Loading...
HomeMy WebLinkAbout063287-FP1 - Construction-Related - Contract - Beck-Potere Joint Venture-FP1 City Secretary 63287 Contract No. FORT WORTH Date Received 6/3/2026 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Parkway Improvements for JPS Parking Garage City Project No.: 106001 Improvement Type(s): ❑x Paving ❑ Drainage ❑x Street Lights ❑ Traffic Signal Original Contract Price: $482,836.76 Amount of Approved Change Order(s): -$12,011.65 Revised Contract Amount: $470,825.11 Total Cost of Work Complete: $470,825.11 Scot Bennett (Jun 2. 202.6 12 28 02 CDT) Contractor Re Title Beck-Potere Joint Venture Company Name Project Inspector d 11 Ahmed Musa (Jun 2, 2026 23:22:35 CDT) ProjjecctManager 1/1 CFA Manager u� LaPr�ieu�r�(Jun 2026 10:18:25 CDT1 TPW Director 06/19/2025 Date 06/02/2026 Date 06/02/2026 Date 06/03/2026 Date 06/03/2026 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Parkway Improvements for JPS Parking Garage City Project No.: 106001 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 180 WD Days Charged: 121 WD Work Start Date: 8/6/2025 Work Complete Date: 2/13/2026 Completed number of Soil Lab Test: 111 Completed number of Water Test: 0 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name JPS PARKING GARAGE Contract Limits Project Type PAVING City Project Numbers 106001 DOE Number 6001 Estimate Number 1 Payment Number 1 For Period Ending 2/13/2026 WD City Secretary Contract Number Contract Date Project Manager NA Contractor BECK - POTERE JOINT VENTURE 464 BALLEY AVE SUITE 210 FORT WORTH, TX 76107 Inspectors D. WATSON / R. WATSON Contract Time 180 WD Days Charged to Date 121 Contract is 100.00 Complete Thursday, May 28, 2026 Page 1 of 5 City Project Numbers 106001 Contract Name JPS PARKING GARAGE Contract Limits Project Type PAVING Project Funding UNIT IV: PAVING IMPROVEMENTS Item Description of Items Estimated Unit No. Quanity ----------------------- 1 REMOVE SIDEWALK 4225 SF 2 REMOVE CONCRETE DRIVE 1030 SF 3 REMOVE CONC CURB&GUTTER 110 LF 4 TEMPORARY ASPHALT PAVING REPAIR 255 LF 5 4" CONC SIDEWALK 6755 SF 6 6" CONCRETE DRIVEWAY 1929 SF 7 BARRIER FREE RAMP, TYPE U-1 1 EA 8 6" CONC CURB AND GUTTER 55 LF 9 PREFORMED THERMOPLASTIC CONTRAST 12 LF MARKINGS - 24" STOP BARS 10 BLOCK SOD PLACEMENT 500 SY 11 PLANT 5" TREE 25 EA 12 TRAFFIC CONTROL 2 MO 13 5' CONC FLUME WITH BOLTED PLATE COVER 17 LF Sub -Total of Previous Unit UNIT V: STREET LIGHTING IMPROVEMENTS Item Description of Items No. ----------------- 1 2" CONDT PVC SCH 80 (T) (CO#1) 2 2" CONDT PVC SCH 80 (B) (CO#I ) 3 NO 6 TRIPLEX OH INSULATED ELEC CONDR 4 NO 8 INSULATED ELEC CONDR 5 NO 8 BARE ELEC CONDR 6 FURNISH/INSTALL GROUND BOX TYPE B, W/APRON (CO#I) 7 RDWY ILLUM ASSMBLY TY 18,18A,19, AND D- 40 8 FURNISH/INSTALL 10'- 14' WASHINGTON STANDARD LIGHT POLE & FIXTURE LED 9 RDWY ILLUM FOUNDATION TY 3,5,6, AND 8 10 RDWY ILLUM FOUNDATION TY 7 Estimated Unit Quanity 905 LF 0 LF 280 LF 1240 LF 1005 LF 5 EA DOE Number 6001 Estimate Number I Payment Number I For Period Ending 2/13/2026 [nit Cost Estimated Total $1.00 $4,225.00 $7.40 $7,622.00 $4.00 $440.00 $45.00 $11,475.00 $20.00 $135,100.00 $20.00 $38,580.00 $675.00 $675.00 $20.00 $1,100.00 $100.00 $1,200.00 $5.84 $2,920.00 $1,100.00 $27,500.00 $4,333.33 $8,666.66 $650.00 $11,050.00 $250,553.66 Unit Cost Estimated Total $45.17 $40,878.85 $64.05 $0.00 $8.40 $2,352.00 $4.78 $5,927.20 $4.78 $4,803.90 $2,302.65 $11,513.25 I EA $10,500.00 $10,500.00 12 EA $10,323.60 $123,883.20 I EA $3,598.35 $3,598.35 6 EA $2,802.45 $16,814.70 Completed Completed Quanity Total 