HomeMy WebLinkAbout065230 - Construction-Related - Contract - SJ Rainbow Ridge Development, LPDate Received: 05/21 /2026 City Secretary
Time Received: 4:55 p.m. Contract No.: 65230
FUTURE IMPROVEMENTS AGREEMENT
FOR
INFRASTRUCTURE IMPROVEMENTS
RALL RANCH RIGHT TURN LANE
This FUTURE IMPROVEMENTS AGREEMENT ("Agreement"), is made and entered into by
and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and SJ Rainbow Ridge Development,
LP ("Developer"), a Texas limited partnership, acting by and through its duly authorized representative.
City and Developer are referred to herein individually as a "party" and collectively as the "parties."
WHEREAS, Developer is the owner of a tract of land within the City of Fort Worth located at
7101 Dutch Branch Road, Fort Worth, Texas 76132, as reflected in Exhibit "A," attached hereto and
incorporated herein by reference ("Property"); and
WHEREAS, Developer is developing the Property by constructing the Rall Ranch
development("Project"); and
WHEREAS, the City approved the preliminary plat for the Project (PP-24-066) and execution of
this Agreement is a condition for approval of the final plat application for the Project (FP-25-102; the "Final
Plat"); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure that is constructed according to City standards; and
WHEREAS, during the traffic impact analysis phase for the Project, identified as TIA-24-00056,
the City determined that, based upon the increased traffic demands created by the Project, Developer is
responsible for thirty-four percent (34%) of the total cost of roadway improvements consisting of a
northbound right turn lane on Harris Parkway at Dutch Branch Road, as more specifically described in
Exhibits "B", "C", and "C-1," attached hereto and incorporated herein by reference ("Improvements"); and
WHEREAS, in lieu of the Developer constructing the Improvements pursuant to a community
facilities agreement, the City has agreed to construct the Improvement(s) with Developer contributing the
funds necessary to construct the Improvements and the City constructing the Improvements at a later time;
and
WHEREAS, the determination of the amount Developer pays to the City pursuant to this
Agreement for construction of the Improvements is not an assessment pursuant to Chapter 313 of the Texas
Transportation Code.
NOW THEREFORE, in consideration of the above recitals, City and Developer, acting by and
through their duly authorized representatives, do hereby agree as follows:
Future Improvements Agreement OFFICIAL RECORD
Rall Ranch Right Turn Lane CITY SECRETARY
SJ Rainbow Ridge Development, LP
Page 1 of 13 FT. WORTH, TX
1.
Incorporation of Recitals
The City and Developer agree that the foregoing recitals are true and correct, form the basis upon
which the City and Developer have entered into this Agreement and are incorporated into this Agreement
by reference.
2.
Improvements
The Improvements shall consist of the construction of a northbound right turn lane on Harris
Parkway at Dutch Branch Road, including any associated paving, street lighting, street signage, related
infrastructure improvements, and soft costs, as more specifically described in Exhibits "B," "C," and "C-
1," attached hereto and incorporated herein by reference. Developer's obligation under this Agreement is
limited to payment of thirty-four percent (34%) of the cost of the Improvements, plus an additional twenty-
five percent (25%) as required by the CFA Ordinance.
3.
Future Improvement Funds
Concurrently with the execution of this Agreement, Developer has paid to the City $101,303.00,
which amount represents one hundred twenty-five percent of Developer's portion of the total estimated cost
of constructing the Improvements ("Future Improvement Funds"). The Future Improvement Funds shall
serve as the entire amount of Developer's contribution for the cost to construct the Improvements. The
calculations of the Future Improvement Funds is set forth in Exhibit "D" and is reflected in the following
table;
Improvements
Amount
Right Turn Lane on Harris
Parkway Dutch Branch Road
$101,303.00
4.
Construction of Improvements
The City may construct, or cause to be constructed, the Improvements at a time convenient to the
City provided that adequate public funds, including the Future Improvement Funds, for construction of the
Improvement are secured.
5.
