COMMUNITY FACILITIES AGREEMENT
BETWEEN THE CITY OF FORT WORTH AND
THE FORT WORTH TRANSPORTATION AUTHORITY
FOR THE INSTALLATION OF
COMMUTER RAIL FACILITIES
WHEREAS, Fort Worth Transportation Authority, hereinafter referred to as the
"T", a governmental entity located in Tarrant County desires to make certain
improvements for the installation of Commuter Rail Facilities in the downtown area of
the City of Fort Worth, Texas; and
WHEREAS, the City of Fort Worth, hereinafter referred to as "City", a municipal
corporation located in Tarrant and Denton Counties, Texas and the City desires to make
certain improvements in the area of the Commuter Rail Facilities in the downtown area of
the City of Fort Worth, Texas; and
WHEREAS, the T has requested the City to do certain work in connection with
said improvements, and the City has requested the T to do certain work in connection
with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
The T, acting herein by and through John P. Bartosiewicz, its duly authorized
General Manager, and the City, acting herein by anc7 through Mike Groomer, its duly
authorized Assistant City Manager, for and in consideration of the covenants and
agreements herein to be performed, do hereby agree as follows:
I. WATER AND SEWER SERVICES
A. The T shall award a contract for the facilities described herein in accordance with
Texas state statutes prescribing the requirements for the letting of contracts for the
construction of public works, and within FTA procurement requirements as
specified in the FTA master Agreement, Circular SOl0.1C, and Circular 4220.1D.
WATER FACILITIES serve the lots as shown on the attached Exhibit A, and
SANITARY SEWER FACILITIES to serve the lots also as shown on the
attached Exhibit A all in accordance with plans and specifications to be prepared
by private engineers employed by the T and approved by the Water Department.
B. The construction cost of the water facilities herein concerned, exclusive of service
lines and engineering, is estimated to be ONE HUNDRED SEVENTY-EIGHT
THOUSAND EIGHT HUNDRED SEVENTY-THREE Dollars ($178,873).
C. The construction cost of the sanitary sewer facilities to be installed hereunder,
exclusive of service lines and engineering, is estimated to be FIVE HUNDRED
U����O�� ��M��
�0� ���G° °Y
�e 11C1VU��u�9 � �
m
. �
THIRTY - FIVE THOUSAND ONE HUNDRED FIFTY — FIVE Dollars
�$ 535.1551.
D. Subsequent to award of the construction contract by the T but prior to the
commencement of construction, the T agrees to pay City a construction inspection
fee equal to two (2%) of the T's actual cost share of the construction cost
(including all services) of the water and/or sanitary sewer facilities.
E. The distribution of estimated construction cost between the City and the T for all
water and sanitary sewer facilities to be constructed hereunder is estimated as
follows:
(1) WATER FACILITIES :
Estimated
T Cost
Mains
$ 62,792
(2) SANITARY SEWER FACILITIES:
Mains
$ 149,131
(3) TOTAL
CONSTRUCTION COST: $ 211,923
Estimated
City Cost
$ 116,081
$ 386,024
Total
Cost
$ 178,873
$ 535,155
$ 502,105 $ 714,028
(4) CONSTRUCTION
INSPECTION FEE : $ 4,239 $ � 10,042 $ 14,281
See Exhibit B for Water Cost Breakdown
See Exhibit C�for Sewer Cost Breakdown
F. Within a reasonable time after completion of the above referenced facilities to be
consiructed by contract awarded by the T, provided all conditions for City
participation have been met, the City agrees to pay the T the "Estimated City Cost"
set out in E. above; provided, however, that said payment shall be calculated using
the actual construction costs and actual service costs under the provisions of the
current Fort Worth City Code, (said payment to be calculated as in E. above),
based on actual quantities as reflected in the final estimate paid to the Contractor
by the T and on the actual records of cost kept by the City as a part of its
customary procedures.
II. STORM DRAIN IMPROVEMENTS
1. Based upon preliminary engineering design, the storm drainage facilities listed
below are required. It is understood that actual sizes, quantities, and costs may vary after
detailed engineering is accomplished, and bids are taken.
COMMUNITY FACILTTIES AGRfiEMENT
FORT WORTH TRANSPORTATION AUTHORITY
COMMLJTER RAIL FACII.ITIES
Page 2 of 9
• •.
,,
2. The T agrees to install or have installed, the storm drain system for this proj ect as
shown on E�ibit D, attached hereto, in compliance with all applicable City of Fort Worth
Rules and Regulations and Construction Standards. Furthermore, The T also agrees as
follows:
a. To construct all storm drainage facilities and appurtenances to the line and grade
established in the final plans.
b. To provide sufficient drainage easements for a11 storm drainage facilities outside a
public right-of-way. Drainage easements shall be provided along the entire length
of the system to include an outfall condition that is acceptable to the City Engineer.
