HomeMy WebLinkAbout059298-A3 - Construction-Related - Contract - Halff Associates, Inc.CSC No. 59298-A3
AMENDMENT No . 3
TO CITY SECRETARY CONTRACT No. 59298
WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 59298, (the
CONTRACT) which was authorized by M&C 23-0269 on the 1111 day of April,
2023 in the amount of $170,380.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1
in the amount of $9,680.00 which was administratively authorized on
September 12, 2023, and Amendment Number 2 in the amount of $56,295.00
which was administratively authorized on November 17, 2023; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
S. Hulen Street and South Drive Highway Safety Improvement Project
(HSIP) , CPN 104095; and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $14,012.04. (See Attached Funding Breakdown Sheet, Page
OFFICIAL RECORD
CITY SECRETARY
2. FT. WORTH, TX
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $250,367.04.
City of Fort Worth, Texas S. Hulen Street and South Drive HSIP
Prof Services. Agreement Amendment Template CPN 104095
Revision Date: June 13, 2025
Page 1 of 4
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
DATE: 05/31 /2026
6avvvaL
ATTEST: p� �FORT9Pd
�o
v�o oid
°° °s 4p
bq�A oa
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
Ma,�tln A. Thl'411�
Martin A. Phillips (May 21, 2026 08:50:31 CDT)
Lauren Prieur
ENGINEER
Halff Associates, Inc.
David A. Burkett (May 13, 2026 08:57:39 CDT)
David A. Burkett, P.E.
Vice President
DATE: 05/13/2026
Director, Transportation & Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
dada, OFFICIAL RECORD
Fanta Kaba, P . E . , PTOE CITY SECRETARY
Proj ect Manager FT. WORTH, TX
City of Fort Worth, Texas S. Hulen Street and South Drive HSIP
Prof Services Agreement Amendment Template CPN 104095
Revision Date: June 13, 2025
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
wmr-
Douglas Black (May 26, 2026 13:13:17 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth., Texas
Prof Services. Agreement Amendment Template
Revision Date: June 13, 2025
Page 3 of 4
M&C No.#: N/A
M&C Date: N/A
S. Hulen Street and South Drive HSIP
CPN 10409'5
FUNDING BREAKDOWN SHEET
City Secretary No. 59298
Amendment No. 3
Fund
Dept ID
Account
Project
ID
CF1-
Activity
CF2 -
Bond
Reference
Amount
34027
0200431
5330500
104095
007230
22010207
14,012.04
Total:
$14,012.04
City of Fort Worth, Texas S. Hulen Street and South Drive HSIP
Prof Services Agreement Amendment Template CPN 104095
Revision Date: June 13, 2025
Page 4 of 4
RT WORTH.
ATTACHMENT "A"
Scope for Engineering Design Related Services for Intersection Improvements
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The objective of the S. Hulen St. and South Dr. Highway Safety Improvement Project
(HSIP) is project is to improve safety of the intersection by providing lane offsets for
the northbound and southbound turn lanes along S. Hulen Street. Also included are
improvements to the traffic signal equipment including cameras, Opticom system and
controller equipment, as well as the addition of new striping to delineate dedicated
left and right turn lanes on South Drive and constructing appropriate repairs to the
curb ramps and crosswalk facilities as needed to comply with the Americans with
Disabilities Act (ADA) requirements.
WORK TO BE PERFORMED
Task 1. Design Project
Design.•
Task 3. Preliminary ■- -••
Task 4. Final Design..• .••
PhaseTask 5. Bid
Task •. Construction
Task 7. RO
Task 8. Survey and SubsurfaGe Utility Engineering Services
Task • ..
Task rrniWRg
City of Fort Worth, Texas S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
Attachment A CPN 104095
PMO Release Date: 07.23.2012
Page 1 of 27
RT WORTH.
