HomeMy WebLinkAbout025239 - Construction-Related - Contract - Turner Collie & Braden�� ; - �i . - : , E' i, 'L 2 6 , ; C ��NDMENT NO . 1
STATE OF TEXAS S CITY SECRETARY CONTRACT NO . p� SpZ,'3�
(No M&C Needed)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Turner Collier &
Braden, (Engineer) made and entered into City Secretary Contract
No. 24737, (the Contract) which was authorized by the City Council
by M&C C-17310 on the llth day of March 1999; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Main C1C4B Drainage
Area Sanitary Sewer System Rehabilitation and Improvements
(Group 6, Contract 2), Part 7.
WHEREAS, it
to said Contract
maximum fee;
has become necessary to execute Amendment No. 1
to include an increased scope of work and revised
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated June 2, 1999, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services
to be performed by Engineer total $4,774.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $239,344.00.
u�(�a�8�� �C��uG��
�B�l ����Q��17
V Ua VVl/U���i�UUp UlSWa
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the /P� day of �
1999, in Fort Worth, Tarrant County, Texas.
ATTEST:
/ �--✓� � �.�P i - ,-{/ !!' ,I A rx
Gl�oria Pearson, City Secretary
`7�.0 1�1 �� .�u �2,��
Contract Authorization
Date
APPROVAL RECOD�NDED:
���� �i � � , � �
A. Douglas Rademaker, P.E. �
Director, Department of
Engineering
APPROVED: �•
O
Mike Groomer �A
Assistant City Manager
TURNER COLLIER & BRADEN, INC.
ENGINEER
By . ���-'-r��� t���
/ '
Name:Robert C. Reach, P.E.
Vice President
1200 Summit Avenue, Suite 600
Fort Worth, TX 76102-4409
APPROVED AS TO FORM AND LEGALITY:
Gary S tei3iberger
Assistant City Attorney
24737
-2-
0
��
r
A
Turn�r Coll�� ��Brad�n I nc.
Engineers • Planners • Project Managers
1200 Summit Avenue
Suite 600
Fort Worth,Texas 76102-4409
817332-8977
Fax 817 332-8979
June 2, 1999
Mr. John Boyer
City of Fort Worth
Department of Engineering
P.O. Box 870
Fort Worth, Texas 76101-0870
Re: Supplemental Authorization Request No. 1(revised)
Main C 1 C4B Drainage Area
Rehabilitation and Sewer Improvements
(Group 6, Contract 2) Part 7
DOE No. 2113
Sewer Project No. PS46-070460410230
TC&B Project No. 47-99680-990
�
Dear Mr. Boyer:
This letter is a request for supplemental authorization to provide for additional surveying services.
On 5/24/99 and 5/28/99; design review meetings were held for the project. At those meetings, the
., following design changes were requested that will require additional surveying and easement
preparation. ,
L-43 8
This existing line runs under a building just north of Magnolia Street (see attached drawing). At
the design review meeting, it was decided to abandon the portion of the line under the building, and
re-route L-438 approximately 275' east along Magnolia and tie into L-437.
Approximately 275' of additional survey is needed along Magnolia Street between L-438 and
L-437 to complete design plans for this change in alignment.
L-464
'I'he City sewer layout map indicates that the existing line north of Magnolia Street ends at Sta.
2+SOE, and design surveys were ended at that point. Field investigations indicate that the line
actually extends further north to serve residences in the north half of the block. Our current scope
of services does not include survey for this additional area.
Approximately 225' of additional survey and preparation of at least 2 additional easements
will be needed to complete design plans in this area.
Esiahlished in 1946
Engineering Excellencc for Over One-Hal( Century
TEXAS AUSTIN / DALLAS / FORT WORTH / HOUSTON / RIO GRANDE VALLEY COLORADO DENVER FLORIDA MIAMI / WINTER PARK
i
L-440
Page 2
This existing line is located in an easement on property primarily owned by Hams Methodist Fort
Worth/Texas Health Systems (see attached drawing). Our current scope of services calls for
replacementlrehabilitation of this line in its existing location. At the design review meeting, it was
decided to abandon the existing line and construct a new line in 5� Ave.
Apprbximately 780' of additional survey is needed along Sth Ave. to complete design plans
for this change in alignment.
The estimated total fee for this additional work is $4,774. A detailed breakdown and summary of
estimated fees are attached.
Mr. John Boyer
City of Fort Worth
Deparhnent of Engineering
PROJECT FEE SUMMARY
Contract Item
Original Contract
Amendment No. 1
TOTAL PROJECT
Descrivtion
City Secretary Contract No. 24737
Additional surveying
Fee
•- $234,570
$ 4,774
$239,344
If you have any questions or need additional information concerning this request, please call me at
332-8977.
