Loading...
HomeMy WebLinkAbout059298-A3 - Construction-Related - Contract - Halff Associates, Inc.CSC No. 59298-A3 AMENDMENT No . 3 TO CITY SECRETARY CONTRACT No. 59298 WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 59298, (the CONTRACT) which was authorized by M&C 23-0269 on the 1111 day of April, 2023 in the amount of $170,380.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $9,680.00 which was administratively authorized on September 12, 2023, and Amendment Number 2 in the amount of $56,295.00 which was administratively authorized on November 17, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: S. Hulen Street and South Drive Highway Safety Improvement Project (HSIP) , CPN 104095; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $14,012.04. (See Attached Funding Breakdown Sheet, Page OFFICIAL RECORD CITY SECRETARY 2. FT. WORTH, TX Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $250,367.04. City of Fort Worth, Texas S. Hulen Street and South Drive HSIP Prof Services. Agreement Amendment Template CPN 104095 Revision Date: June 13, 2025 Page 1 of 4 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager DATE: 05/31 /2026 6avvvaL ATTEST: p� �FORT9Pd �o v�o oid °° °s 4p bq�A oa Jannette Goodall City Secretary APPROVAL RECOMMENDED: Ma,�tln A. Thl'411� Martin A. Phillips (May 21, 2026 08:50:31 CDT) Lauren Prieur ENGINEER Halff Associates, Inc. David A. Burkett (May 13, 2026 08:57:39 CDT) David A. Burkett, P.E. Vice President DATE: 05/13/2026 Director, Transportation & Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. dada, OFFICIAL RECORD Fanta Kaba, P . E . , PTOE CITY SECRETARY Proj ect Manager FT. WORTH, TX City of Fort Worth, Texas S. Hulen Street and South Drive HSIP Prof Services Agreement Amendment Template CPN 104095 Revision Date: June 13, 2025 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: wmr- Douglas Black (May 26, 2026 13:13:17 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth., Texas Prof Services. Agreement Amendment Template Revision Date: June 13, 2025 Page 3 of 4 M&C No.#: N/A M&C Date: N/A S. Hulen Street and South Drive HSIP CPN 10409'5 FUNDING BREAKDOWN SHEET City Secretary No. 59298 Amendment No. 3 Fund Dept ID Account Project ID CF1- Activity CF2 - Bond Reference Amount 34027 0200431 5330500 104095 007230 22010207 14,012.04 Total: $14,012.04 City of Fort Worth, Texas S. Hulen Street and South Drive HSIP Prof Services Agreement Amendment Template CPN 104095 Revision Date: June 13, 2025 Page 4 of 4 RT WORTH. ATTACHMENT "A" Scope for Engineering Design Related Services for Intersection Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The objective of the S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) is project is to improve safety of the intersection by providing lane offsets for the northbound and southbound turn lanes along S. Hulen Street. Also included are improvements to the traffic signal equipment including cameras, Opticom system and controller equipment, as well as the addition of new striping to delineate dedicated left and right turn lanes on South Drive and constructing appropriate repairs to the curb ramps and crosswalk facilities as needed to comply with the Americans with Disabilities Act (ADA) requirements. WORK TO BE PERFORMED Task 1. Design Project Design.• Task 3. Preliminary ■- -•• Task 4. Final Design..• .•• PhaseTask 5. Bid Task •. Construction Task 7. RO Task 8. Survey and SubsurfaGe Utility Engineering Services Task • .. Task rrniWRg City of Fort Worth, Texas S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Attachment A CPN 104095 PMO Release Date: 07.23.2012 Page 1 of 27 RT WORTH. ASSUMPTIONS • Eight (8) meetings with the ether oensi iltant • ENGINEER 411 only he responsible for QAQG of GNGINEE ?