Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
065309 - Construction-Related - Contract - Westwood Professional Services, Inc.
CSC No. 65309 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality ("CITY"), and Westwood Professional Services, Inc., authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: East Vickery Boulevard and Avenue C Storm Drain Rehabilitation — Project No. 106837. OFFICIAL RECORD Article I CITY SECRETARY Scope of Services FT. WORTH, TX The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to $204,945.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. Engineer shall provide monthly invoices to City. The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by Engineer of said payment shall release City from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article III Term Time is of the essence. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 1 of 14 Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Designation of Engineer's Personnel (1) The ENGINEER and CITY shall agree upon the designation of the ENGINEER's "Project Manager" prior to starting work on contract. (2) ENGINEER shall inform CITY in writing of a proposed change to their designated project manager prior to making the change or immediately upon receiving notification that the designated project manager is separating employment with the ENGINEER. (3) ENGINEER shall provide resumes to the CITY of the proposed replacement project manager(s), who shall have similar qualifications and experience as the outgoing person, for review and approval. D. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 2 of 14 (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. E. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. F. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 3 of 14 deviation from the contract documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. G. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. H. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 4 of 14 I. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and City has approved such insurance. L. Independent Consultant City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: August 18, 2025 Page 5 of 14 East Vickery Boulevard and Avenue C Storm Drain Rehabilitation CPN-106837 The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondeat superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. ITT:ml^ ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 6 of 14 A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 7 of 14 claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 8 of 14 J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 9 of 14 b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 10 of 14 H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. I. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY's or ENGINEER's respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 11 of 14 ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2276 of the Texas Government Code, the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 12 of 14 meaning ascribed to those terms by Chapter 2276 of the Texas Government Code. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Attachment F — Insurance Requirements City of Fort Worth, Texas East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Standard Agreement for Engineering Related Design Services CPN-106837 Revised Date: August 18, 2025 Page 13 of 14 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH Jesica McEachern Assistant City Manager Date: 06/06/2026 9FORT �d apF°°°° k,Od ATTEST: p-.° °P Y adcn gEx9soadd Jannette Goodall City Secretary APPROVAL RECOMMENDED: ,71;� By: Lauren Prieur (May 31, 2026 10:29:51 CDT) Lauren Prieur, P.E. Director, Transportation and Public Works APPROVED AS TO FORM AND LEGALITY By: Douglas Black (Jun 2. 2026 11:03:23 CDT) Douglas W Black Sr. Assistant City Attorney Contract Compliance Manager: BY: ENGINEER Westwood Professional Services, Inc. Christopher Cha ay 27, 2026 09:38:36 CDT) Christopher Cha, P.E. Sr. Director, Public Infrastructure Date: 05/27/2026 M&C No.: 26-0372 M&C Date: 5/12/2026 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Pratima Poudyal, P.E. Project Manager City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: August 18, 2025 Page 14 of 14 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX East Vickery Boulevard and Avenue C Storm Drain Rehabilitation CPN-106837 5/21 /26, 10:36 A M M&C Review CITY COUNCIL AGENDA Create New From This M&C Official site of the City of Fort Worth, Texas FORT�'�r�ORTvH REFERENCE **M&C 26- 20SWM EAST VICKERY DATE: 5/12/2026 NO.: 0372 LOG NAME: STORM DRAIN REPLACE- WESTWOOD DESIGN CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (CD 8 and CD 11) Authorize Execution of an Engineering Agreement with Westwood Professional Services, Inc. in the Amount of $204,945.00 for the Design of the East Vickery Boulevard and Avenue C Storm Drain Rehabilitation Project RECOMMENDATION: It is recommended that the City Council authorize execution of an engineering agreement with Westwood Professional Services, Inc., in the amount of $204,945.00, for the design of the East Vickery Boulevard and Avenue C Storm Drain Rehab project (City Project No. 106837). DISCUSSION: This Mayor and Council Communication (M&C) is to authorize execution of a contract with Westwood Professional Services, Inc., which will provide engineering and design services to replace and relocate the deteriorated stormwater infrastructure within the following easement and street as a part of the City's Storm Drain Rehabilitation Program. Easement/Street From To Easement between Wesleyan Street and South Collard North of East Vickery Avenue B Street Boulevard Avenue C Conner Avenue Nashville Avenue In March 2025, the Transportation and Public Works Department (TPW), Capital Delivery Division (CDD), published a Request for Qualifications (RFQ) for various engineering consulting services in seven different categories. Thirty-one consultants responded to the Storm Water Capital Improvement Project (CIP) Project Development and Design category. Apool of twenty-six consultants was selected for stormwater projects based on their submittals and were matched with specific projects. Westwood Professional Services, Inc. was selected as the most qualified consultant to perform project development and design services for this project. Westwood Professional Services, Inc., proposes to complete design and engineering services for a fee of $204,945.00. The services provided will include data collection and design for the replacement and relocation of stormwater pipes, and the replacement of the concrete parking lot in the easement and pavement on Avenue C due to impacts associated with the stormwater work. Staff considers the fee to be fair and reasonable for the proposed scope of services. In addition, $222,360.00 is necessary for project management, permits, easement acquisition, utility coordination, public meetings, and material testing. Upon completion of the design, the project will be advertised for construction. Funding is budgeted in the Drainage Rev Bonds Series 2023 Fund for the TPW Department for the purpose of funding the East Vickery Blvd and Avenue C Storm Drain Rehabilitation project, as appropriated. apps.cfw net.org/council_packet/mc_review.asp?ID=34415&councildate=5/12/2026 1/2 5/21/26, 10:36AM M&CReview The project is located in COUNCIL DISTRICTS 8 and 11. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Drainage Rev Bonds Series 2023 Fund for the E Vickery Blvd to Ave A & AveC project to support the approval of the above recommendation and execution of the contract. Prior to any expenditure being incurred, the Transportation and Public Works Department has the responsibility to validate the availability of funds. TO Fund Department Account Project Program Activity Budget Reference # Amount ID ID l_ f Year (Chartfield 2) FROM Fund Department ID Account Project I Program Activity Budget Reference # Amount ID Year (Chartfield 21 Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: Jesica McEachern (5804) Lauren Prieur (6035) Monty Hall (8662) ATTACHMENTS 20SWM E VICKERY STORM DRAIN REPLACE-WESTWOOD DESIGN- Draft FID R2.xlsx (CFW Internal) 20SWM EAST VICKERY STORM DRAIN REPLACE-WESTWOOD DESIGN funds avail.docx (CFW Internal) Form 1295 E Vickery Blurs to Ave B Storm Drain Improvements CPN 106837.pdf (CFW Internal) M&C Map CPN106837 SWRehab EVickery AueA.pdf (CFW Internal) apps.cfw net.org/council_packet/mc_review.asp?ID=34415&councildate=5/12/2026 2/2 ATTACHMENT "A" Scope for Engineering Design Related Services for Storm Water Improvements Protects The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Under this scope, "ENGINEER" is expanded to include any sub -consultant, including surveyor, employed or contracted by the ENGINEER. OBJECTIVE The CITY has identified storm drain system improvements from E. Vickery Blvd to Avenue B between Wesleyan St and S. Collard St, and along Avenue C from Conner Ave to Nashville Ave CPN. These improvements were identified and ranked through the CITY's Storm Drain Rehabilitation Program (SDRP) and include removal, replacement, realignment and abandonment of existing failing storm drain system pipe segments. CCTV has been performed on many of the pipe segments in the project area showing cracked, broken or fractured pipe segments and sediment deposition blocking pipe flow capacity. Some of the existing storm drain system pipe alignments are not located within existing CITY easements or are located on private property beneath existing structures. The existing storm drain system consists mainly of 24" reinforced concrete pipe (RCP) and there is an existing pipe segment beneath existing structures between Avenue A and Avenue B east of Wesleyan St. The CITY has requested realignment of storm drain systems to be located within existing CITY easements or to prepare proposed easement documents to contain the proposed drainage improvements. The objective of this contract is to collect and analyze data, provide construction plans, specifications, and cost estimates based on the recommendations outlined in the Storm Drain Project Development technical memorandums performed by Halff. The project scope includes data collection, field survey, subsurface utility engineering services, and construction documents preparation for storm drain system improvements from E. Vickery Blvd to Avenue B between Wesleyan St and S. Collard St, and along Avenue C from ConnerAve to Nashville Ave CPN 106837. WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey Services Task 9. Permitting Task 10. Plan Submittal Checklists TASK 1. DESIGN MANAGEMENT. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 1 of 22 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting • Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements. • Conduct and document monthly project update meetings with CITY Project Manager. • Conduct review meetings with the CITY at the end of each design phase. • Conduct and document biweekly design team meetings. • Prepare invoices, in accordance with Attachment B to this Standard Agreement and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the respective CITY Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Menthly MiVVBF= Report Crum anal Final Summary PaypRent Report Cerm n4 the end of the nroient • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design. • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • Assumes project kick-off meeting • Assumes up to 3 plan review meetings with City. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 2 of 19 DELIVERABLES A. Meeting summaries with action items B. Monthly invoices with LOE updates C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes G. Plan Submittal Checklists (See Task 10) TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to identify, develop, communicate through the defined deliverables, and recommend the design concept that successfully addresses the design problem, and to obtain the CITY's endorsement of this concept. ENGINEER will utilize concepts and criteria contained in the current CITY — iSWM Criteria Manual for Site Development and Construction for conceptual planning and design. ENGINEER will develop the conceptual design of the infrastructure as follows] 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will research and make efforts to obtain pertinent information to aid in coordination of the proposed improvements with any planned future improvements that may influence the project. ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including; utilities, agencies (such as TxDOT and railroads), CITY Master Plans, CITY drainage complaint files, existing applicable drainage studies, FEMA floodplain and floodway maps, existing models of project area (if any) and property ownership as available from the Tax Assessor's office. 2.2. Drainage Computations • ENGINEER will assume equivalent capacity as the existing system. It is assumed that most of the storm drain system will be removal and replacement of the same size storm drain system pipe segments in place. There will be one partial relocation pipe section around existing structures. Hydrologic and hydraulic grade line calculations for the proposed improvements will be provided. 2.3. Subsurface Utility Engineering Provide Subsurface Utility Engineering (SUE) to Quality Level A, as described below. The SUE shall be performed in accordance with Cl/ASCE 38-02. Quality Level D City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 3 of 19 • Conduct appropriate investigations (e.g., owner records, County/CITY records, personal interviews, visual inspections, etc.), to help identify utility owners that may have facilities within the project limits or that may be affected by the project. • Collect applicable records (e.g., utility owner base maps, "as built" or record drawings, permit records, field notes, geographic information system data, oral histories, etc.) on the existence and approximate location of existing involved utilities. • Review records for: evidence or indication of additional available records; duplicate or conflicting information; need for clarification. • Develop SUE plan sheets and transfer information on all involved utilities to appropriate design plan sheets, electronic files, and/or other documents as required. Exercise professional judgment to resolve conflicting information. For information depicted, indicate: utility type and ownership; date of depiction; quality level(s); end points of any utility data; line status (e.g., active, abandoned, out of service); line size and condition; number of jointly buried cables; and encasement. Quality Level C (includes tasks