A detention pond may be provided in lieu of an adequate outfall with approval by
the City Engineer. Drainage easements along a required outfall channel or ditch
shall be provided until the flowline "day lights" on natural grade. The minimum
grade allowed on an outfall channel or ditch will be 0.2 foot per 100 feet. Drainage
easements will generally extend at least twenty-five (25) feet past an outfall
headwall to provide an area for maintenance operations.
c. To provide a drainage system which is fully functional and readily maintainable.
d. To provide for storm flow resulting from a one hundred (100) year frequency
storm in accordance with City drainage design criteria. Such flow once contained
in a public drainage easement and/or right-of-way shall continue to be retained
with public easements or rights-of-way, unless approved by the City Engineer
under a strictly controlled set of criteria. Over-flow swales intended to convey
"public" storm flow shall be contained in a drainage easement, included in the
design plan, and constructed in conjunction with the storm drainage
improvements.
e. That the storm drain system will be designed to ultimate land use. If stage
construction is used, temporary offsite measures can be utilized as development
proceeds but must be approved by the City Engineer. These temporary offsite
measures must be brought into conformance with ultimate design standards as
development proceeds.
3. City shall participate in the cost of the storm drain improvements in the total
amount of $200,000, payable at the time the T awards a construction contract.
III. TRAFFIC SIGNAL SYSTEMS
1. Based upon preliminary engineering design performed by the City, the Traffic
Signal Systems ("Systems") consist of traffic signals and associated signage and
striping as shown below. It is understood that actual sizes, quantities and costs of
the Systems may vary during the course of detailed engineering and construction
from that which is described below.
COMMTJNITY FACILITIES AGREEMENT
FORT WORTH TRANSPORTATION AUTHORITY
COMMUTER RAIL FACILITIES
Page 3 of 9
2. Description of the Work
City agrees to design and install the Systems as shown in Exhibit E attached hereto,
at the following locations:
• E. 8�' Street (a two way street) at its intersection with Jones Street (a one way
street
• E. 8`h Street (a two way street east of Calhoun and a one way street west of
Calhoun) at its intersection with Calhoun Street (a one way street)
• E. 9th Street (a two way street) at its intersection with Jones Street (a one way
street)
3. The work may be accomplished with City forces or by contract, as deternuned by
City in its sole discretion.
4. Upon construction of the Systems, City agrees to furnish to The T a comprehensive
detailed invoice of the design and construction costs.
5. The T agrees to reimburse City for the actual costs incurred by the City, such
reimbursement not to exceed $120,000.
IV. STREET
Due to the redesign of the Intermodal Transportation Center, the extent of street
improvements related to the project is undetermined at this time. The T commits to
fund the street improvements generated by the proj ect at a point in time that the
extent of the required improvements is known. The T further agrees that as site
improvements are constructed, necessary frontage improvements including curb,
gutter, driveways, and sidewalks will be incorporated into the construction.
V. STREETLIGHTS
As street improvements are constructed, the T agrees to install necessary
streetlights. The cost of the streetlights is estimated to be $3,500.
VI. GENERAL CONDITIONS
1. The T shall pay a construction inspection and materials testing fee in the amount of
two percent (2%) cost of the storm drainage construction, payable within ten (10)
days from the date of approval of this contract by the City Council of the City.
2. The City requires that certain of the improvements described herein are required
and necessary for the Commuter Rail Facilities construction.
COMMUAIITY FACILITIES AGREEMENT
FORT WORTH TRANSPORTATION AUTHORITY
COMMUTER RAIL FACILITIES
Page 4 of 9
3. The T acknowledges that it has complied with Article 104.100 of Ordinance 7234
and hereby relieves the City of any responsibilities for any inadequacies in
preliminary plans and cost estimates supplied for the purpose of this contract and
further agrees that it will comply with the Subdivision Ordinance, City Plan
Commission Rules and Regulations, and Policy for Installation of Community
Facilities and all applicable policies, rules, regulations and ordinances of the City
regarding development.
4. The City agrees and understands that the T is a grantee of FTA and any third party
contractor, the City in this case, must comply with necessary federal regulations and
rules as it relates solely to the design and installation of the Traffic Signal Systems.
5. The T agrees to install or cause to have installed, the storm drain facilities
improvements shown on the attached Exhibits B in accordance with plans and
specifications prepared by The T's engineer and approved by the City Engineer.
6. City will use its best efforts to cause any utility company with facilities requiring
adjustment to be accomplished by and at the expense of the utility company. In
the event City is unsuccessful in causing the utilities to be relocated, the T agrees
to install, adjust or cause to be installed or adjusted, all of the required utilities to
serve the development. Prior to construction, the T will provide the City a list of
all utilities that will require relocating, along with assurance that no conflicting
street construction will take place until the utility relocation has been completed.
7. The City agrees to install or cause to have installed, the Traffic Signal System
shown on the attached Exhibit C in accordance with plans and specifications
prepared by the appropriate City department.
8. The T hereby agrees and binds itself to provide all necessary right-of-ways and/or
easements required to construct the street improvements including any drainage
outfall, in- lengths, widths, and locations as approved by the City Engineer.