�OjeGt. The other- nonsi iltant will perform it AQG of their werL • ENGINEER will be responsible fE)F GOFnpffi'!Rg and iRGE)rpoFating sheets and i nfermatien preyirdeld frem the ether oensi Rant • ENGINEER well not he responsible fer atteR ding separate design revie�ni meetings for ADDITIONAL PRO ECTC Glearanoe of ADDITIONAL PRO ECTC City of Fort Worth, Texas Page 2 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 2 of 27 CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 3 of 27 Page 3 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. Prepare PFejeGt Status Reports• and submit menthly ■_ updates i Attachment D to thms with a SGhedule narrativ s required ... - .. ._ Stakeholder Register,gister, • Gemplete prelimiRary Monthly M/VVBE Report Form and Final Summary Payment Report Form at the end of the projeGt preposed the desig44 • With infrastruGture, information to tO and provide and obtain needed prepare ENGINEER their respelat GOmmuniGate are apprepriately autherofies • -. GOOFdination with permitting authorities, that with permitting authorities on the designs. SUIGh ENGINEER regulatory requiremeRtS refleGted to the designs, shall work with regulatory to obtain approval of and make Ghanges neGessary 10Gation, ASSUMPTIONS • ..kiGkeffiGharteriRg the ENGINEER or any of its sub Gensultants shall Garry readily visible Meeting Zero (0) field review meetings meetings• ..% aGquisition . -.. These meetings are to be held virtually. • ...% phase. submOttal required for the Gity and.for .. .• • .. _.% be Geerdinated by CITY staff and indude TxDQT RaR review meetings will will prior te submissieR. • All te the City be Quality submittals will cheGked DrejeGt design phase is ontininate d to take ton (10) mOnths innli irdinn twelve (9 7) months City of Fort Worth, Texas Page 4 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 4 of 27 CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 5 of 27 Page 5 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 6 of 27 Page 6 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 7 of 27 Page 7 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 8 of 27 Page 8 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 9 of 27 Page 9 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 10 of 27 Page 10 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. • • ■ • .. ., .. .1 . MM �� .. - ■. -04, MMM, .. • ■. PrejeGt Summary Sheets be the 600%, 900%/951% 1001% design will and ENGINEER• Ges_.. ..• ..• pal3ages.use■. ASSUMPTIONS t-G the CITY fA-.r 11 ..• Design A PDF fole for the 900%/950,; Design be fFom design CAD drawings and will _. be uploaded to the will folder On the GFeated Gity's dGIGUrnent projelSt management system (BIM -sets 11 "xi 7" drawings two be delivered te the CITY f9F of the ..• size Design and (2) set of speGifiGations will A PDF fole fer the 100% Design be Greated from design CAD drawings and well be _. uploaded ENGINEER to the folder will On City's dGIGUMent management systern (BIM PF0jeGt TxPOT will PFIGIvide DELIVERABLES A. ..• .. deGumentati B. Utility G. .. • F810Gatien dGIGUrrentation. .. .. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 11 of 27 Page 11 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 12 of 27 Page 12 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH, TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will not provide GeRStFIAGrtt phase seFy'Ges fer this preieGt ENGINEER will support the construction phase of the project as follows. 6.1. Ge tFUGtt n Phase S Sri e# 6.2 Record Drawings • The ENGINEER shall prepare record drawings for CSJ 0902-90-207 and compile a complete set of record drawings to include all three CSJs (0902-90-207, 0902- 90-209, and 0902-90-212) from information provided by the CITY and/or TxDOT depicting any changes made to the Final Drawings during construction. Information provided by the CITY and/or TxDOT may include, but is not limited to the following: o As -Built Survey o Red -Line Markups from the Contractor o Red -Line Markups from City/TxDOT Inspector o Copies of Approved Change Orders o Approved Substitutions o Record drawings prepared by the Engineer of Record for CSJs 0902-90-209 and CSJ 0902-90-212. • The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and City of Fort Worth, Texas Page 13 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 13 of 27 CPN 104095 RT WORTH, shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, in Adobe Acrobat PDF format (version 6.0 or higher) and in DWF format. The ENGINEER may keep copies of the information provided by the CITY and/or TxDOT for their files, but all original red - lined drawings shall be returned to the CITY with the digital files. • There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set, if required. