HomeMy WebLinkAbout025283 - Construction-Related - Contract - Koch Gateway Pipeline CompanyC;ITY SECRETARY Q
�nNTF�ACT 1�10 . � � U 3
[.KOCH
KOCH GATEWAY PIPELINE COMPANY
September 22, 1999
Mr. Gopal Sahu, P.E.
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
RE: Reimbursement Agreement Between Koch Gateway Pipeline Company ("Koch Gateway")
and the City of Fort Worth ("City") for the Adjustment of Koch Gateway's Index 1 in the
W. G. Elkins Survey, Tarrant County, Texas.
Reimbursement Number - 12-8521
Dear Mr. Sahu:
Under the terms of this Reimbursement Agreement ("Agreement"), Koch Gateway will
adjust the referenced pipeline facilities, located in Tarrant County, TX, to accommodate the City's
rehabilitation of Line A of the sanitary sewer main M-253-A. This Agreement sets forth the
understanding between the City and Koch Gateway with respect to the adjustment of such
facilities. Accordingly, the City and Koch Gateway agree as follows:
1. Subject to the provisions herein, Koch Gateway agrees to raise and replace
approximately 40 feet of 16 inch pipe of Index 1 in the W.G. Elkins Survey of Tarrant
County, Texas ("Facilities"), in order to accommodate the City's proposed installation
of a 30 inch sanitary sewer line.
2. Koch Gateway and the City recognize that certain agreement, dated April 6, 1927,
("Easement") executed by United Gas Pipe Line and C.A. Boaz. In consideration of
Koch Gateway's prompt adjustment of the Facilities, the City hereby agrees to amend
the terms and conditions of the Easement to the extent they conflict with the terms and
conditions of this Agreement.
3. Koch Gateway has projected the adjustment of the Facilities will not exceed
$36,031.60. After completion of the project, Koch Gateway shall submit to the City
an invoice setting forth the actual costs incurred by Koch Gateway in connection with
the adjustment. Such actual costs shall include, but not be limited to, the cost of labor,
materials and supplies, and overhead.
����Co�� ��C�uG�@
20 East Greenway Plaza • Houston, Texas 77046-2002 ■ P.O. Box 1478 • Houston, Te;as ��5'��� D, 6"' °
713/544-4123 ■ 800/890-0205 �o �) �?�f �y ��p
0
Mr. Gopal Sahu
September 22, 1999
Page 2
4. Should the City the fail to pay any sum due Koch Gateway, or if it becomes necessary
for Koch Gateway to employ an attorney to enforce any of the provisions of this
Agreement, Koch Gateway sha11 be entitled to damages suffered by it, including, but
not limited to, attorney fees and accrued interest on the balance due. Interest shall
accrue from the due date at a varying rate per annum equal to the lesser of 115% of
the prime rate charged by the Chase Bank of Texas, NA, Houston, Texas, to its largest
and most credit-worthy borrowers on 90-day commercial loans, or the maximum rate
of interest permitted by law.