9. The T agrees to submit plans and specifications prepared by an approved
professional engineer, registered in the State of Texas, proficient in civil
engineering, for the improvements required under this agreement. Such plans
shall be in compliance with the policies, ordinances, and rules of the City of Fort
Worth, and are subject to approval by the City Engineer. After said plans are
approved as witnessed by the signatures of the City Engineer and of the Deputy
Director of the Water Department, the T's Engineer shall provide the City one (1)
set of reproducible approved plans, plotted x-sections, and specifications; and
nineteen (19) copies of the plans and eight (8) sets of the specifications and
contract documents (four (4) unexecuted, 2 executed and 2 conformed sets).
Additional sets of plans and/or specifications may be required for other
departments and/or agencies depending on the project.
COMMUNITY FACILITIES AGREEMENT
FORT WORTH TRANSPORTATION AUTHORITY
COMMUTER RAIL FACILITIES
Page 5 of 9
10. The T agrees to complete the improvements covered by this agreement within 365
calendar days after having been instructed to do so, in writing, by the Director of
Transportation and Public Works and/or the Director of the Water Department. It
is understood that The T will initiate the construction of all improvements to
conform to its own schedule.
11. The T agrees that all improvements to be constructed hereunder will be subject to
inspection and approval by the City Engineer, and will require any contractor
involved in any earthwork within any future public right-of-way, to notify the
Department of Engineering, Construction Services Division, before any work
takes place and to require all earthwork to be done in accordance with the City of
Fort Worth Standard Specifications to the satisfaction and approval of the City
Engineer or his representative. The T also agrees that no construction shall begin
prior to the City Council's approval of this Community Facilities Agreement in
accordance with Section 104.100 of City Ordinance No.7234.
12. The City's participation in the costs shall be as shown in Section I(Water and
Sewer Services), Section II (Storm Drainage Improvements), and Section III
(Traffic Signalization Revisions) of this agreement. In no event shall the City be
liable to the T for any payments in excess of the City's estimated participation
unless and until there is separate and formal approval by the City Council to pay
such excess amount.
13. The setting of line and grade stakes for streets and storm drains shall be the
responsibility of the T. Following the setting of line and grade by a private
surveyor hired by The T, the contractor shall give 24-hour notice to the
Construction Engineer so that inspection personnel will be available. No work
shall begin until the assigned inspector is present and gives his consent to
proceed; however, in the event the inspector does not arrange for the work to
� proceed within 24 hours after notice has been given, the contractor shall� be
entitled to begin work.
14. Approval by the City Engineer shall not constitute or be deemed to be a release of
the responsibility and liability of The T, its engineer, employees, and agents for
the accuracy and competency of their designs and specifcations. Such approval
shall not be deemed to be an assumption of such responsibility and liability by the
City for any defect in the designs and specifications prepared by the consulting
engineer, his agents and employees, it being the intent of the parties that approval
by the City Engineer signifies the City's approval on only the general design
concept of the improvements to be constructed. In this connection and in so far as
permitted by law, The T shall for a period of five (5) years after the acceptance by
the City of the completed construction project indemnify and hold the City and all
of its officers, agents, servants and employees harmless from any loss, damage,
liability or expense, on account of damage to property and injuries, including
death, to all persons which may arise out of any defect, deficiency or negligence
of the engineer's designs and specifications incorporated into any improvements
COMMUrTITY FACILITIES AGREEMENT
FORT WORTH TRANSPORTATION AUTHORITY
COMMUTER RAIL FACILITIES
Page 6 of 9
constructed in accordance therewith, and The T shall defend at its own expense
any suits or other proceedings brought against the City and its officers, agents,
servants and employees, or any of them on account thereof, to pay a11 expenses
and satisfy all judgments which may be incurred by or rendered against them or
any of them in connection therewith. Nothing contained herein shall be construed
so as to require The T to levy, assess and collect any tax to fund its obligations
under this paragraph.
15. To the extent pernutted by law, the City agrees to, and does by these presents fully
indemnify, defend and hold harmless the T, its officers, servants and employees
from and against any and all claims, suits, or causes of action of any nature
whatsoever, brought for or on account of any injuries or damages to person or
properiy, including death, arising out of or in connection with the construction of the
Traffic Signal System for which the City is responsible for under this agreement.
Nothing contained herein sha11 require the City to assess, levy or collect any ta�c to
fund this indemnification provision.
16. Prior to beginning any work, the T agrees to certify in writing that it has
appropriated sufficient funds to pay its contractor(s) for all work to be performed.