Use of Future Improvement Funds
By accepting the Future Improvement Funds and by execution of this Agreement, City agrees that
the Developer will have no further obligation to pay any amounts in addition to the Future Improvement
Funds or take any further action with regard to the construction of the Improvements, even if. (a) the actual
costs to construct the Improvements exceeds the costs expected by the City as of the date of this Agreement;
(b) the specifications, composition, or other characteristics of the Improvements hereafter change for any
reason; (c) a mistake has been made (mutual or unilateral) in computing the costs of the Improvements; or
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 2 of 13
(d) the costs or scope of the Improvements change for any reason. No refund of any balance of the Future
Improvement Funds shall be made by City to Developer.
Notwithstanding anything to the contrary herein, City may use the Future Improvement Funds to
construct improvements that are located in the vicinity of the Project that address transportation demands
caused by the Project. If some or all of the Future Improvement Funds are used to construct such adjacent
improvements, City shall be responsible for constructing or causing the construction of the Improvements
contemplated by this Agreement at a time convenient to the City.
6.
Notices
All notices required or permitted under this Agreement may be given to a party by hand -
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
leiIVA
Development Coordination Office
City of Fort Worth
100 Fort Worth Trail
Fort Worth, Texas 76102
With copies to:
City Attorney's Office
City of Fort Worth
100 Fort Worth Trail
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
100 Fort Worth Trail
Fort Worth, Texas 76102
I>OLIVAaIto] 90.9-4
SJ Rainbow Ridge Development, LP
7201 Hawkins View Dr., Suite 101
Fort Worth, TX 76132
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
7.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 3 of 13
8.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
9.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
10.
Review of Counsel
City and Developer, and if they so choose, their attorneys, have had the opportunity to review
and comment on this Agreement; therefore any rule of contract construction or interpretation that
would normally call for the document to be interpreted as against the drafting party shall not apply
in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall
be construed solely on the basis of the language contained therein, regardless of who authored such
language.
11.
Amendment
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
12.
No Third -Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise, to any other person or entity.
13.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code.
To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 4 of 13
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement.
14.
Prohibition on Boycotting Energy Companies
Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code (as
added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited from entering into a contract for
goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public
funds of the City, with a company with 10 or more full-time employees, unless the contract contains a
written verification from the company that it: (1) does not boycott energy companies; and (2) will not
boycott energy companies during the term of the contract. The terms "boycott energy company" and
"company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as
added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government
Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's
signature provides written verification to the City that Developer: (1) does not boycott energy
companies; and (2) will not boycott energy companies during the term of this Agreement.
15.
Prohibition on Discrimination Against Firearm and Ammunition Industries
Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is prohibited from
entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly
or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the
contract contains a written verification from the company that it: (1) does not have a practice, policy,
guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will
not discriminate during the term of the contract against a firearm entity or firearm trade association. The
terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those
terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, §
1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by
signing this Agreement, Developer certifies that Developer's signature provides written verification
to the City that Developer: (1) does not have a practice, policy, guidance, or directive that
discriminates against a firearm entity or firearm trade association; and (2) will not discriminate
against a firearm entity or firearm trade association during the term of this Agreement.
16.
Signature Authority
The person signing this Agreement on behalf of Developer, as applicable, warrants that he or she
has the legal authority to execute this Agreement on behalf of the Developer, as applicable, and that such
binding authority has been granted by proper order, resolution, ordinance or other authorization of the
entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement.
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 5 of 13
17.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
18.
Entire Agreement
This written instrument (together with any attachments, exhibits, and appendices) constitutes the
entire understanding between the City and Developer, and any prior or contemporaneous, oral or written
agreement that purports to vary from the terms hereof shall be void.
[Signatures on the following page]
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 6 of 13
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH
AMWIIIA-
Dianna Giordano (May 21, 2026 16:08:40 CDT)
Jesica McEachern
Assistant City Manager
05/21 /2026
Date
Recommended by:
Iroorlol Rios
Leonel Rios (May 14, 2026 12:11:38 CDT)
Leonel Rios
Sr Contract Compliance Specialist
Development Services
APPROVED AS TO FORM AND LEGALITY.•
Jessika Williams
Assistant City Attorney
�.6ovvggq�
ATTEST: Pao �o9=a
i1 ggnaa'a�'
Jannette S. Goodall
City Secretary
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 7 of 13
DEVELOPER:
SJ RAINBOW RIDGE DEVELOPMENT, LP,
a Texas limited partnership
By: SJ RAINBOW RIDGE, LLC,
its General Partner
sH v e- Hla,wIcuw
By: Steve Hawkins (Mav 14. 2026 12:112:35 CDT)
Steve Hawkins
President
05/14/2026
Date
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Cannon R Henry, PE, CFM
Assistant Director
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
1 4a$ s '1
Duch
S��Qd
1�
CL
CID
of
Q
Alto Nlescs Blvd.