ASSUMPTIONS
• Eight (8) meetings with the ether oensi iltant
• ENGINEER 411 only he responsible for QAQG of GNGINEE ?�OjeGt. The other-
nonsi iltant will perform it AQG of their werL
• ENGINEER will be responsible fE)F GOFnpffi'!Rg and iRGE)rpoFating sheets and
i nfermatien preyirdeld frem the ether oensi Rant
• ENGINEER well not he responsible fer atteR ding separate design revie�ni
meetings for ADDITIONAL PRO ECTC
Glearanoe of ADDITIONAL PRO ECTC
City of Fort Worth, Texas Page 2 of 27
Attachment A
PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
Page 2 of 27 CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 3 of 27
Page 3 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
Prepare
PFejeGt Status
Reports•
and submit
menthly
■_
updates
i Attachment D to thms
with a SGhedule
narrativ
s required
...
-
..
._
Stakeholder
Register,gister,
• Gemplete
prelimiRary
Monthly M/VVBE
Report Form
and Final
Summary Payment Report
Form
at the end of the
projeGt
preposed
the desig44
• With
infrastruGture,
information to
tO
and provide and
obtain
needed prepare
ENGINEER
their
respelat
GOmmuniGate
are apprepriately
autherofies
• -.
GOOFdination
with permitting
authorities,
that
with permitting
authorities
on the designs.
SUIGh
ENGINEER
regulatory requiremeRtS
refleGted
to
the designs,
shall work with regulatory
to
obtain
approval of
and
make Ghanges neGessary
10Gation,
ASSUMPTIONS
• ..kiGkeffiGharteriRg
the ENGINEER
or any of its sub
Gensultants
shall Garry readily visible
Meeting
Zero (0)
field review
meetings
meetings•
..%
aGquisition
. -..
These
meetings are to
be held
virtually.
• ...%
phase.
submOttal required
for the Gity and.for
..
.•
• ..
_.%
be Geerdinated
by CITY
staff and indude TxDQT
RaR review
meetings
will
will
prior te submissieR.
• All
te the
City be Quality
submittals
will cheGked
DrejeGt design phase is ontininate d to take ton (10) mOnths innli irdinn
twelve (9 7) months
City of Fort Worth, Texas Page 4 of 27
Attachment A
PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
Page 4 of 27 CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 5 of 27
Page 5 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 6 of 27
Page 6 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 7 of 27
Page 7 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 8 of 27
Page 8 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 9 of 27
Page 9 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 10 of 27
Page 10 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
•
• ■ •
.. ., ..
.1 . MM
��
..
-
■. -04,
MMM, .. • ■.
PrejeGt
Summary
Sheets
be
the 600%,
900%/951%
1001% design
will
and
ENGINEER•
Ges_..
..•
..•
pal3ages.use■.
ASSUMPTIONS
t-G the
CITY fA-.r
11 ..•
Design
A PDF
fole for
the 900%/950,;
Design
be fFom
design
CAD
drawings
and will
_.
be uploaded
to
the
will
folder On the
GFeated
Gity's dGIGUrnent
projelSt
management
system
(BIM
-sets
11 "xi 7"
drawings
two
be
delivered
te the
CITY f9F
of
the ..•
size
Design
and (2) set
of speGifiGations
will
A PDF
fole fer
the 100%
Design be
Greated from design
CAD drawings
and
well be
_.
uploaded
ENGINEER
to the
folder
will
On City's
dGIGUMent management
systern
(BIM
PF0jeGt
TxPOT
will
PFIGIvide
DELIVERABLES
A. ..•
.. deGumentati
B. Utility
G. .. •
F810Gatien dGIGUrrentation.
.. ..
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 11 of 27
Page 11 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 12 of 27
Page 12 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH,
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will not provide GeRStFIAGrtt phase seFy'Ges fer this preieGt
ENGINEER will support the construction phase of the project as follows.
6.1. Ge tFUGtt n Phase S Sri e#
6.2 Record Drawings
• The ENGINEER shall prepare record drawings for CSJ 0902-90-207 and compile
a complete set of record drawings to include all three CSJs (0902-90-207, 0902-
90-209, and 0902-90-212) from information provided by the CITY and/or TxDOT
depicting any changes made to the Final Drawings during construction.