17. On all facilities included in this agreement for which The T awards its own
construction contract, it agrees to the following procedures:
a) The construction contract must be advertised, bid and awarded in accordance
with State statutes and federal rules and regulations and the procurement policies of
the T for the letting of contracts for the construction of public work.
b) To employ a construction contractor who is approved by the Director of the
Department having jurisdiction over the facility to be so constructed, said contractor
to meet City's requirements for being insured, licensed and bonded to do work in
public streets.
c) To require the contractor to furnish to the T payment, performance and
maintenance bonds in the name of the T with the City as successor obligee for one
hundred percent (100%) of the contract price of the improvements to be constructed
by the T, said bonds to be furnished before work is to commence. In the event that
the construction had commenced and the T had abandoned the project, the City
would succeed as the obligee. The T further shall require the contractor to provide
public liability insurance in the amounts required by the City's specifications
covering that particular work.
d) To give 48 hours notice to the department having jurisdiction of intent to
commence construction of the facility so that City inspection personnel will be
COMMUAIITY FACILTTIES AGREEMENT
FORT WORTH TRANSPORTATION AUTHORITY
COMMUTER RAIL FACILITIES
Page 7 of 9
�
available; and to require the contractor to allow the construction to be subject to
inspection at any and all times by City inspection forces, and not to install any
sanitary sewer, storm drain, or water pipe unless a responsible City inspector is
present and gives his consent to proceed, and to make such laboratory tests of
materials being used as may be required by the City.
e) To secure approval by the director of the deparirnent having jurisdiction of
any partial and final payment to the contractor. Said approval shall be forthcoming
from the relevant director within 48 hours after receipt of request for any payment
and shall be subject to and in accordance with the requirements of this agreement.
Such shall not constitute approval of the quantities of which payment is based.
fl To delay connections of buildings to service lines of sewer and water mains
constructed under this contract until said sewer and water mains and service lines
have been completed to the satisfaction of the Water Depariment.
17. The attached E�chibits A, B, and C, and Location and Vicinity Map are made a part
hereof for all intents and purposes.
18. Venue of any action brought hereunder shall be in Fort Worth, Tarrant County,
Texas.
19. City's Policy for the Installation of Community Facilities, as adopted by the City
Council on September 1992, is hereby incorporated herein by reference, and the T
covenants and agrees to comply with said Policy, as pernutted by law, as a condition of this
contract and as a condition to the platting of the subj ect property.
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its City Manager, attested by its
City Secretary, with the corporate seal of the City affixed, and the T has executed this •
instrument in quadruplicate, at Fort Worth, Texas this the day of , 19 _.
COMMUNITY FACILITIES AGREEMENT
FORT WORTH TRANSPORTATION AUTHORITY
COMMUTER RAIL FACILI'ITES
Page 8 of 9
ATTEST:
��.���i ,PC2s1lL�•
C�loria Pearso�
City Secretary
APPROVED AS TO FORM AND
LEGALITY:
��� ���
Gary J�"t�inberger
Assistant City Attorney
APPROVED AS TO FORM:
i
�, : /��� .�� ,.; :J f
�:.r� �, �
��iiyll �aldrep Cranz �
Generaj/Counsel �
CITY OF FORT
By:
TEXAS
Mike Groomer
Assistant City Manager
C- /��S/
�ontract Authorfzation
�'lo"��
vate �
FORT WORTH TRANSPORTATION
AUTHORITY
,i �� ✓
'" B ,�'//l• '
� Y�
�John Bartosiewicz )
� General Manager �
Fort Worth Transportation Authority
COMMUNITY FACILITIES AGREEMENT
FORT WORTH TRANSPORTATION AUTHORITY
COMMUTER RAIL FACILITIES
Page 9 of 9
l
, S
� . .. . 1 a .
, � � _ i
,j
, �, � � �,,
� .. ..�..-i=,�'- ,. yt ,'�
. w,
.i .��
-� —a^,
2 �'9 `\1
�
� �; i
n\ \9
1 \J /��
, \�'/ �] P
�� �/"�`�
: '•'•:
����
,• : �-�
.,
����
\ Y^
� \
WA7ER LEGEND
R-16' = RELOCATED WATER UNE
A-16' � qD1USTED IN PLACE WATER LJNE
�f 1( Y. - ABANDONED IN PiACE WATER UNE
SEWER IEGEND
M-46R „ ��p�7ED SEWER LINE
N-34 = qp��S7FD IN Pl.'�CE SEWER UNE
`: )( 1( = ABANDONED IN PLACE SEWER UNE
1`N �
� �55
� ��1��Y�
� � J•N'SU�ZyO
\c_, A"
��.�, ' I '/ '�'�,' � �j"i-�\ ��..`
��/ � ( � )
� , f\,; y:��\ �\��, j'.�� 6 `J
- i � ys%.
� ;`. `✓,:�:-� � ,\ ` h � ���- �'
/� `^ , i, �°' � r� `.. ' ^% F
• ,= � e ��1i I � �� ��'�'. i ��./
// `� � zr.c�,•i..
��•P�� ���1�� I:aF 0 •� \�., `(��/
li 1 �� �,,� � � 2� ,
� _ � � �.
� �,� ,. � � :
�� tl � - •�"j�
�\ �' I N"� t2" \` �� a'9D' \
� � \
]
�st,. \� �Ii� 2° '\,� . . � ,�•^� � 02•�
_ j �-� i I � � 1 r�� , ' /� � o��
/
I P •F
� �\ ��, i � � i,l . , '� ! n�� �
/ l � �' .- a a,� d �
:� /l.�it�l; 1 .�a ,� .e�b' � � �\ .
