PROJECT FUNDING AGREEMENT
FOR
PEROT FIELD FORT WORTH ALLIANCE AIRPORT
TAXIWAY HOTEL EXTENSION — PHASE I
THIS AGREEMENT is by and between Alliance Center No. 16, Ltd., a Texas limited partnership
("AC 16") and the City of Fort Worth, hereinafter referred to as "City".
WHEREAS, AC 16 and its affiliates own, develop and lease property adjacent to the Airport
("Off -Airport Property") to private tenants; and
WHEREAS, the City has received federal grant funds from the sale of Noiselands properties for
the extension of Taxiway Hotel at Perot Field Fort Worth Alliance Airport ("Airport"), which will extend
Taxiway Hotel to the northeast, allowing for future development and providing access for current and
future tenants adjacent to Airport property; and
WHEREAS, construction of Phase I of the Taxiway Hotel Extension project ("Project") was
awarded to Mario Sinacola & Sons Excavating, Inc. (City Secretary No. 65182, M&C 26-0320); and
WHEREAS, AC 16 desires to make a connection to the new Taxiway Hotel extension that will
allow for access to the Off -Airport Property as depicted in Exhibit A of this Agreement ("Connection");
and
WHEREAS, the Connection is ineligible for Federal Aviation Administration (FAA) Airport
Improvement Program grant funding; and
WHEREAS, AC 16 desires to fund construction of the Connection in the amount of $421,296.00
(the "Contribution") as depicted in Exhibit B of this Agreement; and
WHEREAS, AC 16 has agreed to pay the Contribution, as defined herein, to the City to be
incorporated into the Project;
NOW THEREFORE, in consideration of the above recitals and the promises and covenants
herein, City and AC 16 hereby agree as follows:
1.
AC16 will pay the Contribution in the amount of $421,296.00 to the City concurrent with the
execution of this Agreement.
2.
AC 16's Contribution to the City is the estimated amount of AC 16's obligation for its costs related
to construction of the Connection to the Off -Airport Property as depicted in Exhibit A to this Agreement.
AC 16 shall pay final actual costs of construction of the Connection. OFFICIAL RECORO
CITY SECRETARY
3. FT. WORTH, TX
City will use its best reasonable efforts to perform this Agreement without undue delay. Failure
to fully construct the Connection will entitle AC 16 to a proportional refund of the Contribution.
Project Funding Agreement Page 1 of 6
Taxiway Hotel Extension — Phase I
4.
This Agreement shall be binding upon and inure to the benefit of the City and AC 16 and their
respective successors and assigns. This Agreement, together with any exhibits attached hereto,
constitutes the entire agreement between the parties hereto, and may not be amended except by a writing
signed by all parties and dated subsequent to the date hereof.
5.
Notices required pursuant to the provisions of this Agreement shall be conclusively
determined to have been delivered when (1) hand -delivered to the other Parry, its agents,
employees, servants or representatives, (2) delivered by facsimile with electronic confirmation of
the transmission, or (3) received by the other Parry by United States Mail, registered, return, receipt
requested, addressed as follows:
If to the City:
City of Fort Worth
Attn: Valerie Washington, Assistant City Manager
100 Texas Trail
Fort Worth, TX 76102-6122
With Copy to the City Attorney
If to AC 16:
Alliance Center No. 16, Ltd.
13901 Aviator Way
Fort Worth, Texas 76177
Attn: Chris Ash
With Copy to
Alliance Center No. 16, Ltd.
9800 Hillwood Parkway, Suite 300
Fort Worth, Texas 76177
Attn: Associate General Counsel
Project Funding Agreement Page 2 of 6
Taxiway Hotel Extension — Phase I
Executed by each party's duly designated and authorized representative; effective as of the date
subscribed by the City's designated Assistant City Manager.
