of the removed material to a suitable dump site. For
specifications governing this item see Item No. 104 "Removing Old Concrete", Item No. 504"
a Concrete Sidewatk and Driveways". Pay limits for concrete driveway are as shown in Drawing No.
S-S5 of the Standard Specifications.
PART DA - ADDITIONAL SPECIAL CONDITIONS
The unit price bid per linear foot shall be fulf compensation for all materials, labor, equipment and
incider:als nec�ssary to compiete the work.
DA-23 REPLACEMENT OF 6" CONCRETE DRIVEWAYS:
� The unit price bid per square yard shall be full compensation for all labor, material, equipment,
supplies, and�incidentals necessary to complete the work.
L�J
DA-24 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE: OMIT
�}
�
l�J
L�J
[�J
�
L•J
t`J
�
�
DA-25 GRADED CRUSHED STONES: OMIT
DA-26 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE: OMIT
DA-27 BUTT JOINTS - MILLED: OMIT
DA-28 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX): OMIT
DA-29 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER:
�\ �
This item shall include the removal and reconstruction of existing concrete valley gutters at
locations to be determined in field:
Removal of existing concrete valley, asphalt pavement, concrete base, curb and gutter, and
necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item.
Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the
Engineer and necessary asphalt transitions as shown in the concrete valley gutter details, shall be
subsidiary to this Pay Item.
See standard specification Item No. 314, "Concrete Pavement", Item 312 "Hot-Mix Asphaltic
Concrete", Item No. 104, "Removing Old Concrete", Item No. 106, "Unclassified Street
Excavation" Item No. 208 "Flexible Base." Measurement for final quantities of valley gutter will be
by the square yard of concrete pavement and the curb and gutter section will be included.
Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no
additional cost. See Item 314" Concrete Pavement".
04/1fv�39 ASC-23
�
PART DA - ADDITIONAL SPECIAL CONDITIONS
Asphalt base material may be required at times as directed by the Engineer to expedite the work
af locations identified in the field.
The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per
square inch. Contractor shall work on one-half of Valley Gutter at a time, and the other half shall
be open to traffic. Work shall be completed on each half within seven (7) calendar days.
If the contractor fails to complete the work on each half within seven (7) calendar days, a$100
doilars liquidated damage will be assessed per each half of valley gutter per day.
The unit price bid per square yard for Concrete Vailey as shown on the proposal wiil be fuli
compensation for materials, labor, equipment, tools and incidentals necessary to complete the
work.
DA-30 NEW 7" CONCRETE VALLEY GUTTER: OMIT
DA-31 NEW 4" STANDARD WHEELCHAIR.RAMP: OMIT
DA-32 8" PAVEMENT PULVERIZATION: OMIT
DA-33 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT)
The following specifications are for the furnishing and placing of reinforced concrete pavement or
base as shown on detail and as directed by the Engineer.
A. �GENERAL:
Reinforced concrete pavement or base shall conform to Specification Item No. 314 herein except
for finishing and curing.
B. FINISHING:
The reinforced concrete shall be brought to a uniform surface by working with a wooden float.
The surface shall be flush with the adjacent pavement and shall have a finish similar to the
surrounding pavement. The surface shall be even and shall provide a smooth ride.
C. CURING:
The reinforced concrete pavement surfaces shall be sprayed uniformly with a membrane curing
�compound conforming to the requirements of ASTM C-309, Type 2, white-pigmented compound,
which shall not produce permanent discoloration of the concrete. Concrete shall be allowed to
cure for seven days or test cylinders reach 3000 psi before removal of barricades.
D. EXECUTION:
Included in this item will be the removal of the existing reinforced concrete pavement. The
existing pavement shall be sawed so as to maintain an even, straight pavement cut. The
existing reinforcing steel at sawed line and construction joints shall be lapped 18 inches with the
oai�s�ss ASG24
�
L�J
�
PART DA - ADDITIONAL SPECIAL CONDITIO�NS
new reinforced concrete pavement. Ti �e existing steel shall be thoroughly cleaned before
lapping.
The following work method will be performed on �ach utility cut:
D 1. Place safety signs, barricades and/or other warning devices where necessary and as
required.
2. Replace pavement to nearest joint.
�
L�J
LJ
L�l
C�'
�
3. Mark out the damaged area with keel, chaik line or paint being sure to include all areas
requiring repair.
4. Saw cut along marked lines a minimum of two (2) inches deep.
5. Remove existing concrete.
6. Form joints and place reinforcing steel and Dowel Bars (as required) according to standard
specifications.
7. Place and finish concrete.
8. Clean up job site, removing all debris. -
9. Maintain traffic control devices to protect the area until the concrete has cured seven days or
concrete reaches 3000 psi compressive strength. ,,,
E. PAYMENT:
� Payment shall be made at the unit price per linear foot as shown on the proposal and shall be full
compensation for furnishing all labor, materials, equipment tools and incidentals necessary to
complete the work.
DA-34 RAISED PAVEMENT MARKERS: OMIT
�
!�
�I
��
��
DA-35 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING: OMIT
DA-36 LOADING, TRANSPORTATION, AND DISPOSAL' OF CONTAMINATED SOIL: OMIT
DA-37 ROCK RIPRAP - GROUT - FILTER FABRIC: OMIT
DA-38 CONCRETE PIPE FITTINGS AND SPECIALS: OMIT
ao4iieugs
ASC-25
�
.�--E".�-�_�---�--�-�' � �. ��� ���'' r-� . 0 �- C�
C:�-�-�~� ..A , � :,{' „ - -
:-; : '.,. . . ..
. ��"� ,�.� PMS 167 (Copper) �� ,� PIVIS 288 (B�ue) ,,� pMS 288 (Blue)
� � $� _ ��� . , ,
, , , , .
' ' � � �
, �
_ ,
; ;
3" ,��, 3' -1.5" .;'� 3�� �- ; ...4' -1.5"
�, . ; % , .
,
,
' ,�` ' , ' � �� .
2.25" � ., , � , � ,
; � � : �
, ;
, � , �� �
,
,
C:� �� :.�� C'�
)
3"
J
3.75"
- � O�T �TH otz�: ae. �.
M � � ` � ,
� � �
�
;:r. ��
. r �� -�,� �. F' n c�'s rZ �.� C tt
i�.11�� .�� � I �
. � � , ' I
2.25 "�!
i
� O
on_
� �3.75"
.A
��
0
0
�
N
4.5"
N
0
-..-
4.5"
j . : :
: '; � �3" Radius
/� ` , � /
�� White '�. PMS 288 (Blue) / � �
/ /
� � /
r-�--� � .
� PROJECT SIGN Scale 1" � 1'
�igure 30
�
09/18/96 �� . � � E2-1 Construction
� �("_�.•� � �...�i 1��, � � 4� ';�,�' 4�r� � ti+�.i � � �� � '� �
�: �,' i ts �
-�... .,.. , .. �.
REPLACE PAVEMENT TO NEAREST JOINT
SEE LONGITUDINAL JOINT
� SPACING, �
No.3 BARS ON 24" CENTERS BOTH WAYS WITH
MIN.2 BARS LONGITUOINAL IN DITCH.
CLASS 'A" REINFORCED CONCRETE
EXIST. CURB EXIST. CONC. • PAVEM[NT REPLACEMENT EXIST. CONC. EXIST. CURB
& GUTTER � �— PAVEMENT PAVEMENT & GUTTER - •
EXIST. JOINT—� EXIST. JOINT
� ��� � . r .
• , • •
. • in •
• �1`
• ��,_•\ 1 I. ��, •� � I� I �.��• •
�,` � �� . /.� ! �/.� /.\ � '�i� � i� .�
�.�����• 1 � � / / �� \ • � \ \ 1 \�\��•���
e...s o o� 0 6' MIN. o o° o ° o°o .�P . .
12" o o' ° o o� °°° ' 12'
, , o o �o
° o ° ° ° o ° � ° � EXIST. SUB E3ASE
EXIST. SUB BASE --- o oo� a ° �m° , ° �° ° ° � ° ° �-- 2;27 CONCRETE iIF ANY)
(IF ANY) °°° o ° °°°�° qLL TRENCH BACKFI�L SHALL MEET REOUIREMENTS FOR
°� ° o 0 00 � °°° GRADATION AND COMPACTION AS SPECIFIED IN ITEM 402 OF
. •^ a °o°° THE STANDARO SPECIFICATIONS FOR CONSTRUCTION, PUBUC
CRUSHEI� LIMESTONE 1'0 EXTEND --� �° ��� WORKS DEPT., CiTY OF FORT WORTH, TEXAS OR BACKFILL
FROM 6' E�CLOW PIPE TO SPRINGLINE a�' � o AS SPECIFIED IN SECTIONS E1-2 & E2-2 OF THE
� SPECIFICATIONS FOR WATER DEPT. PROJECTS, FORT WORTN
� O 0 WATER DEPT.. CITY OF FORT WORTH, TEXAS.
• �� �'-, PROPOSED PIPE ••
• p0 a .
0
• � �� o o � o+"— DITCH WALL
D ���p 0� � 0� � p 0 �
� � 6' CRUSHED IIMESTONE
NOTES: �ONGITUDINAL JOINT
1Q REINFORCED CONCRETE PAVEMENT WILL BE REPLACED TO ORIGINAL DEPTH SPACING �
OR TO A MINIMUM DEPTH OF 5", WHICHEVER IS GREATER STREET SPACING
WIDTH ,
U2 IF STEEL EXISTS IN CONCRETE PAVEMENT TO BE CUT,THE STEEL SHALL BE CUT
AND SALVAGED AS POSSIBLE. A MINIMUM LAP SPLICE DISTANCE OF 12' WILL BE 28' & 30' ON �
• PROVIDEO.
36' & qQ' ON & 8' FROM
30 REINFORCED CONCRETE PAVEMENT WILL BE REPLACEO AS SHOWN OVER TRENCH , BA� OF CURf3
IN THE EVEN7 NON-REINFORCED CONCRETE PAVEMENT IS REMOVEO.
� 44' ON � & 11' OFF �
40 BEDDING OF PIPE TO MATCH ADJACEN7 SECTIONS OR SPECIFICATION •402, WHICHEVER
IS GREATER. • � 48' ON �& 12' OFF �
FIGURE 1
TYPICAL SECTION — TRENCH REPAIR CONCRETE PAVEMENT 60- 6- &,a' OFF �
CITY OF FORT WORTFI TRANSPORTATION/PUBLIC WORKS DEPT. ENGINEERING DIVISION
NOT TO SCALE . FIG. 1
� �7�-�� L� C1 �7 �7 � C� C� �] 0 C� C� C� C7 .�7 �7
•,,�; •';;i
� ,;` �',�, . .�
""' REPLACE PAVEMENT TO NEAREST JOINT '� �
SEE LONGITUDINAL JOINT
, � SPACING �
REPLACE CURB
& GUTTER �
CRUSHED LIMESTONE
TO EXTEND
FROM 6" BELOW
PIPE TO SPRINGLINE
NOTES:
, a o o °°°, o� —EXIST. SUB BASE
° ° (IF ANY)
$ o o ma o �o
—; '•—��i.� i �'i �� ��6:MI�f.` � .• i,
i �
•.����1•'i�� � I,� •���� I� �
_�, �y��i"�� •� _ ° ° o �
� o o �2"
.\' o 0 0 0 0 0 o e • .
0 0 0 0
EXIST. JOINT
-� �
. •
No.3 BARS ON 24" CENTERS BOTH WAYS WITH
MIN.2 E3ARS LONGITUDINAL IN DITCH.
CLASS "A" REINFORCED CONCRETE
PAVEMENT REPLACEMENT
� EXIST. JOINT
, � • �� � � �
. �
EXI'5T. CONC. EXIST. CURB
- PAVEMENT --- & GUTTER
.'
. •
� •. iA • �
`���
' "° ° ° � ° ° 2;27 CONCRETE
0 0 00 0�o , o°oo°o
0 0, o 0 0,, o, o o, .. ALL TRENCH BACKFILL SHALL MEET RE�UIREMENTS FOR
,ao
GRADATION AND COMPACTION AS SPECIFIED IN ITEM 402 OF
' "o° ° ° ° ' � � ° THE STANDARD SPECIFICATIONS �FOR CONSTRUCTION, PUBLIC
°°�° �° WORKS DEPT., CITY OF FORT WORTH, TEXAS OR BACKFILL
o�� °�o
0 00 oao° AS SPECIFIED IN SECTIONS E1-2 & E2-2 OF• THE •
00 ��° SPECIFICAI'IONS FOR WATER DEPT. PROJECTS, FORT WORTH
� 0� WATER DEPT., CITY OF FORT WORTH, TEXA�.
0
� � � �PROPOSED PIPE
Do
�o o � p�o ����o �' DITCH WALL
� 6' CRUSHED LIMESTQNE
10 REINFORCED CONCRETE PAVEMENT WILL BE REPLACED TO ORIGINAL DEPTH `
OR TO A MINIMUM DEPTH OF 5', WHICHEVER IS GREATER. •
02 IF STEEL EXISTS IN CONCRETE PAVEMENT TO BE CUT,THE STEEL SHALL BE CUT
AND SAL'VAGED AS POSSIBLE. A MINIMUM LAP SPLICE DISTANCE OF 12' WILL BE
PROVIDED.
3Q REINFORCED CONCRETE PAVEMENT WILL BE REPLACED AS SHOWN OVER TRENCH
IN THE EVEN.T NON-REINFORCED CONCRETE PAVEMENT IS REMOVED.
Q BEDDING OF PIPE TO MATCH ADJACENT SECTIONS OR SPECIFICATION 402, WHICHEVER
IS GREATER. .
FIGURE 1
TYPICAL SECTION - TRENCH REPAIR CONCRETE PAVEMENT
CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS OEPT. ENGINEERING DIVISION
NOT TO SCALE •
LONGITUDINAL JOINT
SPACING
STREET SPACING
WIDTH
28' & 30'
36' & 40'
. 44,
4 8'
�
ON �
ON & £3' FROM
E3A OF CURB
ON � & 11' OFF �
ON � & 12' OFF �
6'& 18'OFF �
FIG. 1
�
� 1 .Y� ;�. � �/ � i� l�V � � �F iY�/ � `.� _-�I � �• � �T�� ��
� '„�f.� .� . . .
I � i ,�
. i. �� •
1 ��.---- Mo ! �A�t a• !�' CtN��11• �OtM wAri, M��iN
� MM1 t�AAf LOMi1 TY�IMAL MI •IttN
e�lwi. s1e�� � .
e�d'i?�A r111�i A�MMIi A��N�Ii {YR/ACi AlhACIMtNf t��ff At►IMLt [�I�T�M�
M���� 11�� Mt111 •YIIIAC� tY11� • W*1tM .
.. . , � �A� OJT ' `"�t�CM COAT �lAM Wi • ,
� i
I ' f
, .. � af. � ••► + � �� � •� •.� ��' ,�' N.. •� + � • • . .
• a� ' ej • ��� • • •' . q�r•�y t ^" •� • ,' �4 � . • � • f � S , '
. •• ' � 1� O � • . � L .•� �'.?c� �s�o r
�� '' j,� /�/I�v �i���*�����A �EL_��j• � f _ �`K�.
r�� C7 I� � �J
- • • • •. • • �: : • •r . .• . �:. G � �
�t �:: ..�•:.:•; • .., :.• .: ::. t�j
,: •: ;'�.::�,,;;�: •, •� • � ---'�
lN��t �i�t NN • �+ . . � ���,� t� . , `
. - . . . .� `�"�!+!1 C0110MTt '
�, �, �� , � � ��': �..