as described for Quality Level D) • Identify surface features, from project topographic data and from field observations, that are surface appurtenances of subsurface utilities. • Include survey and correlation of aerial or ground -mounted utility facilities in Quality Level C tasks. • Survey surface features of subsurface utility facilities or systems. • The survey shall also include (in addition to subsurface utility features visible at the ground surface): determination of invert elevations of any manholes and vaults; sketches showing interior dimensions and line connections of such manholes and vaults; any surface markings denoting subsurface utilities, furnished by utility owners for design purposes. • Exercise professional judgment to correlate data from different sources, and to resolve conflicting information. • Update (or prepare) plan sheets, electronic files, and/or other documents to reflect the integration of Quality Level D and Quality Level C information. • Recommend follow-up investigations (e.g., additional surveys, consultation with utility owners, etc.) as may be needed to further resolve discrepancies. • Provide Quality Level C to identify overhead utilities on the project and provide the overhead utility information on the SUE plan sheets. Level B (includes tasks as described for Quality Level C) • Select and apply appropriate surface geophysical method(s) to search for and detect subsurface utilities within the project limits, and/or to trace a particular utility line or system. • Based on an interpretation of data, mark the indications of utilities on the ground surface for subsequent survey. Utilize paint or other method acceptable for marking of lines. • Unless otherwise directed, mark centerline of single -conduit lines, and outside edges of multi -conduit systems. • Resolve differences between designated utilities and utility records and surveyed appurtenances. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 4 of 19 Recommend additional measures to resolve differences if they still exist. Recommendations may include additional or different surface geophysical methods, exploratory excavation, or upgrade to Quality Level A data. As an alternative to the physical marking of lines, the ENGINEER may, with CITY's approval, utilize other means of data collection, storage, retrieval, and reduction, that enables the correlation of surface geophysical data to the project's survey control. Level A • Expose and locate utilities at specific locations. Approximately six (6) locations. • Tie horizontal and vertical location of utility to survey control. • Provide utility size and configuration. • Provide paving thickness and type, where applicable. • Provide general soil type and site conditions and such other pertinent information as is reasonably ascertainable from each test hole site. 2.4. The Conceptual Design Package shall include the following • Written summary of alternative design concepts considered, strengths and weaknesses of each, and the rationale for selecting the recommended design concept. It is anticipated that there will be one (1) realignment alternative of the existing storm drain system to reroute from beneath existing structures to around structures and within a CITY easement. • Cover sheet • Conceptual iSWM Checklist in accordance with the current iSWM Criteria Manual for Site Development and Construction. Include documentation that the proposed storm water project will not impact upstream and downstream properties. • SUE Plan sheets sealed by a licensed professional engineer registered in the State of Texas. • Horizontal alignment (excluding profiles) of proposed storm water improvements, including existing lot layout, streets, street right-of-way, proposed easements, and existing utilities gathered during the SUE within the project limits. • Proposed phasing of water, sanitary sewer, street and drainage work documented in both the project schedule and narrative form. • Documentation of key design decisions (Project Decision Log). • Estimates of probable construction cost. ASSUMPTIONS • It is assumed that most of the storm drain system will be removal and replacement of the same size storm drain system pipe segments in place. There will be one partial relocation pipe section around existing structures. Hydrologic and hydraulic grade line calculations for the proposed improvements will be provided. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 5 of 19 • The SUE and SUE plan sheets shall be in accordance with Cl/ASCE 38-02. • Three (3) copies of the conceptual design package will be delivered. Drawings will be half size (11" x 17"). • DWF files created from design CAD drawings will be uploaded to the designated project folder in Trimble Unity Construct (E-Builder). • All submitted documents and checklists will also be uploaded to the designated project folder in Trimble Unity Construct (E-Builder). • ENGINEER shall not proceed with Preliminary Design activities without written approval by the CITY of the Conceptual Design Package. DELIVERABLES A. Conceptual Design Package. B. Conceptual iSWM Checklist TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings shall include the following: • Cover Sheet • It is assumed that most of the storm drain system will be removal and replacement of the same size storm drain system pipe segments in place. There will be one partial relocation pipe section around existing structures. Hydrologic and hydraulic grade line calculations for the proposed improvements will be provided. A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). • Overall project easement layout sheet(s). • SUE plan drawings. • Preliminary iSWM Checklist in accordance with the current iSWM Criteria Manual for Site Development and Construction • Plan and profile drawings of proposed storm water improvements, including existing lot layout with property ownership, streets, curb lines, driveways, medians (if applicable), sidewalks, existing and proposed water and sanitary City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 6 of 19 sewer mains, existing utilities gathered during the SUE and existing utility easements within the project limits. • No less than two bench marks per plan/profile sheet. • The ENGINEER will prepare standard and special detail sheets that are not already included in the City's standard details. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. 3.2. Geotechnical Investigation/Pavement Design • There is no geotechnical investigation or pavement design anticipated for the ENGINEER to perform. The CITY will request their geotechnical lab for pavement cores and the CITY will provide street overlay recommendations. 3.3 Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.4 Public Meeting The ENGINEER shall assist the CITY and attend up to two (2) public meetings; one (1) for design and one (1) for construction to help explain the proposed project to residents, property owners and stakeholders. The CITY shall facilitate online meetings or select a suitable location and mail the invitation letters to the affected customers. The ENGINEER shall coordinate with CITY GIS staff to identify affected property owners/residents and develop a spreadsheet listing addresses of those to invite to the public meeting. 