Information provided by the CITY and/or TxDOT may include, but is not limited to
the following:
o As -Built Survey
o Red -Line Markups from the Contractor
o Red -Line Markups from City/TxDOT Inspector
o Copies of Approved Change Orders
o Approved Substitutions
o Record drawings prepared by the Engineer of Record for CSJs 0902-90-209
and CSJ 0902-90-212.
• The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
City of Fort Worth, Texas Page 13 of 27
Attachment A
PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
Page 13 of 27 CPN 104095
RT WORTH,
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not. Each sheet shall clearly indicate all changes which apply to that sheet by
clouding and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
These Record Drawings were prepared using information
provided by others and represent the as constructed
conditions to the extent that documented changes were
provided for recording. The ENGINEER assumes no liability
for undocumented changes and certifies only that the
documented changes are accurately depicted on these
drawings.
• The ENGINEER shall submit a set of sealed Final Drawings, modified and
stamped as Record Drawings, in Adobe Acrobat PDF format (version 6.0 or
higher) and in DWF format. The ENGINEER may keep copies of the
information provided by the CITY and/or TxDOT for their files, but all original red -
lined drawings shall be returned to the CITY with the digital files.
• There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a
separate PDF and DWF file for the Water plan set, if required. Each PDF and
DWF file shall contain all associated sheets of the particular plan set. Singular
PDF and DWF files for each sheet of a plan set will not be accepted. PDF
and DWF files shall conform to naming conventions as follows:
I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number of
sheets in this file.
Example: X-12755_org18.pdf
Both PDF and DWF files shall be uploaded to the project's Record Drawing folder
in the City's document management system (BIM 360).
For information on the proper manner to submit files and to obtain a file number for
the project, the ENGINEER should coordinate with the City project manager. File
numbers will not be issued to a project unless the appropriate project numbers and
fund codes have been assigned and are in the Department of Transportation and
Public Works database.
ASSUMPTIONS
• The ENGINEER will not attend the pre -construction conference.
• The ENGINEER will not attend project construction meetings
City of Fort Worth, Texas Page 14 of 27
Attachment A
PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
Page 14 of 27 CPN 104095
RT WORTH.
• The CITY will handle any public involvement or public meetings during the
construction phase of this project including any exhibits. The ENGINEER will not
provide assistance with a public meeting during the construction phase.
• Two (2) site visits are assumed.
• Four (4) submittal reviews are assumed.
• Four (4) RFI's/Change Order reviews are assumed.
• Two (2) Change Orders are assumed.
• The CITY will provide the ENGINEER record drawings prepared by the Engineer
of Record for CSJs 0902-90-209 and CSJ 0902-90-212. The ENGINEER will not
be responsible for the content or preparation of those sheets.
DELIVERABLES
A. Nene Response to Contractor's Request for Information
B. Review of Change Orders
C. Review of shop drawings
D. Final Punch List items
E. Record Drawings in digital format
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 15 of 27
Page 15 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 16 of 27
Page 16 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 17 of 27
Page 17 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
Reselve d4ereRees betweeR designated utilities and utility rewrds and surveyed
pp� �r+oRaRGe
City of Fort Worth, Texas Page 18 of 27
Attachment A
PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
Page 18 of 27 CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 19 of 27
Page 19 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 20 of 27
Page 20 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
h S Ffa% \Not is Ferm — Halff Will nemnleto the S FfaGe \A/otor
A�CJU'TTCfGG�YClC
SeGtiGIR 402 of the Glean Water Ant
SeGtiGIR 404 of the Glean Water Ant
City of Fort Worth, Texas Page 21 Of 27
Attachment A
PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
Page 21 of 27 CPN 104095
RT WORTH.
• Determinotien of the appropriate nreiert_ onedfin level of inns Iini fer
the
• Genoirderation of the proient design and ROW real Iirementc
f
innll Irdino preient exoayation real iirementc antidpaterd C QVV
I
acq Iioition aR d the rdemolitien er mordifinatien of otrl Intl Irec
I
City of Fort Worth, Texas Page 22 of 27
Attachment A
PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
Page 22 of 27 CPN 104095
RT WORTH.
lfrril■��� _ I■TT.71:ZS�T71tG1M■7IIA�Tt,P.T.7
DELIVERABLES
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 23 of 27
Page 23 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort worth, Texas Page 24 of 27
Attachment A
PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
Page 24 of 27 CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 25 of 27
Page 25 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 26 of 27
Page 26 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
RT WORTH,
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition.