�Ml�f 1M��A� CLAt�~A'11[/NMi�� • � • . • •.' •t � .��, ��/l f�lMCN ��CNllll �NAII r/ff ' ���t W� W�
1 M AMr � C�MCM�� MN � ' • :. : . " • � AIN1�11lM�Mi{ ►o�, �11ANtN� MN ' � 1• •M� 1 .
, �., ...' t01A+�Cf+ON Ar ��ltMrl� 1w �ilM
. . � •y. 101 0/ iN! �1�IIMA� NllNICA•
1�• /OAr CON�TAYCfyM �YK1C ,
� . �� �' •ti ' �N! �t��.Cltr N 1�1• AQtN
' :• •, �� Y/11A• OA�ACIVKL M ltO�I�I� M� �
, - ' • '� � tt CT1pA ! �.! AN� f �• R M tMt �
• ���`� , P.�: . . . MtCil�t�fN11� I�R wMf�R 1lIr1A�• .
. • • � � ��t.11�r•M ~���Mf�QM ft Mt�
• ' �- ' '� , . .' • � .
i� • • „ .,
. . � .; , . . .
. ' ' �: � �� � ' � _'"� IIMr'N!� MR1�Itt �f�l«TIM .
• •• 'r � , , . w.. , , •
• • . . . • . . . .
`. .. ' �11� .
� ' • ' � • . • i. .. , • �. � , . .
. :�� ' t•�= • �. � � :'i_ ' .. . '
�iti, l �•� •�• t j� .� �. ' �'� f • � � . • .
�,t/ � i • .,� �� 'YI�.�.•����•. .n'�b ���1�r . . ' ' • .
11STQ�� � . . ,, . • • . . . .
�i•�s�ri�M! a�eMtt ���R w�s✓ r�t•M �tt�• eN��t� � eMKM�t . M.i•�tNMet� c�t�tt� ���� ��•Ild� �111�1 A�Ia�IT C�uAs� sNQ�I .
@� b�aANw t� MMMM� �MM MN f� N tYt• tM� �ftfl •q.l �t A�KAt�• M�M�wl. ' � 1� MOIK�• i• iM/ MNM1A� •
f�1 A A/IItlIfIMw NltN M' � �MA�I N t11� A4� �K1MN� A� � hrt11 tMMtM N f/t �v�Nt 'IM11• !l�fM. MM111rW1 �/wtrtMT NI Al� '
•.1�'NMis/f� N 1M� �MAf• .�� 0������t A MtpIMYM lA� N�w w�IM/Mt��i�Cw�t� M�f 1� . I��MA1.f •f11tlTi MN1�� �f ly•
•��tAMC� N �t'N1►� N�MrM�I AtIM1►f�. . , M ONM MMN� �11MK! W1M1�.
IC�♦ il�SIM� �} ri�t t� rAtlN A��AClNT NO.�- t+it CONCRlTt MAY �[ dEL[tED If • ' '
�lRftON� !'� �ilt/1!A?NM Nf MINMt1NA NAL► TNC !�[CI►1[0 t .KN[l�Of l�21 i3 ' . , .
10 MSIMt �1AqINMT A00[D TO 111[ C�A'!f "AaCONCII�TE. . . ' • .
TYPICAL SECTION TR E N C M FtEP�41R �� ..
� �PNAI�'�' �►I��tF�1C� 8r REIHFORCE� CONCRET� �1��� -. . .
,. -� ', � � cirr o� fowr�irowrN � � „n_.-�-„ �E,►,,..,
' ' TAAN�rORTATION/PUdi.•,;�* w0AK3 AEr�. �R�-11-�`%� ,
Od4� .. � t�7 . � ' EA�INlIAM�f �:,,.��� � � • �c�•�:-n-�o , fI� �-'��� � .
..-.-..,� , •`� a . _......�.�._ etv -s• �o-�t ��.�:'1'.
� � ' � � � • ' -:�.. �
� �'/� ^r'"`�.�--.� 1�.� f�._� � � �� � „•� .
�•.` tt'• .: ;r� ` • ...
�
�XIST. CURB
& GU7TER
SEE NOTE Q BELOW
EXIST. H.M.A.C,
- SURFACE
SAW CUT—,_
C� f� C� L� C� C� L� :�7 C�
PROPOSED H.M.A.C. REPLACEMENT
�2� �S�N'� EXIST. H.M.A.C.
SAW CU7 � FACE
.--,-T . _ . . . . . .
�
EXIST. CURB
& GUTTER
• �• • /• � • /• •
.� �'\.�i � • �,`-�� .� � �``�� .� • ����i � • ��`� '�'��
��'�' �� �� � � � 8" MIN. �: � : !� ; � � �' � -�
�� . - . . ��
i � o 00 . , ,� � o ,,, -���
. � • � . , . . o , 0 12� �_�` EXISTING GRAVEL BASE
� ° �--� \
,..00.a����o.•
0 0. o 00 . a .
"`�� • " • °�° . o ' ' $ ' . � ,..�_..— EXISTING BASE (IF ANY)
• o . • o .o o • ,o
• •• � • � � • •0 PRIME CO T ""
0 0 00 0
o; a � o 0
°� • � ° ' ° 2:27 CONCRETE
o .
CRUSNED LIMESTONE BEDDING TO EXTEND ; o �' �° � ALL TRENCH BACKFILL SHALL MEET REQUIREA4ENTS FOR
FROM 6' BELOW PIPE TO SPRlNGLINE •. � GRAQATION AND �COMPACTION AS SPECIFIED IN ITCM 402 OF
' � �� THE STANDARD �SPECIFICATIONS .FOR GONSTRUCTION� PUBLIC
Q � o WORKS DEPT., CITY OF FORT WORTH, TEXAS OR BACKF`ILL
p p AS SPECIFIED IN SECTIONS E1-2 � E2-2 OF 7HE
• PROPOSED PIPE . 1 SPECIFICATIONS FOR WATER qEPT. PROJECTS. FORT WORTH
Q WATER DEP7., CITY OF FORT WORTH, TEXAS.
�pp O OO � .
� DITCH WALL ---= 0� o 0 0 0 0 0 � p o e ''
' � 6' CRUSFIED LIMESTONE BEQDING .
NOTES:
�
�
�
�
2:27 CONCRETE SHALL BE INSTALLED A MIN. OF 8' BELOW E30TTOM OF � EXISTING
H.M.A.C. PAVEMEN7.
ALL EXISTING ASPHAL7 SHALL BE REPLACED TO 7HE ORIGINAL DEPTH. MINIMUM
PAVEMENT REPLACEMENT SNALL BE 2`OF' FiNE GRADED SURFACE COURSE.
BEDDING OF PIPE TO MATCH ADJACENT SECTION OR SPECIFICATION A02. WHICHEVER
{S MdRE STRAVGENT.
ON MAJOR PROJECT5�7HE PROJECT ENGINEER OR DESIGNER MUST EVALUATE THE FULL
WIDTH OF EXISTING H.M.A:C: PAVEMENT A5 TO 7{iICKNE5S� CONDITI4NS AND ABILITY TO
WITHSTAND CONSTRUCTION LOAOING. IF APPROPORIATE, THE FULL WID7H OF SURFACE
SNALL BE REMOVED ANp REPLACED WITH APPROPRIATE TREATMEN7 TO EXISTING 8A5.E
OR SUBGRADE MATERIAL.
n
FIGURE 4
ASPHALT PA1lEMENT REPAIR DETA{L
N07 TO SCALE
�
�
�'
�
��
EXCAVATION9 BACKFILL AND PAV�MENT
REPAIR UNDER EXISTING STREETS
; MIN. 2° HOT OR COLD MIX ASPHALT � -TEMPORARY PAVING REPAIR SHOWN - FOR
! � PERMANENT PAVING REPAIR DETAILS SEE
; EX(ST. STREET PAVEMENT FIGURES 1-5 OR AS SPECIFIED IN THE PLANS
�
' OR SPECIFICATIONS.
! � ,
%%���� ��', o-e:e�o�e�^". e '.''+."a'";,'o"o'-'o o - �;e"a"�"a"a"o"e"e„e"o`c`'7�� � //.
.., � �_.._ _ _a_o_c_o_o.;._e_o_c_e_o_o=o_._o_o_o_o_o_�_o_o_a_o_e %/"// %
"//%�/j�./ �/MIN. 6' COMPACTEO ���/ � j��� j�/; / j� j� j/ /�
��/,�FLEX-BASE MATERIAL �� �� �� ����
� d � ° ° C /�i //�'. �i �: �i �/ � /�/�/� /��// � a°
d ♦ � ,
a
� ' <° a a BOTTaM OF TEMPORARY OR MANENT PAVE NT'REPA4R� ,° a
T
EXIST. BASE ��� �
1i .,1
d^
��� , � � ' ,' .' '. • :'• � ' ,' .' ' . •' •�YPE C BACKFILL
� SEE SPEC. Et-2
* SAND MATERIAL �,�:' ' � : : • � .' • ' . : : � � 1'-6' MAXIMUM
EMBEDMENT • • : • • . ��
SEE SPEC. El-2 � � - .�� � •' • : � • ��~ MINIMUM 6' SAND
� •:'; : : ••' .• . • .• �.� EMBEDMENT COVER
�� , • ,• ' :1,:'�"�'
.. �.: :: •.. �..:.. ..
, '. � QQ ' : . MINIMUM 6' EMBEDMENT
� • ' .. .
�r� �•� . •.'•�
� '•�•• : . •`•'•• "•�
• Lir . . . I•I •Ib
1 ��� 1 d1�1E�1 � I��
�
�
�
�
�J
J
�
�
�
i
�
* INCLUDED IN LINEAR FOOT BID PRICE OF PIPE
FIGURE A �
(WATER SIZES UP TO & INCLUDING 12")
NTS
REV: MARCH 25, 1999
�
,
�
�
LJ
EXCAVATION9 BACKFILL AND PAVEMENT
` REPAIR UNDER E�X{STING STREETS
a;
:
�� � _ . � .
� d ,
MIN. 2 HOT OR COLD MIX ASPHALT -TEMPORARY PAVING REPAIR SHOWN - FOR
I PERMANENT PAVING ftEPAIR DETAILS SEE
�� EX(ST. STREET PAVEMENT FIGURES 1-5 OR AS SPECIFIED IN THE PLANS
OR SPECIFICATIONS.
.
�1
�
i• v. •�J�����o�o.,��o�a�o�o�`V'o"o"o"o"o"o b�o�o":,"o`o�o:,o�e"o"e�o"!�///�//, -..
/////�// �• 'Q'O'C'O'O'O'O'O'O'O:C O O�C�O..O_ )�O..O�O_O_O� j0 O�O�D�O•.� / / �
/� // � . i ' � i � • / �V� . � i � /
�i% ij� /i,'i�,MIN. ` COW�PACTED �/// j j��� j/��` j��j������j
�/ %///� � f,�
a Q , 4 � I�EX BAS�MATER// ', %� ;�/��/��/% . ` ,° �
d a
Q e �� d
� ' ° Qa , BOTTOM OF TEMPORARY OR MANENT PAVE NT°REPAIft � ,
< .
EXIST. BASE �'�.l
,* SAND MATERIAL
EMBEDMENT ��
� SEE- SPEC. Et-2
#+� 1) SEWER - MINIMUM 12' --
SAND EMBEDMENT COVER
� 2) WATER - MINIMUM 6"
SAND EMBEDMENT COVER
MINIMIJM 6' EMBEDMENT
�
• . • • : � ,' . • • . • ' ' .' . �- ■TYPE C BACKFILL
• ' .' : • • ' •� � � SEE SPEC. E1-2
�;. ': : � '. : , • . '• : . '. _ � }'-6" MAXIMUM
� ••. • .
•�,�.'.:•�:.••.,�.'�zz �
� �, ..'=: :• •:�'��
. . . �: � �. .
��� ' � • ' ' ' • CRUSHED STONE
;,--�L, • :. •, • � Qt�, • : . SEE SPEC. E1-3
, Q� , .
,� . . , ' , . � ,��i�
�Lr • y � , • � �Y�
J '• • � ���
�
� � � � • � '�'� „',I� . i�"�
��,�; ~`� . ' ��� �-� � �,
+► INC�UDED IN LINEAR . FOOT BID PRICE OF PIPE
FLGURE 8
CSEWERo ALL SIZES)
(WATER SfZES 16" & LARGER)
�
a
NTS
REV: MARCH 25, 1999
�
�
'
�
�
i
�
�
�
�
�
�
�
�
�
�
!�
�
�
�
PROPOSED PAVED STREETS
(BENEATH FUTURE PAVING ONLY)
�
TYPE B OR C BACKIFLL
- SEE SPEC. E1-2
MINIMUM 6' SAND
MIiVIMUM 6" EMBEDMENT
C 1 r:� c,� �,_
L'
• . � �. .' . ' • : . .. .' : • •� • •. ' •
�� ' . '. ; . • . �• ; . ': ; .' , �; ; . .', ; . • . . _
T .... ' : ' • • '•: • : . '. .
� . . . • . . . •
-. . .:. .: '
_^ .:, . . . .
_� •��. � • •.•. �'��
ENT C� :R". .•: .. .; •: i��
. . � n
_ , , . .. . . �-
�, • . . . . . ;
I I . , . , • �
_ ' • •• � ' •• .• I E
• •�
Q�� �. •. .
' • . • . � .
�' . . ' . .
� .,�� ' . � • . � • . .
= INCLUDED IN LINEAR FOOT BID PRICE OF PIPE
+� SAND MATERIAL
EMBEDMENT
SEE SPEC. E1-2
. FIGURE C
(WATER SIZES UP TD & INCLUDING 12")
NTS
REV: MARCH 25, 1999
�
�
�
M
�
�
�
�
�
�
�
�
�
�
�
�
�
r
�
�
PROPOS�ED PAVED STREETS
CBENEATH FUTURE PAVING ONLY)
TYPE B OR C BACKIFLL
SEE SPEC. E1-2
= SAND MATERIAL
EMBEDMENT
SEE SPEC. E1-2
* CRUSHED STONE
SEE SPEC. E1-3
r � _ ��Y;.,���yi; =`:
�
,;;�,"_._._._��
, ���.-
���
1 �-
���
,,��.
. :: :. . . :: . . :: :. . ;��,
� - � �� �. : :.�� �. � � � ��. �. : : ��. :. � ��. ��. : �.� ����
�:�' •:. . : .. .,, ..: �� ,�
3=: • .� . • .•.' . , ••' .,���
+�'j� ; � : • • . . • � . : . • , . � . � '��F
_� . . • . . • .
�
T�� . ', ; • , • ; . ', ; , � i�-@
�� �,. . : . . . � .
.'•: ' ',• � . •'•: ' , ** 1) SEWER - MINIMUM 12"
..'. • SAND EMBEDMENT COVER
� •' 2) WATER - MINIMUM 6° '
'' • • ' SAND EMBEDMENT COVER -
; �. +��.� . �� i
' ' '. : ' '. : . _�
i .' Q� ' ' •'. L i
.� t Q� _��-� �
3�� • , � � • • • � '
� . • • . . . � .
INIMUM 6' EMBEDMENT
= INCLUDED IN LINEAR FOOT BID PRICE OF PIPE
. FIGURE D
(SEWERo ALL SI�ZES)
(WATER Sf�ZES � 16" & LARGER)
NTS
REV: MARCH 25, 1999
�
.�
i� ^�
- � �
.' � f �
� � /� `\ �
� ' ` 1
�
. ; ( + � �
D � �, s ¢ ; r
. \ ��`� E� /
n\� ��, �� ��
u
�`� �'�/
�
L�' � . + .
�"( O Minimrtm 2 roxis
l..j p�Q}orm�bifumas�ic Joint
seaksnt tRam-Nek cr a{�prored �
Q� equc!}.
