HomeMy WebLinkAboutContract 40605 1
SPECIFICATIONS
AND
CONTRACT DOCUMENTS CITY SECRETARYLJ., 0
FOR CONTRACT NO. T"
1
WATER AND SANITARY SEWER REPLACEMENT CONTRACT
1 2004 WSM-E
J Water Project No.: P253-608170125183
CITY SECRETARY Sewer Project No.: P258-708170125183
DOE NO. 4432
D.G.E. FILE City Project No. 01251
a C ONTRACTOR'S BONDING CO.
I� CO�JQ i'(zl.1CTION'S COPY
J CLIENT DEPARTMENT FORT
WORTH
City of Fort Worth,Texas
2010
Dale A.Fisseler,PE Mike Moncrief
City Manager Mayor
William A. Verkest, PE S. Frank Crumb,PE
Director of Director
Transportation and Public Works Water Department
-1 OFFICIAL RECORD
J CITY SECRETARY ��titi�unt
CNPf '� T fist
Prepared By: 3RM,TX r ;s ll
BROWN CARLJ.KROGNESS r
108 West 8`' Street, Suite 200 A s' 91 ss9 /0.
Fort Worth,Texas 76102 ,.35 I PJ90 s�i� oo`���'.r
& GAY -26-10 P1 � Ott $/ONAL0'
ENGINEERS, �. hmt����~
J
21 of solo
Brown&Gay Engineers,Inc.
F-1 046
Page 1 of 3
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 6/15/2010 - Ord. No. 19189-06-2010
DATE: Tuesday, June 15, 2010 REFERENCE NO.: C-24276
LOG NAME: 6004WSME-LAUGHLEY
SUBJECT:
Authorize a Contract in the Amount of$1,405,589.00 with Laughley Bridge &Construction, Inc., for Water
and Sanitary Sewer Replacement Contract 2004, WSM-E on Oakland Boulevard, Scenery Hill Road,
Scenery Hill Court, Menzer Street and Menzer Court and Adopt Appropriation Ordinance (COUNCIL
DISTRICT 8)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of$1,517,041.00 from the Water and Sewer Operating Fund to the Water Capital
Projects Fund in the amount$1,056,111.10 and Sewer Capital Projects Fund in the amount of
$460,929.90;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water Capital Projects Fund in the amount of$1,056,111.10 and Sewer Capital Projects Fund in the
amount of$460,929.90 from available funds; and
3. Authorize the City Manager to execute a contract in the amount of$1,405,589.00 with Laughley Bridge
& Construction, Inc., for Water and Sanitary Sewer Replacement Contract 2004, WSM-E.
DISCUSSION:
On February 24, 2009, (M&C C-23369)the City Council authorized the City Manager to execute an
Engineering Agreement with Brown &Gay, Inc., for Water and Sanitary Sewer Replacement Contract
2004, WSM-E.
This project consists of water and sanitary sewer main replacements on the following streets:
Street From To
Oakland Boulevard Service Road Meadowbrook Drive
Scenery Hill Road Menzer Street Barnett Street
Scenery Hill Court Scenery Hill Road Dead End
Menzer Street Scenery Hill Road Menzer Court
Menzer Court Menzer Street Dead End
This project was advertised for bid on February 4, 2010 and February 11, 2010, in the Fort Worth Star-
Telegram. On March 25, 2010, the following bids were received:
Bidder Amount Time of Completion
*RKM Utility Services $1,273,661.00 230 Calendar Days
*MACVAL Associates, LLC $1,311,585.50
Laughley Bridge& Construction, Inc. $1,405 ,589.00
Conatser Construction TX, LP $1,466,275.00
http://apps.cfwnet.org/ecouncil/printmc.asp?id=13419&print=true&DocType=Print 7/1/2010
Page 2 of 3
Utilitex Construction, LLP $1,557,381.10
ME Burns Construction, Inc. $1,566,298.00
Cleburne Utility Construction, Inc. $1,601,127.00
William J. Schultz, Inc., $1,610,528.00
d/b/a Circle "C" Construction Company
Burnsco Construction, Inc. $1,622,967.50
SHUC, Inc. $1,667,134.95
Tri-Tech Construction, Inc. $1,685,633.00
Jackson Construction $1,737,438.00
Barson Utilities $2,085,471.40
*RKM Utility Services, Inc., and MACVAL Associates, LLC have been determined by staff to be non-
responsive to the contract specifications due to failure to comply with their prequalification pipe size
restriction of 12 inches in diameter and smaller for water and/or sanitary sewer main installation. This
project includes 16 inch water main installation.
