HomeMy WebLinkAbout025232 - Construction-Related - Contract - Freese and Nichols, Inc.STATE OF TEXAS §
COUNTY OF TARRANT §
CITY SECRETARY CONTRACT NO. ��J �'3�
WHEREAS, the City of Fort Worth ("City") and Freese and Nichols, Inc. ("Consultant")
made and entered into City of Fort Worth Secretary Contract No. 24224 ("Contract"), which was
authorized by the City Council by M&C C-16995 on the 25th day of August 1998; and
WHEREAS, the Contract involves professional services for the following project: Village
Creek Wastewater Treatment Plant Uprating Modifications - Phase I; and
WHEREAS, it has become necessary to amend the Contract to include an increased scope
of work and/or revised maximum fee.
NOW, THEREFORE, City and Consultant, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the contract:
1.
EXHIBIT A- Supplemental Scope of Services of the Contract is amended by inserting
Section 2- Basic Services, Item 2.11: "Amendment No. 1 provides for the design of the additional
electrical improvements as summarized in Exhibit "B-6", attached hereto and incorporated herein.
2.
ATTACHMENT "B" - Compensation and Schedule of the Contract is amended to provide
for an increase of $130,000.00 in the maximum fee to be paid to Consultant for all work and services
under the Contract, as amended, so that the total fee to be paid by City for all work and services shall
not exceed the sum of $703,222.00.
3.
EXHIBIT "B-3" - Cost Summary of the Contract is amended by AMENDED EXHIBIT
"B-3", attached hereto and incorporated herein.
���0�8/�� G����G�D
C�� ����G�[�Q�
�0 1�'lV����a ��u�o
C�
All other provisions of the Contract which are not expressly amended herein shall remain
in full force and effect.
Executed on this the ��day of ;��Y,C�, 1999.
�
ATTEST:
,
�
�loria Pears n, City Secretary
APPROVED AS TO FORM
AND LEGALITY
Gary Stein erger, Assistant City Attorney
APPROVED FOR THE
FORT WORTH WATER DEPARTMENT
� ���
Lee . Bradley, Jr., P.E., ir�ctor
�--`����
Contract Authorization
6'�/S 99
Date
CITY OF FORT WORTH
By:
Mike �iroomer, Assistant Ciry �1Vlanager
CONSULTANT:
FREESE D NICHOLS INC.
By: `
; � ��_
Name: ����i" v� ��if/C-�
R
Title: �° v i� d ������'�'
4055 International Plaza, Suite 200
Fort Worth, Texas 76109-4895
ram:OFF98050 [R: \C ONTRAC'I11998�AMENDMN'I1FT W 98424. AM 1�
� AMENDED EXHIBIT "B-3"
FREESE � NiC1-IOLS
� COST' SUMMARY
VILLAGE CREEK WASTEWATER TREATMENT PLANT ~
UPRATING MODlP1CATIONS - PHASE ! �
Exhibit Scope of Servic�s
Fee
j�St � TH QllSafi ADVERTI�MENT PHAS�
1nital C;ontrast
4 New Filters, Reconfigure FC22 & FC24, $573,222
Modifications to FC13-24, Nydraulic
Relief after FC13, Electrical, Instrumentation, Controls
4mendmPnt N�_ 1
iditional Electrical Modifications
TOTAL {Inciuding Amendment No. 1)
Proposed MNVBE Sub-Consultants
Chiang, Patel & Yerby (CPYI)
$130,000
$703,222
M/WBE MM/BE Fee %
CPYf - $116,220 20.3% '
G&A � $10,000 1.7%
CPYI $45,884 35.3%
Services
Electrical, Mechanicai, Power,
Instrumentation, Engineer'rng
& SCADA System
$172,104 24.5% 2
Fees
$162,104
23.1%
Gorrondona & Associates, Inc. (G&A) Surveying Services $1Q,000 1.4%
Notes:
1. Proposed original M/WBE Participation as submitted in original contract
2. Proposed total M/WBE Participation After Amendment No. 1
RWy842t:1 vob3-AMEN.x4s, alt 7/99
t
FF2EESE - NICHOLS
EXMIBIT "B-4"
ADDITIONAL DESIGN ENGlNEERING SERViCES
AMENDMENT N0,1 - ADDITIONAL ELECTRICAL IMPROVMENTS �
VILLAGE CREEK WASTEWATER TREATMENT PLANT
UPRATING MODIFICATIONS - PHASE I
Revised 3/17/99:HIM
PIC/PM APM / Proj. Elec. QC /Res Total Basic
Task Description Engr. Enqr. Rep Tech WP Hours Services
(:ONSTRLGTIQN P ANS AND SPE .S
FNI 8 32 16 4 60 $6 264
CPY
Etectrical Improvments (See attached sheet
for deiai!) .
Addiiional Workshops/Meettngs
FNI
CPY
Construction Cost Estimates
FNI
CPY
Addiitonal M/WBE-SUB Coordinatior� - FNI
Additiona) Quality Control (QA/QC)
FNI
CPY
Additional Expenses
Computer Charges, etc.