,H� �.-t,�.� c`a, ��: �
� .r.S. T..�J. C- ¢T� y�a^vtf
i,c•:�'o�-c�d .•��io�lc
�• ~ s¢cf�o�+4 0� aqwl,
�'J ,p�c�:•-£-2-/�
; 1
� . . � � . >:
.� k
, �:
• . . •;,
�; �
. , � �
� .;d- ,
!
i
. �,;
�1,�•+�ots 1��•+t tws I�f "dri. '
cov�t�� -egc,�rt fa ,4r�,#�ti� ltJ�
lra�.+ /Yar.E�, -
iS/o../ FY.l.�V, ir�Y�f C�CtQ�e+d �'t'�k
s/ofs c�^ pickLYirs, fZef= E2-/4 '•�:
. � . � � . :�:;�
I �
�
n�'
w- ,,�.
;; ' �� _
, ``' •�..
,� ~�:'
'�\ :�
t ,�• i
�
�� =�
� �-- �
� �
t � 1 .
1_ i �
� "�
,
., ,;:,
� �,
..�.;x. R • T c�.c'� �r,'o't
'%• • c� e: c�1d/t .
- ' c.rtc.ts fo
* � �rpc. dc rt'
�_�
�- �
.':��• � «_�
• , ..��,.-�
_=�;_�nr�_-
�.
S
.�
:4"
�Yp�� s.�' ,v�'l.f Si.+tii�
of p*P �
a
(� `'� 6�.b��i{/. -----_ •
�..� (i'roal �.%' � <<..4 �
P�¢��sf� ;�: � �' � .... �'' , ,
;��, �.^\`'•' ��..• .;. w �,+:j'; .`4.:,!
� — ` �'•?.. ..i r�; � •- ;: �• � � • ,Z! � ;:, s : p ;t' • -p-'
' ••`� ••� O � •% � � .:�,'
;f : •,� • ���0.. � �•��. � ; .,>� '�;•.,`.� �
: � �: � . • � . • �i • �.. ., . � _,: f, ,� .
_ - �� '•��•"�:..•.r,�.- . _ _ � - - � :,; �,:.. �2
n�' ��..� 1�-:-. i-�-•.. t-- �—;--r, .. 1 w.�i.� i�ac:.� i6.f .', . • •` �, � . . . . . (� •
� P' �� ...'....,r:...... ^.�— Np: :i;I.j• tI• '�y:•'�i, _(';r,.
�! 'e�:o".:j.•�. •�' %• •o. ;�-,::.', :b:�:,•:rf-%;,i::;i��•.: °i�••:•D� '�'
�-`: �.
. �_:�°
�:
�
�
Class F lv000 �`l C'onc {c —.� . . . . 8 `a4*IN. � ~� "� �
Ff� �� � /y% �
�������� ����Q� �
(Pl'sC�?t1 s'�f o.v'A�
a
E1-1� t�a:erial
E2-14 ConstrucLion
,
LwJ
�'^�1' . ,
� �
Ex.isting surface
a f .
ltlt�7tl��i��i% �'i�
�
1 J
�'
/ �
�
�.,�
� ���
�'
�
�
L3
� .
�
�
�
�
tj
_ _� .
:��`
� 1-1-%8
� �
�
�
8ackfi)1 ss specified
,l�Ji�r(;—�i��iix� ."•�—_.2'•
, f �;' / . • � , • . � - • � .- — . - --
.�, t
�� • . : _ �
� • • 1 • • � I �
• � . . � . • � � .� .
« � . ' � •
;� .
. � � � ' � ��
` ! . � ' ` '
� . • . . .
�{ • • � • • , • • � . • ' , � .1
� � � � . , -� � ` .
� ' .. ' � • ,�: �•�''''•• • ' • • • 1�; l.
� , �';� ;...; r• ! 1��� •. . •�=r;`�:�.:� ��) O
y� ' �/(� � � : �� �k'..:�,' �� ' ��=L%' •» �
���•�_ �� �:'S'•t �:'••, • •1. , • '•� • '' ►j� (
, I. . � p.++:�•. •� , : ::� A ��:�9. il'
y��• ••♦ •�'• •r•• • • • qt.�•, ` t
•/��� ��� • �� . •��1�:�.��.: �
jLI . . � .. �� � � �i�%I : ;� j..�(.
� .5.��' .ti:�' �-
� ' . � �- �'�''�' � '�
�I �;o;: ="�'•`. Q'� . ' �
;_ ::. q� �=' --- —
� + ..', f' ' • . • � �
-�1'• •'. �'O. . :�Q�J
i(�• ,� •���'' - . _' . '•�', � '�;� .
� . : � •'�? • . . . , . . �l,
i� � : �:�'•� . • :��(: Y � • � � �
�,�• •�;�..a. �`:• ' . ';:.,,,,,, = � �
; . . . . . t `, . f �;, •. • � �
; Ub:. y �� 1
1�•-:��'�:,y : �•,' ��' � '' •• '�',b r�,
�' � :`Q.: : a , .. . � � :�: :r. • . . : . ,r`: r�•�.i }
�„=,.I_' = � :i � _ .n,s� . � =�t
Sl��•—.aq�'r c—r.�� -�itj.:o�;�r;Ji...; :�,+�;ri /.,'.._..
2 —•� . � ""1 -
��
O6" min. dimension. 6" max.�for pay purposes when
bio per cubic yard.
O6" min. dimension. Max.
o�� mains 24" and smaller,
when bid per cubic yard.
for pay purposes sna11 be 6"
9" on ma'sns 30" and larger,
O4" min. dimension. �" max. tor pay purposes when
bid per cubic yard.
OClass "c" 1��(l,�' concrete.
CQ��R�TE
�i��ASE�Ek�T
�i V V �� E ��
�G t �Et
E 1-7 Material
E 2-7 Cons�ruction
0
.
�
�``-
fl
�
�
L
�
8 - �a BARS TYP.
PLAC�D 1�IIN 3"
BELOW SURFACE
�
0
�
� •
�•
� PVMT
BASE
� - --� � - ---
l�'
�
i�J
[I■ I
� .
r �:� .
• �:.: �
�^ .
�
GRADE RINGS •AND
RA�i NECK
MANHOLE
WATER VALVE
1/2 W TYP
� �.
� 4.0` hiH Z.0' WV
;�
' ' • •° : ? • '/ '• -• °: . • • • • .' ''
� j , ° • � � �i�.'��`: �' �.. � � .
.j• 'D. �,0 1� ' ,� O.
.:�. ' �� � • : ; ,�J 3" TYP.
•�, � �'d' ;�,1.. . �. T
. � , �� ; � �.`. ..
J� . � ,4 i Q . . �'.
. -�\ �' � � N
. a. �\: �;:�?�• ,' .w ' , � o
'� . ,�J , � •\ `. • �,� o�/ . • _. .•, � �'
. ��� . �, � � �d . �:
. . . . � �•. .� . .� .p, -
� • .•. . . . .�' , • •r �i�%• � I � : `-
' ' ,` • �
.• :� �� � •r .
� ! ` , �y. � •� .
.. ' �� 7 � . +��_
_` ' , , . _ � . .
_ �
A
PVviT
BASE
CONCRETE COLLAR
HEIGHT VARIES
1. ALL CONCRETE USED SHALL BE 300 0 PSI. . '
Z. CONCRETE COLLAR SHALL EXTEND TO THE BOTTOM OF BASE (MIN.).
3. EONCRETE COLLAR SHALL BE: ,
a) 4' x 4' for MANHOLE
- b) Z' x 2' for WATER VALVE.
ATTC
CONCRETE COLLAR
. for �
MANHOLE and wATER VALVE
FIGURE 121
February 1993
�
� ..,
IJ FINISHED GRADE
��\��\��\����/\��\��i/\�/
� i /i. /i. /i. /i. /i. /i /i..
� SEWER PIPE PLUG —�
DIP FOR STACK �
D
�
.�• :
�D �'
,.
;%�
("� ���
� ` . ��/ :
ia� i��
j��
%��`
�•. ��/.�
CLEANDUT WITH BOX
AND LlD
STD CLEANING WYE •
�
EXlST/NG SERV/CE t lNE
ADAPTER COUPL/NG
CROSS—SECTION OF SEWER AT SERVICE CONNECTION
U
U -
�
11
�
�
�� _� .
:_-a
-,:-:�:
�
—�
�O� ;
r i
0
�V�
��
ti
W
W
� QZ
o W�
�
� � FlNlSHED GRAGE
I �%\�i\�/i\�/i\�%\�i\� \i
—6'M/N AT BOTTOM ONL�'
- 953�� BEND
— TYPE 'C,UR B' BACKF/LL
NEW SAN/TARY SEWER LINE
W/TH:6TANDARO EMBEDMENT
PER'F/G 109 .
TEE FITTING
J�—�1.:
�►
:�
. Z
�S �
W
�, � �
� . O
PLAN VIEW �
��i���v �C�����
(N01 TO SCALE)
�
FIGURE A
f!�J
��,
t�i
l�'
��
�,.
�$�/
,� :.
.�;
1-1-7$
MANFtOLE FRAME AND
24"D lA. COVER, EQUAL
TO McKINLEY IRON _
WORiCS ,NO,A24AM:
(REF. E2-14).
1
.�' ���.
� � �
/� /'� � „` \
/ �. �
/ � � �
J � � �
1 � � �
- -}- � — -�
�� 1
� ��'tc�► �,�, � � I
\ �.� � � �
\ /
\``_ �_'�i
TOP OF CONCRETE CONE ;,;;•• � - ��
SEGTlON 15" BELOW �
FINISH RIM ELEVATtON: �
(REF. FIGS. 143 � 104),
NOTE: 1. PRECAST 4'DIA. CONE WlTH
STANDARD 300.# MANNOLE �
COVER AND RING IN LIEU
OF 24"x40" SHALLOW
MANHOLE(REF. FlG 106j.
2. MANHOLE TO BE USED WHERE
SEWER.LiNES ARE LESS
THAN 6' DEEP.
SHAL�LOW MANHOLE
PRECAST CONE
FICURE 105
� �,` ':::
,-:..
•��� �� 16' : M.
i� O -.
6 MIN, i
GROUT� •;:':.,.:�•.:, _,..,.'
:t � ; `s�a_.r.:eX�' •;: � _ � _ :t.
:; � �'t • ',t•� ��
: �% ; � •i � j : j'. • �•. - j.': 1
.,, ,, .; _ , � �, ;�.�
$„ � �"—CLASS F(4000Y) CONC
Ei-14 MATERiAL
E2-14 CONSTRIfCi ION
0
�
0
� . I ♦
� .�� i. ;��*a
.� . - � i --tEMtR' r . .
� ; -
� � '� -- ---
� aQ % _
f RAME o,� COVER
� T Y. I. &, !'ir. PATTERN N.O• 101
. . oa �Eav�� _
� � �
_ ��� _ 3.9 ��� _ ��
��,,.,,.,
� ' � I ~ " �
��M. N. COV ER
D- . � . -
� � ��
38 %t•, ;�
� M.1t. FRAME -�
�
� � .
. � � .
a _ ��
1
�� -� � i '•
_ �
_� ' i
L� �! � ;;
,, . i � `; �
� -=� . , .., =- =
� — � • —� — ` \` — �_
— — � � --
. � � �`i
[� . � ��
n,,,
� �- � .
�..
____ � - � _
�,,
� -.
�
NOTES
1. Shallow manhole to be constructed of Class �
"F" (4000#) concrete (Ref. EZ-14) or of precast
cone with Standard 300# manhole ring and cover..�
� °: =-
�y� �a
2: Frame and cover as manufactured by McKinley �-
Iron Works, No. PM 24X40 or equal, may be
adjusted for elevation on a maximum of four (4)
courses brick in paved streets, or areas to be
paved; minimum of two (2) courses in other
areas.
Mortar � ��
Ref: E i-l4 � See Note 2
.u}9,N Y.�� 7.ir� � �.... .,u ... . � . .r.�
� ��
,- , . :�
�3 � �:� ' =��
� :�,:: ��t
� ��0•.-Z s�•'
� ' `p;�; . See Note 1 ��=,:�
�p •4! % I 'o:' `•. -
6"'til%N.
�
e� A
��
�� a_
a
s
.
,
�
'CLASS"� ~
=.CoHGRETE
� (4000#)
� 3d�"' Manhole to be used where sewer
, S4Xs"' '= 1 i nes are 1 ess than �' 0" deep.
TOP PLAN VIEW •
oF 2a" x ao"M.H. ��._.:: �
DETAIL OF SHALLOW . ��"�.
� . - -- -
- _ SAN ITARY SEWER MAN HOL�
. ._
�---�� - � �� � �FIGURE 106 � E �-14Material
. �_�_7$_ . _ E 2-14 Construction
$ECT10N —"A"=A" OF --
24��X 40�� M. H.
�
n
�
0
�
�►
���
0
PART F
� Certificate of Insurance
Contractor Compliance with Worker's Compensation Laws
� Performance Bond
Payment Bond
� Maintenance Bond
�
�
�
�
��l
�
u
LJ
� ::::;:::::.� ::::::::::::::::::::::::::::.
�'::
.-.'�.....�.,...,:��--��,. � ...........::..:::::::::::::::.
�
I�l
J
Blasting
Collapse of Building or
structures adjacent to
excavations
Damage to Underground
Utilities
Builder's Risk
Comprehensive
Automobile Liability
TO: CITY OF FORT WORTH Date:
� NAME OF PROJECT:
� PROJECT NUMBER:
IS TO CERTIFY THAT :
a is, at the date of this certificate, Insured by this Company with respect to the business operations hereinafter described, for
the type of insurance and accordance with provisions of the standard policies used by this Company, and further
hereinafter described. Exceptions to standard policy noted on reverse side hereof.
� TYPE OF INSURANCE
Policy Effective Expires Limits of LiabiliTy
Worker's Compensation
� Comprehensive General
Liability Insurance (Public
Liability)
�
'
'
�
�
�
'
�
�
�
�
1
Contractual Liability
Other
CERTIFICATE OF INSURANCE
Bodily Injury:
Ea.Occurrence: $
Property Damage:
Ea.Occurrence: $
Ea.Occurrence: $
Ea.Occurrence: $
Ea.Occunence: $
Bodily Injury:
Ea. Person: $
Ea. Occurrence: $
Property Damage:
Ea. Occurrence: $
Bodily Injury:
Ea.Occurrence: $
Property Damage:
Ea.Occurrence: $
Locations covered:
Description of operations covered:
The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or
canceled by the insurer in less than five (5) days after the insured has received written notice of such change/or
cancellation.
Where applicable local laws or regulations require more than five (5) days actual notice of change or cancellation to be
assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement
thereto attached.
AQencv
Fort Worth Asent
Address
�
Title
�
L�1
u
�
�
�
�
�
�
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
Pursuant to V.T.C.A Labor Code Section 406.096, Contractor certifies that it provides workers'
compensation insurance coverage for all its employees employed on city of Fort Worth Project Number PS46-
070460410230
M.E. BURNS CONSTRUCTION, INC.
CONTRACTOR
Byy���-�._, ��
���y�,�`
Title
G� /9� ��l`
Date
STATE OF TEXAS
�
�
COUNTY OF TARRANT
�
a BEFORE ME, the undersigned authority, on this day personally appeared ��in E. Burns�
lrnown to me be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he
executed the same as the act and deed of M. E. Burns Construction, f�e purpose and consideration
therein expressed and in the capacity therein stated.
pGIVEN UNDER MY HAND AND SEAL OF OFFICE this 18th day of
August .19 99 .