M/WBE - Laughley Bridge& Construction, Inc., is in compliance with the City's M/WBE ordinance by
committing to 12 percent M/WBE participation. The City's goal on this project is 12 percent.
In addition to the contract cost$61,000.00 (Water: $35,000.00; Sewer: $26,000.00) is required for
construction staking, project management, material testing and inspection and $50,452.00 (Water;
$29,741.00; Sewer: $20,711.00) is provided for project contingencies.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above recommendations
and adoption of the attached appropriation ordinance, funds will be available in the current capital
budgets, as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund.
FUND CENTERS:
TO Fund/Account/Centers FROM Fund/Account/Centers
1&2)P253 476045 6081701251ZZ $1.056.111.10 1) PE45 538040 0609020 $1.056.111.10
1&2) P258 476045 7081701251 ZZ $460.929.90 1) PE454 538040 0709020 $460.929.90
2) P253 531350 608170125152 $7,000.00 2) P253 541200 602170125183 $991.370.00
2)P253 511010 608170125180 $4,000.00 2)P258 541200 708170125183 $414.219.00
2) P253 541200 608170125183 $1.021.111.10
2) P253 531200 608170125184 $7,000.00
2) P253 531350 608170125184 $2,000.00
2) P253 531350 608170125185 $15.000.00
2) P258 531350 708170125152 $5,000.00
2)P258 511010 708170125180 $5,000.00
2) P258 541200 708170125183 $434.929.90
2) P258 531200 708170125184 $5,000.00
2)P258 531350 708170125184 $1,000.00
2) P258 531350 708170125185 $10.000.00
CERTIFICATIONS:
Submitted for City Manager's Office y• Fernando Costa (6122)
http://apps.cfwnet.org/ecouncil/printmc.asp?id=13419&print=true&DocType=Print 7/1/2010
Page 3 of 3
Originating Department Head: S. Frank Crumb (8207)
Additional Information Contact: Roberto C. Sauceda (2387)
ATTACHMENTS
1. 6004WSME LAUGHLEY MAP REVISED.pdf (Public)
2. 6004WSME-LAUGHLEY AO.doc (Public)
3. 6004WSME-LAUGHLEY COMPLIANCE.pdf (CFW Internal)
4. 6004WSME-Laughley Sewer FAR pdf (CFW Internal)
5. 6004WSME-Laughley Water FAR.pdf (CFW Internal)
6. Accounting Info.pdf (CFW Internal)
http://apps.cfwnet.org/ecouncil/printmc.asp?id=13419&print=true&DocType=Print 7/1/2010
CITY OF FORT WORTH,TEXAS
ICONTRACT
THE STATE OF TEXAS
IKNOW ALL BY THESE PRESENTS
COUNTY OF TARRANT
IThis Contract made and entered into this the day dAiN�TA,# ., 2010, by and between
the CITY OF FORT WORTH,a home-rule municipal corporation situated in Tarrant, Denton,Parker,and
I Wise Counties, Texas, by and through its duly authorized Assistant City Manager, ("Owner"), and
Laughley Bridge & Construction. Inc. Owner and Contractor may be referred to herein individally as a
"Party"or collectively as the"Parties."
IWITNESSETH: That said parties have agreed as follows:
1.
IThat for and in consideration of the payments and agreements hereinafter mentioned to be made
and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith,
the said Contractor hereby agrees with the said Owner to commence and complete the construction of
certain improvements described as follows:
Water and Sanitary Sewer Replacements Contract 2004 WSM-E
That the work herein contemplated shall consist of furnishing as an independent contractor all
labor, tools, appliances and materials necessary for the construction and completion of said project in
I accordance with the Plans and Specifications and Contract Documents prepared by the Department of
Engineering for the Water Department of the City of Fort Worth adopted by the City Council of the City
of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a
Ipart of this contract the same as if written herein.
3.
IThe Contractor hereby agrees and binds himself to commence the construction of said work
within ten (10) days after being notified in writing to do so by the Department of Water(Engineering) of
I the City of Fort Worth.
4.
The Contractor hereby agrees to prosecute said work with reasonable diligence after the
commencement thereof and to fully complete and finish the same ready for the inspection and approval of
the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth
within a period of 180 Calender days.
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract
Documents within the time so stipulated, plus any additional time allowed as provided in the General
Conditions, there shall be deducted from any monies due or which may thereafter Mco- me due iim, t e
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
sum of $420.00 Per working day, not as a penalty but as liquidated damages, the Contractor and his
Surety shall be liable to the Owner for such deficiency
5.