Vicinity
Map
N,T. S.
COUNCIL. DISTRICT 6
FINAL, Pi AT# FP-95-102
MAPS CC PAGE TAR-102C
'ry'�j wWwoodLTALL
RANCH i
,, FII.3F'.FI.'RFnR
"C 4'.. iT- 'aT 'f.11'; --G"VICINITY
MAP
:7]'.t1M%JAS 1f.P.'CF7 SIJI'Ti',':7
'rY+,T RV:f;l�. —.. ,ri1 r
��°SRT 4sY,:ik"FI.'1C *.91:Jy
'Iff-I'I q
ffi`WIRT,-T..
WYiCJI
B�'!.f3e.1aIG
Ci:fTti=T' Stl'E; AKlllll
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 8 of 13
EXHIBIT B
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 9 of 13
EXHIBIT C
APPRaX. LOCATION OF APPROX. LIMITS OF
2-STRECTLIGHTS,
FU1"4JREDEOICATE[]
RIGHT TURN LANE 7-
PROPERTY BOUNDARY
� y
DWINEU0E�LQPED BY:
5J RAINBOW RIDGE DEVELOPMENT, LP
7201 HAWKINS'VIEW DR., SUITE `01
FOR- WORTH, TX 76W COUNCIL L:I ;I;_ c
017-737-4A46 FINAL f LAB- # F%d'-102
CONTACT: STEVE HA NKINS MAJISca PACE TAR-102C
~wvood
RALL RANCH o ��
� 11.?%S5I, LIr=, STREET LIGHTS EXHIBIT G
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 10 of 13
EXHIBIT C-1
APPROX I C;::,:,. 1('N' , F .
1- S C: N slraN - APPROX. I I.1T5 OF
STREET NAME BLADES I FUTURE ❑Edlt wTEd
RIGHT TURN LONE
Y
i
i
OWNEtIDEVELOPEQ BY:
SJ RAINBOW RIDGE DEVELOPMENT, LP
7201 HAWKINSVIE O DR„ SUITE '01
- PROPERTY BOUNDARY
FORT WORTH, TX 7E<32
COUNCIL DISTRICT 6
tit7-737-4446
FINAL PLAT#. FP-75-102
CONTACT: STEVE HAWKINS
MAPSGO PAGE TAR-1WC
RALL RANCH c' zoo,
� Rw GT,�tl
P�TMan1'.M,
P*XE:5i 7-9ii�YP3
STREET NAME SIGNS EXHIBIT C1
-
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 11 of 13
EXHIBIT D - Page 1 of 2
OPINION OF PROBABLE COST
CORN - RALL RANCH TURN) LANE
City of Fort Worth. Tarrant County, Texas
Propect Number.
HCH220CI
D
TOTAL LOTS
Prepared For
COFW'
QD
SINGLE FAMILY ACRES
Date:
March 19, 2D28
10.1
THOROUGHFARE ACRES
File Name:
Rall Ranch OPC Right Turn Lane
301)
LOCAL LENGTH OF STREETS (FT)
Prepared by:
KLC
D
MINOR ARTERIAL LENGTH ITT)
Checked by:
AH6
CONSTRUCTION COSTS
SUMMARY
Rail Ranch
Turn Lane
Direct Costs
Total Costs
DESCRIPTION
1 - Ear*hwork
$18'agai D
$18,89D.100
3 -'Water
$9,901).00
S9,90D.c0
5 - StDnn
$40,72D.06
$40.72D.90
9 -Pavia
$97,08D.QD
$97A5D.00
7 - Street Li hts S Si ns
$26,50D.0D
$28,60D.c0
TOTAL CONSTRUCTION COSTS
1 $192,970.001
$192 970.00
MISCELLANEOUS COSTS
DESCRIPTION CITY
UNIT
AMOUNT
TOTAL
Engineering & Sury in (15%) 15%
%
$28,95D.DD
$28,956.c0
Misc Fees
City Inspeadon Fee (City Fee -4%of Pvg, Drain & Lights)
4%
%
$8,58D.00
$8,5811.c0
Constnuci on Materials Testing (CAy Fee - 2% of Pv g & Utils
2%
%
$2,140.0D
32,140,.(10
PPM Bands
3%
%
S5.7910D
36,790.410
City) llunty Review Fees
1%
%
51,93'D.OD
SI.930,
12 -TOTAL MI SC. COSTS