3.5 Utility Clearance The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. • The ENGINEER shall upload individual DWF files for each plan sheet of the approved preliminary plan set to the designated project folder in Trimble Unity Construct (E-Builder) for forwarding to all utility companies which have facilities within the limits of the project. The DWF files should be created directly from the CAD files as opposed to PDF files. 3.6 Traffic Control Plan • Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's Trimble Unity Construct (E-Builder) website. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 7 of 19 The typicals need not be sealed individually, if included in the sealed contract documents. • Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. ASSUMPTIONS • Since we are assuming equivalent capacity as the existing system, drainage area maps showing proposed improvements with drainage calculations and hydraulic computations are included. • Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an additional four (4) project specific traffic control sheets will be developed. • Three (3) half size construction plans will be delivered for Utility Clearance. • Three (3) half size construction plans will be delivered for Constructability Review. • Three (3) half size construction drawings will be delivered for Preliminary Design. • DWF files created from design CAD drawings will be uploaded to the designated project folder in Trimble Unity Construct (E-Builder). • All submitted documents and checklists will also be uploaded to the designated project folder in Trimble Unity Construct (E-Builder). • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings B. Preliminary iSWM Checklist C. Utility Clearance drawings D. Documentation of key design decisions (Project Decision Log) E. Estimates of probable construction cost F. Public Meeting exhibits G. Traffic Control Plans TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • Final draft construction plans and specifications included iSWM Construction Plan shall be submitted to CITY per the approved Project Schedule. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 8 of 19 • Final iSWM Checklist in accordance with the current CITY iSWM Criteria Manual for Site Development and Construction. • The ENGINEER shall submit a final design estimate of probable construction cost with the final design plans submitted. This estimate shall use ONLY standard CITY bid items. • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Final Plans (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. ASSUMPTIONS • All storm water calculations and design shall conform to the current CITY iSWM Criteria Manual for Site Development and Construction. • Three (3) half size construction drawings will be delivered for the 90% design. • PDF drawings and specifications will be submitted for the 90% design. • A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in Trimble Unity Construct (E-Builder). • PDF drawings and specifications will be submitted for the 100% design.. • A DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in Trimble Unity Construct (E-Builder). • ENGINEER to provide estimated final sheet list (cover, project control, easement layout, SUE plan sheets, no. of plan/profiles, special detail shts, etc.) DELIVERABLES A. 90% construction plans specifications. B. 100% construction plans and specifications. C. Final iSWM Checklist D. Documentation of key design decisions (Project Decision Log). E. Detailed estimates of probable construction cost for the authorized construction project, including summaries of bid items and quantities using the CITY's standard bid items and format. F. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support • The ENGINEER shall upload all plans and contract documents onto Trimble Unity Construct (E-Builder). for access to potential bidders. • Contract documents shall be uploaded in a .xls file. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 9 of 19 • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to Trimble Unity Construct (E-Builder) in two formats, .pdf and .dwf files. The .pdf will consist of one file of the entire plan set. The .dwf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's Trimble Unity Construct (E-Builder) folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto Trimble Unity Construct (E-Builder) and mail addenda to all plan holders. • Attend the prebid conference in support of the CITY. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid Opening in s inner+ of the CITY m ev ali atinn bids, o�TeeemmeRd award of he GeRtraGt. A �i nof the Bid Tab Motion and the GFVV Data Spreadsheet Greaten utilizing GFVV Bidtools only GORMFUGt (E-g ii-va;ld'er T • Assist the CITY with assembling and awarding contracts for construction, materials, equipment, and services. • Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings Final Design Drawings shall be submitted as an Adobe Acrobat PDF format (version 6.0 or higher) file and DWF format. There shall be one (1) PDF file and one (1) DWF file (created from CAD application of drawing) for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 10 of 19 each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in Trimble Unity Construct (E-Builder). • In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans were prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: TPW files shall use the W number as for PDF and DWF files, but shall include the sheet number in the name — "W-1956_SHT01.dwg", "W- 1956_SHT02.dwg", etc. II. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name — "X- 12155_SHT01.dwg", "X-12755_SHT02.dwg", etc. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The project will be bid only once and awarded to one contractor. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 11 of 19 • Four (4) sets of construction documents will be sold to and made available on Trimble Unity Construct (E-Builder) for plan holders and/or given to plan viewing rooms. • Four (4) sets of construction documents will be printed and made available for purchase by planholders and/or given to plan viewing rooms. • Two (2) sets of half size plans and specifications (conformed, if applicable) will be delivered to the CITY. • PDF, DWF and DWG files will be uploaded to Trimble Unity Construct (E- Builder). DELIVERABLES A. Addenda B. Bid tabulations C. Recommendation of award D. Construction documents (conformed, if applicable) E. CFW Data Spreadsheet TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support • The ENGINEER shall attend the preconstruction conference. • After the pre -construction conference, the ENGINEER shall attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. • The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals in Trimble Unity Construct (E-Builder). • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. The ENGINES all at# d �ZCinal" nreient walk #hrei gh and assist ii#h •�T��rrvnTc cm-crcce{�cr rn�cn--�v�c vrsrvvrcrT preparation of final p innh Iis# City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 12 of 19 6.2 Record Drawings • The ENGINEER shall prepare record drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As -Built Survey o Red -Line Markups from the Contractor o Red -Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red -lined drawings shall be returned to the CITY with the mylars. Record Drawings shall also be submitted as an Adobe Acrobat PDF format (version 6.0 or higher) file and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 13 of 19 Example: W-0053_org3.pdf and K-0320_org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in Trimble Unity Construct (E-Builder). For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • Two (2) site visits are assumed. • Two (2) submittal reviews are assumed. • Two (2) RFI's are assumed. • Zero (0) Change Orders are assumed. • One copy of full size (22"x34") mylars will be delivered to the CITY DELIVERABLES A. Response to Contractor's Request for Information B. Review of Change Orders C. Review of shop drawings D. Final Punch List items E. Record Drawings TASK 7. