HomeMy WebLinkAbout064126-CO1 - Construction-Related - Contract - McCarthy Building Companies, Inc.CSC No. 64126-COl
FORT WORTH City of Fort Worth
Change Order Request
Project Name: I Water and Sanitary Sewer Replacement on Camp Bowie: Will Rogers - Part 4 City Sec No.: F64126
Project No.(s):1 1050624 DOE No. N/A City Proj. No.: 105062-4
Project Description:
Water and Sanitary Sewer Repalcement on Tower Dr from W. Lancaster Ave to Burnett Tandy Dr.
Contractor: I McCarthy Building Companies, Inc. Change Order # 0 Date: 5/14/2026
City Project Mgr.1 Preeti KC City Inspector: I Shane Behn
Phone Number: 817-392-5467 Phone Number: 817-392-2190
Dept. I Water
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Revised Contract Amount $2,277,708.68
Original Funds Available for Change Orders $114,070.00
Remaining Funds Available for this CO $114,070.00
Additional Funding (if necessary)
Sewer Paving Totals Contract Time
(Calender days)
527,265.60 1 $3,808,673.77 1200
265.60 1 1 $3,808,673.77
!4 $0.00 $19,976.73 62
.36 $3,788,697.04 262
0 I $190,433.00
0 �190.433.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 -0.52%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,760,842.21
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 1 includes revisions to the project scope associated with the redesign of Tower Drive. The concrete pavement portion was
removed from the scope and will be completed under a separate project by Public Events. The original pay item was revised, and new
proposed pay items have been incorporated accordingly. The change order also provides pay item quantities for permanent pavement repair.
This change order also provides compensation for updated traffic control plan, as Public Events required the contractor to maintain one lane
of traffic at all times during construction. In addition, it includes additional exploratory excavation needed to avoid conflicts with the existing
electric duct bank and existing water services prior to pipe installation.
Staff concurs with the contractor's request for an 62 additional calendar days for the change order.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order,
Contractor's Company Name
Contractor Name
Contractor Signature
Date
McCarthy Building Companies, Inc.
I Mark Valdez
I A+arkWd-
05/19/2026
Inspector
Date
Project Manager
Date
05/21 /2026
05/19/2026
Director (Water Dept)
Date
Construction Supervisor TPW Dept Water
Date
Chritio her fhZVde;- T. S
inn-.., � '�fi9fi o4a, C IT
05/26/2026
Donald watson
:Assistant
05/21 /2026
Senior Assistant City Attorney
Date
City Manager
Date
05/26/2026
05/31 /2026
Council Action (If Required)
M&C Number N/A M&C Date Approved
Fn RT WO RT H City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer Replacement on Camp Bowie: Will Rogers - Part 4 City Sec No.: 64126
Project No.(s): 105062-4 DOE No. N/A City Proj. No,: 105062-4
Project
Description
Water and Sanitary Sewer Repalcement on Tower Dr from W. Lancaster Ave to Burnett Tandy Dr.
