AMENDMENT NO. 4
STATE OF TEXAS § CI'TY SECRETARY CONTRACT NO.�,��7 �
(No M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and AB&A, Inc. (formerly Poe
Engineers) (Engineer) made and entered into City Secretary Contract No. 209g�, (the
Contract) which was authorized by the City Council by M&C C-14781 on the 18th day of
April, 1995; and amended by the City Council on March 13, 1997, by M&C C-15937
(Amendment No. 1) and then by Amendment No. 2 for $4,234.02 by Adininistrative
Order and then by Amendment No. 3 by the City Council on November 3, 1998, by
M&C C-17094.
WHEREAS, the Contract involves engineering services for the following project:
�ngineering Contract for the design of airport facilities for Taxiway Alpha
(A)
WHEREAS, it has become necessary to amend said Contract to include an
increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
l.
Article I, Section 1 of the Contract is amended to include the additional
engineering services specified in a proposal letter dated August 13, 1999, a copy of which
is attached hereto and incorporated herein. The cost to City for the additional services to
be performed by Engineer total $2,741.12.
2.
Article III of the Contract is amended to provide for an increase in the maximum
fee to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of $551,736.17.
3
All other provisions of the contract, which are not expressly amended herein, shall
remain in full force and effect.
U�����Q� ������
�8� �������
�o ��'�, ��.
EXECUTED on this the /((� �
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED:
�4.�G c.�s �'��--@
A.Douglas Rademaker, P.E.
Director, Department of
Engineering
AB&A, Inc. (formerlv Poe En�ineers)
ENGINEER
day of , 19! /, in
i
APPROVED:
.
� .��Mike Groomer ~� � `'�
Assistant City Manager
�l� � �Y�l �� Q ��u /�2,��i
Contract Authorization
By: l
Naine: Marcelino Z. Arredondo
President
AB&A Inc. (formerlv Poe En�ineersl
APPROVED AS TO FORM AND LEGALITY:
�/
Gary ' berger
Assistant City Attorney
Date
ATT�1T:
� ,;;
��r�ri ra �_ ; ,t.�i .��
loria Pearson,;'City Secretary
����
( K' •
� � = � � � =
� � � � • � � S
_ w _ � � � �' � _
. ...,•. .
!_ � i � �_�� �
6850 Manhattan Bivd.
Suite 210
Fort Worth, TX 76120
(817) 429-7870
Arredondo, Brunz & Associates, Inc.
August 13,1999
Mr. Gopal Sahu, P.E.
City of Fort Worth
Department of Engineering
1000 Throckmorton Street
Fort Worth, Texas 76102
Subject: Meacham International Airport
Phase II Construction
Amendment No. 4
Dear Mr. Sahu:
I have discussed Amendment No. 4 on the subject project with ZRHD, the electrical and signing sub-provider for
this project. We have decided to provide the City of Fort Worth with the quickest response time possible, ZRHD
will provide a schedule of signs to be adjusted and we will provide the two plan sheets for the contractors use.
This work can be performed for:
AB&A
ZRHD
Travel
Total Expenses
Total
2 Plan Sheets
Sign Schedule
128 mi. @ .31cents
$ 600.00
$ 39.68
$ 639.68 x 1.1
$ 2,037.47
$ 703.65
$ 2,741.12
We have found that this work will involve one sign face on twenty-four (24) signs and two faces on three (3) signs.
The total number of characters to be changed totals 39, at an anticipated cost of $175.00 per character.
Therefore, the Engineers Opinion as to the Probable Cost will be $6825.00 plus 15% for contingencies or
$7848.75 total. �
AB&A understands the essence of time in this situation; however we must insist upon written confirmation of this
Amendment befbre work commences.
Upon receipt of this written confirmation, AB&A will provide the two plan sheets, which will include a sign schedule
listing all necessary changes within 5 working days.
Sincerely,
!� ; �:����_ .,
�
Weldon D. Jarratt, P. .
Project Manager
civil • structural • municipal • surveying • planning
f. '.
08/13/1999 16:44 8174461030
� s�'i �
6850 M+lanhattan 81vd.
Sufte 210
Fort Worth, TX 78120
(g� 7� a2s-�a�o
August 13,1999
Mr, Gopal Sahu, P.E.
City of Fort Worfh
Depa�tment of Engineering
10U0 Throckmorion Street
Fo�t Wo�th, Texas 76102
Subject: Meacl�am Intemational Airport
Phase II Construction
Dear Mr. Sahu;
PAGE B2
Anedondo, Bruru a A�aociatea, Inc.
1 submit this fetter to supplement our letter of today's date detaifi�g me cost of adding changing sfgn
faces to the Phase I) project.
ihis City of Fort Workh, AB&A and ZRHD a{I realized that upan completion of Taxiway "A' thare woukl be
two (�� Taxiway "A' on the south end of the airporl. !t wauld be necessary to change existing Taxiway "A'
to 7axiway "K' requiring U�e changing of severa! sign faces. We had planned to mave into Ptfase HI
immediately upon the completion af Phase II and to save constructian costs on Phase II, we planned the
sign face changing to be the first item of work on Phase III Gonstruction. Now ixDOT has infom�ed the
City of Fort Worth that funding for Phase III construcaon will be delayed until early 2000. BeC8U5@ Of tI11S
deiay in funding, the City of Fort Wort#� reques#ed thai I determitte the cosE of preparing a Supplernental
Ag�eement far Phase !I Construction to add this changing of sign faces to the Pfiase II Construcban
Contract. The letter 1 hand de�vered earlier today detailed the cost af preparation for two plan sheets for
this supplemental agreement. It also included the Engineers Qpinion as to the Probable Cost of the
supp(emental �greement.
If I may be af further assistance in thls matter, �lease advise,
SinCBreiy,
; � � � •- ..
�.����� � �
Weldon D. Jarratt, P.E �
Projett Manager