Loading...
HomeMy WebLinkAbout061549-A1 - Construction-Related - Contract - 170 Northstar Ranch Developer, Inc.Date Received: 06/01 /2026 City Secretary Time Received: 9 :16 a.m. Contract Number: 61549-Al FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 61549 A COMMUNITY FACILITIES AGREEMENT BETWEEN THE CITY OF FORT WORTH AND 170 NORTHSTAR RANCH DEVELOPER, INC. This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 61549 ("First Amendment") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the state of Texas, and 170 Northstar Ranch Developer, Inc. ("Developer"), a Texas corporation. WHEREAS, the City and Developer entered into a Community Facilities Agreement for the construction of public infrastructure improvements for a Project known as Northstar West Phase 3, City Project Number 104824, City Secretary Contract Number 61549 ("CFA"); and WHEREAS, a portion of the sanitary sewer Improvements being constructed pursuant to the CFA will connect lots to a gravity sewer main ("Gravity Lots"); and WHEREAS, the remaining sanitary sewer Improvements being constructed pursuant to the CFA will connect lots to a lift station being constructed by D.R. Horton — Texas, Ltd. under a separate community facilities agreement ("Lift Station Lots"); and WHEREAS, City and Developer desire to amend the CFA to reflect the timing of the provision of sanitary sewer service to the Gravity Lots and the Lift Station Lots; NOW THEREFORE, City and Developer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends City Secretary Contract No. 61549: 1. The CFA is amended to add Section 38 which shall be and read as follows: 38. Sanitary Sewer Service The Improvements being constructed pursuant to this Agreement are being constructed in connection with the Northstar West Phase 3 final plat FP-25-035 ("Final Plat"), which consists of 243 residential lots. Of the 243 lots, 59 of the lots will connect to a gravity sewer main that is being improved pursuant to this CFA ("Gravity Lots"). The remaining 184 lots connect to a lift station City of Fort Worth, Texas OFFICIAL RECORD Amendment No. 1 to City Secretary Contract No. 61549 CITY SECRETARY Page 1 of 4 FT. WORTH. TX being constructed by D.R. Horton — Texas, Ltd., City Project Number 105187, City Secretary Contract Number 63381 ("Lift Station") that is currently under construction ("Lift Station Lots"). The Gravity Lots and Lift Station Lots and their connection points are more specifically identified in Exhibit D which is attached hereto and incorporated herein by reference. After the City has accepted the improvements in this CFA, and the Final Plat is recorded, City will allow sanitary sewer service to be provided to the Gravity Lots. The City shall not provide sanitary sewer service to the Lift Station Lots, and the City shall not issue any building permits for the Lift Station Lots until the Lift Station is constructed and accepted by the City. 2. The CFA is amended to add Exhibit D, which is attached hereto and incorporated herein by reference. 3. a. All other provisions of City Secretary Contract Number 61549 which are not expressly amended herein, shall remain in full force and effect. b. All terms in this First Amendment that are capitalized, but not defined, shall have the meanings ascribed to those terms in City Secretary Contract Number 61549. [SIGNATURE PAGE FOLLOWS] City of Fort Worth, Texas Amendment No. 1 to City Secretary Contract No. 61549 Page 2 of 4 IN TESTIMONY WHEREOF, the City and Developer have executed this First Amendment to be effective on the date signed by the City's Assistant City Manager. CITY OF FORT WORTH CA Jesica McEachern Assistant City Manager Date: 05/31 /2026 Recommended by: Dwayne Hollars Sr. Contract Compliance Specialist Development Services Department Approved as to Form & Legality: Richard A. McCracken Sr. Assistant City Attorney M&C No. N/A Form 1295: N/A d4'; &44TnC a F%0 ATTEST: Qom, � nu aaQn��og4a Jannette S. Goodall City Secretary City of Fort Worth, Texas Amendment No. 1 to City Secretary Contract No. 61549 Page 3 of 4 DEVELOPER 170 Northstar Ranch Developer, Inc. 1- -41 Kim Gill (May 26, 2026 18:01:37 CDT) Kim Gill President Date: 05/26/2026 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including all performance and reporting requirements. Kandice Merrick Development Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Exhibit D City of Fort Worth, Texas Amendment No. 1 to City Secretary Contract No. 61549 Page 4 of 4 FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: 170 Northstar Ranch Developer, Inc. Subject of the Agreement: CFA - Amendment M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ 61549 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No 8 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104824 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.