I Should the Contractor fail to begin the work herein provided for within the time herein fixed or to
carry on and complete the same according to the true meaning of the intent and terms of said Plans,
Specifications and Contract Documents, then the Owner shall have the right to either demand the surety
to take over the work and complete same in accordance with the Contract Documents or to take charge of
and complete the work in such a manner as it may deem proper, and if in the completion thereof, the cost
to the said City shall exceed the contract price or prices set forth in the said plans and specifications made
a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and
specifying an itemized statement of the total cost thereof, said excess cost.
6
IContractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the
project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify,
hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and
against any and all claims or suits for property loss, property damage, personal injury, including death,
arising out of, or alleged to arise out of,the work and services to be performed hereunder by Contractor,
its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury,
damage or death is caused, in whole or in part, by the negligence or alleged negligence of
Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify
and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and
employees and any damage, loss or destruction to property of the Owner arising from the performance of
any of the terms and conditions of this Contract, whether or not any such injury or damage is
caused in whole or in part by the negligence or alleged negligence of Owner, its officers,
servants or employees..
I In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior
to final payment, final payment shall not be made until Contractor either(a)submits to Owner
satisfactory evidence that the claim has been settled and/or a release from the claimant involved,or(b)
I provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred
to the insurance carrier.
The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public
work from a Contractor against whom a claim for damages is outstanding as a result of work performed
under a City Contract.
7
The Contractor agrees, upon the execution of this Contractor, and before beginning work, to
make, execute and deliver to City of Fort Worth the following bonds in the name of the City of Fort
Worth in a sum equal to the amount of the Contract. The form of the bond shall be as herein provided
and the surety must first be acceptable to the requirements of the Chapter 2253 of the Texas Government
Code, as Amended.
A. If the total contract price is $25,000 or less, payment to the contractor shall be made in
one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has
been completed and accepted by the Owner. F- m-----°--°
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
i
B. If the contract amount is in excess of$25,000, a Payment Bond shall be executed, in the
amount of the Contract, solely for the protection of the claimants supplying labor and material in the
prosecution of the work.
IC If the Contract amount is in excess of$100,000, a Performance Bond shall be executed,
in the amount of the Contract conditioned on the faithful performance of the work in accordance with the
I Plans, Specifications, and Contract Documents. Said bond shall solely be for the protection of the Owner.
D. A Two-year Maintenance Bond in the name of the Owner is required for all projects to
insure the prompt, full and faithful performance of the general guarantee contained in the Contract
IDocuments.
8.
I The Owner agrees and binds itself to pay, and the Contractor agrees to receive, for all of the
aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal
submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in
monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of
invoice from the Contractor. The agreed upon total contract amount(including/excluding)alternates n/a,
shall be ONE MILLION FOUR HUNDRED FIVE THOUSAND FIVE HUNDRED EIGHTY NINE
DOLLARS AND NO CENTS ($1,405,589.00).
9.
It is further agreed that the performance of this Contract, either in whole or in part, shall not be
I sublet or assigned to anyone else by said Contractor without the written consent of the Owner. Any
request for any sublease or assignment shall be made in writing and submitted to the Director of the
Engineering Department.
10.
I
The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is
classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto
Iand made a part hereof the same as if it were copied verbatim herein.
I 11.
I It is mutually agreed and understood that this agreement is made and entered into by the parties
hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of
the State of Texas with references to and governing all matters affecting this Contract, and the Contractor
Iagrees to fully comply with all the provisions of the same.
IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in 8
Icounterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the
corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its
duly authorized officers in 8 counterparts with its corporate seal attached.
OFFICIAL REC O
CIS'SECRETARY
1 FT. WVORTFI,TX
Done in Fort Worth, Texas,this the day of .A.D.,2010
REC DED: CITY OF FORT WORTH
BY:
DIRECTOR, DEPARTMENT OF
IWATER
FERNANDO COSTA, ASST CITY MANAGER
Conriact Authorizatioa
I1 ATTEST:
Late
I
I ,
CONTRACTOR
I
CITY SECRETARY
I (S E A L)
A;>to�Oj 0000000 a A
I BY: p�:oo00d
*0 ova
I ��S►.�t a�j_ - o 0 TITLE �� ` XQS �.d
l2 3 ao APPROVED AS TO FORM AND
300 LEGALITY:
ADDRESS
C6t/
ASSt.r ATTORNEY
OFFICIAL RECOR��
CITY SECRR=TAW"
E
FT WORTH,T)(_