HomeMy WebLinkAbout025240 - Construction-Related - Contract - AB&A, Inc. (fka Poe Engineers)09-1 �i-9 �JPC� �30 �;CVL` AMENDMENT NO. 4 STATE OF TEXAS § CI'TY SECRETARY CONTRACT NO.�,��7 � (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and AB&A, Inc. (formerly Poe Engineers) (Engineer) made and entered into City Secretary Contract No. 209g�, (the Contract) which was authorized by the City Council by M&C C-14781 on the 18th day of April, 1995; and amended by the City Council on March 13, 1997, by M&C C-15937 (Amendment No. 1) and then by Amendment No. 2 for $4,234.02 by Adininistrative Order and then by Amendment No. 3 by the City Council on November 3, 1998, by M&C C-17094. WHEREAS, the Contract involves engineering services for the following project: �ngineering Contract for the design of airport facilities for Taxiway Alpha (A) WHEREAS, it has become necessary to amend said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: l. Article I, Section 1 of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 13, 1999, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $2,741.12. 2. Article III of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $551,736.17. 3 All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. U�����Q� ������ �8� ������� �o ��'�, ��. EXECUTED on this the /((� � Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: �4.�G c.�s �'��--@ A.Douglas Rademaker, P.E. Director, Department of Engineering AB&A, Inc. (formerlv Poe En�ineers) ENGINEER day of , 19! /, in i APPROVED: . � .��Mike Groomer ~� � `'� Assistant City Manager �l� � �Y�l �� Q ��u /�2,��i Contract Authorization By: l Naine: Marcelino Z. Arredondo President AB&A Inc. (formerlv Poe En�ineersl APPROVED AS TO FORM AND LEGALITY: �/ Gary ' berger Assistant City Attorney Date ATT�1T: � ,;; ��r�ri ra �_ ; ,t.�i .�� loria Pearson,;'City Secretary ���� ( K' • � � = � � � = � � � � • � � S _ w _ � � � �' � _ . ...,•. . !_ � i � �_�� � 6850 Manhattan Bivd. Suite 210 Fort Worth, TX 76120 (817) 429-7870 Arredondo, Brunz & Associates, Inc. August 13,1999 Mr. Gopal Sahu, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth, Texas 76102 Subject: Meacham International Airport Phase II Construction Amendment No. 4 Dear Mr. Sahu: I have discussed Amendment No. 4 on the subject project with ZRHD, the electrical and signing sub-provider for this project. We have decided to provide the City of Fort Worth with the quickest response time possible, ZRHD will provide a schedule of signs to be adjusted and we will provide the two plan sheets for the contractors use. This work can be performed for: AB&A ZRHD Travel Total Expenses Total 2 Plan Sheets Sign Schedule 128 mi. @ .31cents $ 600.00 $ 39.68 $ 639.68 x 1.1 $ 2,037.47 $ 703.65 $ 2,741.12 We have found that this work will involve one sign face on twenty-four (24) signs and two faces on three (3) signs. The total number of characters to be changed totals 39, at an anticipated cost of $175.00 per character. Therefore, the Engineers Opinion as to the Probable Cost will be $6825.00 plus 15% for contingencies or $7848.75 total. � AB&A understands the essence of time in this situation; however we must insist upon written confirmation of this Amendment befbre work commences. Upon receipt of this written confirmation, AB&A will provide the two plan sheets, which will include a sign schedule listing all necessary changes within 5 working days. Sincerely, !� ; �:����_ ., � Weldon D. Jarratt, P. . Project Manager civil • structural • municipal • surveying • planning f. '. 08/13/1999 16:44 8174461030 � s�'i � 6850 M+lanhattan 81vd. Sufte 210 Fort Worth, TX 78120 (g� 7� a2s-�a�o August 13,1999 Mr, Gopal Sahu, P.E. City of Fort Worfh Depa�tment of Engineering 10U0 Throckmorion Street Fo�t Wo�th, Texas 76102 Subject: Meacl�am Intemational Airport Phase II Construction Dear Mr. Sahu; PAGE B2 Anedondo, Bruru a A�aociatea, Inc. 1 submit this fetter to supplement our letter of today's date detaifi�g me cost of adding changing sfgn faces to the Phase I) project. ihis City of Fort Workh, AB&A and ZRHD a{I realized that upan completion of Taxiway "A' thare woukl be two (�� Taxiway "A' on the south end of the airporl. !t wauld be necessary to change existing Taxiway "A' to 7axiway "K' requiring U�e changing of severa! sign faces. We had planned to mave into Ptfase HI immediately upon the completion af Phase II and to save constructian costs on Phase II, we planned the sign face changing to be the first item of work on Phase III Gonstruction. Now ixDOT has infom�ed the City of Fort Worth that funding for Phase III construcaon will be delayed until early 2000. BeC8U5@ Of tI11S deiay in funding, the City of Fort Wort#� reques#ed thai I determitte the cosE of preparing a Supplernental Ag�eement far Phase !I Construction to add this changing of sign faces to the Pfiase II Construcban Contract. The letter 1 hand de�vered earlier today detailed the cost af preparation for two plan sheets for this supplemental agreement. It also included the Engineers Qpinion as to the Probable Cost of the supp(emental �greement. If I may be af further assistance in thls matter, �lease advise, SinCBreiy, ; � � � •- .. �.����� � � Weldon D. Jarratt, P.E � Projett Manager civil • �tructural • mun'sCipal ARREDONDO BRUNZ ASSC �urveyin9 • pl�rminq