I�I
lJ
LJ
L'J
�
�
� 2p'�P�Y PUB(�n RENAS.INGL�
, * � * Notary Public
STATE OF Trh ��
, qlF �F �(�'�P� My Comm Exn P3�z� zooi
` ;��-�.rt�t . , . - _ .. . .-. , . ,
i���J „� c?j�����""
JL,-�
Notary Public in and far �/
the State of Texas
C
L
PERFORMANCE BOND
Bond Number: 33-73606
THE STATE OF TEXAS §
COUNTY OF TARRANT �
KNOW ALL MEN BY THESE PRESENTS: That we (1) M.E. BURNS CONSTRUCTION, INC. a(2)
CORPORATION of TEXAS, hereinafter call Principal, and (3)Bankers Insurance Comnanv a
corporation organized and existing under the laws of the State and fully authorized to transact business in the State
of Texas, as Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and
existing under the laws of the State of Texas, hereinafter called Owner, in the penal sum of:
ONE HUNDRED NINETY-EIGHT THOUSAND EIGHT HUNDRED EIGHTY-ONE AND 75/100 ..............
($198.881.75) Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for
the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators
and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS of: OBLIGATION is such that Whereas, the Principal entered into a certain
contract with the City of Fort Worth, the Owner, dated the of a copy of which is hereto attached and
made a part hereof, for the construction of: AuG �. '7 1999
MAIN CIC4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 4, U1�TIT 2
designated as Project No. (s) PS46-070460410230, a copy of which contract is hereby attached, referred to, and
made a part hereof as fully and to the same extent as if copied at length herein, such project and construction being
hereinafter referred to as the "work".
NOW THEREFORE, if the Principal shall well, truly, and faithfully perform the wark in accordance with
the plans, specifications, and contract documents during the original term thereof, and any extensions thereof which
may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands
incurred under such contract, and shall fully indemnify and save harmless the Owner from all costs and damages
which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense
which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in
full force and effect.
FI
PROVIDED FURTHER, that if any legal action filed upon this bond, venue shall lie in Tarrant County,
State of Texas.
AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the contract or to the wark to be performed
thereunder or the specifications accompanying the same shall in any wise affect its obligations on this bond, and it
does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or
to the work or to the specifications.
IN WITNESS WHEREOF, this instrument is executed in 10 counterparts each one of which shall be
deemed an original, this the of _____
ATTEST: ,�y���' :' �' ,���
M.E. BURNS CONSTRUCTION. INC.
(Principal) Secretary
(SEAL)
Witness as to Principal
ATTEST:
(SEAL)
Address
PWNCIPAL (4)
BY: �� • � f'
Title: �z� >, .���.,��
PO BOX 11678
FORT WORTH, TX 76110-0678
(Address)
Bankers Insurance Comnanv
Surety
BY: ! w� W�J
(Attorney-in-fact) (5) Linda W. Sinku
(Surety) Secretary 2425 N. Central Expwy. , Ste.458
Richardson, TX 75080
(Address)
NOTE: Date of Bond must not be
prior to date of Contract
� ,
� �� ( n'
, � r� i�'� }_ �-� i �' �,�%+_�-'�' "� f �.-� '-�-
Wimess asto Surety
1600 W. Seventh, Ft. Worth, TX 76102
(Address)
(1) Correct Name of Contractor
(2) A Corporation, a Parinership or an
Individual, as case may be
(3) Correct name of Surety
(4) If contractor is Partnership all
Pariners should execute Bond
(5) A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact..
F2
PAYMENT BOND
Bond Number: 33-73606
THE STATE OF TEXAS �
COUNTY OF TARRANT �
KNOW ALL MEN BY THESE PRESENTS: That we (1) M.E. BURNS CONSTRUCTION, INC. a(2)
Corporation of Texas, hereinafter call Principal, and (3) Bankers Insurance Comvany , a corporation
organized and existing under the laws of the State and fully authorized to transact business in the State of Texas, as
Surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation organized and existing
under the laws of the State of Texas, hereinafter called Owner, and unto all person, firms, and corporations who
� may furnish materials, for or perform labor upon the building or improvements hereinafter referred to in the penal
1 ' sum of :
ONE HUNDRED NINETY-EIGHT THOUSAND EIGHT HUNDRED EIGHTY-ONE AND 75/100 ..............
($198,881.75) Dollars in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for
the payment of which sum well and truly be made, we hereby bind ourselves, our heirs, executors, administrators
� and successors, jointly and severally, firmly to these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain
contract with the City of Fort Worth, the Owner, dated the day of A.D. , 1999, a copy of which is
hereto attached and made a part thereof, for the construction of:: � ., Q
� M��:i I
.� ►y�
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 4, UNIT 2
lProject No. (s) PS46-070460410230 a copy of which is hereto attached, referred to and made a part hereof
as fully and to the same extent as if copied at length herein, such project and construction being hereinafter referred
to as the "work".
NOW THEREFORE, the condition of this obligation is such that, if the Principal shall promptly make
payment to all claimants as defined in Article 5160, Revised Civil Statutes of Texas, supplying labor and materials
in the prosecution of the work provided for in said Contract, then this obligation shall be null and void, otherwise it
shall remain in full force and effect.
F10
THE BOND IS MADE AND ENTERED into solely for the protection of all claimants supplying labor and
material in the prosecution of the work provided for in said Contract, as claimants are defined in said Article 5160,
and all such claimants shall have a direct right of action under the bond as provided in Article 5160 of the Revised
Civil Statutes.
PROVIDED FURTHER, that if any legal action be filed upon this bond, venue shall lie in Tan-ant County,
State of Texas, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of
time, alteration of addition to the terms of the contract ar to the wark to be performed thereunder or the specification
s accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any
such change, extension of time, alteration or addition to the terms of the contract or to the work to the specifications.
PROVIDED FURTHER, that no final settlement between the Owner and the Contractor shall abridge the
right of any beneficiary hereunder whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in 10 counterparts each one of which shall be
deemed an original, this the day of A.D., 1999.
�: `� �:: �
ATTEST:
(Principal) Secretary
Witness as to Principal
Address
ATTEST:
(SEAL)
M.E. BURNS CONSTRUCTION, INC.
PRINCIPAL (4)
BY: `'t� � /'
Title: �iz�~s.�/'��.���
PO BOX 1678
FORT WORTH, TX 76110-0678 (SEAL)
(Address)
Bankers Insurance mpany
Su \.` `
BY. w �
(Attorney-in-fact) (5) Linda W. Sinku
(Address)
(Surety) Secretary 2425 N. Central Expwy. , Ste. 458
Richardson, TX 75080
(Address)
NOTE: Date of Bond must not be prior to date
of contract
(1)
�2)
(3)
(4)
� ' ` /I
' I r'i`�+-� ; : a ; ,�'���� �:� � � ���' �=
Witness as to Sui�ety
1600 W. Se��Pn.th� Ft. Wox'th� TX 76102
(5)
Correct Name of Contractor
A Corporation, a Partnership or an
Individual, as case may be
Correct name of Surety
If contractor is Partnership all
Partners should execute Bond
A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact..
(Address)
�
lE
l�
�
�
�
�
THE STATE OF TEXAS
COUNTY OFTARRANT
MAINTENANCE BOND
�
�
Bond Number: 33-73606
KNOW ALL MEN BY THESE PRESENTS: That (1) M.E. BURNS CONSTRUCTION, INC. as
Principal, acting herein by and through (2) its duly authorized
and (3) Bankers Insurance Companv a corporation organized under the
laws of the State of TEXAS, as surety, do hereby acknowledge themselves to be held and bound to pay unto the
City of Fort Worth, A Municipal Corporation, chartered by virtue of Constitution and laws of the State of Texas, at
Fort Worth, in Tarrant County, Texas the sum of
ONE HUNDRED NINETY-EIGHT THOUSAND EIGHT HUNDRED EIGHTY-ONE AND 75/100 .............
($198,881.75) in lawful money of the United States, for the payment of which sum well and truly be made unto said
City of Fort Worth and its successors, said Contractor and surety do hereby bind themselves, their heirs, executors,
administrators, assigns and successors, jointly and severally.
This obligation is conditioned, however; that,
WHEREAS, the Principal has entered into a certain contract with the City of Fort Worth, ' W,
the performance of the following described public work and the construction of the following described public
improvements:
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 4, UNIT 2
of same being referred to herein and in said contract as the Work and being designated as project PS46-
070460410230 and said contract, including all of the specifications, conditions and written instruments referred to
therein as contract documents being hereby incorporated herein by reference for all purposes and made a part
hereof, the same as if set out verbatim herein; and ,
WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that
it will remain in good repair and condition for and during the period One (1) Year after the date of the final
acceptance of the wark by the City; and
WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of
One (1) Year; and,
WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or m part at any time
within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be
necessary; and,
WHEREAS, said Contractor binds itself, upon receiving notice of the need therefor to repair or reconstruct
said work as herein provided.
�
�
,
;
NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair ar
reconstruct said work in accordance with all the terms and conditions of said Contract, these presents shall be null
and void, and have no force or effect. Otherwise this Bond shall be and remain in full force and effect, and said
City shall have and recover from the said Contractor and its surety damages in the premises prescribed by said
Contract. This obligation shall be continuing one and successive recoveries may be had hereon for successive
breaches until the full amount hereof is exhausted.
WHEREAS, all parties covenant and agree that if any legal action be filed upon this bond, venue shall lie
in Tarrant County, Texas; and,
IN WITNESS WHEREOF, this instrument is executed in 10 counterparts, each one of which shall be
deemed an original, dated �; ;'� t';' �a�
� ATTEST:
a
; (Principal) Secretary
I (Seal)
�
l
�
� Witness as to Principal
� (Address)
ATTEST:
� (Surety) Secretary
J (SEAL)
��
,�� � {t�'.�,lv�-i����i�,—
Witness as to Surety
1600 W. Seventh, Ft. Worth, TX 76102
M.E. BURNS CONSTRUCTION, INC.
PRINCIPAL (4)
BY: /1,s�/ -- � �
Title: �2cs�.-�.�
PO BOX 11678
FORT WORTH, TX 76110-0678
(Address)
Bankers Insurance mpan
Sur �
B : ��
(Attorney-in-fact) (5) Linda W. Sinku
2425 N.Central Expwy., ��458, Richardson,
(Address) TX 75080
NOTE: Date of Bond must not be prior to
date of Contract
(1) Correct Name of Contractor
(2) A Corporation, a partnership or an
Individual, as case may be
(3) Correct name of Surety
(4) If Contractor is Partnership all
Partners should execute Bond
(5) A true copy of Power of Attorney
shall be attached to Bond by
Attorney-in-Fact.
� F6
f`
��
Po w er o A tto rn e 33-73606
y
KNOW ALL MEN BY THESE PRESENTS: That Bankers Insurance Company, a corporation created by and existing under the laws of
the State of Rorida having its principal office in the City of St. Petersburg, Pinellas County, State of Florida, does hereby nomi�ate, constitute
and appoint:
Gary B. McElroy, Connie S. McMullen, Michael F. Washmon, and/or Linda W. Sinku
of the City of Fo2t WOrtlt , Tarrant County, State af Texas , each its true and
(� lawful, Attorney-in-Fact, with full power and authority conferred upon him to sign, execute, acknowledge and deliver for and on its behalf as
� Surety as its act and deed, any 6ond, undertaking, consent or agreement, not exceeding Two Million and XXI100 Dollars (52,000,000.00) which
this Company may be authorized to write.
The Bankers Insurance Company further certifies that the following is a Vue and correct coPy of Article IV, Section 6 of the By-Laws
duly adopted and now in force, to wit:
� SECTIDN 6, PRESIDENT. The President shall in the absence or disability of the Chairman preside over all meetings of the
Directors and Shareholders and shall have general supervision of the affairs of the Carporation, shall sign or countersign
certificates, contracts, and other instruments of the Corporation as authorized by the Board of Direcrors, shall make reports
�'° to the Board of Directors and Stockholders, and shall perform all such other duties as are incident to his office or are
properly required af him by the Board of Directors.
r IN WITNESS WHEREOF, the Bankers Insurance Company has caused these presents to be signed by its President and,12S'�OfpO��d'tb,_r
^:,,:
Seai to be a�xed by its Secretar� this 17th day of MaY , 19 94 . `'� �- `"' _
L — -
: � ';.•.; = � -.. ,
� ATTEST: , BANKERS I S RANCE COMP _ „=.� �� ` '� � �1 ; �_
C. � � _ - : :� _�� �- = - =
�. .ti
G. nstin Delano, Secretary David . eehan, Pr i en :�--' "
'y This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted �y the.Board.�'`�``
of Directors of the Bankers Insurance Campany at its monthly meeting held in August 1981.
�
�
„
��
�•J
RESOLVED, that the signatures of such Officers and the Seal of the Corporation may be affixed to any such Pnwer of
Attorney or any certified copy thereof or any certification relating thereto, by facsimile and any such Power af Attorney or
any certified copy thereof, or any certification relating thereto bearing such facsimile signatures or facsimile seal shall be
valid and binding upon the Corporation in the future with respect to any bonds, undertakings, recognizance or contracts of
indemnity to which it is attached.
STATE OF FLORIDA )
) SS.
COUNTY OF PINELLAS )
BEFORE ME, the undersigned authority, personally appeared DAVID K. MEEHAN and G. KRISTIN DELANO who acknowledged themselves
to be the President and Secretary of Bankers Insurance Company, a Florida corporation, and they as such President and Secretary being authorized
to do so, executed the foregoing instrument for the purposes therein contained by signing the name of the corporation by themselves as President
and Secretary, and that said secretary affixed thereto the seal of the corporation and attested to the execution of the foregaing instrument.
IN WITNESS WHEREOF, I hereunto set my hand and seal this 17th day of May , 19 94 .
� `,.��' ►w�.,� 'OFFlCIAL SEAL'
My Commission Expires: - 9S �� n
��i a= C�O�Of1 E � p It6S 2/1 f 97 Notary ublic Car o n(,� . Thame s
�'~�OF �,00.'� �CQITNilISSIO(1 �i:i: �
'�i.,.,..�.a•
i I, the undersigned, Secretary of Bankers Insurance Company, do hereby certify that the original Power of Attorney, of which the
` foregoing is a fuil, true and caRect copy, is in full force and effect.
IN WITNESS WHEREOF, I have hereunto subscribed my name as Secretar and affix the corporate seal of the Corporation this
� day of , 19
r = (SEAL)
. Kristin Delano, Secretary
�
IJ
PART G - CONTRACT
� THE STATE OF TEXAS §
aCOUNTY OF TARRANT §
� � �. ,.
THIS CONTRACT, made and entered in�t�O ` byYand between the City of Fort Worth, a
home-rule municipal corporation located in Tarrant County, Texas, acting through its City Manager
thereunto duly authorized so to do, Party of the First Part, hereinafter termed "OWNER", and M.E.
� BURNS CONSTRUCTION, INC. of the City of FORT WORTH County of TARRANT and State of
TEXAS, Party of the Second Part, hereinafter termed "CONTRACTOR".
�
WITNESSETH: That for and in consideration of the payments and agreements hereinafter
� mentioned, to be made and performed by the Party of the First Part (Owner), said Party of the Second
Part (Contractor) hereby agrees with the said party of the First Part (Owner) to cominence and complete
_ certain improvements described as follows:
MAIN C1C4B DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 4, UNIT 2
And all extra work connected therewith, under the terms as stated in the Contract Documents, and at his
� (their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools,
superintendent, labor, bonds, insurance, and other accessories and services necessary to complete the
� said construction, in accordance with all the requirements of the Contract Documents, which include all
maps, plats, blueprints and other drawings and printed or written explanatory matter thereof, and the
specifications thereof, as prepared by the Engineers employed by the Owner, each of which has been
identified by the endorsement of the Contractor and the Engineers thereon, together with the Contractor's
� Written Proposal and the other parts of the Contract Documents hereto attached, including the Fort
Worth Water Department General Contractor pocuments and General Specifications, all of which are
made a part hereof and collectively and constitute the entire contract.