:�� 1. .`. .:' � , �,z .'.�. �
`�\��'I 7 ��\\ 9 B � �
\�
✓�.�-� _ i, �i� ' � „'
`B `��� �' �
V9
37 � ' _ � � � :\��j,� 5�' �E
s, �'� '�'+i= . -;' �j^�� p`�'o. � y��-
i �ii au i �/: �ss � \\
in�^e�nt Caunty
co�.s�von t.,,c..
1. �\
62�\ `�
� 1 �\
�! O
�i`' (� l • ��'' , /" ! � -� -/ • ' •
�r�`� �,\„1�� `" ✓�.:,'i � ' 6 4 � . • 6. `
,'•T ••' :`- �. , .:., =�� ��`�:��,'� �:-
Y :,% � • �9^ �:. ` � :�- � :a� '�i. �
�r f �j,, ` " ' `S' � =• '�.,s'�',�• : �� �'�%a�'::�
' : i�'+' � �
,�� ��•, ��' ' y. "c.�'�/, �� �'
! � . .,., . ,-
��W ' � 'i '' • � _i p
I //� �! 7 �1.`�. // .
( g°r : P �t � �✓� ja_ �\, \, I .
1- � i� ,��. ;;,- G
1` ` � � f ^v'' � I •�
1 1 ';Ga��T'� y� � r
1��: QG � � �� "
���� � � �� 2 G• � r .
y\\�\ \ J� �, a� f/� ~.
ti' \`�\ � ,�\\ �•� ' 'x�%,� '
\\ � , � �1� � �` �%`�,/ ..
' �� ���;� .:'�5� ,-;
\ ��, ����, � �.s� . 6 � . - ':
1����i � � RG .� .J, i\
\`\ � 6'Fl �i
� -�.., � �;
�
I \��\�.. •. , `�
I .� t�\�� I:
z � ':\\\ �. �;..
, •, ,r . , ` 1�
r � � � �.�,:_.: � �
I 9. \\\�` �
\ ���� \�
\ �\ � T� ;:� � ;\ :� — — —
r n - � \� '\+ � y r:
\\\, � '\��•\
� �
�` :
�\ �� k `�
a \''v 5 `
�� `a: ��=�=5 .��
Y .� �� � �Ht ,�GY ,.
�?- , �. S�a25o ,,
A' `�
\ � a�3� �` . \.�'`.
� ��
> � / �;'�`� � ��� �� �,,:'��. ��.
• � e� � '��� � ,
.�
.��% a � \ ` ,Y` �.
60 r � \,1.�
� �l`N�\\ �\�'t.
.�
��f 9 �` �`i ,'� C .• . �\ •\ ��\ •\ .
\� • `�'`/ 1,:
P 6��i,\ �\ � ��
�..nE � �, : � 1\ 1 �. \ .
EXHIBIT "A„ � .
SANITARY SEWER AND WATER LAYOUT
s
{i
^ ��
k
�
�
r
� I�
� �
� I,
5 '� �I
. �.
� X
��d
�
/ `
/ ,
.•
ITEM
NO. DESCRIPTION OF ITEM
1 6" D.I. Water Line
� 2 8" D.I. Water Line
3 Std. Fire Hydrant
4 6" Gate Valve and Box
5 Cast Iron Fittings
6 Permanent Pavement Repair
7 Trench Safety (Depth > 5')
8 � Remove 6" Water Line
9 � 16" D.I. Water Line
10 14" Steel Casing for 6" Line
11 18" Steel Casing for 8" Line
12 30" Steel Casing Pipe for 16" Line
13 � Fire Hydrant Removal
14 �Temporary Paving
TOTAL �WATERIMPROVEMENTS
Date April 15, 1999
DEVELOP. � CITY
QUANTITY QUANTITY UNIT
150 0 LF $
120 1370 LF $
� 1 4 EA $
� 2 � 6 EA $
� 0.5 0.5� TN $
� 516, 0 � SY �$
� 0� 151� LF $
� 260� 0� LF $
� 350� 0� LF $
112� 0� LF � $
� 0 151 � LF �$
� 91' 0 � LF �$
� 0� 3� EA �$
� 0� 1390� SY �$
� � � � �
EXHIBIT "B"
UNIT DEVELOP.
PRICE COST
40 $ 6,000 $
41 $ 4,920 $
850 $ 850 $
600 $ 1,200 $
2,500 � $ 1,250 � $
32 � $ 16,512 � $
1 � $ - � $
14 � $ 3,640 � $
47 � $ 16,450 � $
50 � $ 5,600 � $
60 I $ - � $
70 + $ 6,370 � $
250 � $ - � $
so � - � $
� $62,792�
CITY
COST
56,170
3,400
3,600
1,250
151
9,060
750
41,700
$116,081
: ,
ITEM
NO.