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and easements as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1. Right -of -Way Research • The ENGINEER shall determine rights -of -way and easement needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 14 of 19 7.2 Right-of-Way/Easement Preparation and Submittal. • The ENGINEER shall prepare up to four (4) documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Trimble Unity Construct (E-Builder) site. 7.3 Temporary Right of Entry Preparation and Submittal • Prior to construction, the ENGINEER shall prepare, mail and obtain Temporary Right of Entries from landowners. It is assumed that letters will only be required for land owners adjacent to temporary construction easements or who are directly affected by the project and no easement is required to enter their property. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Trimble Unity Construct (E-Builder) site. ASSUMPTIONS Right -of -Way research includes review of property/right-of-way records based on current internet based Tarrant Appraisal District (TAD) information available at the start of the project and available on -ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. DELIVERABLES A. Right -of -Way, easement exhibits and metes and bounds provided on CITY forms B. Temporary Right of Entry Letters TASK 8. SURVEY. ENGINEER will provide survey support as follows. 8.1 Design Survey ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, utilities as required by the SUE, structures, trees (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 15 of 19 - A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400: - The following information about each Control Point; a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). 8.2. Temporary Right of Entry Preparation and Submittal • Prior to entering property for field survey, the ENGINEER shall prepare, mail and obtain Temporary Right of Entry from landowners. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Trimble Unity Construct (E-Builder) site. 8.3. Construction Survey • Be available to the CITY on matters concerning the layout of the project during its construction • ENGINEER will set control points (i.e. tie survey to permanent monument such as TPW monuments and/or property corners, one location each at beginning and end of project) for the project, these points must be indivisible. ASSUMPTIONS DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. TASK 9. PERMITTING. ENGINEER will provide permitting support for the CITY to obtain any and all agreements and/or permits normally required for a project of this size and type, as follows. 9.3. Floodplain Services City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 16 of 19 • The storm drain system outfalls to Stream SC-1. A FEMA CLOMR/LOMR is not anticipated. A City Floodplain Development Permit may be required. • Negotiating and coordinating to obtain approval of the agency issuing the agreement and/or permits • Completing all forms/applications necessary • Submitting forms/applications for CITY review • Submitting revised forms for agency review • Responding to agency comments and requests 9.4. Texas Department of Transportatien /TxDQT\ Permit if required • TxDQT permit applications may he required for aRy preposed improvements in TxD(DTR9WL. and/crr-Ta/er pern44s • (Completing all forms/eppliretinns neoesseri • Responding to agency comments and requests ASSUMPTIONS • iSWM Construction Plan preparation will begin after approval of the Conceptual Design. • Floodplain Development Permit application, submittal and review, if required. DELIVERABLES • iSWM Construction Plan TASK 10. PLAN SUBMITTAL CHECKLISTS City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 17 of 19 Engineer shall complete and submit Plan Submittal Checklists in accordance with the following table: PLAN SUBMITTAL CHECKLIST REQUIREMENTS Street Water Traffic Traffic Traffic "A" Traffic Storm Storm Lights /Sewer Traffic Control Control Control Attachment Signal Water Water (Submit (Submit Engineering ° 30 /° ° 60 /° ° 90 /° Type (Submit All 30% 60% All All @ (Submit All Required for all work in City @ 30%) 30% 60%) @ 60%) ROW Street X X X X X` X X X X Storm Water X X X X X Water / Sewer X X X X *If included in street project Task 11. Allowance As directed by City's written approval. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existina Scoae of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre -qualification, bid protests, bid rejection and re -bidding of the contract for construction. • Construction management and inspection services. • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. • FEMA coordination or preparation and submittal of any FEMA Letters of Map Revision (LOMRs). City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 18 of 19 • Geotechnical Investigation/Pavement Design. • Environmental permitting assistance. • Construction survey and staking. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 19 of 19 ATTACHMENT B COMPENSATION Design Services for Westwood Professional Services, Inc. City Project No. 106837 Lump Sum Project Compensation A. The ENGINEER shall be compensated a total lump sum fee of $204,945.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 08/18/2025 Page 1 of 3 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant Westwood Professional Services, Inc. Drainage Design $143,495 70.0% Proposed Sub -Consultants Yellow Rose Mapping LLC Design survey/SUE/Easements $61,450 30.0% TOTAL $ 204,945.00 100% Project Number & Name Total Fee Sub Fee CPN 106837 — Vickery Blvd to Ave B Drainage Improvements $ 204,495 $ $61,450 City of Fort Worth, Texas Attachment B Revised Date: 08/18/2025 Page 2 of 3 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 08/18/2025 Page 3 of 3 R E E z to i-; U V O a` L >� E z' y A aL) 6 E O: m 0 ii �t H E 0 V 7 IL F O O' y y N a > w 44 N C 0 % m m `m_ d m y N U V V G G a O 7 7 m Qf 0 > h w O_ U) fn C 0� .E u E a, co C U U U i 0 U a T U — U � O C > — N » CL c c a a (D _ p d o r C. O J E E O Q U s 9 O O u U E N 0 16 � 00 cm E Q Q C U O a O °E E Q 0 C w Ol E N N E � Q Q O Q U O Q1 CL H ` c ❑ m C lC 0 O lL E m E d F= r a u r r � r � r d t o o o o `o o 0 rn N y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N l0 OO � N O(O M O N (O Oo f M M EAO 7 t0O N O N OOO M (O �O OfA H N N M N N O a 4 � W W N N (O � fA EA 6? Efl E9 fA fA tfi 40 V3 EA EA M N � V! 1R EA EA EA IA EA N Y UI O F N O O O 0 0 0 0 O O O 0 0 O O O O O O O O O C 1R bi EA fR EH EA EA EA EA fA � EH fA M N ffi V3 ffi fR EA En oO T NM x Lu U A A m O F- .0 N 7 O C. N O O O C > N cl x F w 3 G OJ c N fA A A o O O a U O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a N w O O .