• Services related to development of the CITY's project financing and/or budget.
• Services related to the development and execution of a Local Project Advance
Funding Agreement (LPAFA) with TxDOT.
• Services related to disputes over pre -qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Construction management and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 27 of 27
Page 27 of 27
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
CPN 104095
ATTACHMENT B
COMPENSATION
Design Services for
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
City Project No. 104095
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the ENGINEER's team member performing the work.
Labor Category Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
2023
Rate
$/hour
2024
Rate
$/hour
2025
Rate
$/hr
2026/27
Rate
$/hr
QA Manager
265.00
278.25
292.16
306.77
Project Manager
250.00
262.50
275.63
289.41
Project Engineer
205.00
215.25
226.01
237.31
E IT
130.00
136.50
143.33
150.50
CADD
143.00
150.15
157.66
165.54
Environmental
Project/QC Manager
200.00
210.00
220.50
231.53
Senior Environmental Scientist
141.00
148.05
155.45
163.22
Mid -Level Environmental
Scientist
123.00
129.15
135.61
142.39
Junior Environmental Scientist
95.00
99.75
104.74
109.98
RPLS
165.00
173.25
181.91
191.01
Survey Tech
125.00
131.25
137.81
144.70
Survey Crew 2-Person
175.00
183.75
192.94
202.59
Administrative
105.00
110.25
115.76
121.55
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 4
CPN 104095
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
LIM
ATTACHMENT B
COMPENSATION
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 4
CPN 104095
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Fee Amount %
Prime Consultant
Halff Project Original Agreement $145,201.00 85.2%
Associates, Management Addendum No. 1 $880.00 9.1 %
Inc. and Design
Addendum No. 2 $56,295.00 100%
Proposed Sub -Consultants
ARS SUE, ROW/
Engineering, Easement
Inc. Services
Addendum No-3 $14,012.04 100%
Total (Original Agreement $216,388.00 86.4%
+ Addenda Nos. 1, 2 & 3)
Original Agreement $25,179.00 14.8%
Addendum No. 1 $8,800.00 90.9%
Addendum No. 2 $0.00 0%
Addendum No. 3 $0.00 0%
Total (Original Agreement $33,979.00 13.6%
+ Addenda Nos. 1, 2 & 3)
Original Agreement
$170,380.00
100%
Addendum No. 1
$9,680.00
100%
TOTAL Addendum No. 2
$56,295.00
100%
Addendum No. 3
$14,012.04
100%
Total (Original Agreement
+ Addenda Nos. 1, 2 & 3)
$250,367.04
100%
Project Number & Name
Total Fee
CPN104095
S. Hulen St. and South Dr.
Highway Safety
Improvement Project (HSIP)
Original Agreement
$170,380.00
Addendum No. 1
$9,680.00
Addendum No. 2
$56,295.00
Addendum No. 3
$14,012.04
Total (Original Agreement +
Addenda Nos. 1, 2 & 3
$250,367.04
City of Fort Worth, Texas CPN 104095
Attachment B S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
Revised Date: 12/9/2022
Page 3 of 4
B-3
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 4 of 4
CPN 104095
S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP)
A
j)
}
,,,,}
}
..........
