Loading...
HomeMy WebLinkAbout025238 - Construction-Related - Contract - Turner Collie & Braden. � �:?9�-14-9�P02�29� RCVU AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO.�oZ�g (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Turner Collie & Braden (Engineer) made and entered into City Secretary Contract No. 24482 (the Contract) which was authorized by the City Council by M&C G17175 on the 8th day of October, ] 998; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for the Pavement Reconstruction and Water and Sanitary Sewer Replacements on Bourine Street (Curzon to West Rosedale) and Merrick Street (Diaz to Locke). WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: l. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 20, 1999, a copy of which is attached hereto and incoiporated herein. The cost to City for the additional services to be performed by Engineer total $2,895.00. 2. Ai•ticle II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $67,895.00. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in fiill force and effect. C���G�Ba� G��CCJ��� ��� ���Q��i� f�o �IC�G��, �. .� � EXECUTED on this the Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: � (P � day of .�;��� c� ��u��-----. A.Douglas Rademaker, P.E. Director, Department of Engineering ENGINEER By: . - � ����� d'�, /�r' Na�e: Robert C. Reacl P.E. Vice-President Ttu7zer Collie & Braden, Inc. I �� , � , � /'i APPROVED: � � � �� . Mike Groomer Assistant City Manager ATTEST: , , ,� �"- �� �, ,��� . loria Pearson, City Secretary `�' a uV Sr(' G( � l�-�. Contract Authorization Date APPROVED AS TO FORM AND LEGALITY: ,� Gary Ste� berger Assistant City Attorney TurnerCollle��Brad�n Inc. Engineers. • Planners • Project Managers . July 20, 1999 Mr. Gopal Sahu, P.E. City of Fort Worth Department of Engineering P.O. Box 870 Fort Worth, Texas 76101-0870 Re: Supplemental Authorization Request No. 1(rev. 7/21/99) Merrick Street Reconstruction — DOE #2162 Dear Mr. Sahu: 1200 Summit Avenue Suite 600 Fort Worth, Texas 76102-4409 817 332-8977 Fax 817 332-8979 ' This letter is a request for supplemental authorization to provide for additional engineering services. In accordance with contract requirements, TC&B prepared and submitted Concept Review plans for the 28' wide reconshuction of Merrick Street on 6/23/99. As a result of the Concept Review, TC&B was instructed on 7/15/99 to revise the width of Merrick Street from 28' to 36'. To accommodate this design change, additional engineering, surveying, and drafting work is required. The estimated total fee for this additional work is $2,895. PROJECT FEE SUMMARY Contract Item Original Contract Amendment No. 1 TOTAL PROJECT Descrintion Fee City Secretary Contract No. 24482 $65,000 Additional engineering & survey $ 2,895 $67,895 If you have any questions or need additional information concerning this request, please call me at 332-8977. Sincerely, c;..)VOI��,Q. Stephen R. James, P.E. Project Manager cc: File 2.1 N:�FTW�98680710_metrick�corresp\ftwWmend 1, 7.20.99.doc EflAblishell in 19aL En};ineering Excellence (or Over One•Hal( Cenlury TEXAS AUSTIN / DALLAS / FORT WORTH / HOUSTON / RIO GRANDE VALLEY COLORADO DENVER FLORIDA MIAMI / WINTER PARK