- N O M (O O N (O of o� M_ M_ fA O V C., O N fA EA O D) O N O Vi J N N N M N N a 7 7 W N N (O O EA A EA EA EA fA fA fA N EA H3 EA C1 N m U w ui v3 vi (» O r N C E a co ao m o 0 0 Q � U O 7 N 7 .o O N M M � w o 0 O {O 7 NN77 7 Mcp d' NN V tiO 4,J N N M M N U al CH Q ,_ a r- w O t0 N oD N N 7 N N 7 10 a N (O N 1� W U N N N N y3 O C 7 V O N `00 m u o d a`o m � A — r � m U (n N = C 61 N Q co N C Ol N U O A O 0 (p > > N o c m � o n E c o K m J J N Of V C N U C N = N W O C O y EL GI N n 0 N N o (n a N UJ a G O 0 .6 > t rnw O N c C 0 3 0 Y - C 'O N U o Q] " EE Q o� m > M w w E me m E y c E d @ o�Eam 0 o > v� Up cr N U U U 3 t6 N N N N c O y' d U m N N O N E E aui o`er c� Uo o u) <n Co IL c) aa0 Z N N N cV N N N d M O 0 O O N N N N N N O M M h N M o 0 0 0 0 o O o 0 0 o O o 0 0 0 o O O o o 0 0 0 0 o O O 0 coN V N M 01O)-� O N (0- .00 OCO O O) V CA aD v) CO � fA 0) O CO tp N �N LL7 COO' O (0 �fA �00 Il OO OO O O N N O W CO N N t'7 �- N N N M V3 fA ow 1A m m fR fA fR V! fA fA to fA fA fA EA M ER EA O O fA fA O O 69 C9 O O fA EA O O O O O O fA 64 O EA O )0 0 EA 0 0 fA 0 O 64 69 O CH O O O �r> O O fA O O O UR O O O O O O O O O Y1 LL� H fA w 44 ff3 N N (H N O N O O N O � fR V3 EA NM NN W � � 1� LOO O LOO O l00 � fq fA M� fA N� fA 1A M W O O O O O O N � tR cV o H3 � O O O O O O 'It O o 0 0 0 O 0000 0 0 0 00 0 LO 0 0 0 0 0 o O N , V N OO EA CD O O) .- O N N CO O c0 O O EA w 1 co-ItO Vi EA mW 1� V a0 N CO O M O fA O 0 fR fA fA N�� �N Of W NNN M M fH fH l EA fA fA EA IA EA EA EA EA O O O O W 0 M 0 N N N N N N O N O 7 N � V 7 N d' 7 t 7 I r 7 N M 7 O N O N N O O O O 3 � o � c m a a � � N C O m c O O J O N O d C am V C C E N C o o y E` Utm U a 0 co o `6 o a o cm c JCO�yo �?❑c JC�o o %NO LaV ONE a—�c(m6 W NwEc N2Ec .N %> D O N 0W rad 01 pp o E wN o o�CO o oUm aa2C� �Jco aaaU�i 22 UNC�tp L02 pc v'�_ sp 0 Ea— -o wooN E �o a m o o c o o o cxN' dg OQ rnE � ca�yan� D ac) LLlln L a mm �NM7 �O CO �N M � 10O M V UO lO I- W �q� .-N M 7 l0 t01010 to Ln �NfO (CI (fl (ONN N M M m M m M -ITV -It V' O to o (fl (O O r h O r 0 0 0 0 0 o O o 0 0 o O o 0 0 0 H3 O O O f CO I H3 ER aD fA 69 EA N No OOO IO NCO a0 O a0 N O N N aD M fA tR EA fR fA W fA EA EA O 0 0 0 0 0 O O O O O O O O o 0 O O oo 61i eA 1- EA EA EA 69 64 HH EH to O N O NM b fA fA VT � w o w N m 000 voi 00o v_ o ooN N � fA f0 fA fA Yi O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V3 O fA EA to O OD EA ER a0 fA EA H3 N N a0 O O N �O a0 W O O o N cV a /A EA � fl3 M rW fA O O 1f1 O c0 0� o r N O O O O p N N N OOf O O tD N A N t0 F (D E ° J a m �- Q C N t9 a1 E _T (D J J co y U W fn rn 'c u) Z U 2 U c Zir c � c u) d 0 `m u) - u c E a c `o �co�o Sao o- m Ed. vp aEi ) a`)i o _ o� Q .!:?9'mO m� H NOHUQ a(n Wu- x a- ID M .-N M o 7 N M :-cD 1O� I� O m aO NN Om m m mmm 16 m G d NNO a N ao J N cn O L y W m x o � � — m ~ > m t N a1 � J N co of > a7 LL O O E O U m C Engineer's Pre -Design Opinion of Probable Construction Cost City of Fort Worth - Vickery Blvd to Ave B Storm Drain Improvements City Project No. 106837 5120/2026 Project Item Information Cost Estimate Bidlist Item No. Description Unit of Measure Bid Quantity Unit Price Bid Value Drainage & Paving Improvements - E. Vickery Blvd to Avenue B 1 0170.0100 Mobilization LS 1 $ 100,000.00 $ 100,000.00 2 0171.0101 Construction Staking LS 1 10,000.00 10,000.00 3 0171 0102 As -Built Survey LS 1 $ 10,000.00 $ 10,000.00 4 0241 3001 Storm Line Grouting CY 45 $ 500.00 $ 22,500.00 5 0241 3015 Remove 24" Storm Line LF 1,000 $ 30.00 $ 30,000.00 6 3110 0101 Site Clearing LS 1 $ 50,000.00 $ 50,000.00 7 3125 0101 SWPPP > 1 acre LS 1 $ 5,000.00 $ 5,000.00 8 3201 0117 10' W ide Asphalt Pvmt Repair LF 850 $ 100.00 $ 85,000.00 9 3213.0106 11" Conc Pvmt Repair SY 250 150.00 37,500.00 10 3217 XXXX Pavement Markings LS 1 $ 10,000.00 $ 10,000.00 11 3291 XXXX Vegetation Re-establishment LS 1 $ 10,000.00 $ 10,000.00 12 3305 0109 Trench Safety LF 1,500 $ 10.00 $ 15,000.00 13 3305 0112 Concrete Collar EA 3 $ 3,000.00 $ 9,000.00 14 3341 0205 24" RCP , Class III LF 1,500 $ 200.00 $ 300,000.00 15 3349 0001 4' Storm Junction Box EA 3 $ 10,000.00 $ 30,000.00 16 3471 0001 Traffic Control MO 6 $ 4,000.00 $ 24,000.00 17 Misc Water/Sewer Relocations EA 4 $ 10,000.00 $ 40,000.00 18 XXXX Drainage Easements*(Approximate) SF 15,000 $ 10.00 $ 150,000.00 Drainage & Paving Improvements - E. Vickery Blvd to Avenue B $ 938,000.00 30% Contingency $ 281,400.00 TOTAL CONSTRUCTION COST $ 1,219,400.00 Further property ownership, deed research and design needs to be performed to determine easements required Page I of I 106837_Vickery Blvd to Ave B Storm Drain Improvements Attachment B3 - OPCC - 060826 ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for E. Vickery Blvd to Avenue B Storm Drain Improvements City Project No. 106837 <List any changes to the Standard Agreement - None> City of Fort Worth, Texas Attachment C PMO Release Date: 05.19.2010 Page I of I I I 3 3 E � � o .: Sr J LLLLLLLLLLLLLLu--LLLLLLLLLL LLLL LLLLLL LLLL -- LLLLLL LLa: a;LL -- L LLL LL e0008�mo� -- o EE u a m E 7�A m 5y �oE'E3Ef zz�� _ - _ E'_`ar ZR �c'e E E '« - E It =. _ a « E. VICKERY BLVD TO AVENUE B STORM DRAIN IMPROVEMENTS ATTACHMENT E - PROJECT LOCATION MAP CITY OF FORT WORTH PROJECT NO. 106837 N sf AQ 0 200 400 Feet EzId sle St 1 inch = 400 feet Elsie St in v a -o 0 PROJECT LOCATION #1 dco Midland St o Z � c LL T E. VICKERY BLVD c E Y C r`a � m E 9 E F�- � c w Q v PROJECT LOCATION #2 Avenue A Y (6 a enue B 2�s = '��. William James o Middle School 7 N T 9 °' D aNi is AVENUE C carter o/ _] \ Northeast Riverside EL POLY Avenue D� PYRAMID ' �� Rock Island - Samuels Ave United Riverside o Avenue E Fort Worth -- -- -- West D __ . _-\ Meadowb < m _ Ha,; Tria nset Terrace o Southeast 0 Kingdom South P 2 SOUTHEAST Westwood Attachment Code: D583373 Certificate ID: 23532869 CNA CNA PARAMOUNT BLANKET ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - WITH PRODUCTS -COMPLETED OPERATIONS COVERAGE ENDORSEMENT POLICY NO: 7011509284 EFFECTIVE DATE: 11/1/2025 FORM: CNA75079XX (3-22) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART It is understood and agreed as follows: I. WHO IS AN INSURED is amended to include as an Insured any person or organization whom you are required by written contract to add as an additional insured on this Coverage Part, but only with respect to liability for bodily injury, property damage or personal and advertising injury caused in whole or in part by your acts or omissions, or the acts or omissions of those acting on your behalf: A. In the performance of your ongoing operations subject to such written contract; or B. In the performance of your work subject to such written contract, but only with respect to bodily injury or property damage included in the products -completed operations hazard, and only if: 1. The written contract requires you to provide the additional insured such coverage; and 2. This Coverage Part provides such coverage; and C. Subject always to the terms and conditions of this policy, including the limits of insurance, the Insurer will not provide such additional insured with: 1. Coverage broader than what you are required to provide by the written contract; or 2. A higher limit of insurance than what you are required to provide by the written contract. Any coverage granted by this Paragraph I. shall apply solely to the extent permissible by law. It. If the written contract requires additional insured coverage under the 07-04 edition of CG2010 or CG2037, then paragraph I. above is deleted