)]
k
oN
§%
(
AR
m;
^~
e
}
LS
)/)g420
/
o of
{_/
� /
- ---------- ----------- ---------------------- ----------- ----------- - --------- ----------- ---- --
CD
i f
—
- - ------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- i ------------ i ------------ ----------- ----------- ----------- --- ------- ----------- -----------
co
B
--------- - --- ------- --- ------- --------- - ---- ------ --- ------- --------- - ---- ------ --- ------- --------- - ---- ------ --- ------- ---------- - -- ------ ---- ------ -------
---------- -- -------- -------- -- ----------- -- -------- ----------- --------- ----------- ----------- ----- ----- ----------- ---- ---- - - -------- --- ------- -------
----------- 4 ----------- 4 ----------- ----------- 4 ----------- 4 ----------- 4 ----------- 4 ----------- ----------- ----------- ----------- ----------- ----------- ----------- -----------
kn
- -
---------- - --- ------- ----------- --------- - ----------- --- ------- ----------- --- ----- - - -- ----- --- ------- ---- ---- - ---------- ----------- ----------- - --------- ----------- ---- --
i t
------------ ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ........... ........... ----------------------------------- ----------- -----------
- —
------- - - - - - - - ------------------------ ----------- - -------- ------ --- ------ -----------
IL
p
pi 2 i�! 2, F4 ai N N FA Any
2
i2- - - - - - - - - -
<U<1< < < as < < < < < < < < < a < < < < < a s a a a ma < a a < < < < < q s a a <
cu
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
cu
cz
J5
x
83
16 2
z E> iE M E n 2
Q
ctory
45
�18 -I
it ol 0 R 17 a
LL
O
cz
-----------'-----------`--------'------------
----- --- `-----`
------- - ------ ------ ------------ ------ ------- ----- --- -----rA
..:----------- ........... ............
:..._..._:.....------,...._.....:..........:__.._----- ..._.--. J........... :.._._..-- -',_.._..----
---__-_.:------- ._..--- ---------- ------ ..
d
o
kn
a
d
OL.
w o 0 0 0 0 0 ..... a .. 0 0 0 F o o -
c
a Q a a a¢ a a a a¢
a¢ a a a a¢ a a a a a a a a a a a a a a a
a a a a a a a a a 'a a a a a a a a
u'
a a a a m a a a
c S P 2
a m a a a m a a a a a a a a a a a a a a a¢
�S � ��� �$ a
¢¢ a a a a a a¢ aQ a av a a a a a a
�
o� o 0 o
Boo ? o o � � o� o
o❑ o S o � � � o 0 0 ��� S 8
o
o cu
.. ... e..
o 0 0. o o.
o. . . o o o o a o 0 0�
a o o
a
o
N ry
S 8 m.m.o.N..
m n
F F. N �� o.o N oR R
N
�
m v
ci ❑ � _
U
�
a1
1]{
2Aj
Z
-gyp
cu
S_c
m
ca
rc
�Eo
O o.
E
O
h a K
al
r� yy E a
d G .E '$ 6 'a U
E
d$ O
❑� c a g ❑ i0 p
70
m a A
Ss-9 E E
a di
9 'm
's psi 2 pS� E
`�
76
ii J. cg o
$ .� .� c ti E i,
5 a
K$_— li
`o 0 0 o D 8❑ E
" a tt U U 8 L E
S
C
4 t
9 E
€ 8 R 3
a j 8 8 0 ,- 0 8 F Q m
6
w m a<¢
o o S
P
o
= 5
LL
III
,.
O
cz
co
g
-----------'-----------`--------'------------ ----- --- `-----` -------------------- -- - ---------- - ------
a
..:......._.J,.........-. J,.._.._...>....--.._ =---------- ---------------------- ------ ---- _--------.------------ _._- -_--- .-----
-- - -
^,
O
a
I
g
CIS
d
o
�
kn
a
V
d
�
0.
o ohm ,
�LL
v
C
o o w o a o a o 0 0 0 0 0 0 0? o o.. o a o o.. o 0 0
a s a a a Q a a a a a a a. m. . m m .„ m
� w �
au
o �
a
Si
o o h o 0 o o 0 0 0 0- o 0 0 0 0
a
1
c
c
R
co
C
v
fEIE
E s c 3
i
m N .'MT
q
Q
n _
E
8 g € $ s, P .a E
a
c'S
oB-aoau
m o Utsd u m o m a
3
O
x
E c m cc 5 8 8 n$ g ie z tU�
2 S 4€ E iE �, obi o 'obi 5O
O 9C_
LP
4� M�
N
S8 Q Y V
op�m�go¢��gm�gm��
o
C
LL
U
U
o
I I I
DOCUMENT TITLE:
M&C:
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
S Hulen St & South Dr Highway Safety Improvements Project
Engineering Contract Amendment #3
CPN: 104095 CSO: 59298 DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Alexandra Ripley
TPW - initial
05/13/2026
2.