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in the City's document management system (BIM 360). For information on the proper manner to submit files and to obtain a file number for the project, the ENGINEER should coordinate with the City project manager. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The ENGINEER will not attend the pre -construction conference. • The ENGINEER will not attend project construction meetings City of Fort Worth, Texas Page 14 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 14 of 27 CPN 104095 RT WORTH. • The CITY will handle any public involvement or public meetings during the construction phase of this project including any exhibits. The ENGINEER will not provide assistance with a public meeting during the construction phase. • Two (2) site visits are assumed. • Four (4) submittal reviews are assumed. • Four (4) RFI's/Change Order reviews are assumed. • Two (2) Change Orders are assumed. • The CITY will provide the ENGINEER record drawings prepared by the Engineer of Record for CSJs 0902-90-209 and CSJ 0902-90-212. The ENGINEER will not be responsible for the content or preparation of those sheets. DELIVERABLES A. Nene Response to Contractor's Request for Information B. Review of Change Orders C. Review of shop drawings D. Final Punch List items E. Record Drawings in digital format City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 15 of 27 Page 15 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 16 of 27 Page 16 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 17 of 27 Page 17 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. Reselve d4ereRees betweeR designated utilities and utility rewrds and surveyed pp� �r+oRaRGe City of Fort Worth, Texas Page 18 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 18 of 27 CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 19 of 27 Page 19 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 20 of 27 Page 20 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. h S Ffa% \Not is Ferm — Halff Will nemnleto the S FfaGe \A/otor A�CJU'TTCfGG�YClC SeGtiGIR 402 of the Glean Water Ant SeGtiGIR 404 of the Glean Water Ant City of Fort Worth, Texas Page 21 Of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 21 of 27 CPN 104095 RT WORTH. • Determinotien of the appropriate nreiert_ onedfin level of inns Iini fer the • Genoirderation of the proient design and ROW real Iirementc f innll Irdino preient exoayation real iirementc antidpaterd C QVV I acq Iioition aR d the rdemolitien er mordifinatien of otrl Intl Irec I City of Fort Worth, Texas Page 22 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 22 of 27 CPN 104095 RT WORTH. lfrril■��� _ I■TT.71:ZS�T71tG1M■7IIA�Tt,P.T.7 DELIVERABLES City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 23 of 27 Page 23 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort worth, Texas Page 24 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 24 of 27 CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 25 of 27 Page 25 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 26 of 27 Page 26 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 RT WORTH, ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Services related to the development and execution of a Local Project Advance Funding Agreement (LPAFA) with TxDOT. • Services related to disputes over pre -qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Construction management and inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 27 of 27 Page 27 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 ATTACHMENT B COMPENSATION Design Services for S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) City Project No. 104095 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Category Rate for the ENGINEER's team member performing the work. Labor Category Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category 2023 Rate $/hour 2024 Rate $/hour 2025 Rate $/hr 2026/27 Rate $/hr QA Manager 265.00 278.25 292.16 306.77 Project Manager 250.00 262.50 275.63 289.41 Project Engineer 205.00 215.25 226.01 237.31 E IT 130.00 136.50 143.33 150.50 CADD 143.00 150.15 157.66 165.54 Environmental Project/QC Manager 200.00 210.00 220.50 231.53 Senior Environmental Scientist 141.00 148.05 155.45 163.22 Mid -Level Environmental Scientist 123.00 129.15 135.61 142.39 Junior Environmental