Sincerely,
�����
Stephen R. James, P.E.
Project Manager
Attachments
cc: Peter Fu, P.E. - FWWD
File 2.1
N:�FI'Nn99680990_claibytTCorrap\ftw�LettersWmrnd I, 5.26.99.doc
\
d
J\v J � 2440 -445
L-444
� 1+92 I� �T
ROS : �Al.� * 1+�-- ',�
m--- I --� ' .�
.{
�` n -J w � M
� ,n LL-- - � — - !� _
d- �
d- - �.�, — i
i. � J
J �� fi
�T
m p �
_�— II �
%�`� O N _ �
�M-299 � i
- - �-_ � ., 2 _
� r � � LE� �D R
Q � � c� ,�a----
o �` � ,
o c �--s� � .
� �
�
� �
� ,
�: � �
—1°"r•rn - w
_� � N
i - - a, � �
J °� cn —sk �
+ ,
. � --1 Ee -
4+16 � MAGNOLIA �p.53
�� � 13+34 _ 14+63 A 17+28
���FVC� 4'S9 `�' �
I I 0+28 0 �''�-
I I �DNE) _ � �
I I 1+38 - -
- 4 31 � R _ _� —�- -�-�—
a, �_� � � `
3* 2 2� �� --� --d-- r �
�-
� (DNE) N � �—
.,�n `: Z � --� z�—
�� z�
M
�
- +
M_�
�
� ''
_ J�Y�
2+62 N �28+03���57 31+� � �31*80
� �
M���,r� � sT.
.-- s r� �
d- � � d- �
—'�1" d- �
d-, d- J
� J J - 3+52
6+59E
�
�.,�,,
0
��---
�
w
� Q
—�
�d- �
--�-
J
� M_30, .� .
= 34*7�. 1�" � 37*45
..
co I ` _�i �
N M I �- �
� �
_ ¢ �` —`1
MC1C4B
ADDITIONAL
L--4�4:
L-438:
�
��
�
i
J
PART 7 ���
SURVEYING:-
225 FT
. .� �
8�� M-30
40±10 42*
---�
�
�
� �--_
_._I �
,�-
,-
�
275 FT - � � _
�
TOTAL: 540 FT
ST. a� uu �� �►
'�M-2.�9 �2„ 9�2s
,� � 22+65 f r0+15
_ 19*94
� � 0+31 �� � I ��.
Z6NE� '
—� � a--
� tO —� �
. lI �
i �_� —r
. t ` � �
—� � �
F�i ST,
8��� � � a
~ � I �, I--
�� -
„
� �
8+4H iJ �7 �, • I w
9*31 � . �...�--w- +•�
Ii� � ��
� � v � � I � �:
I �? d- ! � �" ,- z
�,i � � - o
-� � I -� � c�
� 17 � ��,� - i
I � I� o�* c.=i��
��� � � �
�
4+33L6+� 68K. �' II ST. � -
I �+
5i00 UAHU { �14+54 13+78 =�
4+ti.5 � t--�I I� �� I� � �I 2E �
� ��
\ �
\
i'
+ � 37+73 - - - i
ST 6 6 �
-. 38+20 �+31BK=
.�.y--------. :�� ✓9+25AHD HARRIS �
-- �\\\ � � d-
`��� � i O
3+ S 1 B K= ��.`::.'-- E_�. ...� � N
5+ 18 AHD �' ---.....�;;,, � J
��� � 1'?+83E ��' HOSPITAL N 15+55 �-�'
� � �
� � 11+97 ' � a, �
i U f�
+ ,
(n 6 � � � >
ST. ____ ,
x �—v------ -1�. ,�, ; ��
- � �-----------� ¢ COOPER � ST. � �
`� � � 1u��� 6+06BK= � L-207� ��
� � 10+20 4*21AHD 4+.��= c �
� 19+75 ?
--- ���� � v I c�
>
-0+18= � I
9*OOE � � �I I
� � NI �
__�- U ST. 9+16E + �I I
O �
�.,.-�- o� � I 8+ 5 3 �...----� ..._,�: �2 + 4 3 ,.
—J I I I I I c. c n I,--. I^ �" i r�'1, w Jr;� `;i�.
�
� � �C� � �� ��.j7+cJ,
— �+ � � n' i
� MC1 C4B Part 7 '�` '�� ' "' � ��j
o . i i�� i �!