David Burkett, Consultant
Consultant - Signatures
May 13, 2026
3.
Fanta Kaba
TPW - Signature
Fk
May 13, 2026
4.
Chad Allen
TPW -initial
CA
May 19, 2026
5.
Lissette Acevedo
TPW -initial
C�v
May 19, 2026
6.
Patricia Wadsack
TPW - initial
�[�
May 20, 2026
7.
Lauren Prieur
TPW - signature
MAP
May 21, 2026
8.
Doug Black
Legal - signature
DouA=ask
May 26, 2026
9.
Jesica McEachern
CMO - signature
CA
05/31/2026
10.
Jannette Goodall
CSO - signature
ett� eGootlall
06/01/2026
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
Jay will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: []YES []No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsa FortWorthTexas.gov at ext. 7233 or 8363, for pick up when
completed. Thank you!
Updated 12.07.2022, mdhm
FORT WORTH.
City Secretary's Office
Contract Routing & Transmittal Slip
Contractor's Name: Halff Associates, Inc.
Subject of the Agreement: S Hulen St & South Dr Highway Safety Improvements - Prof Services Agreement Amendment
M&C Approved by the Council? * Yes ❑ No 8
If so, the M&C must be attached to the contract.
Is this an Amendment to an Existing contract? Yes 8 No ❑ CSC No. 59298-A3
If so, provide the original contract number and the amendment number.
Is the Contract "Permanent"? *Yes 8 No ❑
If unsure, see back page for permanent contract listing.
Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is
Confidential, please list what information is Confidential and the page it is located.
Effective Date:
If different from the approval date.
Expiration Date:
If applicable.
Is a 1295 Form required? * Yes ❑ No 8
*If so, please ensure it is attached to the approving M&C or attached to the contract.
Project Number: If applicable. 104095
*Did you include a Text field on the contract to add the City Secretary Contract (CSC)
number? Yes 8 No ❑
Contracts need to be routed for CSO processing in the following order:
1. Katherine Cenicola (Approver)
2. Jannette S. Goodall (Signer)
3. Allison Tidwell (Form Filler)
*Indicates the information is required and if the information is not provided, the contract will be
returned to the department.
104095: S Hulen St & South Dr HSIP: Contract Amendment # 3 Summary
This amendment is for additional efforts for Halff Associates to combine the record drawings for the
three TxDOT South Tarrant Area Office HSIP projects that were let as a package by TxDOT in August
2024. This effort includes combining three plan sets from multiple consultants into one package as well
as additional documentation that may follow such as updating plan, specification, bidding and cost
estimate documentation in TxDOT Connect.
Summary of Contracts/Amendment:
• Contract for Engineering Services: Includes efforts for full PS&E
• Amendment 1: This was issued as ROW was not included in the contract for PS&E. This
amendment provided services for ROW descriptions and meets & bounds which were also
submitted to TxDOT. In order to keep the project on schedule and not risk missing the August
2024 let date, TxDOT requested this information by the 60% design plans submittal.
• Amendment 2: This project will be combined with two additional projects and be let as a single
package by TxDOT. After additional funding was appropriated by M&C 23-0890, this amendment
will be for additional coordination efforts with TxDOT and two other design consultants
including combing all the plan sheets for each submittal. Bid phase and construction phase
efforts were not included in the contract for PS&E; those efforts are included in this amendment
as well.
• Amendment 3: This is for additional efforts for the controlling CSJ consultant to provide project
closeout efforts, such as coordinating with two additional consultants, and combining the record
drawings for all three projects into a single package.
Table of Engineering Fees:
104095: S Hulen St & South Dr HSIP
Contract
Date
Amount
Engineering Services
4/27/2023
$ 170,380.00
Amendment 1: ROW
9/12/2023
$ 9,680.00
Amendment 2: TxDOT; Bid;
Construction
11/17/2023
$ 56,295.00
Amendment 3: Record
Drawings
TBD
$14,012.04
Total
$ 250,367.04