�
G1
�
'
,
,
'
�
�l
I�I
I�I
L�J
L�J
�
�
�
�
��
L�J
�
�
�
0
��
I�
The Contractor hereby agrees to commence work within ten (10) days after the date written
notice to do so shall have been given to him, and to substantially complete same within the time stated in
the proposal.
The Owner agrees to pay the contractor in current funds for the performance of the contract in
accordance with the Proposal submitted therefor, subject to additions and deductions, as provided in the
Contract Documents and all approved modifications thereof, and to make payment on account thereof as
provided therein.
IN WITNESS WHEREOF, the Parties to these presents have executed this Contract in 10
counterparts in the year and say first above written.
Citv of Fort Worth, Texas (Owner)
Party of the First pa
�
BY:
ASST. City Manager
CW
ATTEST:
CiTy Secretary
(Seal)
WIT'NESSES:
M.E. BURNS CONSTRUCTION, INC.
PO BOX 11678
FORT WORTH, TX 76110-0678
Contractor
By: ��.�-- G�
Title: �/L�,si�'`.s�
APPROVED:
� �
� � � � :.�'' � �
.
A. Douglas Rademaker, P.E. Director
Department of Engineering
CW
Approved as to Form and Legality:
�
Gary Steinberger, Asst. City Attorney
� - � 7�g�
Cqntract Author+ization
�� �
Da�e
�
�
�
�
i�
D
0
I.
�
APPENDIX A
� Easement tem ora construction and ermanent documents
� P rY p ) ,
� right-of-entry forms
LJ
�•J
�
�
L■J
�
�!'
�
�
�
�
�
�
�
�;
�
�
UNIT 1
D
Easement (temporary construction and permanent) documents,
D right-of-entry forms
•J
�
�
�
�
�
�
�
�'
��
i��
�
�
u
�
�
�
�
�
�
�
�
, Sani#ar3r Se�er i�ai� C��4�3 Drai�age Area l��is��l�an�aus S� R�place�e�ts
" PARCEi� # 'i'�Ei
i�0� # 1829 �
3717 Livingston Ave. �
Lot 5, Bioc� il, Univ�rsity i��i Addition -
TEM�0�2�1RY CONST'�ITCTION EASEMEI�TT
THAT I/WE, Rogelio & Florinda Gracia, hereinafter referred to as "Grantor" for and
in consideration of One Dollaz ($1.00) and other valuable consideration paid by the City
of Fort Worth, a municipal corporation of Tarrant County, Texas receipt of which is
hereby acknowledged, do grant, bargain and convey unto said City, its successors and
assigns, the use and passage in, over, across, below and along the following pazcel or
tract of land situated in Tarrant County, Texas, in accordance with the plat hereto
attached, to-wit: .
SEE ATTACHED EI�II3IBIT
It is further agreed and understood that the City of Fort Worth will be permitted the use of
the above described strip of land for the purpose of the construction, maintenance and
repair of a sanitary sewer system. An ingress and egress easement shall be granted in
order that access may be gained to the above -described Temporary Construction
Easement.
TO HAVE AND TO HOLD the above� described premises, together with, all arid
singulaz, the rights and appurtenances thereto in anywise belonging, unto the said City of
Fort Worth, its successors and assigns, forever. And Uwe do hereby bind
myself/ourselves, my/our heirs, successors, and assigns, to warrant and forever defend, all
and singular, the said premises unto the said City of Fort Worth, its successors and
assigns, against every person whomsoever lawfully claiming or to claim the same or any
part thereof.
It is intended by these presents to convey a right-of-way to the said City of Fort Worth to
maintain, construct and repair the above described improvements, with the usual rights of
ingress and egress in the necessary use of such right-of-way, in and along said premises.
The City of Fort Worth agrees that in the event any of the existing improvements located
� with the described Temporary Construction Easement, aze damaged by the City
construction crew or by the contractor responsible for the Sanitary Sewer Main C1C4B
� Drainage Area Miscellaneous SS Replacements contract, the City will repair the
damage to a condition compazable to when construction began.
.�
�
�
�
IN WITNESS WHEREOF, Grantors have caused this instrument to be executed on this
the � day of %��G�r-1.� L�'� , 19�.
� • l%
� ✓a :
O e�
Owner(s)
a�!
0
. : _�
n � ��-
l.f `.
�
I
i
i
i
, ,
,. ,
:, �
� �:
� ;
, ,.�.. _ .
, ���s� •
� �.
� ;:
����:������:.������;: :
Q �� . ? - ! �
i' ; � �
_ ; : ; � :.�,�
� I t � \ �`\ ��
I� � � �n
�' C�AI�; ! iVK F=�CE G��t GV \� r ✓
� ' _� _ — l ., � �1�—�., _ -'NOOC F_vC� _ Y � -- CN�iN LiN�C r _N��.�'
. C "
, _I : i'zik � CAfv�_C_
-4 �c AS— — ;_--�-� — — .— — — �_� — —4��c a �—
� � �r' ��� � .
� — — — -- -- — -- — . `'.—" —' - - tx.�:, � --- - .
E�fi EX' '+ o" S.S. SS�t� �-Z ��W
-E— -�r , �- _—,.
�� � r. -' j � � �' � - �. � ' � ., �'—
:CNAiV �i;;�C F_NI.E vN� /
� � ' ��t �C- �� �p,�� �
�.:--�. � �'' `L"_�✓"`SJ-
-:��_�.=i _, ,,,�,,,,� P �P(��ED � � ��, c�ti
i: � �...'1�' �E`MP'.�RARY�� : °'� �,�
�x� � CONSTR��;TION � - � � r�
� ; EASE�F� NT �
. �
� .� � RAME �`; • .
� \ � i!} �, ;, �� X I CRACIA, ROGELIO & FLORINDA �
'• I � � 3717 LIVINCSTON AYE
\
� I � � j UNIYERSITY HILL ADDN (FT W) �
� I � �••..,.........,.,..\ � BLK >1 LOT 5 :
r�
�
i�
�
�
�
YOL 1138 P 38 DRTCT �
YOL l±909 ? 1253 PRTCT '
1
EXHIBIT 'A°
10'TEMPORARY CONSTRUCTION EASEMENT
BLOCK 11, LOT 4 .
UNIVERSITY HILL ADDITION
an addition to the
CITY OF FORT WORTH� TARRANT COUNTY, TEXAS
AS RECORDED IN VOLUME 1138 PAGE 38 DRTCT
AND VOL 11404, PAGE 1253 PRTCT
� �' `� —_:
SCALE: 1°=20'
GROUP 6, CONTRACT 2, PARTv4 � SANITARY SEWER REPLACEMENTS � HalffAssociates,Inc.
0 DOE �1829I PARCEL: TCE1� I AVO: 16993 I OCTOBER 1998 � TCEI.DGN "�`�"._'`�-��:s.�::•.�:5.:_:=�:.=..:rt.;,s
' : f
L1, �� ' � �� � � .�a�itary Segvsr NSaim ��C4� Drainage Ar�a t1�'sca�ianeflus SS R�plac�ms�#s
J � �: - : .=::�:;:-, �- PA�CEL # TCE2 .
�OE # 1829
a 3721 Livangston Ave. �
Lot b, Block 11, University Hill Addition
U' �-..
�
■J
!i
�
L�
L�J
�
L■l
�
�!J
TE�ORA�2Y CONSTRUCTION EASEMENT
TI�AT I/WE, Miguel Etuz Sonia Ramirez., hereinafter referred to as"Grantor" for and
in consideration of One Dollar ($1.00) and other valuable consideration paid by the City
of Fort Worth, a municipal corporation of Tarrant County, Texas receipt of which is
hereby acknowledged, 3o grant, barga.in and convey unto said City, its successors and
assigns, the use and passage in, over, across, below and along the following parcel or
tract of land situated in Tarrant County, Texas, in accordance with the plat hereto
attached, to-wit: .
SEE ATT�CI'�D E�IT
It is fiu�ther agreed and understood that the City of Fort Worth will be pernutted the use of
the above � described strip of land for the purpose of the construction, maintenance and
repair of a sanitary sewer system. An ingress and egress easement shall be granted in
order that access may be gained to the above .described Temporary Construction
Easement. �
�'O �iAV�,' A.� T� d�OLD th� above described pre�ises, t�gether �vit ;, aIl yrd
singular, the rights and appurtenances thereto in anywise belonging, unto the said City of
Fort Worth, its successors and assigns, forever. And Uwe do hereby bind
myself/ourselves, my/our heirs, successors, and assigns, to warrant and forever defend, all
and singular, the said premises unto the said City of Fort Worth, its successors and
assigns, against every person whomsoever lawfully claiming or to claim the same or any
part thereof.
It is intended by these presents to convey a right-of-way to the said City of Fort Worth to
maintain, construct and repair the above described improvements, with the usual rights of
ingress and egress in the necessary use of such right-of-way, in and along said premises.
� The City of For� Worth a�ees that in the event any of the existing improvements located
with the described Temporary Construction Easement, aze damaged by the City
construction crew or by the contractor responsible for the Sanitary Sewer Main C1C4B
� Drainage Area Miscellaneous SS Replaceinents contract, the City will repair the
damage to a condition compazable to when construction began.
��I
D
�
I�I
IN WITNESS W�REOF, Grantors have caused this instnunent to be executed on this
the 1 day of � ,19 t� z'.
� � /% ,
>n ,-� . _._' ��1i r _
Owner(s) y r - - � -�
�;'�Ii C/ _ � I _ /; l'� ��r °,/Y� � ��i-r�,�
Owner(s) �
�
�
. .. .��
Q
�
L1
L�J
; �
� � ti
; ;� �
. ;� ,
. .;
. �c���� ,
; `; ��
.
: �: ��
, ;:�:��.������`� :�.�����
�
�
�
�
I
i
�
r�
���h
�G'�
5
a �' �;E� ` .�,P�
- - �I �
�
,; �..�` . �t. �
�i��JVJ FCid�..L Y I( ..�ls ...JA��'+ �ii.�� F-i..i�:C�����. .�D
LJ � _ ' � " ' _ ' .� ' �
�'ml!: CC�I('r F_ � ; _ -_- - -----
_ —`�- — — ; — — —� �� .q„G.4� o�
, �. �
�— � � t�i i. -, ,..
�.5. �55��l�'�.��'�-''c Iv4 .
--------------- "�'(`�'�/ j � ^1�t �1,�- �K
_ _ �� � � / /o� � �.
�::`� o
:Y`= � ! /, � �.�, s� I
PROPOSED �' /� �tio c.��
10' TEMPORARY—�f �F ��p,�, I
� CONSTRUCTION �• , i�
EASEMENT ' � .
I�J
l�J
liJ
�
�.
'
i
; RAafIREZ, MICUEL ETUX SONIA
3721 LIVINGSTON AV
� UNIVERSITY HILL ADDN �FT W)
: BLK 11 LOT 6
VOL 1138 P 38 DRTCT
. VOL 11078 P 2302 PRTCT
EXHIBIT "A°
10'TEMPORARY CONSTRUCTION EASEMENT
BLOCK 11, LOT 6
UNIVERSITY NILL ADDITION
an addition to the
CITY OF FORT WORTH. TARRANT COUNTY, TEXAS
AS RECORDED IN VOLUME 1138 PAGE 38 DRTET .
AND VOL 11078, PAGE 2302, PRTCT
�
� VV
\
;� `pp
�_l__�
, W
� �
- (�
O
�
U
�
CP ~�
CP��3
1 � � �
SCALE: 1°=20'
GROUP 6, CONTRACT 2, PART 4 I SANITARY SEWER REPLACEMENTS ;; HalffAssociates,Inc.
� DOE �1829IPARCEL: TCE2�I AVO: 16993 INOVEMBER �1998I7CE2.DGN ■�� ���>.�����.;:t�-;:;.�::�.�s.�.�.:.:.f
�� _
�
Sanitary Sewer Main C1C4B Drainage Are� Miscellaneous Sanitary Sewer
; ,. �. Replacements � .
- PARCEL # ROES
TYPE ROE
DOE # 1829
3709 Livingston Ave.
Lot 3, Block I1, University Hill Addition
�
'
�
���
■1
�•!
�
TEMPORARY RIGHT-OF-ENTRY AGREEMENT
Soccoro I. Orgeta, Owner, herewith grants permission to the City of Fort Worth and its
independent contractor, to enter upon the owner's property located at Lot 3, Block 11,
University Hill Addition also described as 3709 Livingston Ave. for the purpose of
rehabilitation/reconstruction of an existing sanitary sewer line.
Any enhy and use of the properry by the City of Fort Worth or its independent contractor,
under the Right-of-Entry agreement shall be pernussive and shall not constitute a trespass
to the property by the City or its independent contractor. Both the City and its
independent contractor, aze released from any adverse consequences related to the entry
or use of the properties by either party. .
The Cifiy of Fort Worth further agrees to restore the properry to the same condition that
existed prior to entry. If restoration is required, the work shall be performed in a ti.mely
�� � �'��' � manner, weather permitting. .
,� Thi� agreement is executed this a�� day of � �`�'-L�
19 �, by, Soccoro I.Ortega, owner.
�
u
�•
�.�- -
OW.�TER:
GQ��
Owner(s)
�
Owner(s)
�
ROE.DOC
�
�
Lt
,
�
� } , . �
�
�
�
�
lJ
��
IAi
L�'
t
�
��
��
�
��
�
�
LJ
�
N
�
I
�
'_..�
----
i
..�
�
_�
�
---�
I
---�
�
.�
i
� s areu
110E i �AGLACE
i . � 6 � T� 2 RuaR£Z
� L-1232 �
STA 0+00 TO STA 18+95E
roRr �n+ ►oc►roe wu ao. m+z-m
SOCOMO I 770! LIVNCSTd� ��'E. it 3 tMvtRSRT M.0 AOpT1d� 6T t1
NEHtT G.R. aTt7 Uv►KSSdI AVE. 11 � ID�vEMtTY NLL ADdTId� ffT fl
ROCELp t ROtwOA IT1T WnGSTON �v� It S INVFRSRY FRL AOOtTIp+ �T t]
�artt tsux taa� srn uvrwssa� �vc, a c u.vEurn sa� �cana� �s n
' .�� � FORT �ORTH,BELT , R.R� � � ` �� , i ,
- L-123 � -• — — •- — -- —
� � � � � BIDDESOIV ST.+ � � � � � _L-1231 _
M-73 i ---•—� �--•--�-: ,:._.,-- � .—=._I�.._..—• �--�• ;� •
—: —f� � ; , � :��24 � . 1 � 2a � � �—
�. �
� � �: � .
� '� 2 : � 2 '.: 23 ; I 2 •`� 23' : � 2 �I
: 2 �: 3 '. : 3' ;� 22 � : 3 Ijf 22 i : 3 ��
� 3 ,` .. .
4 ! � q � � 21 � I 4 �. 21 � 1 q :.
,•
... 4.._.I; 5 � � 5,:; 20 j � 5 ;I� 20 ; I 5 `�
— ..._... _ � 6 � � 6 :� t9 ; � 6 :�� �g � : 6 ,�
; �_ : 7 , � 7 {� 18 � : 7 � � 18 � � 7 !�
i : . . . . �---
� 2 �` 8 I ' 8 i I 17 f ! 8 ��f 17 I � 8
� 3 �� 9 � 9 '' 16 j .I 9 ;I; 16 � ; g �I
:� a —
�
I 4 (� r • 10 �• 15 � ��� ti 15 . : 10 I.
� 10 ' {•� 'I, • . �--
5 �: 11 � � 11• �� �q ' 11 � 14 , � 11 '
I 6 I � : • �� ; ' � :I 4 . � �--
�2 ! '. 12 .� �.13 _I �z ---- �I=--. �3� � i2 ..
i 7 � �--•-- •--..� •—
• aA,9� _„_ _.._. .-_-•� •-_• r••_ -
� s �i � : � :� za � � �� Za � : �
�
.._._�.. 2 j ! 2 1. 23 � 2 N:I 23 � � 2
I � �� 3 ( � 3 ` i 22 � � 3 `� I 22 � � 3 I t t
� ;
�:
i 2 � � q I: a I I Zi :: a ; � 2� : i q I .