4225 $4,225.00 1030 $7,622.00 110 $440.00 255 $11,475.00 6755 $135,100.00 1929 $38,580.00 1 $675.00 55 $1,100.00 12 $1,200.00 500 $2,920.00 25 $27,500.00 2 $8,666.66 17 $11,050.00 $250,553.66 Completed Completed Quanity Total 905 $40,878.85 0 $0.00 280 $2,352.00 1240 $5,927.20 1005 $4,803.90 5 $11,513.25 1 $10,500.00 12 $123,883.20 1 $3,598.35 6 $16,814.70 Thursday, May 28, 2026 Page 2 of 5 City Project Numbers 106001 Contract Name JPS PARKING GARAGE Contract Limits Project Type STREET LIGHTING Project Funding DOE Number 6001 Estimate Number I Payment Number I For Period Ending 2/13/2026 -------------------------------------- Sub-Total of Previous Unit $220,271.45 $220,271.45 Thursday, May 28, 2026 Page 3 of 5 City Project Numbers 106001 Contract Name JPS PARKING GARAGE Contract Limits Project Type STREET LIGHTING Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number I Total Contract Price DOE Number 6001 Estimate Number I Payment Number I For Period Ending 2/13/2026 $482,836.76 ($12,011.65) $470,825.11 Total Cost of Work Completed $470,825.11 Less % Retained $0.00 Net Earned $470,825.11 Earned This Period $470,825.11 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $470,825.11 Thursday, May 28, 2026 Page 4 of 5 City Project Numbers 106001 Contract Name JPS PARKING GARAGE Contract Limits Project Type STREET LIGHTING Project Funding Project Manager NA Inspectors D. WATSON / R. WATSON Contractor BECK - POTERE JOINT VENTURE 464 BALLEY AVE SUITE 210 FORT WORTH, TX 76107 DOE Number 6001 Estimate Number I Payment Number I For Period Ending 2/13/2026 City Secretary Contract Number Contract Date Contract Time 180 WD Days Charged to Date 121 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Funded Net Total Cost of Work Completed $470,825.11 Less % Retained $0.00 Net Earned $470,825.11 Earned This Period $470,825.11 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $470,825.11 Thursday, May 28, 2026 Page 5 of 5 w ° Z ¢ w 2 � U O r O Z c lL6 U Z G `m Q CL U a < o N a c } E F d) U 0 cl Y N a `m 'n N (00 00 n O L L w J J O O C C Cp Ag Lo O w in QO a M � a d O c NO C_ c 7 00 O I,- <t M > > CDa0 w N .- Q M M a3 a a7 a N ro co z Y r a z O U w Q z F U O U Q 0 Z � d ¢ LL � � w J Q U U U IL Xk IL 7 It Lo O N N V 0) CD M co 00 O O Z Z m CD 0 0 � a W Q z a H U w 0 a 0 z� Y} K Q o 0 0 M 00 0 0 0 0 0 N U o 0 r = T U 4'T � 604 eM H fA N ? J h r N fl C w N d C9 N O. O O N M N G C V w w o N 0 O O O O O O O U o 0 0 0 0 0 U (A tR bT u3 VS dY Ip O z � m N N � M O fA a N o o VMi N c > C-4 w N N» G U 0 V o o e o e e 0 o 0 0 0 o H C V Z LU v A F Z 0 V Lo qU ¢ t- o• o 0 0 0 0 o n p O '� w U > m O U N U o 0 0 0 0 0 U L w p to N p 01 LU N 0 O V O O O O O O 6e 6e O. 0 609 6e9 d4 d N O O O p O O O V , o o 0 o 0 c 0 o 0 0 0 0 � U /A 64 fA tlT fA :A O W Q 0 N w 1 Oa us w .n 0 MW v 0 O ❑ U ❑ K w a LU r r 0 a W U � r a z Z o v 0 r U = Q r F- In U w U I- 0 j 0 U Lu � w¢ a¢ v ❑w r w ¢ H ❑ vi w O o F a z rn Q U O 0 F p 0 W w r z z W O F o W r z O j ¢ r O w U O O Q � a) a M QN O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I- M O � FR d3 fH VD (A EA 64 fA tf) fA Vi (f) Efl (A fA E9 fA Vi N 0 v 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 en ua 0 u> 0 0 » CIO Ees 0 0 u� Ev 0 0 Es Va 0 00 ua cn 010,010,01010 .4 u3 av » En 14 � U N. N. M N �O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U O 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 N M O V-1 V3 YA Vj fA V3 V3 EA Vi fR fA fH di fA Vj EH V3 d-T iJ In a N u3 au z c �a U O _ m z 0 o m o Z O 2 2 O 0 U)0 z U U O d a a cr uj z z z 3 p OO=aO V