1
3
4
5
6
7
9
10
11
12
13
14
15
16
17
18
19
20
TOFAL
Date April 15, 1999
fDESCRIPTION OF ITEM
�16" D.l. Sanitary Sewer Line (12'-16')
16" D.I. Sanitary Sewer Line {16'-20')
'16" D.I. Sanitary Sewer Line & Jack
�18" D.I. Sanitary Sewer Line (12'-16')
�18" D.I. Sanitary Sewer Line (16'-20')
18" D.I. Sanitary Sewer Line (20'-25')
Bore & 30" Dia. Steel Casing Casing
33" Dia. Steel Casing Pipe and Grout
Concrete Encasement
�4' Dia. Manhole .
�Additional Manhole Depth (beyond 6')
�Water tight MH insert
� Std Concrete Manhole Collars
�Trench Safety (Depth > 5')
Reconnection of Existing Laterals into New
Manhofe
Cut and Plug Existing 18" Sewer Line
�Vacuum Testing of Sanitary Sewer MH
�Cut/Plug Existing 6" Sanitary Sewer Line
� Temp Pavement Repair
�Temp Sidewalk Repair
� SEWER lMPROVEMENTS
DEVELOP.
QUANTITY
101
541�
0�
61�
0�
0�
0�
61�
20 �
5�
53�
5�
5�
681j
0�
Q+
5�
1�0
0�
�
EXHtBIT "C"
C1TY
QUANTITY UNIT
0� LF
804 LF
218 L.F.
0 LF
172 � LF I
431� LF �
218� L.F. �
50� LF �
20� LF �
8 � EA �
103 V.F.
8 EA
8� LF
1,624� LF �
2 � EA
4 � EA
3 EA
1 EA
670� SY
200I LF
1
UNIT
PRICE
$ 110
$ 120
� $ 150
I $ 120
$ 130
$ 140
$ 250
$ 425
$ 50
$1,750 '',
$ 500 �
$ 65 �
$ 350 �
$ ��
$
$
$
$
$
4Q0 I
600 �
9 00'
350 � 30
15�
�
DEVELOP.
COST
$11,110
$64, 920
'�
$7,320 �
'I
_I
_I
$25,925 �
$1,000�
$8,750 �
$26,500 �
$325 �
$1,750�
$681�
CITY
COST
$96,480
$32,700
$22,360
$60,340
$54,500
$21,250
$1,000
$14,000
$51,500
$520
$2,800
$1, 624
- $800
- $2,400
$500 $300
$350� $350
-� $20,900
-� $3,000
$149,131 ! $386,024
• _ �.,
. � •+i
,;
,.
. •,�� -.._
'� ! ' � .�� : � �..
o�,�: �p�i�5.S1R�.�.�, � �-%�`, r'..--��,�,-�-:r�".
.N. -- --..� ! n an'*' �%..
; '� .o .n f " . , ^ ��7`,�..r./'���'
` \•�� -~�, r,,,.��-w„�L ,,.• , .+ ;' : 1 ,
_�_ .�,..,,.i � �l 8}00 ,�y j , ••l��� ./li. I1.4l:lr�,l1, `i , ' � •
, , t, ` {' ��•u � . , ��
/�� � !rr � �' �it.i'�,1..:•'• ' , t t,:i�
�I' . , '` �i :: j��li�:�. • . ,'` T� -�
� 1� �: �L4.r'✓:.1.�.�
1 1 . " • � �r. � . ,� %1
{ '1i, (� � . 3i:J4• 1
. . s '�t �" 1 Tr��'" / , ' ,`�:`,
. . ; � +� ' ' `, ✓ � •, � i ,�'t,
�` ' •{ •'�} � . `� \��` ,
1 " ` i . : �' ;�: _ •
.'� �,. � , , ` . ., ' ,
, .; ', . ' . , .. ' �..I��.� - ,
\ . , � t • 'S�R�Et -- '1:
'� • ti �'t ' - �' � - , , •GROV� , � �� .
;,, . ',�' ., ` • {,�Y Y • • . ' I f` l,,.•--- "•F ,'.�, ' �, '
V • � � j 1 � � ..,.''� I•
'�S N . t . 7 ... ,/" r��'(� ` •
. / ' ` .. . l�~ . ����• . .
. ..� . . � �'/i � '
,,, r . • .V' . � �. •�
S.+� • � . �Y^.I'fJ' .. 'r,��w���: � . .�
i,.. 1 , � .. ' ' ^ �. ;•� .
i � � . ' "�.�. ;�:;�.' .. • �..
. 1 . ^� 'f'.Yt �C .�
- :', .� . �""'�. ' f ,. Bt�c(( ` . •a '_.
� ' � \ ' . •",,'`'�
• `'� � :', •�i ;,r..:
.- � • .i -
':, '„ :ii-, � .
t;, "" • ''• ` % i, �'} l. ���,r
' � �ti. � � � .+l�'♦ .,?7 '..