$45.390.00
1 1145.390;09
SUMMARY
Construction Costs
$192,97D.�
$192,97c.Dc
Miscellaneous Casts
$45,396
$45,390.90
13 - Contingency Costs
2596,
$59,590.0D
$59,5rt0.Dc
NET PROJECT COSTS
$297 S50.00
$297 950.0c
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 12 of 13
EXHIBIT D - Page 2 of 2
RALL RANCH RIGHT TURN LAPSE DIRECT
EART14 WORK
Description
QTY
UNIT
UNIT PRICE
AMOUNT
On Site Excavation
1,B50
CY
".oO
$0,94D.DD
Sift Fence
300
LF
$aoD
$DOD.DD
Cualex
170
SY
$3.00
$5111.110
6' Tap Sail
23
CY
$48.0D
$1.12D.DD
Block Sod Placement
-40
SY
W.00
$1.26D.D0
Construction Entrance
EA
$2,500.oD
32,5011110
Removal & Di I cF Unsuitable Malerials
LS
$2.500.00
$2,500_DD
TOTAL EARTHWORK $18..6"_00
WATER
Description
Sn-y-
UNIT
UNIT PRICE
AMOUNT
Tire Hydrant Assembly �flna D" Gate Valve.
I
Eh
$8,200.00
$8,20D_DD
Salvage Fire Hydrant
I
H.
$1,7110.001
$1,7013041
TOTAL WATER $9 5w.00
STORM
Descriptiim
QTY
UNIT
UNIT PRICE
AMOUNT
21"RCP
40
LF
$120.Qo
$4, 8QD.00
1G Recessed Inlet
2
EA
$12,000.06
S24,00D.D0
Remnve1D"Recessed Inlet
2
EA
$5,000.0[1
$10,130D.00
Remove2VRCP
20
LF
$50.00
$1,40D.DO
Trench Safe
4.0
LF
$3.oD
$125.7D0
nlebSDMH Protectors
2
EA
$200.QO
$4011.DD
TOTAL STORRM. $ I0, 720.00
PAYING,
Description
QTY
UNIT
UNIT PRICE
AMOUNT
11' Conc Pavement
370
SY
S' 10.
S40,7013.110
6' Lime Stabilized Subgrade
500
SY
S5.100
$2.50D_0D
'Hydrated Lime 28#YSY)
11
TON
$320.OD
$3,3813.00
4' C mc. Sidewalk
1.200
SF
$7.06
$8,40D.D11
Remove Conc Pvrnt
370
SY
$5Q.0o
118.506_110
Removre Corac Our68Gutter
300
LF
$7.04
$2,105.DD
Remove Sidewalk
1,200
SF
$5.oD
$6. OOD_m
RemoveADARamp
1
EA
$1,CQQ.D'D
$1:113.0D
RF Ram
1
EA
$&SDO.DD
$3.50D.DO
Striping
I
LS
$8,000.DO
$O,DOD.DD
Traffic Control
1
EA
$5,00•Q.Oo
$5.[K)HIO
TOTAL PAYING $37 090.00
STREET LIGHTS & SIGNS
Description
QTY
UNIT
UNIT PRICE
AMOUNT
Street Light -1 Fixture
2
EA
$1D,000.00
S20,005_DD
Conduit - 2 Inch - Open Cut - Sched. 86
150
LF
$30.00
$4, 500.D0
NO 1D Insulated Elec Condr
450
LF
52.06
$600.011)
Stop Signs
I
EA
Wom
$400 0-0
Street Name Blades
4
EA
$20Q.00
$60D.D0
TOTAL STREET LIGHTS & SIGNS
$2613610.00
Future Improvements Agreement
Rall Ranch Right Turn Lane
SJ Rainbow Ridge Development, LP
Page 13 of 13
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: SJ Rainbow Ridge Development, LP
Subject of the Agreement:
FIA26-0002
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No 0
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 21
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. NA
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.