Contractor McCarthy Building Companies, Inc. I Change Order:=1 Date: 1 4/6/2026
City Project Mgr. Preeti KC City Inspector FShane Behn
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
21
Construction Staking
Water
1.00
EA
$10,000.00
$10,000.00
37
REMOVE CONC PVMT
Water
1,819.00
SY
$55.55
$101,045.45
38
11" CONC PVMT WITH MONOLITHIC CURB
Water
725.00
SY
$302.00
$218,950.00
39
8" LIME TREATMENT (40LBS/SY)
Water
1,798.50
SY
$24.00
$43,164.00
40
HYDRATED LIME
Water
35.97
SY
$396.75
$14,271.10
41
REMOVE BRICK PVMT
Water
94.00
SY
$155.98
$14,662.12
30
6" Concrete Sidewalk
Water
80.00
SF
$13.25
$1,060.00
42
6" PVC Fire Lane W/6" MJ Solid Sleeve
Water
1.00
EA
$10,623.25
$10,623.25
43
Cut and Restore Paving - Demo/Subgrade/HMA
Water
1,169.00
LF
$168.50
$196,976.50
25
Exploratory Excavation of Existing Utilities
Sewer
1.00
EA
$21,466.96
$21,466.96
34
REMOVE CONC PVMT
Sewer
987.00
SY
$55.55
$54,827.85
35
11" CONC PVMT WITH MONOLITHIC CURB
Sewer
214.00
SY
$302.00
$64,628.00
36
8" LIME TREATMENT (40LBS/SY)
Sewer
1,007.50
SY
$24.00
$24,180.00
37
HYDRATED LIME
Sewer
20.43
SY
$396.75
$8,105.60
38
Barricades, Sign and Traffic Handling
Sewer
1.00
LS
$151,705.31
$151,705.31
39
Concrete Curb and Gutter- Demo and Replacement
Sewer
46.00
LF
$431.04
$19,827.84
40
Additional Exploratory Excavation of Existing Utilities
Sewer
13.00
EA
$4,500.00
$58,500.00
Page 1 of 1
Water
$610,752.42
Sewer
$403,241.56
Paving
Additions Sub Total
$1,013,993.98
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Water and Sanitary Sewer Replacement on Camp Bowie: Will Rogers - Part 4 City Sec No.: 64126
Project No.(s): 105062-4 DOE No. N/A City Proj. No.: 105062-4
Project Description Water and Sanitary Sewer Repalcement on Tower Dr from W. Lancaster Ave to Burnett Tandy Dr.
Contractor
McCarthy Building Companies, Inc.
Change Order: =
Date 5/14/2026
City Project Mgr.
Preeti KC
City Inspector:
FShane Behn
DELETIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
10
4"-12" WATER ABANDONMENT PLUG
Water
1.00
EA
$2,464.41
$2,464.41
24
REMOVE CONC PVMT
Water
2,660.00
SY
$45.00
$119,700.00
25
11" CONC PVMT (NO CURB)
Water
81.50
SY
$175.00
$14,262.50
26
11" CONC PVMT WITH MONOLITHIC CURB
Water
1,695.00
SY
$225.00
$381,375.00',
27
8" LIME TREATMENT (40LBSISY)
Water
2,850.00
SY
$18.30
$52,155.00
28
HYDRATED LIME
Water
57.00
TN
$345.00
$19,665.00
29
REMOVE BRICK PVMT
Water
191.00
SY
$130.00
$24,830.00'
26
REMOVE CONC PVMT
Sewer
1,745.00
SY
$45.00
$78,525.00
27
11" CONC PVMT (NO CURB)
Sewer
34.50
SY
$200.00
$6,900.00
28
11" CONC PVMT WITH MONOLITHIC CURB
Sewer
1,108.00
SY
$235.00
$260,380.00
29
8" LIME TREATMENT (40LBSISY)
Sewer
1,936,00
SY
$18.30
$35,428.80
30
HYDRATED LIME
Sewer
39.00
TN
$345.00
$13,455.00
31
REMOVE BRICK PVMT
Sewer
191.00
SY
$130.00
$24,830.00
Pale 1 of 1
Water
$614,451.91
Sewer
$419,518.80
Paving
Deletions Sub Total 1$1,033,970.71
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Preeti KC
Name of Employee
Sr. Professional Engineer
Title
ATTEST:
04 aRpn
4onr a
p1F
o� o °
i
aan��z P5.o4
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: McCarthy Building Companies, Inc.
Subject of the Agreement: Water ans Sanitary Sewer Replacement on Camp Bowie: Will Rogers - Part 4
M&C Approved by the Council? * Yes ❑ No M
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 0 No ❑ 64126-COl
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 0 No ❑
If unsure, see backpage for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 0 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date: N/A
If different from the approval date.
Expiration Date: N/A
If applicable.
Is a 1295 Form required? * Yes ❑ No ED
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 105062-4
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 0 No ❑
Contracts need to be routed for CSO processing in the followingorder:
rder:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be