1 3 i� 5 � I 5 �i 20 � � 5 �I' 20 I : 5 �
� 4 6 1 { 6 ; i 19 ; i 6 ;I� 19 � � 6 I.�.
� 5 �� � !� 7 1 I ta :: 7 I I ta � � 7,�
. ,
; 6 � �' . a ; : ' N � �7 '• � s I I iT � � s /
� , 1--- ,
. 7 ; � 9 : � !� 15 � I 9 `li t6 � � g .
! g . 10 � � 10 '� 15 � I 10 :`: 15 i �
� t0 I
. _ . _ ..,J � i� i � 1� � ! �a � � » l I �a . :
.. � : ! ' I ' :�: ' : ;� /
' � '� \�'�12� ` 12 ..� i.. 13__... �Z ..—..�1�..._....13 L�� /'` �
� 2 B � � •--, •—••— ---- ._..._ �j—. ---. '/ ,�/' •
3 1 ! : t � •24 � i � ? j =� !-�i
. � , �! I ! i� , / i
4 '� 2 ; ! 2 : I 23 : . 2 CITY OF FORT WORTH, TEXAS
. 5 : i 3 ' 3ROE 5 �: 22 : � WATER DEPARTMENT
6 � 4 � 4ROE6i� 21 4
7 5 ' S tcE �` � 20. � 5
' a l. 6 . 6icE 2:; 19 " ' 6
_..�.._.;._ •
� D:CiiCJ� �cT.' - — - - — • • — 7
� I SNEETS 8.9.10.1 a
SANIiARY SEWER MAIN CiC48 DRAINACE AREA
aEHABiLf?ATION/RELIEF ANO $£'MER IMPROVEMENSS
tGROUP 6.CONTRACT 2)PART 4,PROJECT No.P546-a704604t0230
AriCELLANE0U5 SAt�TARY SEWER REPLACENENiS
EASEMENT LATOUT L-1232
FOR7 ICORikt LOCA70R NAP N0.2042-372
;;; HalffAssociates, Inc.
��� ENCINEERS • SCtENT15T5 • SURVEYORS
OfLW OM1��M Mam CASC SCIL£ I AW f1.L �
ROV i NS I MI�M I NOV I SC�LE� I t6993 mt�m
Qpl 1�: 7f1M
!J
� .:�
� .�
�
0
Sanitary Sewer Main C1C4B Drainage Area Miscellaneous Sanitary Sewer
RepIacements
PARCEL # ROE6
TYPE ROE
DOE # 1829 ,
3713 Livingston Ave.
Lot 4, Block 11, University Hill Addition
' �. ,, '�EMPORARY RIGII'T-OF-ENTRY AGREEMENT
�,�r'�yl �' � :` `� l ��{��.
�-:�.} � � ; � :�(,
,�,-,;-� ;� I�e�ry-�:-�a�aee; dr-_�. Owner, herewith grants permission to the City of Fort Worth and
t��' ��! ��� its independent contractor; to enter upon the owner's property located at Lot 4, Block 11,
University Hili Addition also described as 3713 Livingston Ave. for the purpose of
rehabilitation/reconstruction of an existing sanitary sewer �line.
�•�
�
�
�.! � �� ;
�
�
l,'
Any entry and use of the properry by the City oi Fort Worth or its independent contracior,
under the Right-of-Entry agreement shall be permissive and shall not constitute a trespass
to the properry by the City or its independent contractor. Both the City and its
independent contractor, aze released from any adverse consequences related to the entry
or use of the properties by either party. �
The City of Fort Worth fiu�ther agrees to restore the praperiy to the same condition that
existed prior to entry. If restoration is required, the work shall be performed in a timely
manner, weather pernutting.
�--_.�---{`-
This agreement is executed this ��� day of ��� �' �
19� j� by, Henry C. Wallace, Jr ; owner. -�
a
O R:
�.
. t�� � � �> ,t iJ {�/1 %%��`� �
. . - � :.. �,� �- `.
1 OWII6I�S� •
�
Owner(s)
�
ROE.DOC
�
� •-i `'1
.��
�`�
1
- - �- ;
�.',F� .�
l.j . , ..
� �-�.
_ ° �,
-� �
�.., :
�
�
Q
Q
�
�
��r _� ;�
�
�
LJ
�
'
LI
� <.._:.
:-�
�
�
� L-1232 �
STA 0*00 70 $TA I8+95E
vont .antH �oc�ron r�r ra.za.2-�n
ace s aartw soconao i ��ae uv.+csra+ .vE. u � wvensrtr �� .oarwn ar n
ROE c��u�cE xwRr c.�. sn1 trv�cstan �vE. tt � wvatutt �t +�oarnon vt w�
- rcE � Wa� �oG¢ro a RORHD� 77fi Wr+C5i0M ��E. n 's wvfJas�tt lu �cOrtlah tFi n
' 16 tCE 2 RUMEZ ��euEt Etenc sore� 772t Urr+CSTon �v� U e v�YENS�tt IR� �ODiiroN ffT n
N _.._ �
FDRT fl ORTH BELT � R.R. . �� � .
. : • . �`1" � � •
�-123 -•—�-- � -�----...—.._.._.
1 . � . — . . BIDDESON ST_ _ _� , __ _ . � : __L-123i___. .
•@- _I�-73 �; • . , , ; - , : - � '
—•: •-- 1 . 1 : � 24 ; , 1 ^II' 24 1
: 1 :`i . • : . : ; —
� l 2 2 . 23 ; 2 �, . 23 2 �;
2 3 • 3� � � 2 2 • 3 � 2 2 � 3 ^
3 :I� . � : : : ; ;l; � � ,----
_.--- � 4 ' 4 � � 21 4 � 21 . . 4 .
._ . . 4 _ ^ 5 ; 5 „ 20 � ° 5 `I 20 . 5 �!
-- — ——I 6 6 �� 19 , 6 I� 19 6' ;;
t . ' `
- I{ 7 : 7 �I 18 � : 7 'I. 18 i � 7
; � `
—i , Z � a ! � s :j 17 I : a �: �7 � � a :'
1 3 ��I 9 9 ' 16 I 9 �I� 16 � ; 9 �:
:� � i
• 4 i,: iQ ' 10. :: 15 � 10 :�� 15 : 10 � F--
— 5 i�: » ' n I ( �a �' : >> >i: �4 ' : » ! I—'
• 6 � ' .
� 12 12 _I �.13 � '12 �I� �s ; ; �2
� 7 ,—..— ���\':��' — _.— ._.. r.— • I_••—•• �-- � —
—.� .. $.�.�� 1 � . i .� 24 � j� � ;I; 24 ' , I
.I 2 • 2 � I 23 i 2 �:�� 23 � 2 �
I
— � 1�' 3 . 3 � � 22 � � 3 �� I 22 : ; 3 ��11
; ,
. i
2 .:'s q q i i 21 : q J'. I 21 . ' q � i
� '�
_ ' 3 : � 5 ; � 5 ;� 20 ` I s ��; zo .' S i �; -
' 4 . 6 , 6 � 19 j 6 ; l; 1 9 • 6 !'•
�
—' S i � 7 = 7 �( �a ; . 7 I � ia � 7 �
_--• ,I � ' '
;�,, y N l7 � 8 ��' 17 8
. .� 6 I �,' 8 N . ' , '
7 : J 9 % 16 ' ; 9 f. 16 9, �
.__ s �' �o ' �o ' � �s . � io `�' �s � � , /
� � io ; 7�
—• .+ ._..J�� 11 i i 11 i� 14 ; � il � i 14 , /
� :I: ' �
� _.., — .� � ,1,2,: �.'� ..J�_. t3 _' �t2 ----.!IL..—..13 .
2 Zg � -� _ .. _ .. — .. _ . — .. _ _ .. .. — ` .
� '
� 3 � 1 1 i 24 � 1 �; : . � .
j ;! �`
4 { 2 � . 2 : j 23 2 1 CITY OF FORT WORTH, TEXAS
— 5 3 3fi0E 5;� 22 3 WATER DEPARTMENT
`' � ROE 6, SANITARY SEWER MAIN C1C4B ORAINAGE AREA
6 4 4 �, 2� 4 REHABILI7ATtONlRELIEF ANO Sf'MER IMPROVF}.tENiS
(CROUP 6.CONTRACT 2)PART 4,PROJECT No.P546-070460410230
^ — 7 I 5 5 TCE 1 I i 2� 5 MICELLANEOUS SANtTARY SEMlER REPLACEhIENTS
8 6 6TCE 2 1; 19 6
EASEMENT lAYOUT L-1232
� . _ ., , _ . — • . . — • • — FORT xORTH LOCATOR NAP N0. 2042-312
ri'_LitUv� ��'. 7
—� —�--��--- —��- -��—��-���—���" ;�;HalffAssociates,Inc.
M�� ENGINEERS • SCtEN71ST5 • SURvEY0R5
� SHEETS 8,9�10,1i � ces�a o�..+� c�carn o.�c x•�c .�o I�c �
ROV I NS I MAN I 99� I�S�'�D.I f699] Ic.s�t�ral
!�'
O
l�
�
O
1�'
�
l!J
UNIT 2
� ora construction and ermanent) documents,
Easement (temp ry p
� right-of-entry forms
u
u
�
�
�1
�
�
�
D��-
(� Sa�itary S�wsr 1'Iain CIC4� i�rainag� Area l�iszailaneous Sanitary S�er
I�.� � ` � R�placements . -
PARCEL # ROEl � �
� TYPE ROE . _ �
DOE #.1829 . . . .
5128 Fitzhug3i Ave. � � ' _ � _
� Lot 20, Biock 28, Grove Hill Addition . �
�
�
�
�
�
�
�
1!!
TEl'�ORARY RIGHT-O�'-ENTRY AGREEMEi�1'I'
Hattie Horrice, Owner, herewith gran.ts perm.ission to the City of Fort Worth and its
independent contractor, to enter upon the owner's property located at Lot 20, Biock 28,
Grove Hill Addition also described as 5128 Fitzhugh Ave. for the purpose of
rehabilitation/recorctruction of ar_ exist�.ng sa*iit.�..ry sevrer lin�.
Any entry and use of the properry by the City of Fort Worth or its independent contractor,
under the R.ight-of-Entry agreement shall be permissive and shall not constitute a trespass
to the property by the City or its independent contractor. Both the City and its
independent contractor, aze released from any adverse consequences related to the entry
or use of the properties by either party. �
The City of Fort Worth further agzees to restore the property tQ the same condition that
existed prior to entry. If restoration is required, the wor�fia��e performed in a timely
manner, weather permitting.
This agreement is executed this � day of �?,��",+.��:��:
19 '�, by, Hattie Horrice, owner. �
OWNER:
] r
L� J �
� �' `! /; �T.� ?� J . . � �i,-'/�J'��
�"' �--- — � r-- • a
Owt�sr(s)
�J _
Owner(s)
�
ROE.DOC
��
�
kJ
l G�� � l�loTt �`( �i�-c/Li� �'bP.� f�` ��� cor�t s7-2�IGTi�I` .
�3 S � 39 49- ��(vm$�
� t� — �12 S �- � ����
[�J
�
� � �� .
!�J
��
a_r
�
�i
, ,
!J
�
�
� V��hMy
WYry��
��
�
�
[�J
��—_ =
=��. =
�.1
�
� y --
�
�L-5489 �
STA 0+00 TO STA 3+69
iaar wanrH �x►rat ww rro, zota-zao
ROE I XORPKE MATiIE 512E Fl7ZMl.n1 AVE, 2! 20 qpyE F�y JIDpi�N
� II_ I t ' i � i �� � �
� . _ I ' ; ! � ? I • p� ! Mn � I ' . �
� ; '_� � : ; i . . i - � : ; � , ,
; :� � �� i �c � � : . � � ! ; � I � j i ; ; ; � :
—� i '' f i i- � i, •� 9H an i �' �- I3 � q �� `6 I ; � i' �'_
�� � --.---�---J-. � _ ------._. i�; � -� , ; , �;
. ��_ ---� ,.� _L.l_i ;_ �
� I-- —_—� �:, in''�— - — - - •,— - —; I I 8A I � CHARLBNE ST . _ . . — - - — = -
. r . _ i S i ' i' i Q i o 3r• �rl� =A �: ; I i � -+ i•J � --- -- • � -•— : -� .
I _ ' ' [ ' -�- i _ . .'.
� , . � i I I � � j� ' ��E ! 3'- � � � � i 4 5' S I A� 3 5!'' i
t i (' - ! j � i ' � � ' i ' I° I! '
�'' . ' 4 14 i' � I; i!i I _ �� .�� 86 I 8D � G? � i � I I � � '�
•--- l�_••—I •�_J�.I—I �.._.,r ._J ' I . � � � � i I I ' �
_--3�v'?i�::l�i—��_ �—_--- !,ci ! �K I �.�4 '�� ��z ��; I�o � � I a - ���`� �
. ; �••— •—•• . , +• � -� , 7c � 7p � � � ' . '
: . i � � � i� � d� , i ��' _�__ I. �•-�.�_ i
!'�� � � '� I 3 i � 5 G � 7 �� 4FISEI cB � ��F f rJ :� VEL�ia .S`r
I . . � � i I ' +#j� I + G4� i 7G i 7H + �. �. j"._._�...—.._;._ .
{ . ' ; : � ; + : : ;
� ! • i � i � � '� _�is`� �A� �_ � 6G j 6r I�I �• � 2 �I 4 5 6 7 '� �t•: �'S
i � �I + ' � ' S6 : i : I � i � ��
� , � � � I I , I J � , 6� oD I I �
{��: ;io ;15 il� 1 13 �32 il I 10 I 9 � � I o� � i'� j I � { '•
••-i I i• I-! -•--• � � SE 5F SG SH :• 6A 6g �(Q°°�.,4 jt� 12 �1� I10 9 8 I? �1° !;G
1 I 1 � L_••—•-•--I
'— ----, � I � � � i
H AVE L-5487 FiT7.Hi1CjLc�j1�_ _ "' _ _ ='— •'- —L--548'�—_ �,�r ��';�, � ..
--�—�•—•' I , � � ! �PROP.8'WA�ER � '�.'"_'I � --- ._ �• _• �.
, ' LINE ENCASEMEh' T ��E � : 3 � �
`= ; S� �: . 2 � 2'' 2y 25 I 24 � �3 � 22 21 20 t? � ' ' ;
' � i
i I ;! � i � � � I �7 i ��; I
„ . . 3 � � ; ,�n; 5 5 4 I 3 (
u • •
1 ! � � I 16 I JI t
4 � � I
— ` ' i o i I I 8 9 i0 ii 12 I�3 14 . .
c � � 5 i i ! � � . • ' I �� � � i �
� SHEET 16 �
�
L■J
�.!
�
�I
�
��1
,�
�
IIJ
�
UNIT 3
Easement (temporary construction and permanent) documents,
�} right-of-entry forms
1J
�J
i
��
�J
��
�l
I�
r�
�
���
�
�
l■J
a�=���
t■1
�
�
�
�
�
�
'
�
L�J
[•�I
t�
�
�
'I
�
u
�.� . .NSF CiTY SECRETA1�y
CONTRACT Np ,
This Agreement (hereinafter called "the Agreement") is made by and between the
Dallas Fort Worth Intemational Airport Board, a joint airport board of the Cities of Dallas,
Texas and Fort Worth, Texas (hereinafter called "Airport"), and the City of Ft. Worth, Texas,
an incorporated Home Rule City, (hereinafter called "Ft. Worth"), and is effective as of the
�5�'�day of _Lz�c:Q , 1999.