I�
�; ADDITIONAL SURVEYING= � � �jo ;r
_
L-440R : 780 FT - ; � � ; ; �,� �
_� o . I �
� � I
� i � I I . � I�
.� -�r-E --�=�4-�_ _ — _ �'� � 4+66 � � z I�
�o �+ � 6,��� �SaE� � d-I � � �I 9� L
�c� UL I ST. � � � � ;C° �,
� I � � � J� � � �
> I
22 1 � � ��o � � � � ��
�� _ � Jii I� �� =I�
- -?6+50 �+gp � � � I
2? 6 D +� - � �> �
�.i �1+76 � �= I
433 �+�� ,�+4�- CO i I
+40 L-445 L-444 2+62 N 28+03 �'S7 31+00 31+8 � M-30
� -- � � - �� 6 - _ � ��
�� 1+�3 � � M��- � 1s-2— � . � 4+ � � 12
�_ o � � � S T . ..,.t.......�
i � I� + � +
� —� d�- � d- r�
� � _
�}- � d- d- _I i
. I , � i
. � � � �, _ _ -z���
/�
CITY OF FORT WORTH
iNAIN C1C4B DRAINAGE AREA
SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS
(GROUP 6, CONTRACT 2), PART 7
DOE No. 2113
PS46-070460410230
ADDITIONAL TOPOGRAPHIC SURVEY FOR L-438, L-434, 8� L-440
TC&B LABOR ESTIMATE
� ProJect Project $enior
TASK LISTING I Principal II Manager 1 Engineer ll Technician
I I I
�rOTAt HoURs
�LABOR E�{�ENSE TOTALS
TC&B NON-LABOR ESTIMATE
CAD
�rinting/Plotting
Engr/Admin PC
Technician I Clerical IITOTAL
II
II
I � II
I II
I II
I II
I I
I II
I il
a � o II
So so li
�
I
I
$ol
so I
$ol
sol
So I
�
�a �
$0
$0
I �
�NON-LABOR TOTAL �� �� Sp �
SUBCONSULTANT SERVICES
Labor Markup Subcontrac{
Subconsultant & Exp. I 10.00°/. I Expense I
�?opographi,GS�Sratieqs� � ���= .,���1�,2$b�lt �?.ST3_"..0,�/ f (���� " � �,���`� �� .,.:.,�`��:846�I � ' 3843� , ., � � �'��I
�Easemen ": ��. � � . �.,, � `��ea�t�i525o�Ea emen� `�.... , ��� �S �. �Un� .: 30;� S55o��
� I
�St18CONSULTANT7��l'ALS II • I � $4,774 �
0
So
a � a
SO � SO
a
So
I�Td'iAL EST1IVIAT�
M-126/250 - PT 5
�I �a.7�a11
6/1/99
FOT OTH
R_ R.
- _. ,
-_� �
�,
. __._�.,�;._____
MEMORANDUM
TO: A. Douglas Rademaker, Director, DOE and
Mike Groomer, Assistant City Manager
FROM: Tony Sholola, DOE � S.
DATE: August 23, 1999
RE: DESIGN FEE AMENDMENT NO. 1 TO MAIN C1C4B DRAINAGE
AREA SANITARY SEWER SYST M REHABILITATION AND
IMPROVEMENTS (GROUP 6, CO TRACT 2), PART 7, DOE NO.
2113, SEWER PROJECT NO. PS46- 70460410230
The proposed amendment will reimburse Turner Collier & Braden, Inc. (TCB) for addi-
tional design services on the project as requested by the City.
The Water Department requested that Lateral L-438 be rerouted from under an existing
building into public right-of-way. It is also necessary to replace a 250 ft. section of Lat-
eral L-464. Field investigations revealed the existence of this segment of the line. Two
permanent easements are required to replace this line. In addition, it is necessary to relo-
cate lateral L-440 currently located on Harris Methodist Hospital right-of-waX.
Turner Collier & Braden, Inc. has requested reimbursement in the amount of $4,774.00
for the additional design services they performed thereby increasing the contract fee from
$234,570.00 to $239,344.00. I believe this fee is fair and reasonable for the additional
services that were provided.
Please authorize this additional fee by your signatures on the attached contract amend-
ment form.
cc: Ralcesh Chaubey, Project Manager
Berdena Hamilton, Water Department
Dan Pepon, Water Department
MEMO 2113
ENGINEERING DEPARTMENT
�� THE CITY OF FORT WORTH * IOOO THROCKMORTON STREET * FORT WORTH, Texas 76 1 02-63 1 1
(81'� 871-7941 * Fax (81'� 871-7854
�^� Printed on recycled paper