in its entirety and replaced by the following: WHO IS AN INSURED is amended to include as an Insured any person or organization whom you are required by written contract to add as an additional insured on this Coverage Part, but only with respect to liability for bodily injury, property damage or personal and advertising injury caused in whole or in part by your acts or omissions, or the acts or omissions of those acting on your behalf: A. In the performance of your ongoing operations subject to such written contract; or B. In the performance of your work subject to such written contract, but only with respect to bodily injury or property damage included in the products -completed operations hazard, and only if: 1. The written contract requires you to provide the additional insured such coverage; and 2. This Coverage Part provides such coverage. III. But if the written contract requires: A. Additional insured coverage under the 11-85 edition, 10-93 edition, or 10-01 edition of CG2010, or under the 1001 edition of CG2037; or B. Additional insured coverage with "arising out of" language; then paragraph I. above is deleted in its entirety and replaced by the following: WHO IS AN INSURED is amended to include as an Insured any person or organization whom you are required by written contract to add as an additional insured on this Coverage Part, but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out of your work that is subject to such written contract. IV. But if the written contract requires additional insured coverage to the greatest extent permissible by law, then paragraph I. above is deleted in its entirety and replaced by the following: V. The insurance granted by this endorsement to the additional insured does not apply to bodily injury, property damage, or personal and advertising injury arising out of: A. The rendering of, or the failure to render, any professional architectural, engineering, or surveying services, including: 1. The preparing, approving, or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; and Attachment Code: D583373 Certificate ID: 23532869 2. Supervisory, inspection, architectural or engineering activities; or B. Any premises or work for which the additional insured is specifically listed as an additional insured on another endorsement attached to this Coverage Part. VI. Under COMMERCIAL GENERAL LIABILITY CONDITIONS, the Condition entitled Other Insurance is amended to add the following, which supersedes any provision to the contrary in this Condition or elsewhere in this Coverage Part: Primary and Noncontributory Insurance With respect to other insurance available to the additional insured under which the additional insured is a named insured, this insurance is primary to and will not seek contribution from such other insurance, provided that a written contract requires the insurance provided by this policy to be: 1. Primary and non-contributing with other insurance available to the additional insured; or 2. Primary and to not seek contribution from any other insurance available to the additional insured. But except as specified above, this insurance will be excess of all other insurance available to the additional insured. VII. Solely with respect to the insurance granted by this endorsement, the section entitled COMMERCIAL GENERAL LIABILITY CONDITIONS is amended as follows: The Condition entitled Duties In The Event of Occurrence, Offense, Claim or Suit is amended with the addition of the following: Any additional insured pursuant to this endorsement will as soon as practicable: 1. Give the Insurer written notice of any claim, or any occurrence or offense which may result in a claim; 2. Send the Insurer copies of all legal papers received, and otherwise cooperate with the Insurer in the investigation, defense, or settlement of the claim; and 3. Make available any other insurance, and endeavor to tender the defense and indemnity of any claim to any other insurer or self -insurer, whose policy or program applies to a loss that the Insurer covers under this coverage part. However, if the written contract requires this insurance to be primary and non-contributory, this paragraph 3, does not apply to other insurance under which the additional insured is a named insured. The Insurer has no duty to defend or indemnify an additional insured under this endorsement until the Insurer receives written notice of a claim from the additional insured. Vill. Solely with respect to the insurance granted by this endorsement, the section entitled DEFINITIONS is amended to add the following definition: Written contract means a written contract or written agreement that requires you to make a person or organization an additional insured on this Coverage Part, provided the contract or agreement: A. Was executed prior to: 1. The bodily injury or property damage; or 2. The offense that caused the personal and advertising injury; for which the additional insured seeks coverage; and B. Is still in effect at the time of the bodily injury or property damage occurrence or personal and advertising injury offense. All other terms and conditions of the Policy remain unchanged. This endorsement, which forms a part of and is for attachment to the Policy issued by the designated Insurers, takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. POLICY NO: 7011509284 EFFECTIVE DATE: 11/112025 FORM: CNA75079XX (3-22) Attactiment Code: D583373 Certificate ID: 23532869 CNA PARAMOUNT Amendment - Additional Insured Limit Provisions This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART It is understood and agreed as follows: When the Named Insured agrees in ritten contract to matwanother entity an Additional Insured, and to carry particular limits of liability insurance, and • The minimum limit of insurance the written contract requires the Named Insured to carry is lower than the limit of insurance otherwise provided by this Policy; and • The written contract does not specify a limit of liability for insurance that applies excess of this Policy, then provisions in this Policy's Additional Insured endorsements that cap the limits available to such Additional Insureds to no more than the amount specified by the written contract continue to apply. In all other instances, however, such provisions in all Additional Insured endorsements attached to this policy do not apply, and are hereby rendered null and void. In no event, however, will the limits of insurance available under this Policy to an Additional Insured be higher than the limits available to the Named Insured. All other terms and conditions of the Policy remain unchanged. This endorsement, which forms a part of and is for attachment to the Policy issued by the designated Insurers, takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. Page 1 of 1 Insured Name: WESTWOOD PROFESSIONAL SERVICES, INC. Copyright CNA All Rights Reserved. Policy No: 7011509284 Form Number: CNA91567XX 03-18 Effective Date: 11 /1 /2025 Attachment Code: D583373 Certificate ID: 23532869 Business Auto Policy Policy Endorsement B. Transfer Of Rights Of Recovery Against Others To Us The following is added to Section IV, Paragraph A.S. Transfer Of Rights Of Recovery Against Others To Us: We waive any right of recovery we may have, because of payments we make for injury or damage, against any person or organization for whom or which you are required by written