ALLIANCE CENTER NO. 16, LTD.
a Texas limited partnership
By: HFC Management 1, LLC,
a Texas limited liability company,
its general partner
By:
Name: H Haul K. Burton
Title: rnxecutiye Mce Pdent
Date: 5lay /oZ� &
CITY OF FORT WORTH, TEXAS:
✓AL wmn�
By: Valerie Washington (May 22, 2026 10:51:21 CDT)
Valerie Washington
Assistant City Manager
Date: 05/22/2026
APPROVAL RECOMMENDED:
By: -`—
Roger Venables, Director
Aviation
APPROVED AS TO FORM AND LEGALITY:
Carldoce, Pagliara
By: Candace Pagliara (May 22, 202e 10:24:33 CDT)
Candace Pagliara
Senior Assistant City Attorney
FORM 1295: N/A
Project Funding Agreement Page 3 of 6
Taxiway Hotel Extension — Phase I
CONTRACT AUTHORIZATION
M&C: N/A
Date Approved:
N/A
d� �f®ggIl
ORT�Oaa
ATTEST: ono o=o
By:
Jannette Goodall
City Secretary
CONTRACT COMPLIANCE MANAGER:
By signing, I acknowledge that I am the person responsible for the monitoring and administration of
this contract, including ensuring all performance and reporting requirements.
By: �a,ph0.o-
Sasha Kane
Airport Grants Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Project Funding Agreement Page 4 of 6
Taxiway Hotel Extension — Phase I
EXHIBIT A
ALLIANCE CENTER NO. 16, LTD.'S FUNDED EXTENSION
MiINN
r M
114
PEROT FIELD
NIH
LEGEND
Project Funding Agreement Page 5 of 6
Taxiway Hotel Extension — Phase I
EXHIBIT B
CONTRIBUTION BY ALLIANCE CENTER NO. 16, LTD.
Item
Spec No.
Item Description
Unit of
Measure
Bid Quantity
Unit Price
Bid Value
8
P-152-4.1
Unclassified Excavation
CY
-
$2700
50.00
10
P-155-8.1
Lime -Treated Suhgrade
SY
1059
$10 00
310.590 00
11
P-155-8.2
Lime
TON
45
$330.00
$14.850.00
12C
P-209-5.1
Crushed Aggregate Base Course, 20-inch Thickness
SY
533
($45.00
(523,965.00)
13
P-209-5.2
Crushed Aggregate Base Course, 6-inch Thickness
SY
371
$20.00
S7,420.G0
14
P-304-8.1
Cement -Treated Base Course, 6-inch Thickness
SY
685
$45 00
$30.825 00
15
P-403-€1.1
.Asphalt Mixture Surface Course
TON
99
$125.00
512,37500
15C
P-403-8.1
Asphalt Mixture Surface Course
TON
150
(S125.iI
(518,750.00)
17
P-501-8 2
11-inch Concrete Pavement, Unreirnforced
SY
948
$15000
$142,20000
18
P-501-8 3
11-inch Concrete Pavement, Reinforced
SY
1.052
$155.00
$'163,060.00
19
P-602-5.1
Emulsified Asphalt Prime Coat
GAL
106
$3.00
$318.00
19C
P-602-5.1
Emulsified Asphalt Prime Coat
GAL
160
($3.00)
(S480.00)
20
P-603-5.1
Emulsified Asphalt Tack Coat
GAL
25
S3.00
S75.00
20C
P-603-5.1
Emulsified Asphalt Tack Coat
GAL
37
($3.00)
(S111.00)
21
P-605-5.1
Joint Sealing Filler - 7tenr is now Incidental and has been removed
LF
$0.00'
$0.00
22
P-620-5.2
Marking
SF
-
S1.35
$000
23
P-620-5.3
Reflective Media, Type III
LB
-
$8-00
50.00
25C
F-162-5.1
Chain -Link Fencing
LF
378
($42.00}
($15.876.00)
30
T-900-5.2
Water for Irrigation
CCF
-
$100
$000
31
T-904-5.1
Sodding
SY
-
$4.04
S0.00
32
T-905-5.1
Topsoil, 4-inch thickness
SY
-
$1.00
$0.00
34
L-108-52
No. 6 Solid CU Counterpoise Inst. wlGround Rods And Connectors
LF
144
51.50
S216.G0
36
L-110-52
2" Sch. 40 PVC Conduit Under New Full Strength Pvmt., Incl. Trench And Backfill
LF
87
$23.00
$2.001.00
37
L-110-5.3
2" Sch. 40 PVC Conduit Under New Shoulder Pvmt., Incl. Trench And Backfill
LF
57
$26.00
$1,482-00
44
L-125-5-4
Furnish And Install L-867 Base In New Shoulder Pvmt.
