HomeMy WebLinkAboutContract 40610-CO4 CITY SECRLET�olQ,o
CONTRACT N0.
FORT WORTH['H City of Fort Worth
Change Order Request
Project Name I Water and Sanitary Sewer Relocations for SH121T Crossing West of Hulen Bridge City Sec No. 40610
Project No.(s) P265-603170133287 and P275-703170133287 I DOE No. 6338 City Pro.No. 01332
Project Description Water and Sanitary Sewer Relocations for SH121 Crossing West of the Hulen Street Bridge within the UPRR Davidson Rail
Yard Part 2-Hulen Street Bridge and Water Main Extension to Como Pump Station,Part 2
Contractorl S.J.Louis Construction of Tx,Ltd. Change Order# ® Date: 12/21/2012
City Project Mgr.1 Liam Conlon City Inspector I Raymond H.Brice
Phone Number:1 817-392-6824 Phone Number: 817-319-7943
Dept. Water Al Water A2 Sewer Totals Contract Time
(Calendar days)
Original Contract Amount $1,958,606.73 $2,352,962.50 $1,595,105.60 410
Extras to Date $98,134.51 $834,289.33 $224,436.54 ,I " 44
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date :_ � # � f lf .$ 2.E
Amount of Proposed Change Order 014
Revised Contract Amount ,.
Original Funds Available for Change Orders $50,000.00 $80,000.00 $48,000.00
Remaining Funds Available for this CO
Additional Funding(if necessary) �•
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%)
The change order will provide additional pay items for the following:
• The removal and reinstallation of a project sewer tunnel across Vickery Boulevard due to survey
error by City forces that placed the tunnel 15 feet off the intended location.
• The removal of a previously unknown abandoned 36-inch steel pipe that was encountered in direct
conflict with a project sewer tunnel across Union Pacific Railroad.
• Emergency repair of a recently installed project main that broke apart due to excessive pressure on
the line and necessitated the replacement of a 12-inch gate valve and related appurtenances. The
water main had passed City testsg n service.
a-0" ORT �4
Staff concurs with the contractor'sppe�b4 P94t {inal calendar days on this change order.
At 00d br- Q�° o V
C
0
0
t isaahan r I actor constitutes an accord and satisfaction and represents payment in
(both time nd )for all costs arising out ir4' ntal to�b@ aboohange Order.
S.J.Louis Consstruction of TX,Ltd Jus F itrran
1 ?�S �. - �-- —�a l2—
ORD
M&C Number N/A M&C Date Approved Y SECRE RY
FT.WORTH, TX
FORT WC>a`FH City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer Relocations for SH121T Crossing West of Hulen Bride City Sec No. 1 40610
Project No.(s) P265-603170133287 and P275-703170133287 DOE No. 6338 City Pro.No. 01332
Project Water and Sanitary Sewer Relocations for SH121 Crossing West of the Hulen Street Bridge within the UPRR Davidson Rail
Description Yard,Part 2-Hulen Street Bridge and Water Main Extension to Como Pump Station,Part 2
Contractor S.J.Louis Construction of Tx,Ltd. Change Order# ® Date:F 2/2112012
City Project Mgr. Liam Conlon City Inspector -Raymond H.Brice
ADDITIONS
DESCRIIIIIINTION
DEPT Unit Uni Cost Total
43 lRemove and Re-Install the SS-1 Tunnel Under Vickery Sewer 1.00 LS $8,745.75 $8,745.75
emove Existing "Steel Pipe in Proposed "Tunnel Sewer 1.00 LS $15,180.00 $15,180.00
Emergency Leak Repair Water Al 1.00 LS $34,206.47 $34,206.47
Water Al $34,20647
Water A2
Sewer $23,925.75
Additions Sub Total $58,132.22
Page 2 of 4
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Water and Sanitary Sewer Relocations for SH121T Crossing West of Hulen Bridge City Sec No. 40610
Project No.(s) P265-603170133287 and P275-703170133287 I DOE No. E338 City Pro. No. 01332
Project Description Water and Sanitary Sewer Relocations for SH121 Crossing West of the Hulen Street Bridge within the UPRR
Davidson Rail Yard Part 2-Hulen Street Bridge and Water Main Extension to Como Pump Station Part 2
Contractor S.J. Louis Construction of Tx, Ltd. Change Order#[E Date 2/21/2012
City Project Mgr. Liam Conlon City Inspector Raymond H. Brice
DELETIONS
DESWUPT10N DEPT Qty JUnlftt Unk Cod otad
20 Pipe- Pressure-Extra Depth Greater Water Al 300.00 VF $$1.00.50 $4,204.50
$3,000.00
26 Inspection-Post Construction Clean and TV Water Al 2803.00 LF $1
13 Pipe-Pressure-Extra Depth Greater Water A2 250.00 VF $10.00 $2,500.00
23 Inspection-Post Construction Clean and TV Water A2 1894.00 LF $1.50 $2,841.00
12 Remove and Salvage Gate Valve Water Al 2.00 EA $5,000.00 $10,000.00
14 Manhole-Std 4-foot Diameter(to 6 foot) Sewer 6.00 EA $3,400.00 $20,400.00
Water Al $1720450
Water A2 $5,341.00
Sewer $20,400.00
Page 3 of 4 Deletions Sub Total $42,945.50
MMBE Breakdown for this Change Order
MME Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
BATE AOUivT ;;
Total 0.0