WHEREA,S Fort Worth desires to install a sanitary sewer line and all reasonable and
necessary appurtenances (hereinafter referred to as "Line"), on Airport property, more
particulazly described on the attached Exhibit "A", (hereinafter refened to as "Licensed
Premises") and in accordance with the approved engineering plans (hereinafter referred to
as "Plans").
NOW, THEREFORE, for and in consideration of the mutual covenants set forth
herein, Airport and Fort Worth agree as follows:
1. Airport grants a license to Fort Worth for a period of forty (40) years,
commencing on the date of execution of this Agreement, to enter upon
Airport property to construct, install and maintain at Fort Worth's sole
expense, except as hereinbelow provided, a sanitary sewer line. The
construction shall be done on the Licensed Premises. Said construction shall
be in accordance with the Plans approved in writing ry Airport's Building
Official prior to construction of the Line.
2. Actual construction, relocation of fences, maintenance and repair of the Line
shown on the Plans shall be the responsibility of Fort Worth. It is understood
and a�reed that reasonable and necessary maintenance and repair of the Line
is necessary to maintain it in a safe and usable condition consistent with other
sanitary lines maintained by Fort Worth, in accordance with the standards set
forth in the ordinances and regulations of Fort VVorth. Fort Worth, its officers,
employees and agents shall have the authority to enter onto the Licensed
Premises for the purpose of constructing, monitoring, maintaining and
repairing the Line. Subject to Paragraph 3 hereof, it is understood and agreed
that in the event said Line is not constructed by Fort Worth, the only remedy
of Airport shall be the termination of this Agreement and all ri�hts to the
Licensed Premises. The standard for maintenance as recited above shall not
be deemed as the Airport's adoption of such ordinance and regulations of Fort
Worth. �
3. Airport shall be entitled to tie into the Line, without a tie-in fee, at a future
date and upon prior written notice to Fort Worth. Airport shall pay its
construction costs related to accomplishing tie-in to the line and sanitary
���d 5��i �i�: ='.; t;'�i ~i��l �' �i
�•� l h��: :_ a:5�vd�L•
j,� ;;�72�,1i ;.c�;= �1Fa ?�,'� �+ �,17
� ��� 11 \'L'1 W�'�'i.~. ��JV� Y
l ,, "r•'- `�� r��!4�
J !�� 1V��`��i.:iiil9 �154tiie
J
�
O
-�
=�
�
�
�
�
�J
��
L�J
��
��
���
��
rM�
J
!J
�
�.
�`,
��
sewage usa�e fees, reasonable and customary, following any tie-in.
4. Airport shall have the right at any time to revoke this Agreement upon a
finding based upon substantiated facts that the Line causes a safety hazard to
operations at the Airport, or for any breach of the terms of this Agreement not
corrected by Fort Worth within (60) days of receipt of written notice to correct
such breach or, in the case of a breach not reasonably capable of correction
within said time period, if Fort Worth, within said sixty (60) days or at any
time thereafter fails to diligently undertake and pursue the correction of such
breach. Fort Worth shall be notified by written notice sent to its City
Manager at least fifteen (15) days prior to the Airport's consideration of the
termination of this Agreement.
5. If Fort Worth abandons construction or use of the Line before the expiration
or earlier revocation of the Agreement, Fort Worth shall, if requested in
writing by Airport, promptly, and in the manner directed by Airport's
Building Official, remove part or all of Line from Airport property and restore
said property to the condition existing prior to the construction of the Line.
In the event Fort Worth fails or refuses to remove said Line and restore the
Licensed Premises to the condition existin� prior to construction, Airport may
remove the Line and restore the Licensed Premises and Fort Worth shall pay
Airport the cost of such work. Notwithstandins the above, if prior to
abandonment of the Line the Airport has tied into the Line, then Fort Worth
shall not abandon without first notifying the Airport twelve (12) months in
advance and working with the Airport to arrange the most reasonable and
economic alternative to the tie-in to be effected.
6. The waiver of a breach of any of the terms or conditions hereof shall be
limited to the act or acts constituting such breach and shall never be construed
as being a continuing or permanent waiver of any such items or conditions,
all of which shall remain in full force and effect as to future acts or
happenings, notwithstanding any such waiver.
7. This License is personal to Fort �Vorth and is not assignable or transferable.
8. Fort Worth shall have twenty-four (24) months from the date this A�eement
is executed to begin construction of the Line. Once construction has begun,
Fort Worth will diligently pursue completion of the Line.
9. In the event that the Airport should require the Licensed Premises during the
term of this A�reement, upon twelve (12} months' prior notice to Fort Worth,
Airport a�rees to use its best efforts to relocate the Line to mutually
satisfactory site. Costs of the relocation shall be paid by Fort Worth. If no
site can be agreed upon, the Airport shall terminate this License. In the event
of such termination by the Airport, Airport shall pay to Fort Worth the
2
��
�
U `,�; � �
unamortized costs of constructing the Line as located on Airport property.
Removal of the Line and restoration of the Licensed Premises shall tie by Fort
Worth and at Fort Worth's expense, and as directed by the Airport.
10. Within sixty (60) days immediately following completion of the Line, Fort
D Worth agrees to provide the Airport with verification of the "cost of
constructing the Line." Amortization for the purpose of repayment of
unamortized costs shall be on a straight line basis, over a twenty (20} year
�
�
�
�
,;J
Ll: ��.
�`
J
�1
'�
�
�J
!J
,'
term.
11. This License is not intended as the grant of an exclusive right or interest.
Airport shall be allowed and reserves the right to grant additional licenses,
easements, or rights in the property herein described without being in conflict
herewith so long as said grant of right, license or easement does not interfere
with the use of the License herein granted.
12.
All notices required pursuant to this Agreement shall be sent by first-class
United States mail, postage prepaid, registered or certified with return receipt
requested: �
If to Airport:
Dallas-Fort Worth International Airport Board
Attn: Executive Director
Post Officer Drawer 619428
Dallas-Fort Worth Airport, Texas 75261
If to Fort Worth:
City of Fort Worth
Attn: City Manager
1000 Throckmorton Street
Fort Worth, Texas 76102
13.
14.
Fort Worth shall not operate said sewer line in violation of any state, federal
or local ordinance, regulation or law.
The Licensed Premises shall not be used for any purpose not specified herein.
15. Neither this Agreement nor the grantin� of the License shall be deemed as any
warranty or representation by the Airport of fee title ownership of the
Licensed Premises; Board shall assume no liability whatsoever, and Fort
Worth shall hold the Board hannless, concerning any boundary or
encroachment claim that may arise from any adjoinging landowner.
3
�
�
LI
�f.•:�:y�
L�'
�?
L�J
' �J
L!J
l�J
�=�:?°
�
�
�
�1'
�f
�
�
�
EXECUTED IN TRIPLICATE THIS ��AY OF ? , 1999, the City
of Fort Worth signing through its City Manager, ` , and the Dallas-Fort
Worth International Airport Board signing through its Executive Director as authorized by
resolution passed on , 1999, each attesting throu�h its Secretary and
thereafter notarized accordingly.,
APPROVED AS TO FORM:
. > > !�
/ � �� '�
� s� se`�for the Board\
ATTEST:
Staff Secretary for the Board
A TEST:
4
�� r � ��, ��
ecretary, Cit of Fort Worth
DALLAS FORT WORTH
INTERNATIONAL AIRPORT BOARD
:�
Executive Director
CITY FOR 0
By �
��City Manager, City of Fort Worth
APPROVED AS TO FORM� CE��tic.�[�t�
_ �� .
��jy'�.City Attomey, City of Fort Worth
s:\docs\other\licenseagrnmtftworth
0
� — �v�� -/ '`Y
Contract Authorization
'�- � � ��%
Date +
u
��
�
a.-� _,;
�
D
D
�
a
�
'
�
L�1
�
u
L
0
�
1�
..�r� Y1�A�
SANITARY SEWER MAIN M-C1C4B DRAINAGE
AREA (GROUP 6, CONTRACT 2) PART 4
DOE No. 1829
4000 STATE HIGHWAY 360
TRA.CT 2A3, J. BURNETT SURVEY, ABSTRACT No.178
�XHIBIT "A"
� ., .. .... , . _ ...,�..,�.��, . ;
PARCEL No.1PE
Being a Permanent Utility Easement out of a 34.803 acre tract of land situated in the J. Burnett
Survey, Abstract No. 178, in the City of Fort Worth, Tarrant County, Texas, said 34.803 acre
tract of land being deeded to the Dallas-Fort Worth Regional Airport Board as recorded in
Volume 6653, Page 855 of the Deed Records of Tarrant County, Texas, said Permanent Utility
Easement being more particularly described by metes and bounds as follows:
BEGINNING at a DFW concrete monument found for the southwest corner of said 34.803 acre
tract of land and being the southeast corner of Lot 1, Block 1 of International Airport Substation
Addition, an addition to the City of Fort Worth, Tarrant County, Texas as recorded in Volume
388-213, Page 59 of the Plat Records of Tarrant County, Texas, said DFW monument being in
the north line of a tract of land deeded to the City of Dallas and Fort Worth as recorded in
�olume 7726, Page 1848 of the Deed Records of Tarrant County, Texas, said DFW concrete
monument also being in a curve concave to the southeast and from which a 7/8 inch iron rod
found for the southeast corner of said 34.803 acre tract of land bears a chord bearing of North 85
degrees 23 minutes 16 seconds East (Reference Bearing), a distance of 1073.40 feet
(Deed=1473.89 feet), said 7/8 inch iron rod being at the intersection of the west right-of-way line
of State Highway No. 360 with the north line of the Dallas and Fort Worth tract of land;
THENCE North 00 degrees 15 minutes 46 seconds West, with a conunon line between said
� 34.8Q3 acre tract of land and said Lot 1, a distance of 3.44 feet to a point for corner;
T�IENCE North 77 degrees 42 minutes 00 seconds East, a distance of �203.23 feet to a point for
�nrnPr• --- ----- --- - - - ----- —
p. . .. .............. . -.--__-.---. ____ ..--_- ---_...:._._.._. _. ------___._ .._�._..______-_-- -__.__.__ .__ _______�_
a .'
O
r`yY=
L�� .
4=-..
D
�
� �
�
O .
U
�:• _ :.�1
:;�;; .
a
�
�
�
D
�
�
�,:_ �
a
0
,r . � �
�'XH.�B I �' "�• "
PARCEL No 1 PE
. 1
0 30 60
SCALE IN FEET
12�
�
,
� . CURVE TABLE
�I N CMBER I 0 t� 00'41 ", 1 609. S6 I 204 91 I 2040.90 � S 314I' � 3"W
�
���
4��
��v
�-�A4F:
�' � � M Ci
C.,C�����Er
o��(O��
.���4�
��M
�
�`��
�
J. BURNETT SURVEY
ABSTRACT No. 178
34.803 ACRES
OALIAS-FORT WORTH REG(ONAL
AIRPORT 80ARD
VOI. 6653, PG. 856
D.R.T.C.T.
Licensed Area —
2,641 50. Fi. OR Q.Q61 AC.
�.a
`Y�
�
G�
�� .
`y.G
'2
0
.w
. �
� O
�- S 12' 18'UO"E
23.15'
_ . ...........::::......._�;::-.:::.:;:
�� .. ...._. � `...._�'r' " r.:r.:q••:gi:• �Fi:...,:;-:.... .
�..:.:•: �� �i � � �u�i� .:..� ��� ;c �::i j�� ���' " � .....::_.......,.: � . .i::. y
/cir:rr^^ ...... �
7 �-��C.;...,,, ^' �._...,.;?=, ,,,
N 003' S�'46�V �--:',�:� �i'�;.l��.. �,,,�,,. . vi. �..=N Tg5 23' 16"E EED� 1�0�3.89.� �/e'�RON
CHORO �Q R00 FOUNO
(REFERENCE BEARtNG)
P. 0. B.
9Fw CONC.
MONUTAENT
C11Y OF DAI.LAS & FOR7 WORTH
VOL. 7726, PG. 1848
�.R.T.C.T.
�
_�
CL Of ��RQAO t�KS
�
�
�
.�.�._ __�. �
._ _ ... . �
a! rr..
., . ' _ � �? ;:Wr:',
. �'
. � ' �E
. . . �
�:.. .� �
u . � : .�
�J ;
� �
C
-� �
. �
z=
ri
�
_ �
. , ;�",;
D. � � :� -
�' + .
n. . . ' .
��]
'
, `'t +
� :��,;
SANITARY SEWER MAIN M-C1C4B DRAINAGE
AREA (GROUP 6, CONTRACT 2) PART 4
DOE No. 1829 .. .
3851 POST OAK BOULEVARD
BLOCK 2, POST OAK VILLAGE ADDITION
THE STATE OF TEXAS
COUNTY OF TARRANT
}
}
PERMANENT UTILITY EASEMENT
C� (C�� l �-'-' 1��
PARCEL No. 2PE
c� �,� �
i �.. �, .
n�. �
��r -n
c::� w _�
•r
. � -� _ �
n _ �
�r;_� -D ..
:)4� � .'�
� `, _
-- w
• p .�i
THAT WE, Lazedo National Bank, hereinafter referred to as "Grantors", for and in
consideration of One Dollar ($1.00) and other valuable consideration paid by the City of Fort
Worth, a municipal corporation of Tarrant County, Texas, receipt of which is hereby
acknowledged, do grant, bazgain, and convey unto said City, its successors and assigns, the use
and passage in, over, across, below arid along the following parce! or tract of land situated in
Tarrant County, Texas, in accordance with the plat hereto attached: �
SEE ATTACHED EXHIBTT
',
It is further agreed and understood that the City of Fort Worth will be permitted �the use of the
above described strip of land for the purpose of the construction and maintenance of a sanitary
sewer main. An ingress and egress easement shall be granted in order that�access may be gained '
to the above described Permanent Sanitary Sewer Easement. i
TO HAVE AND TO HOLD the above described premises, together with all and singular, the
rights appurtenances thereto in anywise lielonging. unto the said City of Fort Worth, its
successors and assigris, forever. And 1 hereby bind myself, my heirs, successors and assigns, to "
warrant and forever defend, all and singulaz, the said premises unto the said City of Fort Worth,
its successors and assigns, against every person whomsoever lawfully claiming or to claim the
same or any part thereof.
It is� intended by these presents to convey a right-of-way to the said City of Fort Worth to
maintain, construct and repair the above described improvements, with the usual rights of ingress
and egress in the necessary use of such right-of-way, in and along said premises. ' �
IN WITNESS WHEREOF, Grantors have caused this instrument to be executed on the
20th day Of January ,19 99 .
l:�i..�e�.r0 ��I� ii�
Duane L, Lewis
Page 1 of 4
CORRONOONA k ASSOCIATES. INC. • 6737 BREN7WOOD STAIR ROAD SVITE 22� • FORT WORTN, TX 76112 . PM. 817-�96-1�24 iAX Bi7-�96i 1:68
'
�
�
�
C'
�
�
'
�
�
�
�
'
�
�
�
- : -, -
� ''�is: .
. - , ::'.:,
.. - ,Y?,
, .;Sr•� • ':j`� .
.. " �.;i� �
. e::- + :i
. Y, ' ' •.
. : i'.:
. .i �.:�� .
. � l, .'. .
'ii.:�•;.`:.
..•{. . _
' �:ii�. •.1''
, : .i �.�i.r .;
� J.:� .
�
�
�`�, ;l;::.