U fq W Z a. W N {V o O LL Pf M N N N c M W J J i O O N ~ O V) H n O Q 7 a moo o u� r o o v U N N M LU w a E m N N a Ix § \ 0 k 2 � 2/co t \ 7 \ ƒ# § G 3C _ ( } §20 ) >Z;j / \ o } \ \ # ( § § z � � u k f ■ ■ ] } / ) 2 Q . § z z § k k § ` ) \ / a / \ % 7 f z z k a k r 2 � 0 § w \ ° \ } o= Lq § \ E 9 m z ) } § ) / F § k ƒ FORTWORTH. TRANSPORTATION AND PUBLIC WORKS May 22, 2026 Beck— Potere Joint Venture 464 Bailey Ave, Suite 210 Fort Worth, TX 76107 RE: Acceptance Letter Project Name: Parkway Improvements for JPS Parking Garage Project Type: Paving, Street Light City Project No.: 106001 To Whom It May Concern: On May 4, 2026 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on May 22, 2026. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on May 22, 2026, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-2084. Sincerely, 401, Ahmed Musa (Jun 2, 2026 23:22:35 CDT) Ahmed Musa, Project Manager Cc: Robert Watson, Inspector Cody Horton, Inspection Supervisor Oscae Agullion, Senior Inspector Andrew Goodman, Program Manager Teague Nall and Perkins, Consultant Beck-Potere Joint Venture, Contractor John Peter Smith Hospital, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Jeff Massie, Operations Manager Of HCBeck, Ltd, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; JPS New Parking Garage r BY Jeff Mas e, Operations Manager Subscribed and sworn before me on this date 19 of February, 2026. ABBY GARCIA Notarryy PWk. Sure of Texas ' * MY O mr mi P02 ExAires 18 Notary Pub is Tarrant County, Texas CONSENT OF SURETY OWNER El TO FINAL PAYMENT N:CHITECT Cl CONTRACTOR Cl .CIADocurnpnt 6707 sURM Bond No 6742254.52 CIT HFR TO O%VNER: ARCHITECT' S PROJFCT NO.: (Name euredadetrzt—, City of Fort Worth CFA 25-0044; Paving & Pedestrian Light to Serve 200 Texas Street CONTRACT FOR: Parkway Improvements for JPS Parking Garage Forth Worth, TX 76102 PROJECT: CONTRACT DA17D: (Annie artd adtdrrr.<t) CFA 25-0044; Paving & Pedestrian Light to Serve Parkway Improvements for JPS Parking Garage In accordance v, irh the provisions of the Contract hem een the Owner anti the Contractor as indicated above, the Onserd rxen z,r and aelydrt�s of Srrr egg Liberty Mutual Insurance Company 175 Berkeley Street Boston, MA 02116 , SbRETY, on bond of (1resrrt ream o ay addre.,.c of Coulractruy Beck - Potere Joint Venture 464 Bailey Ave. Suite 210 Fort Worth, TX 76107 C0N-ITACTOR, hereby apprMes of the final payment to the Contractor, and agrees iliac final payment to the Contractor shall not relieve the Surety of any of its obligations to (tirzwtt nautea»c1 adebrss ref mvnerj City of Fort Worth 200 Texas Street Forth Worth, TX 76102 as set ford) in said. Surety's bond. IN VATNESS WHEREOF, the Surety has hereunto set its hand can this date: June 1, 2026 fftwr9 !rt errithW tlx ;nonrh fb1!wvd 4-r tPx uurrreric darearrd rear.; P�-%Nsu � J��ostvoRyT 4'�i+ 1912 2 ��i 9SSACNus �� 64��L(y Attest: {Seal}: Liberty Mutual Insurance Company (Sut�Y) IAIQLI,I�I�{�( Wiz.' �'- ,�,� C5��rlfifi3lY afai111)p>'IXCFt Jr)7Jt�stnlaYil�J Mariana Walker, Attorney -in -Fact (Pole;al ttdtrae arrel titici Surety Phone No. 617-357-9500 , OWNER, G707-1994 :• Liberty POWER OF ATTORNEY mutuile Liberty Mutual Insurance Company SURETY The Ohio Casualty Insurance Company West American Insurance Company KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohm Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company ds a corporation duly organized under the laws of the State of Massachusetts, and West Amencan Insurance Company is a oorporation duly