5. TO THE FULLEST EXTENT PERMITTED BY LAW, THE CITY SHALL DEFEND,
PROTECT, INDEMNIFY AND SAVE HARMLESS KOCH GATEWAY AND ITS PARENT
COMPANY� AND THEIIt RESPECTIVE OFFICERS, DIItECTORS AND EMPLOYEES
(COLLECTIVELY REFERRED TO FOR PURPOSES OF THIS PARAGRAPH 5 AS "KOCH
GATEWAY"� FROM AND AGAINST ALL CLAIMS, DEMANDS, LAWSUITS, CAUSES OF
ACTION, STRICT LIABILITY CLAIMS, PENALTIES� FINES, ADMINISTRATIVE LAW
ACTIONS AND ORDERS, EXPENSES (INCLUDING, BUT NOT LIMITED TO, ATTORNEYS'
FEES� AND COSTS OF EVERY KIND AND CHARACTER ARISING OUT OF OR IN ANY
WAY INCIDENT TO ANY OF THE WORK PERFORMED UNDER THIS AGREEMENT, ON
ACCOUNT OF PERSONAL INJURIES, DEATH, DAMAGE TO PROPERTY, OR DAMAGE TO
TIiE ENVIRONMENT, REGARDLESS OF WHETHER SUCE HARM IS TO THE CITY, KOCH
GATEWAY, THE EMPLOYEES OR OFFICERS OF EITHER OR TO ANY OTHER PERSON
OR ENTITY. THE DUTY TO DEFEND, PROTECT, INDENINIFY AND SAVE KOCH
GATEWAY HARMLESS REFERRED TO IN THE PRECEDING SENTENCE SHALL
INCLUDE, BUT NOT BE LIMITED TO, CLAIMS� DEMANDS, LAWSUITS, STRICT
LIABILITY CLAIMS, PENALTIES, FINES, ADMINISTRATIVE LAW ACTIONS AND
ORDERS, COSTS, EXPENSES AND CAUSES OF ACTION WHICH RESULT FROM THE
COMPARATIVE� CONCURRENT OR CONTRIBUTING NEGLIGENCE OF ANY PERSON OR
ENTITY INCLUDING, BUT NOT LIMITED TO, KOCH GATEWAY, ITS AGENTS,
EMPLOYEES OR OFFICERS, EXCEPT THAT THE CITY SHALL NOT BE LIABLE FOR NOR
HAVE ANY OBLIGATION TO INDEMNIFY, HOLD HARMi.ESS AND DEFEND AGAINST
LOSS OR DAMAGE RESULTING FROM THE SOLE (1Q0%� NEGLIGENCE OR
INTENTIONAL ACTS OF KOCH GATEWAY. IT IS THE INTENTION OF THE PARTIES
THAT THE INDENINITY OBLIGATIONS OF THE CITY ARE WITIiOUT REGARD TO
WHETHER THE NEGLIGENCE, GROSS NEGLIGENCE, FAULT OR STRICT LIABILITY OF
KOCH GATEWAY IS A CONCURRENT OR CONTRIBUTORY FACTOR, AND SUCH
OBLIGATIONS ARE INTENDED TO PROTECT KOCH GATEWAY AGAINST THE
CONSEQUENCES OF TTS OWN NEGLIGENCE. THIS AGREEMENT IS NOT INTENDED TO
CREATE ANY RIGHTS IN PERSONS OR ENTITIES THAT ARE NOT PARTIES TO THIS
AGREEMENT, NOR TO WAIVE ANY RIGHTS, LIMITATIONS OR IMMUI�TITIES
AVAILABLE TO THE CITY UNDER THE TEXAS TORT CLAIMS ACT OR OTHER
APPLICABLE LAW.
„ . � . r
Mr. Gopal Sahu
September 22, 1999
Page 3
6. The City shall send payments, notices and communi�ations to Koch Gateway to the
following address:
Koch Gateway Pipeline Company
Attention: Cris Franklin, Project Engineer
606 South Shelby Street
Carthage, TX 75633
Telephone: (903) 693-5172 x2549
If the City agrees with these terms and conditions, please so indicate by having an
authorized representative sign the two originals of this Agreement in the appropriate spaces arYd
return one fully-executed original to my attention.
AGREED AND ACCEPTED
this '�� day of L��� • 191r2
Cit;
�:
Printed Name: Mike Groomer
Title:_ AGG; stant G���, Mana�ar
Sincerely,
�� ���
Cris Fr klin
Project Engineer
AGREED AND ACCEPTED
this ?�r dday of .��b��19q9
.. �-.
Koch Gateway Pipeline Company
By: � .�L
7 C. Earl
Attorney in Fact
APPROVED
.l���'
A. ouglas Rademaker, P.E.
Director, Engineering Department
AF V�D AS 7,`0 b'0� A�, l[s13C.�J,ITY:.