EA
3
$2,330-00
$6,990.00
45
L-125-5 5
Furnish And Install L-868 2-Piece Base In New Full Strength Pumt,
EA.
11
$3,154-00
$34,694.00
46
L-125-5.1
Furnish And Install L-867 Blank Lid
EA
-
$3011
$0.00
47
L-125-5-7
Furnish And Install L-868 Blank Lad
EA
$275-00
$000
48
L-125-5.8
Furnish L-852C(L) Bidirectional Toy Centerline Fixture And Transformer
EA
2
S3 550 40
$7,100.00
49
L-125-5-9
Furnish L-852D(L) Bidirectional Twy Centerline Fixture And Transformer
Eft.
9
$1,600.00
314,400.00
50
L-125-5.10
Furnish L-861T(L) Twy Edge Fixture And Transformer
EA
3
$514.00
$1,542.t10
51
L-I25-5.11
Furnish And Install L-853 Elevated Retroreflective Taxiway Edge Marker
EA.
3
$220 00
$66000
52
L-125-5.12
Install Fixture And Transformer
EA
14
$650.00
$9,10000
55
L-125-5.15
Furnish And Install L-858(L) 3 Mod, Single Face Sign, Incl. Foundation
EA
-
Total Construction
$10,300.00
Cost
$20,600.00
$ 421,296.00
Assumptions
1 Contractor Mobilization, CQCP, Temporary Measurers are accounted for in the Taxiway Hotel Extension Phase I Project Cost
2 Taxiway H4 Centerline Lighting Quantities shown meet the requirements for operational visibility below 1200 RVR (12.5' Spacing).
Project Funding Agreement Page 6 of 6
Taxiway Hotel Extension - Phase I
FORT WORTH
Routing and Transmittal Slip
Aviation
Department
DOCUMENT TITLE: AFW Taxiway Hotel Extension Phase I Project Funding Agreement
M&C
CPN
CSO #
DOC#
DATE: 5/21/2026
INITIALS
DATE OUT
TO:
1. Sasha Kane
sashaKane
05/21 /2026
2. Roger venables
R r Venables
05/21 /2026
3. Candace Pa liars
CP
CP
05/22/2026
4. Valerie Washington
WO
05/22/2026
5. Jannette Goodall
J nette Goodall
05/26/2026
1-6.
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and
take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes ❑X No
RUSH: ❑ Yes ❑X No SAME DAY: ❑ Yes ❑ No
ROUTING TO CSO: ❑X Yes ❑ No
Action Required:
❑ As Requested
❑ For Your Information
1 Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑ Yes ❑ No
❑ Attach Signature, Initial and Notary Tabs
Return to: Please call Tyler Dale at ext. 5416 for pick up when completed. Thank you.
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Alliance Center No. 16 Ltd.
Subject of the Agreement:
Project Funding Agreement for a connection to the new Taxiway Hotel extension
that will allow for access to a private, Off -Airport development that is ineligible for Federal Aviation Administration (FAA)
Airport Improvement Program (AIP) grant funding at Perot Field Fort Worth Alliance Airport.
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes ❑ No
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 9 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No ® If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: Date of Execution
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No M
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable.
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be