Scientist 95.00 99.75 104.74 109.98 RPLS 165.00 173.25 181.91 191.01 Survey Tech 125.00 131.25 137.81 144.70 Survey Crew 2-Person 175.00 183.75 192.94 202.59 Administrative 105.00 110.25 115.76 121.55 ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 1 of 4 CPN 104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) LIM ATTACHMENT B COMPENSATION iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 2 of 4 CPN 104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant Halff Project Original Agreement $145,201.00 85.2% Associates, Management Addendum No. 1 $880.00 9.1 % Inc. and Design Addendum No. 2 $56,295.00 100% Proposed Sub -Consultants ARS SUE, ROW/ Engineering, Easement Inc. Services Addendum No-3 $14,012.04 100% Total (Original Agreement $216,388.00 86.4% + Addenda Nos. 1, 2 & 3) Original Agreement $25,179.00 14.8% Addendum No. 1 $8,800.00 90.9% Addendum No. 2 $0.00 0% Addendum No. 3 $0.00 0% Total (Original Agreement $33,979.00 13.6% + Addenda Nos. 1, 2 & 3) Original Agreement $170,380.00 100% Addendum No. 1 $9,680.00 100% TOTAL Addendum No. 2 $56,295.00 100% Addendum No. 3 $14,012.04 100% Total (Original Agreement + Addenda Nos. 1, 2 & 3) $250,367.04 100% Project Number & Name Total Fee CPN104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Original Agreement $170,380.00 Addendum No. 1 $9,680.00 Addendum No. 2 $56,295.00 Addendum No. 3 $14,012.04 Total (Original Agreement + Addenda Nos. 1, 2 & 3 $250,367.04 City of Fort Worth, Texas CPN 104095 Attachment B S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Revised Date: 12/9/2022 Page 3 of 4 B-3 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 4 of 4 CPN 104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) A j) } ,,,,} } .......... )] k oN §% ( AR m; ^~ e } LS )/)g420 / o of {_/ � / - ---------- ----------- ---------------------- ----------- ----------- - --------- ----------- ---- -- CD i f — - - ------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- i ------------ i ------------ ----------- ----------- ----------- --- ------- ----------- ----------- co B --------- - --- ------- --- ------- --------- - ---- ------ --- ------- --------- - ---- ------ --- ------- --------- - ---- ------ --- ------- ---------- - -- ------ ---- ------ ------- ---------- -- -------- -------- -- ----------- -- -------- ----------- --------- ----------- ----------- ----- ----- ----------- ---- ---- - - -------- --- ------- ------- ----------- 4 ----------- 4 ----------- ----------- 4 ----------- 4 ----------- 4 ----------- 4 ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- kn - - ---------- - --- ------- ----------- --------- - ----------- --- ------- ----------- --- ----- - - -- ----- --- ------- ---- ---- - ---------- ----------- ----------- - --------- ----------- ---- -- i t ------------ ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ........... ........... ----------------------------------- ----------- ----------- - — ------- - - - - - - - ------------------------ ----------- - -------- ------ --- ------ ----------- IL p pi 2 i�! 2, F4 ai N N FA Any 2 i2- - - - - - - - - - <U<1< < < as < < < < < < < < < a < < < < < a s a a a ma < a a < < < < < q s a a < cu - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - cu cz J5 x 83 16 2 z E> iE M E n 2 Q ctory 45 �18 -I it ol 0 R 17 a LL O cz -----------'-----------`--------'------------ ----- --- `-----` ------- - ------ ------ ------------ ------ ------- ----- --- -----rA ..:----------- ........... ............ :..._..._:.....------,...._.....:..........:__.._----- ..._.--. J........... :.._._..-- -',_.._..---- ---__-_.:------- ._..--- ---------- ------ .. d o kn a d OL. w o 0 0 0 0 0 ..... a .. 0 0 0 F o o - c a Q a a a¢ a a a a¢ a¢ a a a a¢ a a a a a a a a a a a a a a a a a a a a a a a a 'a a a a a a a a u' a a a a m a a a c S P 2 a m a a a m a a a a a a a a a a a a a a a¢ �S � ��� �$ a ¢¢ a a a a a a¢ aQ a av a a a a a a � o� o 0 o Boo ? o o � � o� o o❑ o S o � � � o 0 0 ��� S 8 o o cu .. ... e.. o 0 0. o o. o. . . o o o o a o 0 0� a o o a o N ry S 8 m.m.o.N.. m n F F. N �� o.o N oR R N � m v ci ❑ � _ U � a1 1]{ 2Aj Z -gyp cu S_c m ca rc �Eo O o. E O h a K al r� yy E a d G .E '$ 6 'a U E d$ O ❑� c a g ❑ i0 p 70 m a A Ss-9 E E a di 9 'm 's psi 2 pS� E `� 76 ii J. cg o $ .� .