organized under the laws of the State of Indiana (herein collectively called the -Companies-), pursuant to and by authority herein set forth, does hereby name, constitute and appoint Mariana Walker all of the city of Kansas City , state of MO its hue and lawful atfomey-in-fact, with full power and authority hereby conferred to sign, execute and acknowledge the following surety bonds, undertakings, recognizances, contracts of indemnity, and all other surety obligations related thereto, the execution of which shall be binding upon the Companies as if it had been duly signed and executed by its own officers: Principal Name: Beck - Potere Joint Venture Obligee Name: City of Fort Worth Surety Bond Number: 674225452 Bond Amount: See Bond Fortin IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 1 st day of June 2026 Liberty Mutual Insurance Company ti 1xSr/� y1Y INS , mN s U 4 The Ohio Casualty Insurance Company �JQ4o�volt"r1 1 yC �Jt"4ocvoggr VPGawucr��r y� West American Insurance Company r Fa m to 2 [� 1912 o a 1919 1991 0 dy`Tsrcwuswfiaa3 Wyk nMtgpb r�, 'AaimNr aa3 B Q Nathan J. Zangede, Assistant Secretary STATE OF PENNSYLVANIA ss COUNTY OF MONTGOMERY On this 1 St day of June 2026 , before me personally appeared Nathan J. Zangede, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notanal seal at Plymouth Meeting, Pennsylvania, on the day and year first above written. Sr, PAST 5`aNWF4���y Commonwealth of Pen nsylvaria - Notary Seat - Teresa Pastella.ome Notary Coun Pubic � or Montgomery expires County � My commission expires March 29, 2029 BY: Commission number 1126044 Teresa Pastella, Notary Public Member, Pennsylvania Assocuom of Notaries This Power of Attorney is made and executed pursuant to and by authority of fhe following By-laws and Authorizations of The Ohio Casualty Insurance Company. Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows ARTICLE lV— OFFICERS: Section 12, Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attor mays -in -€act, as may be necessary to actin behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations- Such altomeys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of he Corporation When so executed, such Instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the provisions of this article; may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIIt— Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in wrtng by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shalt appoint such aftormeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, reecgnizances and other surety obligations. Such aftomeys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such Instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Nathan J. Zangerle, Assistant Secretary to appoint such attorneys-infact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and ether surety obligations_ Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C Llewellyn, the undersigned. Assistant Secretary, of Liberty Mutual Insurance Company, The Ohio Casualty Insurance Company, and West American Insurance Company do hereby certify that this power of attorney executed by said Companies is in full farce and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 1st day of June 2026 - 111sug, �ZY INSU INSO& PoggT�y(1O'g4.pRy'P co'ps'or4rq?'C� ru y1912yo �_a1919�Q 1991 0 `yam y: _ rd� stgcrus �aa$ Za ��hAMtg�� b �s NainNp da enee C. Llewellyn Assistant Secretary •� c�.1 Cr to e E O a, •c U $1 7 Q � rn 0 a_ C co QE Q o 00 0m �o? O p ka — c 0 Q as Lit_ CL LMIC, OEIC, WAIC - Sure Path 012025