} •�:�
��
�;
�
�
�
[�
�
3�
� -^;
SANITARY SEWER MA,IN M-C1C4B DRAINAGE
AREA (GROUP 6, CONTRACT 2) PART 4
DOE No. 1829
3851 POST OAK BOULEVARD
BLOCK 2, POST OAK VILLAGE ADDTTION'
ACKNOWLEDGEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
PARCEL No. 2PE
BEFORE ME, Edna A. ,a �ta , the undersigned authority, on this day
personally
appeared, Duane L. Lewis, Executive Vice President �of Laredo National Bankkllown
to me, or proved to me to be the person whose name is subscribed to the foregoing instrument,
and acknowledged to me that he/she executed the same for the purposes and consideration
therein expressed. '
GIVEN UNDER MY HAND AND SEAL OF OFFICE, this 2ochthe day of
January . • , 19 99 ,
. 0000
� ,•�':
. ; p: •"�`,�; ; EDMA A. GARCIA
� :�?•: Notery Public, State of Texas
�� . � ' -.,� �; �.= My Commisslon Exp(res 03-01-00
, �,.•�`
Edna A. Garcia Notary Pub ic, State of exas
My Commission expires on the lst day of
$�X 2000 ,
r
March
a
�
' Page 2 of 4
GORRONDONA h ASSOCu1E�5, MC. • 8737 BRENTWOOD STA�R ROnO SUITE 22a • FORT WORTH. TX T6112 . PH, 817-�9g-If24 FAX 817-a98-17681
�
�' �_,
�.
a
��� �
Y';
:�
�:
:',:.
�.,:
�•,':
� �.
�'••
a� .-
a'::
�=.'
�;; :-
��� .:
�'.
�� �
���.
��'�,� .
:�`�
���'�:
�.:�'.
�'� .
. -';'„ �
c: :� ♦�`
- ;�, ::;.:.: :�;
' : .. . �.:��f��:
� � 't
. .E.
- - ����.
� : ;��:..::.. .
;'.... �' .
k^
:�`: , .
- : t::...
�
i}
3
�;�Y��'�
t:'' .
°i
_�..
�
�
�
ti
i�
;�.'-�
� �: �
SANITARY SEWER MAIN M-C1C4B DRAINAGE
AREA (GROUP 6, CONTRACT 2) PART 4
DOE No. 1829
3851 POST OAK BOULEVARD � .
BLOCK 2, POST OAK VILLAGE ADDITION
EXHIBIT "A"
PARCEL No. 2PE
Being a Permanent Utility Easement out of Block 2, Post Oak Village Addition to the City of
Fort Worth, Tarrant County,�Texas as recorded in Volume 388-144, Page 66 of the Plat Records
of Tarrant County, Texas, said Block 2 being deeded to Lazedo National Bank as recorded in
Volume 9692, Page 1168 of the Deed Records of Tarrant County, Texas, said Permanent Utility
Easement being more particulazly described by metes and bounds as follows: �
COMMENCING at a 1/2 inch iron rod found with cap for the southeast corner of said Block 2
and being in the north line of a tract of land deeded tb the City of Dallas and Fort Worth as
recorded in Volume 7726, Page 1848 of the Deed Records of Tarrant County, Texas, said 1/2
inch iron rod with cap being the beginning of a non-tangent curve to the left with a radius of
11559.30 feet, a central angle of 04 degrees 24 minutes 47 seconds and from which a I/2 inch
iron rod found at the end of said curve bears a chord bearing of South 78 degrees 00 minutes 31
seconds West (Reference Bearing), a distance of 890.10 feet, said 1/2 inch iron rod also being a
corner in the south line of Lot 2R, Block 4, Post Oak Viilage Addition to the City of Fort Worth,
Tarrant County, Texas as recorded in Volume 388-158, Page 6 of the Plat Records of Tarrant
County, Texas; THENCE North 00 degrees 50 minutes 02 seconds East, with the east line of said
Block 2 and a north line of said City of Dallas and Fort Worth tract of land, a distance of 5.09
feet to the POINT OF BEGINNING of the herein described Permanent Utility Easement, said
point being the northeast corner of an existing 5.0' wide utility easement as shown on plat of
Block 2 of said Post Oak Village Addition, said point also being the beginning of a non-tangent
curve to the left with a radius of 1156430 feet, a central angle of 00 degrees 58 minutes 59
seconds and whose chord beazs South 79 degrees 43 minutes 42 seconds West, a distance of
198.42 feet; - �
THENCE with said non-tangent curve to the left and the north line of said existing 5.0' wide� .
utility easement, an azc length of 198.42 feet to a point for corner in the west line of
said Block 2 and being in the east line of said Lot 2R, from which a point for the
southwest corner of said Block 2 and the southeast comer of said Lot 2R bears South
. 15 degrees 12 minutes 44 seconds East, a distance of 5.02 feet;
THENCE North 15 degrees 12 minutes 44 seconds West, with the west line of said Block 2 and
the east line of said Lot 2R, a distance of 2.53 feet to a point for corner;
THENCE North 44 degrees 35 minutes 34 seconds West, with the west line of said Block 2 and
the east line of said Lot 2R, a distance of 7.16 feet to a point for corner; �
THENCE North 77 degrees 42 minutes 31 seconds East, a distance of 205.88 feet to a point for
corner in the east line of said Block 2 and being in a north line of said City of Dallas
and Fort Worth tract of land;
THENCE South 00 degrees 50 minutes 02 seconds West, with the east line of said Block 2 and
a north line of said City of Dallas and Fort Worth tract of land, a distance of 15.99
feet to the POINT OF BEGINNING and containing 2,379 square feet or 0.055
acres of land, more or less. •
Date: I (- 5 -q �
�
Jo . Cooper —
Re 'stered Professional Land Surveyor
No. 5254
Page 3 of 4
=-:�',:�; 5 r � •;�-�
��,.,:�. i �n.
.,::: �r .�:
_ii)?'J �. c��;r-�'
�` ,p. ...:;���'°. >
. :`��, �� r,-
!4_'�'•� _ ::��'..:�:
m
m
CORRONpOtU & ASSOCNTES� INC. . 6757 BRENTYOOD STAIR ROAO SViTE 224 • FORT VIORTH, TX 76112 • PH. 017-496-1424 FAX 8Y17-.96-1768
_ , . , • . -- •:-as . .
�... ; . ::t�':.�?t';='� ��
. ' ` o`. f �ti:: P
- - � ::;� _ ��<<:.
.. -� �:;�
D. r ��
� '. =`� = - _ ::+'� ��y
_ ` : L�. � ;�:i�: 3.F
'� • '...t;.'• '. �
. �'.'•i�•.
�•"... .. ' t
. � r;:':t.`•:;;i:" . _;
. .. , ,, ._
::' •:, .; • ' . -=1:.. - - . ;..
. • E�
• ' .���l:!y'.'� �
�•. . •
�. , t �`: .; r _ : .
`'< ��?��. �
, s� ,
� �.., . •
f
: ,--'.
.,.. ,
: �., . : , _
,�., r
� .�. :.�' . ` � �� � .
. i ��
;� �'; ;^ l j
.. .: ..,� ......:........ �.'.
- �� rh� 1
�i•�. � - �?[
.. ,;;a:��; -::;s',:.
�::,• .... f*r, _ ..... f ......... . .....k::
:f
' � •.;::
�.`.� il���*,�'y'`
,g; .
�c:r .
���r • . �'•i'^:.
�I , . . . . . '
�:'' - . . -
`_ '• . :: �,�` ,.f -:;::;:��.
�•, `
_ ' - a
�.
.� ` .. .
�.'��;. � . _ ..
�,, �... ' _
:��_. _'_ _
�i.:.h . , �} '.
S� _ Y.
.�l ' 1'r.
v ' �. ' ;i,,t4-
t�', . '
EXHIBI T "B "
PARCEL N.o. 2PE
�
� 0 30 60
� LINE TABLE � ' �
NUMBER BEARING �is7ar�cE � SCALE IN FEET
L-1 S 15 7 2'44"E 5.02' � .
L-2 N 15'12'44"W 2.53' � '
L=3 N 44'35'34"W 7.16' � .
NUMBER DELTA
C—i I 04'24'47"
C-2 00'S8'S9"
CURVE TABLE �
RADIUS ARC I CHORD BEARING �
11559.30 890.32 � 890.10 _ S 78'00'31 "W +
11564.30 198.42 � 198.42 S 79'43'42"W �
atocx z
POST OAK VILLACE
VOL. 388— > 44, PC. 66
P.R. T. C. T.
15.0' UTIL1iY EASMENT
� VOL 588-144, PC. 66
� P.R.T.C.T, d�
VO4 388-758. PC. 8
� P.R.T.C.T.
�\ ••
�
�
�
�
�
\
\ 2
LOT 2R � � �'
BLOCK 4 \ \
POST OAK VILLACE � �
VOL. 388-158, PC. 6 �
' P.R. T. C. T. �
7/2'IRON
R0i FOUND
� ,?
t,•;s�� �
ti —���1��
10.0' CAS EASEMENT
VOl 388-14{, PC. 66
P.R.T.C.T, k
LAREDO NATIONAL BANK
VOL. 9692, PG. ,1168
D.R.T,C.T.
PERMANENT SANITARY —
SEWER EASEMENT
,379 SQ. fT. OR 0.055 AC.•
5.0' UTRrt`f FASMENT
VOl 38B-1S6, PC. B
P.R.T.�T.
` S.0' UTILtiY EASAIENT
' V01. lH8-144, PC, 66
P.R.T.C.T.
(REFERENCE BEARINC)
CHORD BEARINC�S 78'00'311v
E90.10
�
� �
�
�
. � �
�
_I �
�
I
� ,
I
�
I
�
�
I •
� •
120'
�
U
U tND
�^
v� a'-:
U
� Nj F-
F.rnd)
Wao
J
W J
X O
F
I s oo�so'qsw
15.99
1��1��'�'� P.O.B.
�hy�,l,�r �
N 00'S0'02i
�5.09'
P. 0. C.
1/2'IRON ROD
. FOUND W/CAP
.. —
—
��Of� 1R/�K`�
� .
_� �. ' CIiY OF DALLAS dc FORT WORTH
j' VOL 7726, F'G. 7848
. D.R.T.C.T.
E7CHIBIi SHOWINC
A
PERMANENT SANITARY SEWER EASEMENT - "''J��
BEINC A PORTION Of ��yr����'� .
BLOCK 2 f�rj' :r.�3;sT�•�c?:1��
� POST OAK VILLAGE :� -�;`:�..:�:�..<:�'';ti�
AN ADOtT10N TO TME ' j .Cl���•i.. i_:i.ii� '= '
' _ CITY OF FORT WORTH, TARRANT COUNN, TEXAS `� °- F`� '�
RECORDED IN VOLUME 388-144, PAGE 66 ,'�`�� f' ��:%�� .s�:';�. ��
OF THE �a'.� �.` Ss�•,'�'(j;-,7�J
PIAT RECORDS OF TARRANT COUNTY, TEXAS '�s�� ;% � � �� � � �;���1
PROJECT: SANITARY SEWER M—C1C48 GgOUP 6. CONTRACT 2 PART 41DOE No. 1829 �.�
EASEMENT ACQUISITION ARE�: 2.379 SOUARE FEET OR 0 055 ACRES ,J� L. � bOPER �~�
JOB N0.9802-861 ORAWN BYWLC GDD Fl1E:863E1 {t STEREO PROFESSIONAL 0 SURVEYOR
DATE: NOVEMBER 5, 1998 PACE L OF 4 (SCALE: 1' . 60' � O. 5254
i
GORRONDONA dc /�SSOCWTES.INC. 6737 BRENiW00D STNR ROAD SUITE 224 fORi WORTH. TX. PH. S1�/496-7424 FAX 877/{g6-1768
�
�� .
�
�
�
a
�
L]
a
�- -
a���
0
�
�
�
�
�
�
ENVIRONMENTAL STATEMENT
City of Fort Worth
Real Property Management Office
927 Taylor Street
Fort Worth, Texas 76102
Re: DOE # 1829
M-C 1 C4B PT 4, GR 6, CONT 2 DR.AINAGE AREA SS MAIN
PARCEL # PUEZ
3851 POST OAK BLVD.
LOT-, BLK-2, POST OAK VILLAGE ADDITION .
PUE
To the best of my/our knowledge, neither myself/ourselves nor any person(s) has ever
disposed of, or will ever dispose of, any hazardous material or substance upon, under, or
through the property that is involved in the easement that was granted on Jan . 2 o t t, 19 9 9
�/� � ���
��
Duane L. Lewis
Executive Vice President
The Laredo National Bank
Q
�.� _
L*J
.Tann,ary 9(1_ 1999
Date
Date
�
City of Fort Worth, Texas
�i✓I�Ayar Af1d Caunc�l Cammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
8�� 7�99 **C-17595 30RIVER 1 of 2
SUBJECT AWARD OF CONTRACT TO . E. BURNS CONSTRUCTI N, INC. FOR MAIN C1C4B
DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2) PART 4, UNIT 2
RECOMMEND TA ION:
It is recommended that the City Council authorize the City Manager to execute a contract with M. E.
Burns Construction, Inc. in the amount of $198,881.75 for Main C1 C4B Drainage Area Sanitary Sewer
System Rehabilitation and Improvements (Group 6, Contract 2) Part 4, Unit 2.
DISCUSSION:
On February 24, 1998 (M&C C-16627), the City Council authorized the City Manager to execute an
engineering agreement with Halff & Associates, Inc. to prepare plans and specifications for the
reduction of inflow/infiltration in sanitary sewer main C1 C4B drainage area.
The project is part of the City's Integrated Wet Weather Wastewater Management Program to comply
with an administrative order from the U.S. Environmental Protection Agency to eliminate sewer
overflows from the City's wastewater collection system.
The project consists primarily of the following sewer laterals:
• L-927 Beginning on Riverside Drive between the alley located between Glen
Garden Drive and Cantey Street westerly approximately 1,500 feet.
• L-5489 Located on Marlin Street from Fitzhugh Avenue to Sunshine Drive.
The proposed improvements consist of the replacement of approximately 2,200 linear feet of primarily
8-inch sewer pipe.
The project is located in COUNCIL DISTRICTS 5 and 8, Mapsco 77U, 77Y and 79T.
The project was advertised for bid on June 24 and July 1, 1999. On July 15, 1999, the following bids
were received:
BIDDER
AMOUNT
TIME OF COMPLETION
M. E. Burns Construction. Inc.
Cleburne Utility Construction, Inc
B&H Utilities, Inc.
Burleson Utilities, Inc.
FuTechn Construction, Inc.
Stocker Enterprises, Inc.
Whizcon Utilities, Inc.
$198.881.75
218,320.00
223, 742.00
224,862.10
249,254.50
297,266.00
299,949.00
90 Calendar Days
� City of Fort Worth, Texas
�i►�A�or And Caunc�! �.ammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
$�� 7�99 **C-� 7595 30RIVER 2 of 2
` SUBJECT AWARD OF CONTRACT TO . E. BURNS CONSTRUCTION, INC. FOR MAIN C1 C4B
DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND
, IMPROVEMENTS (GROUP 6, �ONTRACT 2) PART 4, UNIT 2
In addition to the contract cost, $14,000.00 is required for inspection and survey and $10,000.00� is
provided for project contingencies.
M. E. Burns Construction, Inc. is in compliance with the City's M/WBE Ordinance by committing to 14%
M/V1/BE participation. The City's goal on this project is 14%.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Commercial Paper-Sewer Fund.
IliC�A.7
Subautted for City Manager's
Office by:
Mike Groomer
Originating Department Head:
A. Douglas Rademaker
Additional Information Contact:
I FUND I ACCOUNT I
I (t°)
I
6140 I
�
6157 I (from)
PS46
�
A. Douglas Rademaker 6157 I
CENTER I AMOUNT
541200 070460410230 $198,881.75
CITY SECRETARY
qPPROVED
�CITY CO�1NCf� _
etl� �7 1999
����,
City SecretalY of the
City of Fori �IorLn, �eaas