HomeMy WebLinkAbout061549-A1 - Construction-Related - Contract - 170 Northstar Ranch Developer, Inc.Date Received: 06/01 /2026
City Secretary
Time Received: 9 :16 a.m. Contract Number: 61549-Al
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 61549
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND
170 NORTHSTAR RANCH DEVELOPER, INC.
This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER
61549 ("First Amendment") is made and entered into by and between the City of Fort Worth
("City"), a home -rule municipal corporation of the state of Texas, and 170 Northstar Ranch
Developer, Inc. ("Developer"), a Texas corporation.
WHEREAS, the City and Developer entered into a Community Facilities Agreement
for the construction of public infrastructure improvements for a Project known as Northstar
West Phase 3, City Project Number 104824, City Secretary Contract Number 61549 ("CFA");
and
WHEREAS, a portion of the sanitary sewer Improvements being constructed pursuant
to the CFA will connect lots to a gravity sewer main ("Gravity Lots"); and
WHEREAS, the remaining sanitary sewer Improvements being constructed pursuant
to the CFA will connect lots to a lift station being constructed by D.R. Horton — Texas, Ltd.
under a separate community facilities agreement ("Lift Station Lots"); and
WHEREAS, City and Developer desire to amend the CFA to reflect the timing of the
provision of sanitary sewer service to the Gravity Lots and the Lift Station Lots;
NOW THEREFORE, City and Developer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends City Secretary
Contract No. 61549:
1.
The CFA is amended to add Section 38 which shall be and read as follows:
38.
Sanitary Sewer Service
The Improvements being constructed pursuant to this Agreement are being constructed in
connection with the Northstar West Phase 3 final plat FP-25-035 ("Final Plat"), which consists of
243 residential lots. Of the 243 lots, 59 of the lots will connect to a gravity sewer main that is being
improved pursuant to this CFA ("Gravity Lots"). The remaining 184 lots connect to a lift station
City of Fort Worth, Texas OFFICIAL RECORD
Amendment No. 1 to City Secretary Contract No. 61549 CITY SECRETARY
Page 1 of 4 FT. WORTH. TX
being constructed by D.R. Horton — Texas, Ltd., City Project Number 105187, City Secretary
Contract Number 63381 ("Lift Station") that is currently under construction ("Lift Station Lots").
The Gravity Lots and Lift Station Lots and their connection points are more specifically identified
in Exhibit D which is attached hereto and incorporated herein by reference.
After the City has accepted the improvements in this CFA, and the Final Plat is recorded,
City will allow sanitary sewer service to be provided to the Gravity Lots. The City shall not provide
sanitary sewer service to the Lift Station Lots, and the City shall not issue any building permits for
the Lift Station Lots until the Lift Station is constructed and accepted by the City.
2.
The CFA is amended to add Exhibit D, which is attached hereto and incorporated herein
by reference.
3.
a. All other provisions of City Secretary Contract Number 61549 which are not expressly
amended herein, shall remain in full force and effect.
b. All terms in this First Amendment that are capitalized, but not defined, shall have the
meanings ascribed to those terms in City Secretary Contract Number 61549.
[SIGNATURE PAGE FOLLOWS]
City of Fort Worth, Texas
Amendment No. 1 to City Secretary Contract No. 61549
Page 2 of 4
IN TESTIMONY WHEREOF, the City and Developer have executed this First
Amendment to be effective on the date signed by the City's Assistant City Manager.
CITY OF FORT WORTH
CA
Jesica McEachern
Assistant City Manager
Date: 05/31 /2026
Recommended by:
Dwayne Hollars
Sr. Contract Compliance Specialist
Development Services Department
Approved as to Form & Legality:
Richard A. McCracken
Sr. Assistant City Attorney
M&C No. N/A
Form 1295: N/A d4'; &44TnC
a F%0
ATTEST:
Qom, � nu aaQn��og4a
Jannette S. Goodall
City Secretary
City of Fort Worth, Texas
Amendment No. 1 to City Secretary Contract No. 61549
Page 3 of 4
DEVELOPER
170 Northstar Ranch Developer, Inc.
1- -41
Kim Gill (May 26, 2026 18:01:37 CDT)
Kim Gill
President
Date: 05/26/2026
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including all
performance and reporting requirements.
Kandice Merrick
Development Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Exhibit D
City of Fort Worth, Texas
Amendment No. 1 to City Secretary Contract No. 61549
Page 4 of 4
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: 170 Northstar Ranch Developer, Inc.
Subject of the Agreement:
CFA - Amendment
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ 61549
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 104824
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.