Subcontraclor Mark-Up `
Tota! Hours
Tota! Eifort
tila: (FTW98424] t:\vo-b4lin-3.xls
16
8
4
8
2
46
16
8
24
16
.�
�
440 500 24 980 $96,933
16
8
16
16
4
�
468 16 532
' Reduced Mark-up rate due to retaining afready marked up slructural design fee
� Total
Effort
$6,264
$96,933
24 $3,204 $3,204
16 $1,914 $1,914
S $800 $800
8 $957 $957
44 $4,482 $4,482
4 44 . $5,383 $5,383
6 $880 $880
$2,OOQ $2,300
$6,883
32 1,190
$120,817 $130,000
r
E
�
��
AMENDED EXHIBIT "B-5"
FREESE � NICHOLS C�TY OF FORT WORTH
VtLLAGE CREEK WASTEWATER TREATMENT PLAN�'
UPRATING MODIFICATIONS - PHASE I
OPINION OF PROBABLE CONSTRUCTION COST
TASK #
ITEM 1
ITEM 2
0
ITEM 3
ITEM 4
ITEM 5
DESCRIPTtON
4 New Automatic Backwash Filters
Refocate Utility Road & Water Line
Reconfigure FC22 �& FC24 �
Modifications to FC13-24
Hydraulic Reiief Line After FC13
Electrical, Instrumentation, Controis
TC?TAL
Original - Prior to Amendment No. 1
AMENDMENT No. 1 Additional Electrical Improvements
TOTAL Including Amendment Nv. y
FlLE [FTW98424] AMEND-EXHIBIT-85xis
COST
$3,100,000
$1,250,000
$860,000
$130,000
$350,000
$5,690,000
$1,439,000
$7,129,000
�_ . .
ExH�6�-r ��B-s„
. SUMMARY OF ADDITIONAL ELECTRICAL�IMPROVEMENTS
VILLAGE CREEK 1NWTP UP�iATING MODIFICATiONS - PHASE 1-
AMENDMENT No. 7
(REVISED PER PLANT STAFF INPUT ON 3/11/99)
Manhole
51
45
26
26
43
42
42
41
37
68
54
46
Storm Water
4�4�
32
32
Selector Switch
39/42-40/41
25,26
10
28
24
45
31�,57
20
19
56
43/44
37
57
17/18
1/2
5/6
Location
Daft
Fiters
Grit
Cent.
RS 7
SW 3
NSW & S02
RS 2
RS 1
RS 3 "
Diq 3
Grease
S02
FE 1
PS3 & SS3
P E2A & B
Alternative
2
2
2
2
2
1
1
2
2
2
2
2
4
4
4
4
Alternative 1: Replace the fuses in the manholes with a selector switch with protective
- device (fuse or circuit breaker) in close location to the manhole. A short
tap feeder is provided from the manhole to the slector switch. Two longer
feeders are provided from the protective switch to the selector switch in the
the plarrt process area.
Altemative 2: Same as above except a"single" longer feeder is provided from the
protective switch to the selector switch in the plant process area.
Alternaiive 4: Consists of replacing tt�e tap feeders only.
,
City of Fort Worth, Texas
�✓I�Ayar And Caunc�l Cammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
6/15/99 **C-17474 60UPRATE I 1 of 1
SUBJECT AMENDMENT NO. 1 TO }iE ENGINEERING AGREEMENT WITH FREESE &
NICHOLS, INC. FOR THE DESIGN OF THE VILLAGE CREEK WASTEWATER
TREATMENT PLANT UPRATING MODIFICATIONS, PHASE I
�COMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No.1 to the
engineering agreement with Freese & Nichols, Inc., City Secretary Contract No. 24224, for the design of
the Village Creek Wastewater Treatment Plant (VCWWTP) Uprating Modifications, Phase I, increasing
the total contract cost by $130,000, from $573,222 to $703,222.
DISCUSSION:
On August 25, 1998 (M&C C-16995), the City Council authorized the execution of an engineering
agreement with Freese & Nichols, Inc. for the design of the VCWWTP Uprating Modifications, Phase I.
The Texas Natural Resource Conservation Commission requires that the VCWINTP either be
expanded or that the current permit be upgraded to a higher rated capacity. This project includes
specific facility modifications to provide the required capacity for the proposed rating of 166 MGD
(average day flow) and/or 369 MGD Peak Flow (2-hour peak). The project also includes the installation
of the four automatic backwash effluent filters and modifications to several existing final clarifiers
and aeration basins. As part of the design, the engineer was required to review the dual electric power
system for the connection of new process equipment. The engineer found that the primary equipment
fuses and electrical cable in the planYs dual electrical feed manholes facilities need to be replaced.
This amendment is for the design of additional electrical improvements for the VCWWTP. These
improvements include relocation of the primary equipment fuses and electrical cable in the planYs dual
electrical feed manholes. Freese & Nichols Inc. has proposed to do this work for a fee not to exceed
$130,OQ0.
Freese & Nichols, Inc. is in compliance with the City's M/WBE Ordinance by committing to an additional
33% M/WBE participation on this amendment.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Commercial Paper-Sewer Fund.
MG:k
Submitted for City Manager's
Office by:
Mike Groomer
Originating Department Head:
Lee Bradley, Jr.
Additional Informatioa Contact:
Lee Bradley, Jr.
I FUND I ACCOUNT I
� (to)
�
6140
�
8207 I (from)
PS46 531200
8207 I
�
CENTER I AMOUNT
070460300110 $130,000.00
CITY SECRETARY
����Q���
ceTY �ou���
.! JtJ 1 S 1999
�� r)
���...�
City Secretary ot the
Citq of Fo�rt Ji►ortJ►,'�x�+e