contract or agreement to obtain this waiver from us. This injury or damage must arise out of your activities under a contract with that person or organization You must agree to that requirement prior to an accident or loss. Form No: CNA63359XX (04-2012) Policy No: 7011509298 EFF Date: 11/1/2025 Attachment Code: D583373 Certificate ID: 23532869 CNA PARAMOUNT Architects, Engineers and Surveyors General Liability Extension Endorsement 26. WAIVER OF SUBROGATION - BLANKET Under CONDITIONS, the condition entitled Transfer Of Rights Of Recovery Against Others To Us is amended to add the following: The Insurer waives any right of recovery the Insurer may have against any person or organization because of payments the Insurer makes for injury or damage arising out of: 1. the Named Insured's ongoing operations; or 2. your work included in the products -completed operations hazard. However, this waiver applies only when the Named Insured has agreed in writing to waive such rights of recovery in a written contract or written agreement, and only if such contract or agreement: 1, is in effect or becomes effective during the term of this Coverage Part; and 2. was executed prior to the bodily injury, property damage or personal and advertising injury giving rise to CNA74858XX (1-15) Policy No: 7011509284 Endorsement No 7 The Continental Insurance Co. Effective Date: 11/1/2025 Insured Name: WESTWOOD PROFESSIONAL SERVICES, INC. Copy CNA All rights Reserved. Includes copyrighted material of Insurance Services Office., Inc with its permission. Attactnnent Code: D583373 Certificate ID: 23532869 POLICY NUMBER: 7011509298 CNA63359XX (Ed. 04/12) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTORS EXTENDED COVERAGE ENDORSEMENT - BUSINESS AUTO PLUS - This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM I. LIABILITY COVERAGE A. Who Is An Insured The following is added to Section II, Paragraph A.1., Who Is An Insured: 1. a. Any incorporated entity of which the Named Insured owns a majority of the voting stock on the date of inception of this Coverage Form; provided that, b. The insurance afforded by this provision A. 1. does not apply to any such entity that is an 'insured' under any other liability 'policy' providing 'auto' coverage. 2. Any organization you newly acquire or form, other than a limited liability company, partnership or joint venture, and over which you maintain majority ownership interest. The insurance afforded by this provision A.2.: a. Is effective on the acquisition or formation date, and is afforded only until the end of the policy period of this Coverage Form, or the next anniversary of its inception date, whichever is earlier. b. Does not apply to: (1) 'Bodily injury' or 'property damage' caused by an 'accident' that occurred before you acquired or formed the organization; or (2) Any such organization that is an 'insured' under any other liability "policy" providing "auto' coverage. 3. Any person or organization that you are required by a written contract to name as an additional insured is an 'insured" but only with respect to their legal liability for acts or omissions of a person, who qualifies as an 'insured" under Section II Who Is An Insured and for whom Liability Coverage is afforded under this policy. If required by written contract, this insurance will be primary and non-contributory to insurance on which the additional insured is a Named Insured. CNA63359XX (Ed. 04112) Attachment Code: D583373 Certificate ID: 23532869 Workers Compensation And Employers Liability Insurance Policy Endorsement We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule Any Person or Organization on whose behalf you are required to obtain this waiver of our right to recover from under a written contract or agreement. The premium charge for the endorsement is reflected in the Schedule of Operations. All other terms and conditions of the policy remain unchanged. This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective Date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy unless another expiration date is shown below. Form No: WC 00 03 13 (04-1984) Endorsement Effective Date: 11/1/2025 Policy No: 7011509303 (AOS) Attachment Code: D583373 Certificate ID: 23532869 CNA Workers Compensation And Employers Liability Insurance Policy Endorsement This endorsement changes the policy to which it is attached. It is agreed that Part One - Workers' Compensation Insurance G. Recovery From Others and Part Two - Employers' Liability Insurance H. Recovery From Others are amended by adding the following: We will not enforce our right to recover against persons or organizations. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) PREMIUM CHARGE - Refer to the Schedule of Operations The charge will be an amount to which you and we agree that is a percentage of the total standard premium for California exposure. The amount is 2%. All other terms and conditions of the policy remain unchanged This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective Date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy unless another expiration date is shown below. Form No: G-19160-B (11-1997) Policy No: 7018431689 (CA) Policy Effective Date: 11/1/2025 Endorsement No: 2; Page: 1 of 1 Policy Page: 32 of 46 Underwriting Company: Continental Casualty Company, 151 N Franklin St, Chicago, IL 60606 © Copyright CNA All Rights Reserved. FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: East Vickery Boulevard and Avenue C Storm Drain Rehabilitation M&C: 26-0372 CPN: 106837 CSO: DOC#: 1 Date: To: Name Department Initials Date Out 1. Christopher Cha - Signature Westwood Engineering Services christopher.cha@westwoodps.com Consultant G� cic 05/27/2026 2. Pratima Poudyal - Signature TPW Project Manager P PB� 05/27/2026 3. Thanaa Maksimos - Review TPW Program Manager TM TM 05/27/2026 4. Lissette Acevedo - Review TPW Sr. CPO A 05/29/2026 5. Patricia Wadsack - Review TPW Asst. Dir. F>LW 05/29/2026 6. Lauren Prieur - Signature TPW Dir. ?L° P,,... 05/31/2026 7. Doug Black - Signature Legal oo a=Baok 06/02/2026 8. Jesica McEachern - Signature ACM CM 06/06/2026 10. Katherine Cenicola - Approver CSO -cc 06/08/2026 11. Jannette Goodall - Signature CSO 'a„e�oo,a„ 06/08/2026 12. Allison Tidwell - Review CSO 4L 06/10/2026 DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: []YES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return to: tpw sw contracts(a,fortworthtexas.2ov Call 817-229-3283 with questions. Thank you! FORT W City Secretary's Office Contract Routing & Transmittal Slip Contractor's Name: Westwood Professional Services, Inc. Subject of the Agreement: East Vickery Boulevard and Avenue C Storm Drain Rehabilitation M&C Approved by the Council? * Yes ® No ❑ If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No 0 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes ® No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? *Yes ❑ No ® If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If different from the approval date. Expiration Date: If applicable. Is a 1295 Form required? * Yes ® No ❑ *If so, please ensure it is attached to the approving M&C or attached to the contract. Project Number: If applicable. 106837 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes ® No ❑ Contracts need to be routed for CSO processing in the followingorder: rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.