V � I � x 'T, '� J ' `:
1 n i r�;�% F
• • ` ` .. "',,� ' i� � .1-�"�.i ; f�' ��1t1. p 'tJ1Ct{tL7lt/IJ1tU1�LL.«�.u4�Ui✓1�:L::U/tttltiJJ_.� ' ',fl� �
• 1 � � � .... . ._. � �:;... _. «
,._ 1 _1 � - --___. . _,_ � _ _
- ��..� �..._.__._ _ ___.:___._... - _
,_,.,�_.�"...-•.�.--�-""' _ ...._r-"`�"� v • " . .r-- ' �'- ...�._.._��,-�....�._�._.__ .�. _ •-
,� .
___ - . . . � . . :.f.. ...� .�.� � w _ }......-.�-.....y. - - . .... _ . .. _ • . �_ ��� _. �� _._... .. .�� ".�_......... � -..�..�.� �...���.►�.-.��.��..�
. �...�.�_ �..-�.... . ` : "'"' `f��v -�-� •. ,. _ .... .� . ' _._..�.----• ..._... �. .�.....�_ ,�...�.... :� • ""'
, . ... . .. ... ... .. ... ...._ .. ' .. ._ -" _..-_....- ....t. .. . ._...... �L.,... -^ O_" " . .... _. -.. ._ '_
._._... .... .....__ . ........:. ----�-•---�-�-•-- ..�._ .. . •--• _ .. _...__ �"------.�'._.. • ..�.._...'—B1vSF'RAiIROAD�-- _'.. —
. . �....•.. . .' '.._ .... �. � .��.... _ _.. _.' .. -.. _ :-...._-... _........- ^. . .�. » •�^ y-.. ._�•+-. _.".' '. ' " f '. ...,.�__a---a-•� ' -� _ ._,._,`�_ � __�--..,. . .. =.........�_. . v.,.
� "_' . ;"'"�^ . �. � •_-•_.�.... '...t~...,...'..__..^.�.._-....• �.......... '.... � _ .._ ... ..-'... ..__"�-n*-... -__-.+� � �,...... Y_�� . -.. ,..'-r___-.»• ,." • .............
,.. . .. • •�. _ ' •" " -� . . ,� � .. .. ...«+•---.._...._-..�-..--. � •-_' '"_--� -' _'__ .. _..-_ �-. »• -.• ---+ . _.. .,_-.. .� .._...-.. ��,-... � .. ��..------.-_"_'_'..-. _' '.«._ .......... ...._
. „ . . � " _ _.., .. �........ �. -t � � • r -. . .,,, ,� • — -� �^� ` ' _ }O
. . :,� , � 1 ��.___._
. . � _-
. M � �
._ , . . : : . -.:.�:: _�:: ;-: �-:. :;. .. .. ..__ _ ,,;% � ° ,,._.. ;� - - � � � :
. _....___ _. _. , _ _ _ .. ,, .
�_.- _��: f.. . . . B
, � o o .:y: � � ; " FN E• KEITr
._ ..---_.�.._.___,__,-- . -• ' ' " ' � �`.. ` ; �/,�. ' ``: , Ft o
�� f 1 '• ..� .., `` \ ea•f4
� '•�t • i � , ,y \� ` ` . ..� `�'.
i `^ •t� � � '�`` � ` .�;.
s�a �xH, �,� , , . -.:,' . .` . .` sy
R/� o��N �r ..o„ , � :
q�F sysr �:: , � ; . , .
�MS
� � nr\\jt d' r ��
� � ' ���^;'�.[� �\,C�1 � t ' . ' • �a G
� �`i�+-�\��:W::"� :�.¢C'ni.LF w�,. ����
. _ � . �i'�:.i+' ��
GRO V�
� _ ,
, ` �_ 4 .
� S
I \ '; f.
�
ALLIED
ELECTRONICS
�
JONES
,
_�
�
00
�
�,
CALHOU'N
�
r
:.���'•` �`.�.:+"`�^y
. . . :
_ _ e_ e •
� —. l'�_ `' � �_. . .......,."""" '_"' . . .
._: ' --._.— . ..
; =1' ... ... ........�_...._....-""'____' '_....... _"..
�, �J= ��r�f��s-o� _ ���'"� ���`__�_ _ _ _ ��'_'
� • • • • • • • •
---� i i�i i
l..._%�.�..t-.� ..,�.__r,.�—i'- -:-. --:_-- --.---- - _
i"�� ���5��. ;s--.� .i -� -------r-==-- - _-_' �-= '- -"'--� -- -._ '�_- wi
--�: --i r�
�� �.� .1 �j� ., u�,( L _ --r--1, e . . . e . .
�1,���'wJ�"`C.1f�W��� LRI�fU•1V:�� ..__.�__ e ��� • s e • . . � .
'n',"•��li�R,vS�'�j�..�...��i."",_;:_1��,'„�� Te� '� '
�;— -1/��_ — _�`-: �: :'. _. .,. � .—
, �� , � � � �.�_� :.
. _ _ .� _..,� �� � I 3
� • �; � ; ._ ..:�_/�i—� :'----.