��� ��
Assisi:ant ,Gitg o�aey -
�'— 30— 99
A'I'i'ESiE
�i
C- /7���
�Wontract Authorization
9- �8�99
Date
City of Fort T�T'orth, 7'exas
Mayor and Council
Communication
DATE REFERENCE NUMBER LOG NAME PAGE
9�28�99 ''�`C-17665 30KOCH � 1 of 1
SUBJECT AGREEMENT WITH KOCH GATEWAY PIPELINE COMPANY TO RELOCATE A,GAS
LINE TO AVOID CONFLICT WITH SANITARY SEWER MAIN M-253-A REHABILITATION
NEAR VILLAGE CREEK WASTEWATER TREATMENT PLANT
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to enter into an agreement with
Koch Gateway Pipeline Company for relocation of a natural gas transmission line to avoid a conflict
with sanitary sewer Main M-253A rehabilitation, at a cost not to exceed $36,031.60.
DISCUSSION:
On May 18, 1999 (M&C C-17429), the City Council awarded a contract to S. J. Louis Construction Inc.
for sanitary sewer Main M-253A rehabilitation near the Village Creek Wastewater Treatment Plant.
During the course of construction, it was discovered that a 16-inch gas transmission main was in
conflict with the grade of the proposed sanitary sewer line. This gas line is located on private property
in a gas line easement, and is not within the City of Fort Worth right-of-way. Koch Gateway Pipeline
Company does not have a franchise agreement with the City for this gas line.
The Water Department will be required to fund 100% of the gas line relocation costs. The estimated
cost of work associated with the re-routing of approximately 40 linear feet� of 16-inch gas line is
$36,031.60.
This project is located in COUNCIL DISTRICTS 4 and 5, Mapsco 67 U and V.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Commercial Paper-Sewer Fund.
MG:k
Submitted for City Manager's
Office by:
Mike Groomer
Originating Department Head:
A. Douglas Rademaker
I FUND I ACCOUNT � CENTER � AMOUNT
� (to)
�
6140
6157 I (from)
I PS46 I 539120 I 070460140270 �$36,031.60
CITY SECRETARY
APPROVED 9/28/99
Additional Information Contact:
City of For�t Worth, Texas
�i►�Ay�r And Caunc�l Cammun�cAt�an
DATE REFERENCE NUMBER LOG NAME PAGE
9�28�99 **C-17665 30KOCH 1 of 1
SUBJECT AGREEMENT WITH KOCH GATEWAY PIPELINE COMPANY TO RELOCATE A GAS
LINE TO AVOID CONFLICT WITH SANITARY SEWER MAIN M-253-A REHABILITATION
NEAR VILLAGE CREEK WASTEWATER TREATMENT PLANT
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to enter into an agreement with
Koch Gateway Pipeline Company for relocation of a natural gas transmission line to avoid a conflict
with sanitary sewer Main M-253A rehabilitation, at a cost not to exceed $36,031.60.
DISCUSSION:
On May 18, 1999 (M&C C-17429), the City Council awarded a contract to S. J. Louis Construction Inc.
for sanitary sewer Main M-253A rehabilitation near the Village Creek Wastewater Treatment Plant.
During the course of construction, it was discovered that a 16-inch gas transmission main was in
conflict with the grade of the proposed sanitary sewer line. This gas line is located on private property
in a gas line easement, and is not within the City of Fort Worth right-of-way. Koch Gateway Pipeline
Company does not have a franchise agreement with the City for this gas line.
The Water Department will be required to fund 100% of the gas line relocation costs. The estimated
cost of work associated with the re-routing of approximately 40 linear feet of 16-inch gas line is
$36,031.60.
This project is located in COUNCIL DISTRICTS 4 and 5, Mapsco 67 U and V.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Commercial Paper-Sewer Fund.
MG:k
Submitted for City Manager's
Office by:
I FUND I ACCOUNT I CENTER I AMOUNT
� (to)
CITY SECRETARY
Mike Groomer
Originating Department Head:
A. Douglas Rademaker
Additional Information Contact:
6140
�
6157 I (from)
I PS46 539120 070460140270 $36,031.60
A. Douglas Rademaker 6157 I
� ApPROVED
iCl'fY COU�C�-
SEP �8 1999
�,�,,., l�u�"'�1
u�$�JaS�iOtdYy O�� ��c
. �.�.
�;;tv rs.. >