� c ti E i, 5 a K$_— li `o 0 0 o D 8❑ E " a tt U U 8 L E S C 4 t 9 E € 8 R 3 a j 8 8 0 ,- 0 8 F Q m 6 w m a<¢ o o S P o = 5 LL III ,. O cz co g -----------'-----------`--------'------------ ----- --- `-----` -------------------- -- - ---------- - ------ a ..:......._.J,.........-. J,.._.._...>....--.._ =---------- ---------------------- ------ ---- _--------.------------ _._- -_--- .----- -- - - ^, O a I g CIS d o � kn a V d � 0. o ohm , �LL v C o o w o a o a o 0 0 0 0 0 0 0? o o.. o a o o.. o 0 0 a s a a a Q a a a a a a a. m. . m m .„ m � w � au o � a Si o o h o 0 o o 0 0 0 0- o 0 0 0 0 a 1 c c R co C v fEIE E s c 3 i m N .'MT q Q n _ E 8 g € $ s, P .a E a c'S oB-aoau m o Utsd u m o m a 3 O x E c m cc 5 8 8 n$ g ie z tU� 2 S 4€ E iE �, obi o 'obi 5O O 9C_ LP 4� M� N S8 Q Y V op�m�go¢��gm�gm�� o C LL U U o I I I DOCUMENT TITLE: M&C: FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department S Hulen St & South Dr Highway Safety Improvements Project Engineering Contract Amendment #3 CPN: 104095 CSO: 59298 DOC#: Date: To: Name Department Initials Date Out 1. Alexandra Ripley TPW - initial 05/13/2026 2. David Burkett, Consultant Consultant - Signatures May 13, 2026 3. Fanta Kaba TPW - Signature Fk May 13, 2026 4. Chad Allen TPW -initial CA May 19, 2026 5. Lissette Acevedo TPW -initial C�v May 19, 2026 6. Patricia Wadsack TPW - initial �[� May 20, 2026 7. Lauren Prieur TPW - signature MAP May 21, 2026 8. Doug Black Legal - signature DouA=ask May 26, 2026 9. Jesica McEachern CMO - signature CA 05/31/2026 10. Jannette Goodall CSO - signature ett� eGootlall 06/01/2026 11. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: []YES []No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContractsa FortWorthTexas.gov at ext. 7233 or 8363, for pick up when completed. Thank you! Updated 12.07.2022, mdhm FORT WORTH. City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Halff Associates, Inc. Subject of the Agreement: S Hulen St & South Dr Highway Safety Improvements - Prof Services Agreement Amendment M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes 8 No ❑ CSC No. 59298-A3 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No 8 *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 104095 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processing in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department. 104095: S Hulen St & South Dr HSIP: Contract Amendment # 3 Summary This amendment is for additional efforts for Halff Associates to combine the record drawings for the three TxDOT South Tarrant Area Office HSIP projects that were let as a package by TxDOT in August 2024. This effort includes combining three plan sets from multiple consultants into one package as well as additional documentation that may follow such as updating plan, specification, bidding and cost estimate documentation in TxDOT Connect. Summary of Contracts/Amendment: • Contract for Engineering Services: Includes efforts for full PS&E • Amendment 1: This was issued as ROW was not included in the contract for PS&E. This amendment provided services for ROW descriptions and meets & bounds which were also submitted to TxDOT. In order to keep the project on schedule and not risk missing the August 2024 let date, TxDOT requested this information by the 60% design plans submittal. • Amendment 2: This project will be combined with two additional projects and be let as a single package by TxDOT. After additional funding was appropriated by M&C 23-0890, this amendment will be for additional coordination efforts with TxDOT and two other design consultants including combing all the plan sheets for each submittal. Bid phase and construction phase efforts were not included in the contract for PS&E; those efforts are included in this amendment as well. • Amendment 3: This is for additional efforts for the controlling CSJ consultant to provide project closeout efforts, such as coordinating with two additional consultants, and combining the record drawings for all three projects into a single package. Table of Engineering Fees: 104095: S Hulen St & South Dr HSIP Contract Date Amount Engineering Services 4/27/2023 $ 170,380.00 Amendment 1: ROW 9/12/2023 $ 9,680.00 Amendment 2: TxDOT; Bid; Construction 11/17/2023 $ 56,295.00 Amendment 3: Record Drawings TBD $14,012.04 Total $ 250,367.04