.' , '
� 0 . 1 0
,, � � .� '__' .�\`1` �'.�,Y�. � !^���"f
.,����-��� .. .. _. _.._..��. .
-----.. �, t�.—� t— - _ �:� — `•e � :,
----_._ d, ° .
• a a
�._a�•�-.�•� "'..�....�
��'•`1• ���;.: .'.�. .. . -" _
0, � . Z •
} l� ��-,I..�
. . �.,.
-�=
�
�
�1
� �
�
, �
O
�
J . ,
}� 1 (, � , ,
EXHIBIT "E"
TRAFFIC SIGNAL SYSTEMS .
�----- ----� - -- � --� -
,
iG��- � '�'��
INTEROFFICE MEMO
To: GARY STEINBERGER- LEGAL
From: MARIBEL LUTTRELL, CITY SECRETARY' S OFFICE
Date: September 7, 1999
Subject: CO1��IlVILT�IITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND THE FORT WORTH
TRANSPORTATION AUTHORITY FOR THE
INSTALLATION OF COMMUTER RA�, FACILITIES.
M&C C-17581 APPROVED 8-10-99
Attached are (5) contracts, with the above referenced contractor for
The Installation of Commuter Rail Facilities in the Downtown Area of
Fort Worth.
All signatures, except the above referenced contracting part, have been
affixed.
Please obtain the necessary signature(s) and then return the copv stamued
"Of�cial Record Citv Secretary Fort Worth, TX" to the Office of the
City Secretary for the assignment of a contract number. Thank you in
advance for your cooperation. If you have any questions, please feel free
to call me at 6153.
City of Fort Wo�th, Texas
�i►�Ayar And Caunc�l C,ammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
8/10/99 C-17581 I 20RAIL I 1 of 2
SUBJECT COMMUNITY FACILITIES AGREEMENT WITH THE FORT WORTH TRANSPORTATION
AUTHORITY FOR THE INSTALLATION OF COMMUTER RAIL FACILlTIES IN THE
DOWNTOWN AREA OF FORT WORTH
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a Community Facilities
Agreement with Fort Worth Transportation Authority for the installation of Commuter Rail Facilities.
DISCUSSION:
Fort Worth Transportation Authority, hereinafter referred to as "The T", desires to make certain
improvements for the installation of Commuter Rail Facilities in the downtown area of the City of Fort
Worth, Texas.
This Community Facilities Agreement is in compliance with standard City development participation
policy. The improvements covered under this agreement include water, sewer, storm drainage, street
lights and traffic signals. The cost participation in street improvements will be covered in a subsequent
Community Facilities Agreement.
ESTIMATED COSTS:
Proiect Cost Developer
I. Water $ 62,792
Sewer 149,131
Construction Insp. Fee 4,239
�
�
Storm Drain Improvements
Street Lights
Traffic Signals
TOTAL
1,630,000
3,500
120,000
$1,969,662
C itv Total
$116,081 $ 178,873
386,024 535,155
10,042 14,281
200,000
��
1,830,000
3,500
120,000
$712,147 $2,681,809
City shall participate in the cost of the storm drain improvements in the total amount of $200,000,
payable at the time "The T" awards a construction contract. The City shall bill "The T" for the actual
cost of traffic signal systems, not to exceed $120,000 at the time work has been completed by the City.
This project is located in COUNCIL DISTRICT 9.
° A
��
City of Fo�tt Worth, Tezas �
A � ar �And . a11�1c1` . aftlf�lwutllcAtlaflk'
�� � C C
DATE REFERENCE NUMBER LO� NAME PAGE
8/10/99 C-17581 I x� 20RAIL I 2°of 2
.�
suB�ECT ' COMMUNITY FACILITIES AGRE��MENT WITH THE FORT WORTH TRANSPORTATION
AUTHORITY F�R THE INSTALC:ATION OF �COMMUTER RAIL FACIL•ITIES IN THE
DOWNTOWN AREA OF FORT WQRTH
x
n •
° Y1
FISCAL INFORMATION/CERTIFICATION: 'fl ,
The Finance� Director of certifies that funds are available in the current capital budget, as appropriated,
of the Street Improvements anc� the Comrimercial �Paper-Sewer Funds.
MG:j
.,
�!
0
�
�
4�
�
ll
�
�
�
SubiniYted fo'r City Manager's
Office by:
Mike Groomer
Origiaating Department Head:
Hugo Malanga
Additional Information Contact:
Hugo Malanga
6140
I FUND
� (tO)
�
�
7801 � (from)
I C115
PW77
� PS46
7801 �
!
ACCOifNT �
a
f'
.,
e
�8
541200
5391�0
539140
ov
�
CEN'I�ER I AMOUNT
0201150289�9 $200,000.00 �
060770152510 $116,081.00 �
070460132370 $386,024.00 �
. �
y
CITY SECRETA1tY
APPRQVED�
CITY COUNG�L
r
AUG 14 1999
�� ��
Cit� SecretuY of the
Cit� QE For4 Wost3i, 3F�r.as